Pondicherry University at Puducherry TENDER DOCUMENTS - Rites
Pondicherry University at Puducherry TENDER DOCUMENTS - Rites
Pondicherry University at Puducherry TENDER DOCUMENTS - Rites
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Pondicherry</strong> <strong>University</strong> <strong>at</strong> <strong>Puducherry</strong><br />
<strong>TENDER</strong> <strong>DOCUMENTS</strong><br />
FOR THE WORK OF<br />
Supply, Erection, Testing & Commissioning of<br />
VRF(Variable Refrigerant Flow) Air Conditioning System<br />
work for Bioinform<strong>at</strong>ics & Madanjeet Singh School of<br />
Green Buildings under 11 th Plan Building for <strong>Pondicherry</strong><br />
<strong>University</strong> <strong>at</strong> <strong>Puducherry</strong>.<br />
<strong>TENDER</strong> NO:RITES/CO/B&A/EE/PU/VRF/BIO&GB/2011<br />
PART-I<br />
(A - TECHNICAL BID)<br />
Tender Document issued to<br />
_________________ (Name of tenderer)<br />
________________________ (Address of Tenderer)<br />
RITES LTD<br />
(A Government of India Enterprise)<br />
ELECTRICAL ENGINEERING DIVISION<br />
5 TH FLOOR, LEFT WING, RITES BHAWAN<br />
1, SECTOR-29, GURGAON-122001 (HARYANA)<br />
December - 2011
PART - I<br />
A - TECHNICAL BID
CERTIFICATE<br />
Certified th<strong>at</strong> this PART- I (A- Technical Bid) of the tender documents contains serially<br />
machined numbered pages from S.No. 001 to 02 5.<br />
(Name, Design<strong>at</strong>ion and Sign<strong>at</strong>ure of<br />
Officer Issuing Tender Documents)<br />
EED/ RITES LTD.
Press NIT<br />
RITES LIMITED<br />
(A Government of India Enterprise)<br />
NOTICE INVITING <strong>TENDER</strong><br />
NIT No: RITES/CO/B&A/EE/PU/BIO&GB<br />
GM (EE) RITES Limited on behalf of <strong>Pondicherry</strong> <strong>University</strong> (PU), <strong>Puducherry</strong>, invites sealed<br />
tenders from contractors who fulfill Qualifying Criteria stipul<strong>at</strong>ed in tender documents for the<br />
following work:<br />
Name of work: SITC of VRF air-conditioning system for Green & Bioinform<strong>at</strong>ics buildings <strong>at</strong> PU<br />
Estim<strong>at</strong>ed Cost: Rs. 310.74 Lacs, EMD: Rs. 3,11,000.00, Completion Period: 7 Months, Last d<strong>at</strong>e of<br />
Submission of tender: 30.01.2012 up to 14:00Hrs.<br />
Complete tender documents including Qualifying Criteria, provision of joint venture, etc. can be<br />
purchased from the office of Sr. Dy. General Manager (Elect.), EE Division, RITES Ltd, 5 th Floor, Left<br />
Wing, RITES Bhawan, 1, Sector-29, Gurgaon 122001, Phone No. : 0124-2818573/2818956, Fax:<br />
0124-2571660 <strong>at</strong> a cost of Rs. 7500/- or download from our web site www.rites.com<br />
Amendments/Corrigendum, if any, would be hosted on the website only.
RITES<br />
(A Government of India Enterprise)<br />
NOTICE INVITING <strong>TENDER</strong><br />
1). Sealed tender in ‘Two packet system’ (i.e. Technical Bid and Financial Bid) are invited by<br />
RITES Limited for and on behalf of <strong>Pondicherry</strong> <strong>University</strong> (PU), <strong>Puducherry</strong> from<br />
experienced contractors/firms/companies for the work of “Supply, Erection, Testing &<br />
Commissioning of VRF (Variable Refrigerant Flow) Air Conditioning System work for<br />
Bioinform<strong>at</strong>ics & Madanjeet Singh School of Green Buildings under 11 th Plan Building<br />
Projects for <strong>Pondicherry</strong> <strong>University</strong> <strong>at</strong> <strong>Puducherry</strong>.<br />
2) Scope of Work: The work comprises of SITC of VRF air-conditioning system.<br />
a) Tender No. : RITES/CO/B&A/EE/PU/BIO&GB-1/2011<br />
b) Estim<strong>at</strong>ed cost of work: Rs. 310.74 Lakhs (approx.) based on NSR & prevailing market<br />
r<strong>at</strong>es.<br />
c) Earnest Money Deposit (EMD): Rs. 3,11,000.00 (Rupees Three Lakhs Eleven Thousand<br />
only) in the form of Banker’s Cheque/ Pay Order/ Demand Draft payable <strong>at</strong> GURGAON<br />
valid for a period of six months or more after last d<strong>at</strong>e of receipt of Tender pledged in<br />
favour of RITES Ltd, RITES Bhawan, 1, Sector-29, Gurgaon-122001.<br />
d) Completion period: 07 (Seven) months.<br />
e) Tender Sale Start d<strong>at</strong>e (11:00Hrs to 16:00Hrs): 12.01.2012 and Close D<strong>at</strong>e: 25.01.2012<br />
f) D<strong>at</strong>e of tender submission: 14:00 hours on 30.01.2012.<br />
g) D<strong>at</strong>e of tender opening: 14:30 hours on 30.01.2012.<br />
3) Tender documents can be obtained on any working day <strong>at</strong> the time and period mentioned above<br />
(except S<strong>at</strong>urday, Sunday and Gazetted Holiday) on payment of Rs. 7,500/- (Seven Thousand<br />
five Hundred only) (non-refundable) in the form of Banker Draft / Banker Cheque / Pay order<br />
drawn on any schedule bank in favour of RITES Ltd, payable <strong>at</strong> Gurgaon.<br />
4) Tenders in One sealed packets, as detailed below, shall be received up to the d<strong>at</strong>e and time of<br />
submission indic<strong>at</strong>ed in Para 3 above. Bids received after the stipul<strong>at</strong>ed d<strong>at</strong>e and time are liable<br />
to be rejected.<br />
Two Packet System: (Technical & Price Bid)<br />
The tenderer shall submit the tender in original in two sub packets (A&B) as under:<br />
Complete tender documents (both sub packet) shall be submitted in ‘single main<br />
envelope’, which will be containing the followings:
Sub packet -A containing:<br />
Envelope (1) Earnest Money and Authority to Sign the tender documents.<br />
Envelope (2) Qualific<strong>at</strong>ion Inform<strong>at</strong>ion (in Requisite Form<strong>at</strong>).<br />
Envelope (3)<br />
Technical Bid comprising of PART-I (A – Technical Bid & B – General<br />
conditions of contract) of tender document.<br />
Sub packet -B containing: Envelope (4) Price Bid (PART-II)<br />
5. Address for collection & submission of tender documents:<br />
Sr. Dy. General Manager (Electrical), Electrical Engineering Division, 5th Floor, Left<br />
Wing, RITES Ltd, RITES Bhawan, Plot No.1, Sector 29, Gurgaon- 122001 (Haryana).<br />
6. Qualifying Criteria:<br />
a) Work Experience: Firm should have completed successfully in its/his own name <strong>at</strong><br />
least one work of similar n<strong>at</strong>ure for a minimum value of Rs 248.59 Lakhs or two<br />
similar works of minimum value of Rs 155.37 Lakhs or three similar work of<br />
minimum value of Rs 124.29 Lakhs each during the last five years in Govt.<br />
Organiz<strong>at</strong>ions/ Semi Govt. Organiz<strong>at</strong>ions/ Public Sector Undertakings/<br />
Autonomous bodies of Central St<strong>at</strong>e Govts. / Municipal Bodies/Public Ltd. Cos.<br />
listed in stock Exchange in India or abroad prior to the d<strong>at</strong>e of submission of bid.<br />
(Any VRF Air Conditioning work shall be considered as similar work.)<br />
b) Minimum Annual Turn Over: Firm must have achieved a minimum Annual<br />
Turnover of 310.74 lakhs during any one of the last five financial years.<br />
c) A Solvency Certific<strong>at</strong>e of minimum solvency of Rs 124.29 lakhs (Suggested<br />
form<strong>at</strong> <strong>at</strong> Proforma-2) from a N<strong>at</strong>ionalized or a Scheduled Bank issued not earlier<br />
than 6 months from the last d<strong>at</strong>e of submission of tender is required to be<br />
submitted by the bidder.<br />
d) The applicant firm shall be a profit (net) making firm and shall have made profit in<br />
each of the last two Financial Years and in <strong>at</strong>least one out of the three Financial<br />
Years immedi<strong>at</strong>ely preceding the last two Financial Years.<br />
e) Joint Ventures are not acceptable.<br />
7. This work is to be carried out in the existing working/functional area of <strong>Pondicherry</strong><br />
<strong>University</strong>, <strong>Puducherry</strong> hence it is suggested th<strong>at</strong> all intending bidders may visit the site<br />
and acquaint themselves of the site conditions before bidding for the work. The firm has<br />
to abide by the rules and regul<strong>at</strong>ions of the <strong>Pondicherry</strong> <strong>University</strong> authority and shall<br />
also have to abide the labour laws prevailing in the st<strong>at</strong>e of <strong>Puducherry</strong>.<br />
8. Tender documents should be obtained from RITES office (as address given above in<br />
Para 5.0) and can also be downloaded from RITES website. Applic<strong>at</strong>ions made on such
a form/document shall be considered valid for particip<strong>at</strong>ing in the tender process. The<br />
tenderer who wishes to download the form/document, should deposit the cost of<br />
document by demand draft in favour of RITES Limited while submitting his bid along<br />
with bid documents.<br />
9. In case the bid of a tenderer who has downloaded the document from website is<br />
accepted, the contract shall be executed in the original/manual tender document issued<br />
by concerned RITES office.<br />
10. In case during the scrutiny of downloaded tender documents, any<br />
modific<strong>at</strong>ion/correction, etc. is noticed as compared to the original documents posted on<br />
the website, the bid submitted by such a tenderer is liable to be rejected.<br />
11. Pre-bid meeting will be held <strong>at</strong> 11.30 Hrs on 19.01.2012 <strong>at</strong> RITES LTD.<br />
12. RITES reserve the right to accept or reject any/all the tenders in full or part without<br />
assigning any reasons wh<strong>at</strong>soever.<br />
13. For other criteria and further details regarding similar works, % age of weight age of<br />
previous years on Turnover, Experience, details of documents to be submitted and<br />
other terms & conditions etc., the tender documents may be seen <strong>at</strong> RITES Office or <strong>at</strong><br />
RITES web site www.rites.com.<br />
14. Amendments / Corrigendum, if any, would be hosted on RITES website only.<br />
General Manager (Electrical),<br />
Electrical Engineering Division,<br />
RITES Limited,<br />
For & behalf PU, <strong>Puducherry</strong>.
Section - 1<br />
NOTICE INVITING <strong>TENDER</strong> AND<br />
INSTRUCTIONS TO <strong>TENDER</strong>ERS<br />
SECTION 1
1.0 GENERAL<br />
1.1 Tender Notice<br />
NOTICE INVITING <strong>TENDER</strong> AND INSTRUCTIONS TO <strong>TENDER</strong>ERS<br />
Tenders are invited by RITES Ltd., a Public Sector Enterprise under the Ministry of<br />
Railways, acting for and on behalf of <strong>Pondicherry</strong> <strong>University</strong> (Employer) as an Agent/Power<br />
of Attorney Holder, from working contractors (including contractors who have executed<br />
works within the last five years reckoned from the scheduled d<strong>at</strong>e of opening of tender) of<br />
Railways, CPWD, MES, DOT, RITES, St<strong>at</strong>e PWD or any other Central / St<strong>at</strong>e Government<br />
Undertaking, Municipal Body, Autonomous Body of Central/St<strong>at</strong>e Governments or Public<br />
Ltd. Cos. listed in stock Exchange in India or abroad prior to the d<strong>at</strong>e of submission of bid<br />
for the work of “Supply, Erection, Testing & Commissioning of VRF (Variable Refrigerant<br />
Flow) Air Conditioning System work for Bioinform<strong>at</strong>ics & Madanjeet Singh School of Green<br />
Buildings under 11 th Plan Building Projects for <strong>Pondicherry</strong> <strong>University</strong> <strong>at</strong> <strong>Puducherry</strong>”.<br />
Throughout these bidding documents, the terms ‘bid’ and ‘tender’ and their deriv<strong>at</strong>ives are<br />
synonymous).<br />
1.2 Estim<strong>at</strong>ed Cost of Work<br />
The work is estim<strong>at</strong>ed to cost Rs.3,10,74,239.00 Lacs (Rupees Three Crore Ten Lakhs<br />
Seventy four thousand Two hundred Thirty Nine only). This Estim<strong>at</strong>e, however, is given<br />
merely as a rough guide.<br />
1.3 Time for Completion<br />
The time allowed for completion will be 07 (Seven) months from the d<strong>at</strong>e of start which is<br />
defined in Schedule F under Clause 5.1a of Clauses of Contract.<br />
Brief Scope of Work<br />
“Supply, Erection, Testing & Commissioning of VRF (Variable Refrigerant Flow) Air<br />
Conditioning System work for Bioinform<strong>at</strong>ics & Madanjeet Singh School of Green Buildings<br />
under 11 th Plan Building Projects for <strong>Pondicherry</strong> <strong>University</strong> <strong>at</strong> <strong>Puducherry</strong>”.<br />
1.4 Availability of Site<br />
The site for the work is available/ shall be made available in parts, as specified below:<br />
Site for the work shall be made available in parts. The work shall be carried out in the<br />
existing working/functional area of <strong>Pondicherry</strong> <strong>University</strong> Campus, <strong>Puducherry</strong>.<br />
2.0 QUALIFICATION CRITERIA TO BE SATISFIED<br />
2.1 The Qualific<strong>at</strong>ion Criteria to be s<strong>at</strong>isfied are given <strong>at</strong> Annexure I enclosed.
