site meeting and you review what is being passed for J1K<br />

work. I think you would be enlightened by a site visit.<br />

Furthernlore the seismic 38 <strong>Versar</strong> is going to mod your<br />

contract for $35,000. Considering this figure I am appalled<br />

by the original proposal <strong>of</strong>$350,000 to complete th~ work.<br />

JJKNersar did not have enough pro<strong>of</strong>that we objected to the<br />

seismic 38 with the government. We (presumably<br />

JJKNersar) coordinated the meeting between the A&E and<br />

the Seismic engineer where the A&E and Seismic Engineer<br />

determined what was needed. The seismic engineer (a sub to<br />

a sub <strong>of</strong>JJK) submitted supplemental information directly to<br />

the A&E which bound JJKNersar to the work~ I have asked'<br />

J1K for back up from the seismic engineer but have not<br />

received pro<strong>of</strong>that we (JJKNersar) are in the right and not<br />

required to add the additional seismic.<br />

As f~r the re-hanging <strong>of</strong>the FCDs we tried to sell the<br />

installation that was done. Ifthe installation had .. .looked<br />

good (quality work) we may have been able to sell it even<br />

though it was not according to the prints. Additionally <strong>Versar</strong><br />

asked JJK for code/engineering backup to support what was<br />

installed...still waiting. <strong>Versar</strong> had an independent structural<br />

engineer on site to verifY the installation was reasonable,<br />

needless to say I asked him not to send me a repoli.<br />

The Punch list that was done by the A&E the week <strong>of</strong>July 27,<br />

2007 is 29 pages long which is not indicative <strong>of</strong>the amount <strong>of</strong><br />

work remaining. Because about 7 pages applies to every room.<br />

J1K has provided letters and schedules with dates <strong>of</strong><br />

completion and they all passed by with the blink <strong>of</strong>an eye. It<br />

is imperative that you address your continually slipping<br />

schedule. Your contract ends August 31, 2007 ..<strong>Versar</strong> is<br />

prepared to supplement your forces starting September 1,<br />

2007 to help you meet your date.<br />

(Ex. G-1 at 1) Before sending the letter, Mr. Stiles corrected inaccuracies in monetary<br />

amounts and adjusted its tone (tr. 2/163-65; 4/142-44).<br />

38