- Page 1 and 2: Pondicherry University at Puducherr
- Page 3 and 4: CERTIFICATE Certified that this PAR
- Page 5 and 6: RITES (A Government of India Enterp
- Page 7 and 8: a form/document shall be considered
- Page 9 and 10: 1.0 GENERAL 1.1 Tender Notice NOTIC
- Page 11 and 12: • Indication of the precise respo
- Page 13 and 14: containing the Earnest Money Deposi
- Page 15 and 16: The Earnest Money of the Tenderers
- Page 17 and 18: All rates and amounts, whether in f
- Page 19 and 20: (c) Both packets A and B should be
- Page 21 and 22: Financial evaluation of Tenders. Bu
- Page 23 and 24: scope and specifications of the wor
- Page 25 and 26: e.g. Rs.2.15 P and in case of words
- Page 27 and 28: Notes: The bidder should have achie
- Page 29 and 30: Municipal bodies/ Public Ltd. Cos.
- Page 31 and 32: Large Works (Not Applicable) All th
- Page 33 and 34: In case of a Certificate from a Pub
- Page 35 and 36: Proforma 3 DECLARATION BY THE BIDDE
- Page 37: ) BY JOINT VENTURE PARTNERS FOR “
- Page 41 and 42: ANNEXURE II B (L) (Not Applicable)
- Page 43 and 44: ANNEXURE II B (N) (Not Applicable)
- Page 45 and 46: Encl: As in Paras 1, 2 & 4 Signatur
- Page 47 and 48: as indicated in the Annexure. These
- Page 49 and 50: Notes: - In case the Firm / Company
- Page 51 and 52: Witness 1 Witness 2 Name: Name: Add
- Page 53 and 54: This Letter of Acceptance is being
- Page 55 and 56: 3. In consideration of the payment
- Page 57 and 58: Act, or if there be a substantive s
- Page 59 and 60: Section -8 Independent External Mon
- Page 61 and 62: Witness 2 -------------------------
- Page 63 and 64: iii) ‘Investigating Department’
- Page 65 and 66: 7.2 If the Competent Authority is p
- Page 67 and 68: Section - 2 TENDER & CONTRACT FORM
- Page 69 and 70: Conditions of the Tender which are
- Page 71 and 72: Section - 3 SPECIAL CONDITIONS
- Page 73 and 74: egulations, Bye- laws, applicable i
- Page 75 and 76: ) Manufacturer's catalogues of all
- Page 77 and 78: 18. TERMS OF PAYMENT: Progressive o
- Page 79 and 80: Section - 4 SCHEDULES A TO F
- Page 81 and 82: Component of Cement (Xc) expressed
- Page 83 and 84: Gross work to be done together with
- Page 85 and 86: 1 Cement 2 Steel reinforcement 3 St
- Page 87 and 88: The work of this contract is the pr
- Page 89 and 90:
All works performed and equipments
- Page 91 and 92:
SYSTEM-32 (65 HP) FLOOR LOCATION AR
- Page 93 and 94:
PROJECT: FLOOR: AC FOR: DATE: PREPA
- Page 95 and 96:
Area- 219 x 0.06 13.14 Air changes
- Page 97 and 98:
Roof 0 x 0.12 x 53 0 Ventilation 23
- Page 99 and 100:
PROJECT: FLOOR: AC FOR: DATE: PREPA
- Page 101 and 102:
1 Ventilation or Infiltration Peopl
- Page 103 and 104:
PROJECT: FLOOR: AC FOR: DATE: PREPA
- Page 105 and 106:
Air changes / hour 1 121.25 121 Tot
- Page 107 and 108:
Ventilation 175 x 0.1296 x 28 636 3
- Page 109 and 110:
PROJECT: FLOOR: AC FOR: DATE: PREPA
- Page 111 and 112:
People (not smoking) 12 x 5 60 Area
- Page 113 and 114:
Area 930 Sqft Summer DB %RH WB GR/L
- Page 115 and 116:
Sunglass(NW) 0 x 0.22 x 148 0 Sungl
- Page 117 and 118:
Total space sensible heat gain 5098
- Page 119 and 120:
PROJECT: FLOOR: AC FOR: DATE: PREPA
- Page 121 and 122:
Area- 582 x 0.06 34.92 Air changes
- Page 123 and 124:
Roof 0 x 0.12 x 53 0 Ventilation 17
- Page 125 and 126:
PROJECT: FLOOR: AC FOR: DATE: PREPA
- Page 127 and 128:
PROJECT: FLOOR: AC FOR: DATE: PREPA
- Page 129 and 130:
Area- 302 x 0.06 18.12 Air changes
- Page 131 and 132:
Roof 0 x 0.12 x 53 0 Ventilation 43
- Page 133 and 134:
PROJECT: FLOOR: AC FOR: DATE: PREPA
- Page 135 and 136:
People (not smoking) 3 x 5 15 Area-
- Page 137 and 138:
Floor 302 x 0.4 x 23 2778 Roof 0 x
- Page 139 and 140:
6 Ventilation air heat 43897
- Page 141 and 142:
Area 819 Sqft Summer DB %RH WB GR/L
- Page 143 and 144:
Sunglass(NW) 0 x 0.22 x 148 0 Sungl
- Page 145 and 146:
S.No. Description A EQUIPMENT-VRF 1
- Page 147 and 148:
S.No. Description BIO- INFORMATICS
- Page 149 and 150:
S.No. Incomer Feeder Description BI
- Page 151 and 152:
VARIABLE REFRIGERANT VOLUME SYSTEM:
- Page 153 and 154:
The outdoor units shall be suitable
- Page 155 and 156:
• Outdoor Units mounted on Balcon
- Page 157 and 158:
• All Units shall have “Self-Di
- Page 159 and 160:
These units shall be installed betw
- Page 161 and 162:
The remote must constantly monitor
- Page 163 and 164:
a) Oil entrainment by hot gas shall
- Page 165 and 166:
iii) After all leaks have been repa
- Page 167 and 168:
c) All exposed ducts within conditi
- Page 169 and 170:
All supply/return air duct or path
- Page 171 and 172:
vi) Testing & Balancing: After the
- Page 173 and 174:
Payment for Grille/ Diffuser shall
- Page 175 and 176:
and hence unequal recovery; also th
- Page 177 and 178:
• Operating tests on all protecti
- Page 179 and 180:
LIST OF APPROVED MAKES: S.No. Item
- Page 181:
LIST OF DRAWINGS ENCLOSED Sl. No. D
- Page 186 and 187:
CERTIFICATE Certified that this par
- Page 188 and 189:
RITES LIMITED General Rules & Direc
- Page 190 and 191:
7. The receipt of an accountant or
- Page 192 and 193:
after the decimal figures, e.g. Rs.
- Page 194 and 195:
PREAMBLE - B.O.Q. These preambles a
- Page 196 and 197:
S.N DESCRIPTION UNIT QUANTITY RATE
- Page 198 and 199:
S.N DESCRIPTION UNIT QUANTITY RATE
- Page 200 and 201:
S.N DESCRIPTION UNIT QUANTITY RATE