2.2 The Qualific<strong>at</strong>ion Criteria to be s<strong>at</strong>isfied will depend on the c<strong>at</strong>egory of works,<br />
whether Normal or Large. Normal Works are those costing upto Rs.30 Crores each<br />
and Large Works are those costing more than Rs.30 Crores. The work for which the<br />
Tender is being invited falls under the c<strong>at</strong>egory of Normal.<br />
2.3 The Qualific<strong>at</strong>ion Criteria to be s<strong>at</strong>isfied will also depend on whether the Work falls in<br />
Normal area or difficult area. Difficult area includes North East St<strong>at</strong>es, Jammu &<br />
Kashmir, Jharkhand, Ch<strong>at</strong>tisgarh and Andaman & Nicobar Islands. Normal area<br />
covers all areas other than difficult area. The work for which this Tender has been<br />
invited falls under Normal area.<br />
2.4 In this Tender Joint Venture is Not Applicable.<br />
In case Joint Venture is allowed the following will apply:<br />
a) If JV is successful in the Bid, the Contract will be awarded in the name of JV. The JV<br />
Agreement should be executed within 15 days of receipt of Letter of Acceptance and<br />
the JV Agreement duly registered in accordance with law so as to be legally valid and<br />
binding on the members. The JV shall also open a Bank account in the name of JV<br />
and all payments due to the JV shall be credited by the Employer to th<strong>at</strong> account<br />
only. To facilit<strong>at</strong>e st<strong>at</strong>utory deductions such as towards Income Tax, VAT etc. made<br />
from the amounts due to the JV being credited to the concerned Government<br />
Departments, the JV shall arrange to obtain in the name of JV, PAN/TIN etc as<br />
required.<br />
b) Bid submitted by a Joint Venture of two or more firms as Partners/Members shall be<br />
accompanied by the following documents:<br />
i) A copy of Joint Venture MOU/Agreement duly notarized so as to be legally<br />
valid and binding on all the Partners/Members and incorpor<strong>at</strong>ing the following<br />
provisions (Suggested form<strong>at</strong> <strong>at</strong> Annexure III):<br />
• The Bid and, in case of a successful Bid, the Agreement shall be signed<br />
so as to be legally binding on all Partners/Members.<br />
• One of the Partners/Members shall be nomin<strong>at</strong>ed as being in charge<br />
and this authoriz<strong>at</strong>ion shall be evidenced by submitting Power of<br />
Attorney signed by legally authorized sign<strong>at</strong>ories of all the<br />
Partners/Members.<br />
• The Partner-in-charge/Lead Member shall be authorized to incur<br />
liabilities and receive instructions for and on behalf of any and all<br />
partners/members of the Joint Venture and the entire execution of the<br />
Contract, shall be done exclusively with the Partner in charge.<br />
• All the partners of the Joint Venture shall be liable jointly and severally<br />
for the execution of the Contract in accordance with the Contract terms<br />
and a st<strong>at</strong>ement to this effect shall be included in the authoriz<strong>at</strong>ion<br />
through a Power of Attorney in favour of the Partner-in-charge/Lead<br />
Member as well as in the Bid and in the Agreement (in case of a<br />
successful bid).
• Indic<strong>at</strong>ion of the precise responsibility of all Partners/Members of the<br />
Joint Venture in respect of planning, design, construction equipment,<br />
key personnel, work execution and financing of the Project duly<br />
indic<strong>at</strong>ing the percentage in financing of JV by each Partner.<br />
• In the case of Large Works, the maximum number of Partners can be<br />
only three and the Partner-in-Charge/Lead Member shall have more<br />
than 50% particip<strong>at</strong>ion in financing of the JV and each of the other<br />
Members minimum 20% particip<strong>at</strong>ion in financing of JV. In case of<br />
`Normal Works’, the Partner-in-Charge/Lead Partner shall be<br />
responsible for 100% financing of the J.V.<br />
• All partners/members of the JV shall comply with the provisions in the<br />
Integrity Pact and any viol<strong>at</strong>ion of the Pact by any partner/member shall<br />
be construed as a viol<strong>at</strong>ion by the JV.<br />
ii)<br />
Power of Attorney in favour of the Partner-in-charge/Lead Member on the lines<br />
mentioned in item “a” above.(Suggested form<strong>at</strong> <strong>at</strong> Annexure V).<br />
2.5 The documents to be furnished by the Bidder to prove th<strong>at</strong> he is s<strong>at</strong>isfying the<br />
Qualific<strong>at</strong>ion Criteria laid down should all be in the Bidder’s name, except in cases<br />
where though the name has changed, the owners continued to remain the same and<br />
in cases of amalgam<strong>at</strong>ion of entities.<br />
3.0 FORMAT AND CHECK LIST FOR SUBMISSION OF INFORMATION ON<br />
QUALIFICATION CRITERIA<br />
3.1 Other than Joint Ventures<br />
The Tenderer shall furnish a Letter of Transmittal as given in Annexure II A<br />
enclosing the documents mentioned therein/listed in para 1(a) of Annexure IA.<br />
3.2 Joint Ventures (For Large Works) (Not Applicable in this Tender)<br />
The Partner in charge / Lead member shall furnish a Letter of Transmittal as given in<br />
Annexure II B (L) enclosing the documents mentioned therein/listed in para 1(b) of<br />
Annexure I A.<br />
3.3 Joint ventures (For Normal Works) (Not Applicable in this Tender)<br />
The Partner in charge / Lead Member shall furnish a Letter of Transmittal as given in<br />
Annexure II B (N) enclosing the documents mentioned therein/listed in para 1(c) of<br />
Annexure I A.<br />
(Note:- Tender document approving authority to delete Sub Para 3.2 or 3.3 or both as<br />
applicable.)<br />
4.0 CONTENTS OF <strong>TENDER</strong> DOCUMENT
4.1 Each set of Tender or Bidding Document will comprise the Documents listed below<br />
and addenda issued in accordance with para 7 :<br />
PART – 1 :- Technical Bid Packet<br />
Section 1 Notice Inviting Tender and Instructions to Tenderers.<br />
Section 2 Tender and Contract Form.<br />
Section 3 Special Conditions.<br />
Section 4 Schedules A to F<br />
Section 5 Technical Specific<strong>at</strong>ions<br />
Section 6 Drawings<br />
PART – 2:- Financial Bid Packet<br />
Schedule of Quantities (Bill of Quantities)<br />
PART – 3:- General Conditions of Contract<br />
Section 7<br />
Section 8<br />
Section 9<br />
Section 10<br />
Section 11<br />
Conditions of Contract<br />
Clauses of Contract<br />
RITES Safety Code<br />
RITES Model Rules for protection of Health and Sanitary<br />
Arrangements for Workers<br />
RITES Contractor’s Labour Regul<strong>at</strong>ions<br />
4.2 General Conditions of Contract (Compil<strong>at</strong>ion of Sections 7 to 11) with upto d<strong>at</strong>e<br />
correction slips is also available in RITES website <br />
5.0 ISSUE OF <strong>TENDER</strong> DOCUMENT<br />
5.1 A complete set of Tender Document (Technical and Financial Bid) described in Para<br />
4.1 above can be seen in the office of the SDGM/Elect, Electrical Engineering<br />
Division, 5 th Floor, Left Wing, RITES Limited, RITES Bhawan, Plot No.1, Sector-29,<br />
Gurgaon-122001 (Haryana) between hours of 11.00 AM and 4.00 PM every day<br />
except on S<strong>at</strong>urdays, Sundays and Public Holidays.<br />
5.2 One set of Tender Document may be purchased from the office of SDGM/Elect,<br />
Electrical Engineering Division, 5 th Floor, Left Wing, RITES Limited, RITES Bhawan,<br />
Plot No.1, Sector-29, Gurgaon-122001 (Haryana) from 12.01.2012 to 25.01.2012 for<br />
a non refundable fee per set of Rs.7,500.00 (Rupees Seven Thousand Five<br />
Hundred Only) in the form of Demand Draft/ Pay Order/ Banker’s cheque drawn on<br />
any Scheduled Bank payable <strong>at</strong> New Delhi/Gurgaon in favour of RITES Ltd.,<br />
Gurgaon, on submission of an applic<strong>at</strong>ion.<br />
5.3 Tender Documents including drawings can also be downloaded from RITES Website<br />
(www.rites.com) and in such a case, the Tenderer shall deposit the cost of tender<br />
documents along with submission of tender, failing which his tender shall not be<br />
opened. The cost of tender documents shall be deposited in the form of a separ<strong>at</strong>e<br />
Banker’s cheque / Demand Draft / Pay Order and enclosed in the envelope
containing the Earnest Money Deposit. The amendments / clarific<strong>at</strong>ions to the<br />
Tender documents will also be available on the above website.<br />
5.4 Tender Documents downloaded from RITES website shall be considered valid for<br />
particip<strong>at</strong>ing in the tender process. During the scrutiny of downloaded tender<br />
document, if any modific<strong>at</strong>ion / correction etc. is noticed as compared to the original<br />
documents posted on the website, the bid submitted by such a Tenderer is liable to<br />
be rejected. In case the bid of a Tenderer who has downloaded the document from<br />
website is accepted the contract shall be executed in the original / manual tender<br />
document issued by the concerned RITES officer.<br />
5.5 Clarific<strong>at</strong>ions on Tender Documents<br />
A prospective Tenderer requiring any clarific<strong>at</strong>ion on the Tender Document may<br />
notify Sr. Deputy General Manager/Elect in writing or by telefax/ or by E-mail <strong>at</strong> the<br />
following Postal Address/ Fax No./E-mail address: Sr. Deputy General Manager,<br />
Electrical Engineering Division, 5 th Floor, Left Wing, RITES Limited, RITES Bhawan,<br />
Plot No.1, Sector-29, Gurgaon-122001 (Haryana), Fax No. 0124-2571660<br />
In cases where Pre-Bid Meeting is not proposed to be held, request for clarific<strong>at</strong>ions<br />
including request for Extension of Time for submission of Bid, if any, must be<br />
received not l<strong>at</strong>er than 10 (ten) days prior to the deadline for submission of tenders.<br />
Details of such questions raised and clarific<strong>at</strong>ions furnished will be uploaded in<br />
RITES website without identifying the names of the Bidders who had raised the<br />
questions. Any modific<strong>at</strong>ion of the Tender Document arising out of such clarific<strong>at</strong>ions<br />
will also be uploaded on RITES website only.<br />
In cases where Pre-Bid Meeting is proposed to be held, provisions in para 6.0 below<br />
may be referred to.<br />
6.0 PRE-BID MEETING<br />
6.1 The Tenderer or his official represent<strong>at</strong>ive is invited to <strong>at</strong>tend a pre-bid meeting which<br />
will take place <strong>at</strong> the Office of on 19.01.2012 <strong>at</strong> 1100hrs.<br />
6.2 The Tenderers are required to submit any question on issues rel<strong>at</strong>ing to the tender, in<br />
writing or by telefax or by E-mail so as to reach Sr. DGM/Elect (the official nomin<strong>at</strong>ed<br />
for this purpose) not l<strong>at</strong>er than 3 (three) days before the d<strong>at</strong>e fixed for the meeting.<br />
6.3 The purpose of the meeting will be to clarify the issues raised and to answer<br />
supplementary questions on such issues.<br />
6.4 Minutes of the meeting including the text of the questions raised (without identifying<br />
the source of enquiry) and the responses given will be uploaded on RITES website.<br />
Any modific<strong>at</strong>ions of the Tender Document which may become necessary as a result<br />
of the Pre-bid Meeting shall be made exclusively through the issue of an Addendum /<br />
Corrigendum and not through the Minutes of the Pre-Bid Meeting. The Minutes of the<br />
Meeting as described above and the Addendum / Corrigendum, if any, will be<br />
uploaded on RITES website only.
