03.06.2014 Views

Measurement in the Capability Maturity Model Integration (CMMI)

Measurement in the Capability Maturity Model Integration (CMMI)

Measurement in the Capability Maturity Model Integration (CMMI)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Measurement</strong> <strong>in</strong> <strong>CMMI</strong><br />

Matur<strong>in</strong>g <strong>the</strong> M & A Process Area<br />

<strong>Capability</strong> Level 1 Description:<br />

- (Level 1 PcM, Performed) A performed process is a process that<br />

completes <strong>the</strong> needed work and transforms <strong>the</strong> identified <strong>in</strong>put work<br />

products to produce identified output work products. The def<strong>in</strong>ition,<br />

plann<strong>in</strong>g, monitor<strong>in</strong>g, or controll<strong>in</strong>g of <strong>the</strong> process may be<br />

<strong>in</strong>complete, <strong>the</strong>reby result<strong>in</strong>g <strong>in</strong> an unstable and <strong>in</strong>consistently<br />

implemented process.<br />

<strong>Capability</strong> Level 1 Generic Goal:<br />

- (Level 1 PcM-GG 1.1) (Achieve Specific Goals) The <strong>in</strong>-use process<br />

achieves <strong>the</strong> specific goals of <strong>the</strong> process area.<br />

<strong>Capability</strong> Level 1 Generic Practices:<br />

- (PcM-GP 1.1) (Perform Basic Activities) Perform <strong>the</strong> basic activities<br />

of <strong>the</strong> process.<br />

Pg. 47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!