6.5 Non-<strong>at</strong>tendance <strong>at</strong> the Pre-bid Meeting will not be a cause for disqualific<strong>at</strong>ion of a<br />
tenderer.<br />
7.0 AMENDMENT OF <strong>TENDER</strong> DOCUMENT<br />
7.1 Before the deadline for submission of tenders, the Tender Document may be<br />
modified by RITES Ltd. by issue of addenda/corrigendum. Issue of addenda /<br />
corrigenda will however be stopped 7 days prior to the deadline for submission of<br />
tenders as finally stipul<strong>at</strong>ed.<br />
7.2 Addendum/corrigendum, if any, will be hosted on website only and shall become a<br />
part of the tender document. All Tenderers are advised to see the website for<br />
addendum/ corrigendum to the tender document which may be uploaded upto 7 days<br />
prior to the deadline for submission of Tender as finally stipul<strong>at</strong>ed.<br />
7.3 To give prospective Tenderers reasonable time in which to take the addenda/<br />
corrigenda into account in preparing their tenders, extension of the deadline for<br />
submission of tenders may be given as considered necessary by RITES.<br />
8.0 <strong>TENDER</strong> VALIDITY<br />
8.1 The Tender shall be valid for a period of 90 days from the due d<strong>at</strong>e for submission of<br />
Tender or any extended d<strong>at</strong>e as indic<strong>at</strong>ed in sub para below.<br />
8.2 In exceptional circumstances, during the process of evalu<strong>at</strong>ion of tenders and prior to<br />
the expiry of the original time limit for Tender Validity, the Employer may request th<strong>at</strong><br />
the Tenderers may extend the period of validity for a specified additional period. The<br />
request and the tenderer’s response shall be made in writing. A Tenderer may refuse<br />
the request without forfeiting his Earnest Money. A Tenderer agreeing to the request<br />
will not be permitted to modify his Financial Bid to a higher amount but will be<br />
required to extend the validity of the Earnest Money for the period of the extension.<br />
9.0 EARNEST MONEY<br />
9.1 The Tender should be accompanied by Earnest Money of Rs.3,10,750.00 Lacs<br />
(Rupees Three Lakh Ten Thousand Seven Hundred Fifty only) in any of the forms<br />
given below:-<br />
Banker’s Cheque / Pay Order/ Demand Draft payable <strong>at</strong> New Delhi/Gurgaon, drawn<br />
in favour of RITES Ltd.<br />
9.2 Any Tender not accompanied by Earnest Money in an acceptable form shall be<br />
rejected by the Employer as non-responsive.<br />
9.3 Refund of Earnest Money<br />
a) Two Packet System
The Earnest Money of the Tenderers whose Technical Bid is found not acceptable<br />
will be returned without interest soon after scrutiny of Technical Bid has been<br />
completed by the Employer subject to provisions of Para 9.4 (b). The Earnest Money<br />
of the Tenderers whose Technical Bid is found acceptable but Financial Bid is<br />
rejected will be returned without interest within 28 days of the end of Tender Validity<br />
Period subject to provisions of Para 9.4 (b).<br />
b) Single Packet System<br />
After evalu<strong>at</strong>ion of the Financial Bids, the Earnest Money of unsuccessful Tenderers<br />
will be returned without interest within 28 days of the end of Tender Validity Period<br />
subject to provisions of Para 9.4 (b).<br />
c) In case of both Two Packet and Single Packet System, the Earnest Money of the<br />
successful Tenderer, without any interest, will be adjusted as a part of the Security<br />
Deposit payable in terms of provisions in the General Conditions of Contract (Clause<br />
1A of Clauses of Contract).<br />
9.4 The Earnest Money is liable to be forfeited<br />
a) if after bid opening, but before expiry of bid validity or issue of Letter of<br />
Acceptance, whichever is earlier, any Tenderer<br />
i) withdraws his tender or<br />
ii)<br />
makes any modific<strong>at</strong>ion in the terms and conditions of the tender which<br />
are not acceptable to the Employer.<br />
b) in case any st<strong>at</strong>ement/inform<strong>at</strong>ion/document furnished by the Tenderer is<br />
found to be incorrect or false.<br />
c) in the case of a successful Tenderer, if the Tenderer<br />
i) fails to furnish the Performance Guarantee within the period specified<br />
under Clause 1 of “Clauses of Contract”. or<br />
ii)<br />
fails to commence the work without valid reasons within the period as<br />
specified in Schedule F after the d<strong>at</strong>e of issue of Letter of Acceptance or<br />
from the first d<strong>at</strong>e of handing over of the site, whichever is l<strong>at</strong>er.<br />
In case of forfeiture of E.M. as prescribed hereinabove, the Tenderer shall not be<br />
allowed to particip<strong>at</strong>e in the retendering process of the work.<br />
10.0 ALTERNATIVE PROPOSALS BY THE <strong>TENDER</strong>ERS<br />
The Tenderers shall submit offers which comply strictly with the requirements of the<br />
Tender Document as amended from time to time as indic<strong>at</strong>ed in Para 7.0 above.<br />
Altern<strong>at</strong>ives or any modific<strong>at</strong>ions shall render the Tender invalid.
10.1 (A) Performance Guarantee and security Deposit<br />
Recovery of Additional Performance Guarantee<br />
The Successful Tenderer is also to deposit Additional Performance Guarantee<br />
in case of Unbalanced bid as explained in Special conditions. This will also be<br />
in the same Form as normal Performance Guarantee and deposited within the<br />
same time limit.<br />
11.0 SUBMISSION OF <strong>TENDER</strong><br />
11.1 Two Packet System and Single Packet System<br />
(a)<br />
Two Packet System (Applicable in this tender)<br />
The tenderer shall submit the Tender in original in two packets as under:-<br />
PACKET A :- TECHNICAL BID<br />
Envelope 1<br />
Envelope 2<br />
Earnest Money & Cost of Tender Document if the bid is<br />
submitted on the document downloaded from RITES<br />
website.<br />
“Authority to Sign”, ‘Integrity Pact’ (If applicable) and<br />
Qualific<strong>at</strong>ion Inform<strong>at</strong>ion along with all enclosures /<br />
documents as per Letter of Transmittal/ Checklist given in<br />
Annexure II A/ II B (L)/IIB(N). As regards “Authority to<br />
Sign” Para 11.2 below may be referred to. As regards<br />
‘Integrity Pact’ (If applicable), para 11.7 below may be<br />
referred to.<br />
Technical Bid (Part 1 and Part 3) (Refer Para 4.1)<br />
including<br />
sign<strong>at</strong>ure on Tender Form (Section 2) duly witnessed after<br />
filling up blanks therein.<br />
Each page of the above documents including all Drawings<br />
should bear the d<strong>at</strong>ed initials of the Tenderer along with<br />
the seal of the Company, in token of confirm<strong>at</strong>ion of<br />
having understood the Contents.<br />
PACKET B: - FINANCIAL BID<br />
Envelope 3 Schedule/Bill of Quantities.<br />
Each page of the Financial Bid (Part 2 – Refer Para 4.1) should be signed by the<br />
Tenderer along with the seal of the company. In the last page of Financial Bid, <strong>at</strong> the<br />
end, the Tenderer should sign in full with the name of the Company, Seal of the<br />
Company and D<strong>at</strong>e.
All r<strong>at</strong>es and amounts, whether in figures and words, must be written in indelible ink.<br />
Each Correction, Cutting, Addition and overwriting should be initialed by the<br />
Tenderer.<br />
The r<strong>at</strong>es must be quoted in decimal coinage. Amounts must be quoted in full rupees<br />
by ignoring fifty paisa and less and considering more than fifty paisa as rupee one. If<br />
the same item figures in more than one section/part of Schedule of Quantities, the<br />
Tenderer should quote the same r<strong>at</strong>e for th<strong>at</strong> item in all sections/parts. If different<br />
r<strong>at</strong>es are quoted for the same item, the least of the different r<strong>at</strong>es quoted only shall<br />
be considered for evalu<strong>at</strong>ion of th<strong>at</strong> item in all sections/parts of the Schedule of<br />
Quantities.<br />
Instructions contained in subsequent Para 17.6 (a) on “Item r<strong>at</strong>e tender” and 17.6 (b)<br />
on “Percentage r<strong>at</strong>e tender” may be carefully studied and complied with.<br />
b) Single Packet System (Not Applicable): Both Technical Bid (including sign<strong>at</strong>ure on<br />
Tender Form in Section 2 duly witnessed) and Financial Bid Documents will be<br />
submitted in one Packet. Precautions as described above for Two Packet System<br />
shall be observed by the tenderers.<br />
11.2 Authority to Sign<br />
a) If the applicant is an individual, he should sign above his full type written name<br />
and current address.<br />
b) If the applicant is a proprietary firm, the Proprietor should sign above his full<br />
type written name and the full name of his firm with its current address.<br />
c) If the applicant is a firm in partnership, the Documents should be signed by all<br />
the partners of the firm above their full type written names and current<br />
addresses. Altern<strong>at</strong>ively the Documents should be signed by the person<br />
holding Power of Attorney for the firm in the Form<strong>at</strong> <strong>at</strong> Annexure IV.<br />
d) If the applicant is a limited Company, or a Corpor<strong>at</strong>ion, the Documents shall be<br />
signed by a duly authorized person holding Power of Attorney for signing the<br />
Documents in the Form<strong>at</strong> <strong>at</strong> Annexure IV.<br />
e) If the applicant is a Joint Venture, the Documents shall be signed by the Lead<br />
Member holding Power of Attorney for signing the Document in the Form<strong>at</strong> <strong>at</strong><br />
Annexure V. The sign<strong>at</strong>ory on behalf of such Lead Partner shall be the one<br />
holding the Power of Attorney in the Form<strong>at</strong> <strong>at</strong> Annexure IV.<br />
11.3 Items to be kept in mind while furnishing details<br />
While filling in Qualific<strong>at</strong>ion Inform<strong>at</strong>ion documents and the Financial Bid, following<br />
should be kept in mind:<br />
i) There shall be no additions or alter<strong>at</strong>ions except those to comply with the<br />
instructions issued by the Employer or as necessary to correct errors, if any,<br />
made by the Tenderers.<br />
ii)<br />
Conditional Offer/ Tender will be rejected. Unconditional reb<strong>at</strong>e/ discounts in<br />
the Financial offer will however be accepted.
iii)<br />
The Employer reserves the right to accept or reject any conditional<br />
reb<strong>at</strong>e/discounts. While evalu<strong>at</strong>ing the Bid Price, the conditional<br />
reb<strong>at</strong>es/discounts which are in excess of the requirements of the bidding<br />
documents or otherwise result in accrual of unsolicited benefits to the<br />
Employer, shall not be taken into account.<br />
11.4 Sealing and Marking of Tenders<br />
11.4.1 Two Packet System (Applicable in this tender)<br />
(a) PACKET A – TECHNICAL BID<br />
Envelopes 1 & 2 as described in Para 11.1 (a) above should be sealed separ<strong>at</strong>ely<br />
superscribing “Technical Bid” with Envelope Number, Name of the work and<br />
Name of the tenderer. In addition, the following should also be super scribed on the<br />
respective envelopes.<br />
Envelope 1<br />
Envelope 2<br />
i) Earnest Money<br />
ii) Cost of Tender Document if the Bid is submitted<br />
on the document downloaded from RITES website.<br />
i) Authority to Sign, ‘Integrity Pact’ (If applicable as<br />
per para 11.7 below) and Qualific<strong>at</strong>ion Inform<strong>at</strong>ion/<br />
documents as per checklist in Annexure IIA / IIB<br />
(L)/ II B (N).<br />
ii) Technical Bid including Drawings<br />
Both the envelopes should be put in a packet which should be sealed. The following<br />
should be superscribed on the packet:<br />
i) Packet A – Technical Bid<br />
ii)<br />
Name of the Work<br />
iii)<br />
Name of the Tenderer<br />
(b) PACKET B – FINANCIAL BID<br />
Envelope 3 – Financial Bid should be put in Packet B which should be sealed. The<br />
following should be superscribed on the packet.<br />
i) Packet B - Financial Bid<br />
ii)<br />
iii)<br />
Name of the work<br />
Name of the tenderer
(c)<br />
Both packets A and B should be put inside an outer envelope and sealed. This<br />
envelope should be superscribed with the following details:<br />
i) Tender for (Name of work)<br />
ii)<br />
iii)<br />
iv)<br />
Tender number<br />
D<strong>at</strong>e and time of opening of Tender<br />
From (Name of Tenderer)<br />
v) Addressed to ---- (RITES Officer inviting the Tender)<br />
11.4.2 Single Packet System (Not applicable in this tender)<br />
Two envelopes of Technical Bid and one of Financial Bid shall be made out as<br />
stipul<strong>at</strong>ed in Para 11.4.1 (a) and (b) above with the Name of the work and Name<br />
of the Tenderer super scribed on each of the envelopes. All the three envelopes<br />
shall be put in a Single Packet which shall be super scribed in the same manner as<br />
given in Para 11.4.1 (c) above.<br />
11.4.3 If the envelopes and packets are not super scribed and sealed as indic<strong>at</strong>ed in Paras<br />
11.4.1/ 11.4.2 above, the Employer will assume no responsibility for the<br />
misplacement or prem<strong>at</strong>ure opening of the Tender.<br />
11.5 Deadline for submission of Tender<br />
11.5.1 Tenders must be received by the Employer <strong>at</strong> the following address not l<strong>at</strong>er than<br />
30.01.2012 Hrs. on 1400 hrs. In the event of the specified d<strong>at</strong>e for the submission of<br />
the Tender being declared a holiday due to Strike/Bandh or on any account by the<br />
Employer, the Tenders will be received up to the appointed time on the next working<br />
day.<br />
Address for submission of Tender: SDGM/Elect, Electrical Engineering Division, 5 th<br />
Floor, Left Wing, RITES Limited, RITES Bhawan, Plot No.1, Sector-29, Gurgaon-<br />
122001 (Haryana)<br />
11.5.2 The Employer may extend the deadline for submission of Tenders by issuing an<br />
amendment in writing in accordance with Para 7.3 in which case all rights and<br />
oblig<strong>at</strong>ions of the Employer and the Tenderer previously subject to the original<br />
deadline will be subject to new deadline.<br />
11.6 L<strong>at</strong>e Tender / Delayed Tender
Any Tender received by the Employer after the specified d<strong>at</strong>e and time of receipt of<br />
Tender will be returned unopened to the Tenderer.<br />
11.7 Integrity Pact (Not Applicable in this Tender)<br />
(i)<br />
(ii)<br />
The Bidder/Contractor is required to enter into an Integrity Pact with the<br />
Employer, in the Form<strong>at</strong> <strong>at</strong> Annexure VIII. The Integrity Pact enclosed as<br />
Annexure VIII will be signed by RITES for and on behalf of Employer as its<br />
Agent/Power of Attorney Holder <strong>at</strong> the time of execution of Agreement with the<br />
successful Bidder. While submitting the Bid, the Integrity Pact shall be signed<br />
by the duly authorized sign<strong>at</strong>ory of the Bidder/Lead Member of JV. In case of<br />
failure to submit the Integrity Pact duly signed and witnessed, along with the<br />
Bid, the Bid is likely to be rejected.<br />
In case of any contradiction between the Terms and Conditions of the Bid<br />
Document and the Integrity Pact, the former will prevail.<br />
Provided always th<strong>at</strong> provision of this para 11.7 – Integrity Pact, shall be<br />
applicable only when so provided in para 11.7A below which will also stipul<strong>at</strong>e<br />
the name and address of the Independent External Monitor as well as the<br />
Name, design<strong>at</strong>ion and address of the official nomin<strong>at</strong>ed by the Employer to<br />
act as the Liaison Officer between the Independent External Monitor and the<br />
Engineer-in-Charge as well as the Contractor.<br />
11.7A Whether para 11.7 (Integrity Pact) shall be applicable No.<br />
If Yes, Name and Address of the Independent External<br />
Monitor (In case value of contract is Rs.10 crores or more)<br />
Name, Design<strong>at</strong>ion and Address of RITES’ Liaison<br />
Officer<br />
11.8 Modific<strong>at</strong>ion and Withdrawal of Bids<br />
11.8.1 Tenderers may modify or withdraw their bids by giving notice in writing before the<br />
deadline prescribed in para 11.5 for submission of Bids.<br />
11.8.2 Each modific<strong>at</strong>ion or withdrawal notice shall be prepared, sealed, marked and<br />
delivered in accordance with paras 11.1, 11.2 and 11.4 with the outer envelopes<br />
additionally marked ‘Modific<strong>at</strong>ion’ or ‘Withdrawal’ as appropri<strong>at</strong>e.<br />
The envelopes for modific<strong>at</strong>ions on ‘Technical Bid’ and ‘Financial Bid’ shall be<br />
submitted in separ<strong>at</strong>e sealed envelopes and marked as ‘Modific<strong>at</strong>ions of Technical<br />
Bid’ or ‘Modific<strong>at</strong>ions of Financial Bid’ as the case may be.<br />
11.8.3 No bid may be modified after the deadline for submission of Bids except as indic<strong>at</strong>ed<br />
below. If a Bidder makes a suo moto offer of reb<strong>at</strong>e / discount in his Financial Bid<br />
after the deadline for submission of Bids, such offer will not be considered for
Financial evalu<strong>at</strong>ion of Tenders. But if the Tenderer is successful in the Bid based<br />
on his original offer without considering the suo moto offer, the reb<strong>at</strong>e / discount<br />
offered will be taken into account for incorpor<strong>at</strong>ion in the Contract Agreement.<br />
11.8.4 Withdrawal or modific<strong>at</strong>ion of a Bid, subject to provisions in Para 11.8.3 above, after<br />
the deadline for submission of Bids shall result in forfeiture of the Earnest Money.<br />
12.0 <strong>TENDER</strong> OPENING, EVALUATION AND CLARIFICATIONS OF<br />
APPLICATIONS<br />
12.1 The Employer will open all the Tenders received (except those received l<strong>at</strong>e or<br />
delayed)as described in para 12.2/12.3 below, in the presence of the Tenderers or<br />
their represent<strong>at</strong>ives who choose to <strong>at</strong>tend <strong>at</strong> 30.01.2012 Hrs. on 1430 hrs. in the<br />
office of SDGM/Elect, Electrical Engineering Division, 5 th Floor, Left Wing, RITES<br />
Limited, RITES Bhawan, Plot No.1, Sector-29, Gurgaon-122001 (Haryana). In the<br />
event of the specified d<strong>at</strong>e of the opening being declared a holiday by the Employer,<br />
the Tenders will be opened <strong>at</strong> the appointed time and loc<strong>at</strong>ion on the next working<br />
day.<br />
12.2 Two Packet System (Applicable in this tender)<br />
(a)<br />
(b)<br />
(i) The PACKET A will be opened and Envelope 1 containing Earnest Money and<br />
Cost of Tender Document (where Bid is submitted in the document downloaded<br />
from RITES website) of all the Tenderers will be opened first and checked. If the<br />
Earnest Money furnished is not for the stipul<strong>at</strong>ed amount or is not in an<br />
acceptable form and where applicable, the cost of Tender Document has not<br />
been enclosed for the correct amount and in an acceptable form, the Envelope 2<br />
of PACKET A (TECHNICAL BID) and PACKET B will be returned to the Tenderer<br />
concerned unopened <strong>at</strong> the time of opening of the Tender itself. The Envelopes 2<br />
of PACKET A (TECHNICAL BID) of other Tenderers who have furnished Earnest<br />
Money of correct amount in acceptable form and where applicable the cost of<br />
Tender Document for the correct amount and in an acceptable form will then be<br />
opened. The Tenderer’s name, the presence of Earnest Money and Authority to<br />
sign and such other details as the Employer may consider appropri<strong>at</strong>e will be<br />
announced by the Employer <strong>at</strong> the time of opening of Packet A. PACKET B<br />
(FINANCIAL BID) of the Tenderers whose Technical Bids have been accepted for<br />
evalu<strong>at</strong>ion will be checked to see if the seals are intact. All such PACKETS B will<br />
be put in an envelope and sealed. The Employer’s official opening the Tender<br />
will sign on this envelope and will also take the sign<strong>at</strong>ures of preferably <strong>at</strong> least<br />
two Tenderers or their represent<strong>at</strong>ives present. This envelope will be kept in safe<br />
custody by the Employer.<br />
The Employer will scrutinize the Technical Bids accepted for evalu<strong>at</strong>ion to determine<br />
whether each Tenderer<br />
(i)<br />
(ii)<br />
has submitted `Authority to sign’ as per para 11.2 above and Integrity Pact<br />
(where applicable) duly signed and witnessed as per para 11.7 above;<br />
meets the Qualific<strong>at</strong>ion Criteria stipul<strong>at</strong>ed in Para 2.0; and
(iii)<br />
Conforms to all terms, conditions and specific<strong>at</strong>ions of the Tender Document<br />
without any modific<strong>at</strong>ions or conditions.<br />
(c)<br />
If required, the Employer may ask any such Tenderer for clarific<strong>at</strong>ions on his<br />
Technical Bid. The request for clarific<strong>at</strong>ion and the response from the Tenderer will<br />
be in writing. If a Tenderer does not submit the clarific<strong>at</strong>ion/document requested, by<br />
the d<strong>at</strong>e and time set in the Employer’s request for clarific<strong>at</strong>ion, the bid of such<br />
Tenderer is likely to be rejected. Tenderers whose Technical Bids are not found<br />
acceptable will be advised of the same and their Earnest Money and PACKET B<br />
(FINANCIAL BID) will be returned unopened. Tenderers whose Technical Bids are<br />
found acceptable will be advised accordingly and will also be intim<strong>at</strong>ed in writing of<br />
the time and d<strong>at</strong>e and place where and when the PACKET B (Financial Bid) will be<br />
opened.<br />
(d)<br />
At the appointed place, time and d<strong>at</strong>e, in the presence of the Tenderers or their<br />
represent<strong>at</strong>ives who choose to be present, the Employer will open the envelopes<br />
containing the PACKET B (FINANCIAL BID). The Tenderer’s name, the tender<br />
amount quoted and such other details as the Employer may consider appropri<strong>at</strong>e will<br />
be announced by the Employer.<br />
12.3 Single Packet System (Not applicable in this tender)<br />
(a)<br />
Envelope 1 of all the Tenders will be opened first and checked. If the Earnest Money<br />
furnished is not for the stipul<strong>at</strong>ed amount or is not in an acceptable form and where<br />
applicable the Cost of Tender Document has not been furnished for the correct<br />
amount and in an acceptable form, the remaining envelopes will be returned to the<br />
tenderer concerned unopened <strong>at</strong> the time of opening of the Tender itself. The<br />
Envelopes no. 2 of Technical Bid and no. 3 of Financial Bid of other Tenderers who<br />
have furnished Earnest Money and where applicable the Cost of Tender Document,<br />
in acceptable form will then be opened. The Tenderer’s name, the presence of<br />
Earnest Money, the Authority to Sign the Tender, amount quoted and such other<br />
details as the Employer may consider appropri<strong>at</strong>e will be announced by the<br />
Employer.<br />
13.0 INSPECTION OF SITE BY THE <strong>TENDER</strong>ERS<br />
Tenderers are advised to inspect and examine the site and its surroundings and<br />
s<strong>at</strong>isfy themselves before submitting their Tenders, as to the n<strong>at</strong>ure of the ground<br />
and sub-soil (as far as is practicable), the form and n<strong>at</strong>ure of the site, the means of<br />
access to the site, the accommod<strong>at</strong>ion they may require and in general shall<br />
themselves obtain all necessary inform<strong>at</strong>ion as to risks, contingencies and other<br />
circumstances which may influence or affect their Tender. A Tenderer shall be<br />
deemed to have full knowledge of the site whether he inspects it or not and no extra<br />
charges consequent on any misunderstanding or otherwise shall be allowed. The<br />
Tenderer shall be responsible for arranging and maintaining <strong>at</strong> his own cost all<br />
m<strong>at</strong>erials, tools & plants, w<strong>at</strong>er, electricity, access, facilities for workers and all other<br />
services required for executing the work unless otherwise specifically provided for in<br />
the contract documents. Submission of a tender by a Tenderer implies th<strong>at</strong> he has<br />
read this notice and all other contract documents and has made himself aware of the
scope and specific<strong>at</strong>ions of the work to be done and of conditions and r<strong>at</strong>es <strong>at</strong> which<br />
stores, tools and plant etc. will be issued to him by the Employer and local conditions<br />
and other factors having a bearing on the execution of the work.<br />
14.0 EMPLOYER’S RIGHT ON ACCEPTANCE OF ANY <strong>TENDER</strong><br />
(i) If required, the Employer may ask any Tenderer the breakdown of unit r<strong>at</strong>es. If<br />
the Tenderer does not submit the clarific<strong>at</strong>ion by the d<strong>at</strong>e and time set in the<br />
Employers request for clarific<strong>at</strong>ion, such Tender is likely to be rejected.<br />
(ii) The competent authority on behalf of the Employer does not bind himself to<br />
accept the lowest or any other Tender and reserves to himself the authority to<br />
reject any or all the Tenders received without the assignment of any reason. All<br />
Tenders in which any of the prescribed conditions is not fulfilled or any condition<br />
is put forth by the Tenderer shall be summarily rejected.<br />
15.0 CANVASSING PROHIBITED<br />
Canvassing whether directly or indirectly, in connection with tenders is strictly<br />
prohibited and the tenders submitted by the Contractors who resort to canvassing will<br />
be liable to rejection.<br />
16.0 EMPLOYER’s RIGHT TO ACCEPT WHOLE OR PART OF THE <strong>TENDER</strong><br />
The competent authority on behalf of the Employer reserves to himself the right of<br />
accepting the whole or any part of the tender and the Tenderer shall be bound to<br />
perform the same <strong>at</strong> the r<strong>at</strong>es quoted.<br />
17.0 MISCELLANEOUS RULES AND DIRECTIONS<br />
17.1 The Tenderer shall not be permitted to tender for works if his near rel<strong>at</strong>ive is posted<br />
as Associ<strong>at</strong>ed Finance Officer between the grades of AGM(F) and J.M (F) in the<br />
concerned<br />
SBU Unit of RITES or as an officer in any capacity between the grades of GGM/GM<br />
and Engineer (both inclusive) of the concerned SBU of the Employer. He shall also<br />
intim<strong>at</strong>e the names of persons who are working with him in any capacity or are<br />
subsequently employed by him and who are near rel<strong>at</strong>ives to any Gazetted officer in<br />
the organiz<strong>at</strong>ion of the Employer. Any breach of this condition by the Tenderer would<br />
render his Tender to be rejected.<br />
No Engineer of Gazetted rank or other Gazetted Officer employed in Engineering or<br />
Administr<strong>at</strong>ive duties in an Engineering Department of the Organis<strong>at</strong>ion of the<br />
Employer is allowed to work as a contractor for a period of one year after his<br />
retirement from the Employer’s service without the previous permission of the<br />
Employer in writing. The contract is liable to be cancelled if either the Contractor or<br />
any of his employees is found any time to be such a person who had not obtained the<br />
permission of the Employer as aforesaid before submission of the tender or<br />
engagement in the Contractor’s service.
17.2 If required by the Employer, the Tenderers shall sign a declar<strong>at</strong>ion under the officials<br />
Secret Act 1923, for maintaining secrecy of the tender documents drawings or other<br />
records connected with the work given to them. The unsuccessful Tenderers shall<br />
return all the drawings given to them.<br />
17.3 Use of correcting fluid anywhere in tender document is not permitted. Such tender is<br />
liable for rejection.<br />
17.4 a) In the case of Item R<strong>at</strong>e Tenders, only r<strong>at</strong>es quoted shall be considered. Any<br />
tender containing percentage below/above the r<strong>at</strong>es quoted is liable to be rejected.<br />
R<strong>at</strong>es quoted by the Tenderer in item r<strong>at</strong>e tender in figures and words shall be<br />
accur<strong>at</strong>ely filled in so th<strong>at</strong> there is no discrepancy in the r<strong>at</strong>es written in figures and<br />
words. However, if a discrepancy is found, the r<strong>at</strong>es which correspond with the<br />
amount worked out by the Tenderer shall unless otherwise proved be taken as<br />
correct. If the amount of an item is not worked out by the Tenderer or it does not<br />
correspond with the r<strong>at</strong>es written either in figures or in words then the r<strong>at</strong>es quoted by<br />
the Tenderer in words shall be taken as correct. Where the r<strong>at</strong>es quoted by the<br />
Tenderer in figures and in words tally but the amount is not worked out correctly, the<br />
r<strong>at</strong>es quoted by the Tenderer will, unless otherwise provided, be taken as correct and<br />
not the amount. In the event th<strong>at</strong> no r<strong>at</strong>e has been quoted for any item(s), leaving<br />
space both in figure (s) or word(s) and the amount blank, it will be presumed th<strong>at</strong> the<br />
Tenderer has included the cost of this/ these item (s) in other items and r<strong>at</strong>e for such<br />
item (s) will be considered as zero and work will be required to be executed<br />
accordingly.<br />
b) In case of percentage R<strong>at</strong>e Tender only percentage quoted shall be considered. Any<br />
tender containing item r<strong>at</strong>es is liable to be rejected. Percentage quoted by the<br />
Tenderer in percentage r<strong>at</strong>e tender shall be accur<strong>at</strong>ely filled in figures and words so<br />
th<strong>at</strong> there is no discrepancy. If, for any Schedule in Financial Bid, the total amount<br />
has been indic<strong>at</strong>ed by the Tenderer and if discrepancy is noticed in the percentages<br />
quoted in words and figures, then the percentage which corresponds with the total<br />
amount, shall, unless otherwise proved be taken as correct. If the total amount is not<br />
worked out or if worked out, it does not correspond with the percentages written<br />
either in figures or in words, then the percentage quoted by Tenderer in words shall<br />
be taken as correct. When the percentages quoted by the Tenderer in figures and in<br />
words tally but the total amount is not worked out correctly, the percentage quoted by<br />
the Tenderes shall be taken as correct, unless proved otherwise and the total amount<br />
worked out accordingly.<br />
17.5 In the case of any Item r<strong>at</strong>e tender where unit r<strong>at</strong>e of any item/items appears<br />
unrealistic, such tender will be considered as unbalanced and in case the Tenderer is<br />
unable to provide s<strong>at</strong>isfactory explan<strong>at</strong>ion, such a tender is liable to be disqualified<br />
and rejected.<br />
17.6 (a) In Item r<strong>at</strong>e Tender, all r<strong>at</strong>es shall be quoted on the tender form. The amount for<br />
each item should be worked out and requisite totals given. Special care should be<br />
taken to write the r<strong>at</strong>es in figures as well as in words and the amount in figures only,<br />
in such a way th<strong>at</strong> interpol<strong>at</strong>ion is not possible. The total amount in each Schedule<br />
should be written both in figures and in words. In case of figures, the word ‘Rs.’<br />
should be written before the figure of rupees and word ‘P’ after the decimal figures,
e.g. Rs.2.15 P and in case of words, the word, ‘Rupees’ should precede and the word<br />
‘Paise’ should be written <strong>at</strong> the end. Unless the r<strong>at</strong>e is in whole rupees and followed<br />
by the word ‘only’ it should invariably be up to two decimal places. While quoting the<br />
r<strong>at</strong>e in schedule of quantities, the word ‘only’ should be written closely following the<br />
amount and it should not be written in the next line.<br />
(b) In Percentage R<strong>at</strong>e Tender, the Tenderer shall quote percentage below / above<br />
(in figures as well as in words) <strong>at</strong> which he will be willing to execute the work. He<br />
shall also work out the total amount of his offer and the same should be written in<br />
figures as well as in words in such a way th<strong>at</strong> no interpol<strong>at</strong>ion is possible. In case of<br />
figures, the word “Rs” should be written before the figure rupees and word ‘P’ after<br />
the decimal figures (eg.) Rs.2.15 P and in case of words the word “Rupees” should<br />
precede and the word “Paisa” should be written <strong>at</strong> the end.<br />
17.7 Sales-tax/VAT (except Service Tax), purchase tax, turnover tax or any other tax/<br />
Cess on m<strong>at</strong>erial, labour and Works in respect of this Contract shall be payable by<br />
the Contractor and the Employer will not entertain any claim wh<strong>at</strong>soever in respect of<br />
the same. However, in respect of Service Tax, same shall be paid by the Contractor<br />
to the concerned department on demand and it will be reimbursed to him by the<br />
Engineer-in-Charge after s<strong>at</strong>isfying th<strong>at</strong> it has been actually and genuinely paid by<br />
the Contractor.<br />
17.8 Each Bidder shall submit only one Bid either as an individual or as a Proprietor in a<br />
Proprietary firm or as a Partner in a Partnership firm or as a Director of a limited<br />
Company/Corpor<strong>at</strong>ion or as a Partner in a Joint Venture. Any Bidder, who has<br />
submitted a Bid for a work, shall not be a witness for any other Bidder for the same<br />
work. Failure to observe the above stipul<strong>at</strong>ions would render all such Tenders<br />
submitted as a Bidder and / or as a witness, liable to summary rejection.<br />
17.9 The Contractor shall be fully responsible for all m<strong>at</strong>ters arising out of the Performance<br />
of the Contract and shall, <strong>at</strong> his own expense, comply with all laws/ acts/ enactments/<br />
orders/ regul<strong>at</strong>ions/ oblig<strong>at</strong>ions wh<strong>at</strong>soever of the Government of India, St<strong>at</strong>e<br />
Government, Local Body and any St<strong>at</strong>utory Authority.<br />
18.0 SIGNING OF CONTRACT AGREEMENT<br />
18.1 The Tenderer whose tender has been accepted will be notified of the award by the<br />
Employer by issue of a `Letter of Acceptance’ ‘ prior to expir<strong>at</strong>ion of the Bid Validity<br />
period, in the form <strong>at</strong> Annexure VI.<br />
The Letter of Acceptance will be sent to the Contractor in two copies one of which he<br />
should return promptly, duly signed and stamped. The Letter of Acceptance will be a<br />
binding Contract between the Employer and the Contractor till the formal Contract<br />
Agreement is executed.<br />
18.2 Within the period as specified in Clause 1 of `Clause of Contract’, of the d<strong>at</strong>e of issue<br />
of Letter of Acceptance, the successful Tenderer shall deliver to the Employer,<br />
Performance Guarantee and Additional Performance Guarantee (where applicable)<br />
in the form<strong>at</strong> prescribed.
18.3 The Tenderer whose Tender is accepted shall be required to submit <strong>at</strong> his cost stamp<br />
papers of appropri<strong>at</strong>e value as per the provisions of Indian Stamp Act within 15 days<br />
of the d<strong>at</strong>e of issue of Letter of Acceptance.<br />
18.4 At the same time the Employer notifies the successful Tenderer th<strong>at</strong> his Tender has<br />
been accepted, the Employer will direct him to <strong>at</strong>tend the Employer’s office within 28<br />
days of issue of Letter of Acceptance for signing the Agreement in the proforma <strong>at</strong><br />
Annexure VII. The Agreement will however be signed only after the Contractor<br />
furnishes Performance Guarantee and Additional Performance Guarantee (where<br />
applicable) and hence, where justified, the period of 28 days stipul<strong>at</strong>ed above will be<br />
extended suitably.<br />
1. Annual Financial Turnover<br />
QUALIFYING CRITERIA FOR WORKS CONTRACTS<br />
ANNEXURE – I
Notes:<br />
The bidder should have achieved a minimum annual financial turnover of Rs. 310.74<br />
Lacs in any one of the last 5 Financial Years.<br />
- The financial turnover will be taken as given under the head “Income” in audited Profit<br />
and Loss Account and excluding non-recurring income, income from other sources<br />
and stock. It is clarified th<strong>at</strong> the Financial Turnover means relevant revenue as<br />
recorded in the Income side of Profit and Loss Account. It does not mean Profit.<br />
- Closing stocks in wh<strong>at</strong>soever manner should not form part of turnover.<br />
- Weightage of 5% (compounded annually) shall be given for equ<strong>at</strong>ing the financial<br />
turnover of the previous years to the current year.<br />
- For considering the Financial Years, for example for a work for which the Tender is<br />
being opened in Financial Year 2011-12, the last five Financial Years shall be 2010-<br />
11, 2009-10, 2008-09, 2007-08 and 2006-07. For a Tender opened on (say) 06.06.11<br />
(F.Y. 2011-12), with weightage of 5% compounded annually, the weightages to be<br />
applied on the Turnover of the previous five Financial Years will be : F.Y. 2010-11 =<br />
1.050; F.Y. 2009-10 = 1.103; F.Y. 2008-09 = 1.158; F.Y. 2007-08 = 1.216; F.Y. 2006-<br />
07 = 1.276.<br />
- The Bidder should furnish Annual Financial Turnover for each of the last 5 Financial<br />
Years in tabular form and give reference of the document (with page no.) relied upon<br />
in support of meeting the Qualific<strong>at</strong>ion Criterion.<br />
- The Bidder should submit self <strong>at</strong>tested copy of Auditor’s Report along with Balance<br />
Sheet and Profit and Loss St<strong>at</strong>ement along with Schedules for the relevant Financial<br />
Year in which the minimum criterion is met. Provisional audit reports or certified<br />
st<strong>at</strong>ements will not be accepted.<br />
- If the Audited Balance Sheet for the immedi<strong>at</strong>ely preceding year is not available in<br />
case of tender opened before 30th Sept., audited Balance Sheets, Profit and Loss<br />
St<strong>at</strong>ements and other financial st<strong>at</strong>ements of the five Financial Years immedi<strong>at</strong>ely<br />
preceding the previous Financial Year may be adopted for evalu<strong>at</strong>ing the credentials<br />
of the Bidder.<br />
- In case JV is permitted the following provisions will apply:<br />
Large Works (Not applicable in this tender)<br />
For each Partner, the highest Annual Turnover in any of the last five Financial Years<br />
will be considered and the weighted figure for the current Financial Year will be<br />
worked out as described in Para 1 (Note 3). This should not be less than the figure<br />
arrived <strong>at</strong> by multiplying the minimum Annual Turnover stipul<strong>at</strong>ed for the Bidder in<br />
Qualific<strong>at</strong>ion Criterion multiplied by the percentage of Financial particip<strong>at</strong>ion by th<strong>at</strong><br />
partner in the JV. Each partner should s<strong>at</strong>isfy this requirement and thus<br />
autom<strong>at</strong>ically JV will s<strong>at</strong>isfy the criterion of minimum Annual Turnover.<br />
Normal Works (Not Applicable in this Tender)
The Partner-in-charge/Lead Member shall singly meet this criterion.<br />
2. WORK EXPERIENCE<br />
a) Similar Works Experience<br />
(i)<br />
(ii)<br />
For works in normal areas (other than difficult areas)<br />
The Bidder should have s<strong>at</strong>isfactorily completed in his own name <strong>at</strong><br />
least one similar work of minimum value of Rs. 248.59 Lacs OR <strong>at</strong><br />
least two similar works each of minimum value of Rs.155.37 lacs OR <strong>at</strong><br />
least three similar works each of minimum value of Rs. 124.29 Lacs<br />
during the last 5 (five) years prior to the last stipul<strong>at</strong>ed d<strong>at</strong>e for<br />
submission of the Bid. Works completed prior to the cut off d<strong>at</strong>e shall<br />
not be considered.<br />
Or<br />
For works in difficult areas (North East St<strong>at</strong>es, J&K, Jharkhand,<br />
Ch<strong>at</strong>tisgarh and Andaman & Nicobar Islands) (Not Applicable)<br />
Similar Works<br />
The Bidder should have s<strong>at</strong>isfactorily completed in his own name or<br />
proportion<strong>at</strong>e share as a member of a Joint Venture, <strong>at</strong> least one similar<br />
work of minimum value of Rs. ____ OR <strong>at</strong> least two similar works each<br />
of minimum value of Rs. ____ during the last 5 (five) years prior to the<br />
last stipul<strong>at</strong>ed d<strong>at</strong>e for submission of the Bid. Works completed prior to<br />
the cut off d<strong>at</strong>e shall not be considered.<br />
(Any VRF Air Conditioning works shall be considered as similar work.)<br />
Notes:<br />
- A weightage of 5% (compounded annually from the d<strong>at</strong>e of completion of the work to<br />
the submission of the Bid) shall be given for equ<strong>at</strong>ing the value of works of the<br />
previous years to the current year.<br />
- Only such works shall be considered where physical completion of entire work is over<br />
or commissioning of work has been done, whichever is earlier.<br />
- The Bidder should submit the details of such similar completed works as per the<br />
form<strong>at</strong> <strong>at</strong> Proforma-1 enclosed.<br />
- Works carried out by another Contractor on behalf of the Bidder on a back to back<br />
basis will not be considered for s<strong>at</strong>isfaction of the Qualific<strong>at</strong>ion Criterion by the<br />
Bidder.<br />
- Credential certific<strong>at</strong>es issued by Govt. Organiz<strong>at</strong>ions/ Semi Govt. Organiz<strong>at</strong>ions/<br />
Public Sector Undertakings/ Autonomous bodies of Central/St<strong>at</strong>e Governments /
Municipal bodies/ Public Ltd. Cos. listed in Stock Exchange in India or abroad shall<br />
only be accepted for assessing the eligibility of a Tenderer.<br />
- The cut off d<strong>at</strong>e shall be calcul<strong>at</strong>ed backwards from the last stipul<strong>at</strong>ed d<strong>at</strong>e for<br />
submission/ opening of Tender i.e. for a Tender which is being opened on<br />
06.08.2011, the cut off d<strong>at</strong>e shall be 07.08.06.<br />
- In case JV is permitted the following provisions will apply:<br />
Large Works (Not applicable in this tender)<br />
All the partners shall jointly meet this criterion.<br />
Normal Works (Not applicable in this tender)<br />
The Partner-in-charge/Lead Member shall singly meet this criterion.<br />
b) Construction Experience in key activities/specified components (Not<br />
Applicable)<br />
To qualify for award of the contract, each Bidder in his own name or as a member of<br />
a Joint Venture should have, in the last five Years prior to the last stipul<strong>at</strong>ed d<strong>at</strong>e for<br />
submission of the Bid, executed the following key activities in any one work* / more<br />
than one work*<br />
(* Strike out whichever is not applicable).<br />
…………………………………………………………………………………………………<br />
……………………………………………………………………………………………<br />
(Ideally only very few and th<strong>at</strong> too, specialized components of the work may be<br />
specified <strong>at</strong> the discretion of NIT approving authority).<br />
Notes:<br />
- The work s<strong>at</strong>isfying the criterion for a particular key activity may be different<br />
from a work s<strong>at</strong>isfying the criterion for another key activity.<br />
- The Bidder should furnish with his Bid a tabular st<strong>at</strong>ement giving contract-wise<br />
quantities of key activities / specialized components executed in the last 5<br />
years which meet the Qualific<strong>at</strong>ion Criterion along with documentary proof in<br />
support thereof (indic<strong>at</strong>ing page nos.).<br />
- Even if a work has not been completed but if the specified quantity of the key<br />
activity has been completed, the same shall be taken into consider<strong>at</strong>ion for the<br />
purpose of this criterion.<br />
- Any work executed by the Bidder as a member of a Joint Venture will be<br />
accepted provided there is documentary proof in support of the same either in<br />
the MOU/ Agreement of the JV or in a declar<strong>at</strong>ion by the other Members of<br />
th<strong>at</strong> JV or the Client confirming th<strong>at</strong> the specialized work was actually<br />
executed by the Bidder.<br />
- In case JV is permitted the following provisions will apply:
Large Works (Not Applicable)<br />
All the partners shall jointly meet this criterion.<br />
Normal Works (Not Applicable)<br />
Same as for large works.<br />
3. SOLVENCY CERTIFICATE<br />
A Solvency Certific<strong>at</strong>e of minimum solvency of Rs. 124.29 Lacs (suggested form<strong>at</strong> <strong>at</strong><br />
Proforma 2) from a Scheduled Bank issued not earlier than 6 months from the last<br />
d<strong>at</strong>e for submission of tender is required to be submitted by the bidder.<br />
Notes:<br />
- The certific<strong>at</strong>e so produced by the Bidder may be got verified from the<br />
issuing Bank.<br />
- In case JV is permitted the following provisions will apply:<br />
Large Works (Not Applicable)<br />
For each Partner, the figure in the Solvency Certific<strong>at</strong>e issued as above in favour of<br />
th<strong>at</strong> Partner, should be not less than the minimum Solvency figure stipul<strong>at</strong>ed for the<br />
Bidder in the Qualific<strong>at</strong>ion Criterion multiplied by percentage of Financial<br />
particip<strong>at</strong>ion by th<strong>at</strong> Partner in the JV.<br />
Normal Works (Not Applicable)<br />
The Partner-in-charge/Lead Member shall singly meet this criterion.<br />
4. PROFITABILITY<br />
The applicant firm shall be a profit (net) making firm and shall have made profit in<br />
each of the last two Financial Years and in <strong>at</strong>least one out of the three Financial<br />
Years immedi<strong>at</strong>ely preceding the last two Financial Years.<br />
The Bidder should furnish figures of net profit of last 5 years in a tabular form and<br />
submit <strong>at</strong>tested copies of Auditor’s Reports along with audited Balance Sheets and<br />
Profit and Loss St<strong>at</strong>ements for the last Five Financial Years. In case the firm is profit<br />
making for the last three Financial Years continuously, the Bidder may submit the<br />
above documents for last three Financial Years only. Specific reference with page no.<br />
of document which proves s<strong>at</strong>isfaction of this Qualifying Criterion should be indic<strong>at</strong>ed<br />
in the tabular st<strong>at</strong>ement.<br />
Notes:<br />
- In case JV is permitted, the following provisions will apply:
Large Works (Not Applicable)<br />
All the partners shall meet individually this criterion.<br />
Normal Works (Not Applicable)<br />
The Partner-in-charge/Lead Member shall singly meet this criterion.<br />
5. POINTS TO NOTE ON SATISFACTION OF QUALIFYING CRITERIA IN CASE OF<br />
BOTH LARGE AND NORMAL WORKS<br />
a) Sub-Contractor’s Experiences and Resources<br />
Sub-Contractors’ Experiences and Resources will not be taken into account in<br />
determining the Bidder’s compliance with the qualifying criteria.<br />
b) Experiences and Resources of the Parent Company and other<br />
subsidiary companies<br />
If the Bidder is a wholly owned subsidiary of a company, the experience and<br />
resources of the owner/parent company or its other subsidiaries will not be<br />
taken into account. However, if the Bidder is a Company, the Experience and<br />
Resources of its subsidiaries will be taken into consider<strong>at</strong>ion.<br />
6. DECLARATION BY THE BIDDER<br />
Even though the Bidders may meet the above qualifying criteria, they are subject to<br />
be disqualified if they have<br />
a) Made misleading or false represent<strong>at</strong>ion in the forms, st<strong>at</strong>ements and<br />
<strong>at</strong>tachments in proof of the qualific<strong>at</strong>ion requirements. In such a case, besides<br />
Tenderer’s liability to action under para 9.4 of Instructions to Tenderers, the<br />
Tenderer is liable to face the penalty of banning of business dealings with him<br />
by RITES.<br />
b) Records of poor performance such as abandoning the work, not properly<br />
completing the contract, inordin<strong>at</strong>e delays in completion, litig<strong>at</strong>ion history or<br />
financial failures etc.<br />
c) Their business banned or suspended by any Central/St<strong>at</strong>e Government<br />
Department/ Public Undertaking or Enterprise of Central/St<strong>at</strong>e Government<br />
and such ban is in force.<br />
d) Not submitted all the supporting documents or not furnished the relevant<br />
details as per the prescribed form<strong>at</strong>.<br />
A declar<strong>at</strong>ion to the above effect in the form of affidavit on stamp paper of Rs. 10/-<br />
duly <strong>at</strong>tested by Notary/Magistr<strong>at</strong>e should be submitted as per form<strong>at</strong> given in<br />
Proforma 3 enclosed.
Proforma-1<br />
LIST OF SIMILAR WORKS SATISFYING QUALIFICATION CRITERION COMPLETED<br />
DURING THE LAST 5 YEARS<br />
S. No. Client's<br />
Name<br />
and<br />
Address<br />
Name of the<br />
Work &<br />
Loc<strong>at</strong>ion<br />
Scope of<br />
work<br />
carried<br />
out by<br />
the<br />
Bidder<br />
Agreement /<br />
Letter of<br />
Award No.<br />
and d<strong>at</strong>e<br />
Contract Value D<strong>at</strong>e of start D<strong>at</strong>e of Completion Reason<br />
s for<br />
delay in<br />
complet<br />
ion<br />
if any<br />
Awarded Actual on<br />
completion<br />
As per LOA/<br />
Agreement<br />
Actual<br />
Ref. of<br />
document<br />
(with page no.)<br />
in support of<br />
meeting<br />
Qualific<strong>at</strong>ion<br />
Criterion<br />
SEAL AND SIGNATURE OF THE BIDDER<br />
Note :<br />
1. In support of having completed above works, <strong>at</strong>tach self <strong>at</strong>tested copies of the<br />
completion certific<strong>at</strong>e from the owner/client or Executing Agency / Consultant<br />
appointed by owner / Client indic<strong>at</strong>ing the name of work, the description of work done<br />
by the Bidder, d<strong>at</strong>e of start, d<strong>at</strong>e of completion (contractual & actual) and contract<br />
value as awarded and as executed by the Bidder . “Contract Value” shall mean gross<br />
value of the completed work including cost of m<strong>at</strong>erials supplied by the owner/client<br />
but excluding those supplied free of cost.<br />
2. Such Credential certific<strong>at</strong>es issued by Govt. Organiz<strong>at</strong>ions/ Semi Govt. Organiz<strong>at</strong>ions<br />
/ Public Sector Undertakings / Autonomous bodies of Central or St<strong>at</strong>e Government /<br />
Municipal Bodies / Public Ltd. Co. listed on BSE/NSE shall only be accepted for<br />
assessing the eligibility of a Tenderer.
In case of a Certific<strong>at</strong>e from a Public Limited Co., the Bidder should also submit<br />
documentary proof th<strong>at</strong> the Public Ltd. Co. was listed on BSE or NSE when the work<br />
was executed for it.<br />
3. Inform<strong>at</strong>ion must be furnished for works carried out by the Bidder in his own name or<br />
proportion<strong>at</strong>e share as member of a Joint Venture. In the l<strong>at</strong>ter case details of<br />
contract value including extent of financial particip<strong>at</strong>ion by partners in th<strong>at</strong> work<br />
should be furnished.<br />
4. If a Bidder has got a work executed through a Subcontractor on a back to back basis,<br />
the Bidder cannot include such a work for his s<strong>at</strong>isfying the Qualific<strong>at</strong>ion Criterion<br />
even if the Client has issued a Completion Certific<strong>at</strong>e in favour of th<strong>at</strong> Bidder.<br />
5. Use a separ<strong>at</strong>e sheet for each partner in case of a Joint Venture.<br />
6. Only similar works completed during the last 5 years prior to the last stipul<strong>at</strong>ed d<strong>at</strong>e<br />
for submission of Bid, which meet the Qualific<strong>at</strong>ion Criterion need be included in this<br />
list.
Proforma 2<br />
SOLVENCY CERTIFICATE FROM A NATIONALISED<br />
OR A SCHEDULED BANK<br />
This is to certify th<strong>at</strong> to the best of our knowledge and inform<strong>at</strong>ion, M/s<br />
____________________, having their registered office <strong>at</strong> _____________, a customer of<br />
our Bank, is a reputed company with a good financial standing and can be tre<strong>at</strong>ed as<br />
solvent to the extent of Rs. ___________. This certific<strong>at</strong>e is issued without any guarantee<br />
or risk and responsibility on the Bank or any of its officers.<br />
Sign<strong>at</strong>ure with d<strong>at</strong>e<br />
Senior Bank Manager (Name of Officer issuing the<br />
Certific<strong>at</strong>e)<br />
Name, address & Seal of the Bank/ Branch<br />
Note:<br />
Banker’s Certific<strong>at</strong>e should be on letter head of the Bank.
Proforma 3<br />
DECLARATION BY THE BIDDER<br />
(Affidavit on Non-Judicial Stamp Paper of Rs.10/- duly <strong>at</strong>tested by Notary / Magistr<strong>at</strong>e)<br />
This is to certify th<strong>at</strong> We, M/s. __________________________, in submission of this offer<br />
confirm th<strong>at</strong>:-<br />
i) We have not made any misleading or false represent<strong>at</strong>ion in the forms, st<strong>at</strong>ements<br />
and <strong>at</strong>tachments in proof of the qualific<strong>at</strong>ion requirements;<br />
ii)<br />
iii)<br />
iv)<br />
We do not have records of poor performance such as abandoning the work, not<br />
properly completing the contract, inordin<strong>at</strong>e delays in completion, litig<strong>at</strong>ion history or<br />
financial failures etc.<br />
No Central / St<strong>at</strong>e Government Department/ Public Sector Undertaking or Enterprise<br />
of Central / St<strong>at</strong>e Government has banned/suspended business dealings with us as<br />
on d<strong>at</strong>e.<br />
We have submitted all the supporting documents and furnished the relevant details<br />
as per prescribed form<strong>at</strong>.<br />
v) List of Similar Works s<strong>at</strong>isfying Qualific<strong>at</strong>ion Criterion indic<strong>at</strong>ed in Proforma 1 does<br />
not include any work which has been carried out by us through a Subcontractor on a<br />
back to back basis.<br />
vi)<br />
vii)<br />
The inform<strong>at</strong>ion and documents submitted with the Tender and those to be submitted<br />
subsequently by way of clarific<strong>at</strong>ions / making good deficient documents are correct<br />
and we are fully responsible for the correctness of the inform<strong>at</strong>ion and documents<br />
submitted by us.<br />
We understand th<strong>at</strong> in case any st<strong>at</strong>ement/inform<strong>at</strong>ion/document furnished by us or<br />
to be furnished by us in connection with this offer, is found to be incorrect or false, our<br />
EMD in full will be forfeited and business dealings will be banned.<br />
SEAL, SIGNATURE & NAME OF THE BIDDER<br />
Signing this document
ANNEXURE I A<br />
CHECK LIST OF <strong>DOCUMENTS</strong> TO BE SUBMITTED<br />
1. a) BY BIDDERS OTHER THAN JOINT VENTURES<br />
i) Annual Financial Turnover<br />
- Annual financial turnover for each of the last 5 Financial Years in<br />
tabular<br />
form.<br />
- Self <strong>at</strong>tested copies of Auditor’s Report along with the Balance Sheet<br />
and Profit and Loss St<strong>at</strong>ement for the relevant Financial Year in which<br />
the minimum criterion is met (Refer Notes under Para 1 of Annexure I).<br />
ii)<br />
Work Experience<br />
- Similar Work Experience : Proforma 1 of Annexure I with details of 1,<br />
2 or 3 works as the case may be, which s<strong>at</strong>isfy requisite qualific<strong>at</strong>ion<br />
criterion with self <strong>at</strong>tested copies of supporting document (Refer Para<br />
2a of Annexure I).<br />
- Construction Experience in Key Activities/Specialized Components:<br />
Tabular St<strong>at</strong>ement giving contract-wise quantities executed in last 5<br />
years along with documentary proof in support of having met the<br />
criterion (Refer Para 2b of Annexure I).<br />
iii)<br />
Solvency Certific<strong>at</strong>e.<br />
Suggested form<strong>at</strong> <strong>at</strong> Proforma 2 of Annexure I (Refer Para 3 of Annexure I)<br />
iv)<br />
Profitability<br />
- Net profit of last 5 Financial Years in tabular form.<br />
- Self <strong>at</strong>tested copies of Auditor’s Report along with the Balance Sheets<br />
and Profit and Loss St<strong>at</strong>ements for last 5 or 3 Financial Years, as the<br />
case may be (Refer Para 4 of Annexure I).<br />
v) Declar<strong>at</strong>ion by Bidder<br />
Proforma 3 (Refer Para 6 of Annexure I)<br />
vi)<br />
Integrity Pact (Not applicable in this Tender) : duly signed and witnessed in<br />
the form<strong>at</strong> <strong>at</strong> Annexure VIII (Refer para 11.7 of NIT & Instructions to<br />
Tenderers)
) BY JOINT VENTURE PARTNERS FOR “LARGE WORKS” (Not Applicable.)<br />
(1) By Partner-in-Charge/Lead Member<br />
i) JV MOU/Agreement (Refer Para 2.4 of NIT & Instructions to<br />
Tenderers)<br />
ii) Power of Attorney (Refer Para 2.4 of NIT & Instructions to Tenderers)<br />
iii) Annual Turnover : As in a(i) above<br />
iv) Work Experience<br />
- Similar Work Experience : As in (a) (ii) above<br />
- Construction Experience in Key activities/ specialised<br />
components: As in (a) (ii) above.<br />
v) Solvency Certific<strong>at</strong>e: As in (a) (iii) above.<br />
vi) Profitability: As in (a) (iv) above.<br />
vii) Declar<strong>at</strong>ion by Bidder: As in (a) (v) above.<br />
viii) Integrity Pact: duly signed and witnessed, as in (a) (vi) above.<br />
(2) By Partners other than Partner-in-Charge/Lead Member<br />
i) Annual Turnover: As in (a) (i) above)<br />
ii) Work Experience<br />
- Similar Work Experience : As in (a) (ii) above<br />
- Construction Experience in Key activities/specialized<br />
components: As in (a) (ii) above.<br />
iii) Solvency Certific<strong>at</strong>e: As in (a) (iii) above .<br />
iv) Profitability: As in (a) (iv) above.<br />
vi) Declar<strong>at</strong>ion by Bidder: As in (a) (v) above.<br />
c) BY JOINT VENTURE PARTNERS FOR “NORMAL WORKS” (Not<br />
applicable for this Tender)<br />
(1) By Partner-in-Charge/Lead Member<br />
i) JV MOU/Agreement (Refer Para 2.4 of NIT & Instructions to Tenderers)<br />
ii) Power of Attorney (Refer Para 2.4 of NIT & Instructions to Tenderers)<br />
iii) Annual Turnover: As in a(i) above – to meet 100 % of requirement as<br />
per criterion<br />
iv) Work Experience<br />
• Similar Work Experience : As in (a) (ii) above – to meet 100% of<br />
requirement as per criterion<br />
• Construction Experience in Key activities/specialised components:<br />
As in (a) (ii) above.<br />
v) Solvency Certific<strong>at</strong>e : As per (a) (iii) above – To the extent of 100%<br />
financial particip<strong>at</strong>ion<br />
vi) Profitability : As in (a) (iv) above.<br />
vii) Declar<strong>at</strong>ion by Bidder: As in (a) (v) above.<br />
vii) Integrity Pact : : duly signed and witnessed, as in (a) (vi) above.
(2) By Partners other than Partner-in-Charge/Lead Member<br />
i) Work Experience : Construction experience in Key Activities/<br />
Specialised Components : As in (a) (ii) above.<br />
ii) Declar<strong>at</strong>ion by Bidder : As in (a) (v) above.
ANNEXURE II A<br />
QUALIFICATION INFORMATION/CHECKLIST OF <strong>DOCUMENTS</strong><br />
--LETTER OF TRANSMITTAL BY OTHER THAN JOINT VENTURES<br />
(on letter head of the Applicant)<br />
From<br />
_____________<br />
Sir,<br />
To<br />
RITES Ltd._________<br />
(Authority Inviting Tender)<br />
Sub: Submission of Qualific<strong>at</strong>ion inform<strong>at</strong>ion /documents as per Checklist.<br />
1. I/We hereby submit the following documents in support of my/our s<strong>at</strong>isfying the<br />
Qualific<strong>at</strong>ion Criteria laid down for the work:-<br />
a) Self <strong>at</strong>tested copy of a certific<strong>at</strong>e, confirming th<strong>at</strong> the applicant is a working<br />
contractor or has executed any work within the last five years reckoned from the<br />
d<strong>at</strong>e of opening of Tender, issued by Railways, CPWD, MES, DOT, RITES, St<strong>at</strong>e<br />
PWD or any other Central/St<strong>at</strong>e Government Undertaking, Municipal Body,<br />
Autonomous Body of Central or St<strong>at</strong>e Government or Public Limited Company<br />
listed on NSE/BSE.<br />
b) Annual Financial Turnover<br />
(i) Annual financial turnover for each of the last 5 Financial Years in a tabular<br />
form.<br />
(ii) Self <strong>at</strong>tested copy of Auditor’s Report along with the Balance Sheet and Profit<br />
and Loss St<strong>at</strong>ement and Schedules for the relevant Financial Year in which<br />
the minimum criterion is met, with calcul<strong>at</strong>ions in support of the same.<br />
c) Work Experience<br />
i) Similar Work Experience :- In Proforma 1 with details of 1 / 2 / 3 works<br />
as applicable and self <strong>at</strong>tested copies of supporting documents as<br />
mentioned therein.<br />
ii)<br />
Construction experience in key activities / specialised components:<br />
Tabular St<strong>at</strong>ement giving contract wise quantities executed in last 5<br />
years with documentary proof.<br />
d) Solvency Certific<strong>at</strong>e - Proforma 2.<br />
e) Profitability - Net profit of last 5 Financial years in tabular form with self<br />
<strong>at</strong>tested copies of Profit and Loss St<strong>at</strong>ements for the last 5 or 3 Financial<br />
Years as applicable.<br />
2. In addition the following supporting documents are also enclosed.<br />
a) Self <strong>at</strong>tested copy of Partnership Deed/Memorandum and Articles of<br />
Associ<strong>at</strong>ion of the Firm.<br />
b) Self <strong>at</strong>tested copies of PAN/TAN issued by the Income Tax Department.
c) Declar<strong>at</strong>ion – Proforma 3<br />
d) Self <strong>at</strong>tested copy of Sales Tax, Works Contract Tax, Service Tax Registr<strong>at</strong>ion<br />
Certific<strong>at</strong>e (as applicable).<br />
e) Self <strong>at</strong>tested copy of Registr<strong>at</strong>ion under Labour Laws, like PF, ESI etc.<br />
f) Self <strong>at</strong>tested copy of ISO 9000 Certific<strong>at</strong>e ( if any)<br />
g) Integrity Pact (Not applicable) : duly signed and witnessed.<br />
3. I authorize you to approach any Bank, Individual, Employer, Firm or Corpor<strong>at</strong>ion,<br />
whether mentioned in the enclosed documents or not, to verify our competence and<br />
general reput<strong>at</strong>ion.<br />
4. I also enclose written Power of Attorney of the sign<strong>at</strong>ory of the Tender on behalf of<br />
the Tenderer.<br />
Yours faithfully,<br />
Encl: As in Paras 1, 2 & 4<br />
Sign<strong>at</strong>ure of Applicant with<br />
Name _________________<br />
D<strong>at</strong>e with seal
ANNEXURE II B (L)<br />
(Not Applicable)<br />
QUALIFICATION INFORMATION /CHECKLIST OF <strong>DOCUMENTS</strong><br />
– LETTER OF TRANSMITTAL BY JOINT VENTURE<br />
(FOR LARGE WORKS COSTING OVER Rs.30 CRORES)<br />
(To be signed by the Lead Member on his Letter Head)<br />
From<br />
______________<br />
Sir,<br />
To<br />
RITES Ltd.___________<br />
(AUTHORITY INVITING <strong>TENDER</strong>)<br />
Subject:<br />
Submission of Qualific<strong>at</strong>ion Inform<strong>at</strong>ion/ documents as per Checklist.<br />
1. As the Lead Member of the Joint Venture, I/We hereby submit the following<br />
documents in support of our JV:<br />
a) Self certified copy of the Joint Venture Agreement/Memorandum of<br />
Understanding.<br />
b) Power of Attorney in my/our favour as the Lead Member executed by the<br />
authorized represent<strong>at</strong>ives of all the members.<br />
c) Self <strong>at</strong>tested copy of Sales Tax, Works Contract Tax, Service Registr<strong>at</strong>ion<br />
Certific<strong>at</strong>e (as applicable).<br />
d) Self <strong>at</strong>tested copy of Registr<strong>at</strong>ion under Labour Laws, like PF, ESI etc.<br />
e) Self <strong>at</strong>tested copy of ISO 9000 Certific<strong>at</strong>e (if any)<br />
f) Integrity Pact (where applicable) – Duly signed and witnessed.<br />
2) I/We also enclose the following documents pertaining to each of the Partners<br />
including Lead Partner duly signed by the Authorized represent<strong>at</strong>ive of each<br />
Partner/Member of J.V.<br />
i) Qualific<strong>at</strong>ion Criteria<br />
a) Self <strong>at</strong>tested copy of a certific<strong>at</strong>e, confirming th<strong>at</strong> the applicant is a working<br />
contractor or has executed any work within the last five years reckoned from the<br />
d<strong>at</strong>e of opening of Tender, issued by Railways, CPWD, MES, DOT, RITES, St<strong>at</strong>e<br />
PWD or any other Central/St<strong>at</strong>e Government Undertaking, Municipal Body,<br />
Autonomous Body of Central or St<strong>at</strong>e Government or Public Limited Company<br />
listed on NSE/BSE.<br />
b) Annual Turnover<br />
- Annual financial turnover for each of the last 5 Financial Years in tabular form.
- Self <strong>at</strong>tested copy of Auditor’s Report along with the Balance Sheet and Profit<br />
and Loss St<strong>at</strong>ement and Schedules for the relevant Financial Year in which<br />
the minimum criterion is met, with calcul<strong>at</strong>ions in support of the same.<br />
c) Work Experience<br />
- Similar Works Experience :- In Proforma 1 with details of 1 / 2 / 3 works as<br />
applicable and self <strong>at</strong>tested copies of supporting documents as mentioned<br />
therein.<br />
- Construction experience in key activities / specialised components:-<br />
Tabular St<strong>at</strong>ement giving contract wise quantities executed in last 5 years<br />
with documentary proof.<br />
d) Solvency Certific<strong>at</strong>e - Proforma 2.<br />
e) Profitability - Net profit of last 5 Financial Years in tabular form with self <strong>at</strong>tested<br />
copies of Profit and Loss St<strong>at</strong>ements for the last 5 or 3 Financial Years as<br />
applicable.<br />
(ii)<br />
Other Supporting Documents<br />
a) Self <strong>at</strong>tested copy of Partnership Deed/Memorandum and Articles of<br />
Associ<strong>at</strong>ion of the Firm.<br />
b) Self <strong>at</strong>tested copy of PAN/TAN issued by Income Tax Department.<br />
c) Declar<strong>at</strong>ion – Proforma 3<br />
3) I/We authorize you to approach any Bank, Individual, Employer, Firm or Corpor<strong>at</strong>ion,<br />
whether mentioned in the enclosed documents or not, to verify the competence and<br />
general reput<strong>at</strong>ion of each Member of our JV.<br />
4) I also enclose written Power of Attorney of the sign<strong>at</strong>ory of the Tender on behalf of<br />
the Tenderer.<br />
Encl: As in Paras 1, 2 & 4<br />
Yours faithfully,<br />
Sign<strong>at</strong>ure of Applicant<br />
with Name<br />
D<strong>at</strong>e and Seal
ANNEXURE II B (N)<br />
(Not Applicable)<br />
QUALIFICATION INFORMATION /CHECKLIST OF <strong>DOCUMENTS</strong><br />
- LETTER OF TRANSMITTAL BY JOINT VENTURE<br />
(FOR NORMAL WORKS COSTING BETWEEN Rs.1 CRORE and Rs.30 CRORES)<br />
(To be signed by the Lead Member in his Letter Head)<br />
From<br />
___________________________<br />
Sir,<br />
To<br />
RITES Ltd.________________<br />
(AUTHORITY INVITING <strong>TENDER</strong>)<br />
Subject:<br />
Submission of Qualific<strong>at</strong>ion Inform<strong>at</strong>ion/ documents as per Checklist.<br />
As the Lead Member of the Joint Venture, I/We hereby submit the following documents in<br />
support of our JV:<br />
Details pertaining to JV<br />
a) Self certified copy of the Joint Venture Agreement / Memorandum of Understanding.<br />
b) Power of Attorney in my/our favour as the Lead Member executed by the authorized<br />
represent<strong>at</strong>ives of all the members.<br />
c) Self <strong>at</strong>tested copy of a certific<strong>at</strong>e, confirming th<strong>at</strong> each Member of JV is a working<br />
contractor or has executed any work within the last five years reckoned from the d<strong>at</strong>e<br />
of opening of Tender, issued by Railways, CPWD, MES, DOT, RITES, St<strong>at</strong>e PWD or<br />
any other Central/St<strong>at</strong>e Government Undertaking, Municipal Body, Autonomous Body<br />
of Central or St<strong>at</strong>e Government or Public Limited Company listed on NSE/BSE.<br />
d) Self <strong>at</strong>tested copy of Sales Tax, Works Contract Tax, Service Registr<strong>at</strong>ion Certific<strong>at</strong>e<br />
(as applicable).<br />
e) Self <strong>at</strong>tested copy of Registr<strong>at</strong>ion under Labour Laws, like PF, ESI etc.<br />
f) Self <strong>at</strong>tested copy of ISO 9000 Certific<strong>at</strong>e ( if any)<br />
g) Integrity Pact (where applicable) duly signed and witnessed.<br />
Details pertaining to Lead Member<br />
(i)<br />
Qualific<strong>at</strong>ion Criteria<br />
a) Annual Turnover<br />
form.<br />
- Annual financial turnover for each of the last 5 Financial Years in a tabular
- Self <strong>at</strong>tested copy of Auditor’s Report along with the Balance Sheet and Profit<br />
and Loss St<strong>at</strong>ement and Schedules for the relevant Financial Year in which<br />
the minimum criterion is met, with calcul<strong>at</strong>ions in support of the same.<br />
b) Work Experience<br />
- Similar Works Experience: - In Proforma 1 with details of 1 / 2 / 3 works as<br />
applicable and self <strong>at</strong>tested copies of supporting documents as mentioned<br />
therein.<br />
- Construction experience in key activities/ specialised components:-<br />
Tabular St<strong>at</strong>ement giving contract wise quantities executed in last 5 years<br />
with documentary proof.<br />
c) Solvency Certific<strong>at</strong>e - Proforma 2.<br />
d) Profitability -Net profit of last 5 Financial years in a tabular form with self <strong>at</strong>tested<br />
copies of Profit and Loss St<strong>at</strong>ements for the last 5 or 3 Financial Years as applicable.<br />
ii)<br />
Other supporting documents<br />
a) Declar<strong>at</strong>ion – Proforma 3<br />
b) Self <strong>at</strong>tested copy of PAN/TAN issued by the Income Tax Department.<br />
2) I/We also enclose the following documents pertaining to each of the other Partners of<br />
J.V. duly signed by the Authorized represent<strong>at</strong>ive of each Partner/Member of J.V.<br />
i) Qualific<strong>at</strong>ion Criteria<br />
- Work experience<br />
- Construction experience in key activities/ specialised components:-<br />
As per para i (b) above as for Lead Member.<br />
ii)<br />
Other Supporting Documents<br />
Self <strong>at</strong>tested copy of Partnership Deed/ Memorandum and Articles of Associ<strong>at</strong>ion of<br />
the firm.<br />
3) I/We authorize you to approach any Bank, Individual, Employer, Firm or Corpor<strong>at</strong>ion<br />
whether mentioned in the enclosed documents or not, to verify the competence and<br />
general reput<strong>at</strong>ion of each Member of our JV.<br />
4) I also enclose written Power of Attorney of the sign<strong>at</strong>ory of the Tender on behalf of<br />
the Tenderer.<br />
Yours faithfully,
Encl: As in Paras 1, 2 & 4<br />
Sign<strong>at</strong>ure of Applicant with<br />
Name<br />
D<strong>at</strong>e and Seal
DRAFT MEMORANDUM OF UNDERSTANDING<br />
EXECUTED BY MEMBERS OF THE CONSORTIUM / JOINT VENTURE<br />
(On each firm’s Letter Head)<br />
From<br />
_______________<br />
_______________<br />
To<br />
RITES Ltd<br />
_______________<br />
Dear Sir,<br />
ANNEXURE III<br />
(Not Applicable)<br />
Re: RITES Tender Notice No.________________ d<strong>at</strong>ed _______ for_____ (Name of<br />
Work)<br />
We wish to conform th<strong>at</strong> our company / firm (delete as appropri<strong>at</strong>e) has formed a<br />
Consortium with _____ (insert names of all other members of the group) for purposes<br />
associ<strong>at</strong>ed with your Tender No.__________<br />
(Members who are not the Lead Member of the Consortium should add the following<br />
paragraph) *<br />
* The Consortium is led by _________ (insert name of the Lead Member) whom we hereby<br />
authorize to act as leader on our behalf for the purposes of submission of Bid for ____<br />
(name of work) and to incur liabilities and receive instructions for and on behalf of any and<br />
all the partners of the Joint Venture/Members of the Consortium. For this purpose we have<br />
executed a Power of Attorney in favour of ______ (name of the Lead Member)<br />
(Member who is the Lead Member of the Consortium should add the following paragraph)**<br />
** In this Consortium we act as Lead Member and for the purposes of bidding for the<br />
work, represent the Consortium.<br />
Till the award of work, the Lead Partner shall furnish Bid bond and all other<br />
bonds/guarantees to the Employer on behalf of the Joint Venture, which shall be legally<br />
binding on all the partners of the Joint Venture.<br />
In the event of our Consortium being awarded the contract we agree to be jointly with<br />
________ (insert names of all other members of the Consortium) and severally liable to<br />
RITES, its successors and assigns for all oblig<strong>at</strong>ions, liabilities, duties and responsibilities<br />
arising from or imposed by the contract subsequently entered into between RITES and our<br />
Consortium.<br />
The precise responsibility of the Lead Member and other Members of the Consortium in<br />
respect of planning, design, construction equipment, key personnel, work execution and<br />
financing of the Work including Percentage of financial particip<strong>at</strong>ion by each Member will be
as indic<strong>at</strong>ed in the Annexure. These shall not be varied/ modified subsequently without<br />
your prior approval.<br />
We further agree th<strong>at</strong> entire execution of the contract shall be carried out exclusively<br />
through the Lead Member.<br />
In case our Bid is successful, the Joint Venture Agreement incorpor<strong>at</strong>ing the above<br />
provisions will be executed within 15 days of receipt of Letter of Acceptance from you and<br />
shall be registered <strong>at</strong> the place where the Agreement will be signed, so as to be legally valid<br />
and binding on all Members of the Consortium.<br />
We agree th<strong>at</strong> the Joint Venture Agreement shall be valid during the entire currency of the<br />
Contract including the period of extension if any, and the maintenance period after the work<br />
is completed.<br />
We further confirm th<strong>at</strong> we shall open a Bank Account in the name of JV and all payments<br />
due to the JV shall be made by you by crediting to th<strong>at</strong> Account. To facilit<strong>at</strong>e st<strong>at</strong>utory<br />
deductions such as towards Income Tax and VAT made from the amounts due to us against<br />
our bills, being credited to the concerned Government departments, we shall obtain<br />
PAN/TIN number etc. as required and advise you the details before claming our first onaccount<br />
bill.<br />
We affirm th<strong>at</strong> the Integrity Pact with the Employer in the form<strong>at</strong> <strong>at</strong> Annexure VIII (if<br />
applicable) shall be signed by the Lead Member duly witnessed, on behalf of the Joint<br />
Venture/Consortium. All Members including the Lead Member shall comply with the<br />
provision in the Integrity Pact and any viol<strong>at</strong>ion of the Integrity Pact by any Member shall be<br />
construed as viol<strong>at</strong>ion by the Joint Venture/Consortium.<br />
Encl: Annexure.<br />
Yours faithfully,<br />
Sign<strong>at</strong>ure ____________<br />
(Name of Sign<strong>at</strong>ory)___________<br />
(Capacity of sign<strong>at</strong>ory)_________<br />
Seal<br />
Witness 1 Witness 2<br />
Name<br />
Name<br />
Address<br />
Address<br />
Occup<strong>at</strong>ion<br />
Occup<strong>at</strong>ion<br />
Note :<br />
1. To be executed by each Member of the Consortium individually.
FORMAT FOR POWER OF ATTORNEY TO AUTHORISED SIGNATORY<br />
POWER OF ATTORNEY<br />
ANNEXURE IV<br />
(To be executed on non-judicial stamp paper of the appropri<strong>at</strong>e value in accordance with<br />
relevant Stamp Act. The stamp paper to be in the name of the firm/ company who is issuing<br />
the Power of Attorney).<br />
We, M/s.______ (name of the firm/company with address of the registered office) hereby<br />
constitute, appoint and authorise Mr./Ms.______ (Name and residential address) who is<br />
presently employed with us and holding the position of ______ and whose sign<strong>at</strong>ure is given<br />
below as our Attorney to do in our name and our behalf all or any of the acts, deeds or<br />
things necessary or incidental to our bid for the work _____ (name of work), including<br />
signing and submission of applic<strong>at</strong>ion / proposal, particip<strong>at</strong>ing in the meetings, responding<br />
to queries, submission of inform<strong>at</strong>ion / documents and generally to represent us in all the<br />
dealings with RITES or any other Government Agency or any person, in connection with the<br />
works until culmin<strong>at</strong>ion of the process of bidding, till the Contract Agreement is entered into<br />
with RITES and thereafter till the expiry of the Contract Agreement.<br />
We hereby agree to r<strong>at</strong>ify all acts, deeds and things lawfully done by our said Attorney<br />
pursuant to this Power of Attorney and th<strong>at</strong> all acts, deeds and things done by our aforesaid<br />
Attorney shall always be deemed to have been done by us.<br />
(Add in the case of a Consortium/Joint Venture)<br />
Our firm is a Member/Lead Member of the Consortium of ___________, _________ and<br />
___________.<br />
D<strong>at</strong>ed this the _____ day of ______ 20<br />
(Sign<strong>at</strong>ure and name of authorized sign<strong>at</strong>ory being given Power of Attorney)<br />
___________<br />
(Sign<strong>at</strong>ure and name in block letters of *All the partners of the firm, * Authorized Sign<strong>at</strong>ory<br />
for the Company)<br />
(* Strike out whichever is not applicable)<br />
Seal of firm/ Company<br />
Witness 1: Witness 2:<br />
Name:<br />
Name:<br />
Address:<br />
Address:<br />
Occup<strong>at</strong>ion:<br />
Occup<strong>at</strong>ion:
Notes:<br />
- In case the Firm / Company is a Member of a Consortium/ JV, the authorized<br />
sign<strong>at</strong>ory has to be the one employed by the Lead Member.<br />
- The mode of execution of the Power of Attorney should be in accordance with the<br />
procedure, if any, laid down by the applicable law and the charter documents of the<br />
executant(s) and when it is so required the same should be under common seal<br />
affixed in accordance with the required procedure.
ANNEXURE V<br />
(Not Applicable)<br />
FORMAT FOR POWER OF ATTORNEY TO LEAD MEMBER OF CONSORTIUM / JOINT<br />
VENTURE<br />
(To be executed on non-judicial stamp paper of the appropri<strong>at</strong>e value in accordance with<br />
relevant Stamp Act. The stamp paper to be in the name of the company who is issuing the<br />
Power of Attorney)<br />
Whereas ______ RITES Ltd. has invited bids for _______ (Name of work) for and on behalf<br />
of ________ as an Agent /Power of Attorney Holder.<br />
Whereas, the Members of the Consortium comprising of M/s.________, M/s.______,<br />
M/s.______ and M/s._______ (the respective names and addresses of the registered offices<br />
to be given) are interested in bidding for the work and implementing the same in accordance<br />
with the terms and conditions contained in the bid documents.<br />
Whereas, it is necessary for the members of the Consortium to design<strong>at</strong>e one of them as<br />
the Lead Member with all necessary power and authority to do, for and on behalf of the<br />
Consortium, all acts, deeds and things as may be necessary in connection with the<br />
Consortium’s bid for the work.<br />
NOW THIS POWER OF ATTORNEY WITNESSETH THAT<br />
We, M/s._________ , M/s ________ and M/s_________hereby design<strong>at</strong>e M/s. ______<br />
being one of the members of the Consortium, as the Lead Member of the Consortium, to do<br />
on behalf of the Consortium, all or any of the acts, deeds or things necessary or incidental to<br />
the Consortium’s bid for the work, including submission of applic<strong>at</strong>ion proposal, particip<strong>at</strong>ing<br />
in meetings, responding to queries, submission of inform<strong>at</strong>ion/documents and generally to<br />
represent the Consortium in all its dealings with RITES or any other Government Agency or<br />
any person, in connection with the work until culmin<strong>at</strong>ion of the process of bidding till the<br />
contract agreement is entered into with RITES and thereafter till the expiry of the contract<br />
agreement.<br />
We hereby agree to r<strong>at</strong>ify all acts, deeds and things lawfully done by our said Attorney<br />
pursuant to this Power of Attorney and th<strong>at</strong> all acts, deeds and things done by our aforesaid<br />
Attorney shall and shall always be deemed to have been done by us/Consortium.<br />
D<strong>at</strong>ed this the ________ day of _______ 20<br />
_______________<br />
(Sign<strong>at</strong>ure and Name in Block letters of *All the Partners of the firm / * Authorized Sign<strong>at</strong>ory<br />
for the Company)<br />
____________<br />
(* Strike out whichever is not applicable)<br />
Seal of firm / Company
Witness 1 Witness 2<br />
Name:<br />
Name:<br />
Address:<br />
Address:<br />
Occup<strong>at</strong>ion:<br />
Occup<strong>at</strong>ion:<br />
Notes:<br />
- To be executed by all the members individually, in case of a Consortium.<br />
- The mode of execution of the Power of Attorney should be in accordance with the<br />
procedure, if any laid down by the applicable law and the charter documents of the<br />
executant (s) and when it is so required the same should be under common seal<br />
affixed in accordance with the required procedure.
ANNEXURE VI<br />
(FORM OF LETTER OF ACCEPTANCE)<br />
(By REGD POST / ACK.DUE)<br />
(On the letter head of RITES)<br />
NO. : RITES/ D<strong>at</strong>ed :<br />
To<br />
_________________aggreg<strong>at</strong>e<br />
(Name & Address of the Contractor)<br />
Dear Sirs,<br />
Sub: <strong>TENDER</strong> No.<br />
FOR THE WORK OF<br />
Ref:<br />
Your Tender d<strong>at</strong>ed _________________ and letters d<strong>at</strong>ed _____________<br />
and this office letter Nos. ___________ d<strong>at</strong>ed___________ in reply to the same.<br />
This is to notify you th<strong>at</strong> your Tender for the work under reference has been accepted by the<br />
Competent Authority of RITES LIMITED for a total Contract Price of Rs. _______ (Rupees<br />
_____________only) in its capacity as an Agent /Power of Attorney Holder acting for and on<br />
behalf of ______ (the Employer).<br />
Pursuant to Clause 1 of the Contract, you are required to furnish irrevocable Performance<br />
Guarantee for an amount equivalent to 5% (Five percent) of the Contract Price and an<br />
Additional Performance Guarantee for an amount of Rs. ------------ (if applicable). The<br />
Guarantee Bonds aggreg<strong>at</strong>ing for an amount of Rs.______________ are required to be<br />
submitted within ___ days of issue of this Letter of Acceptance. Bank Guarantees issued by<br />
the following Banks will not be acceptable _____________________ (Names of Banks<br />
_________)<br />
The time of ________months allowed for execution of the work will be reckoned from the<br />
d<strong>at</strong>e of start as defined in Schedule F or from the first day of the handing over of the site,<br />
whichever is l<strong>at</strong>er, in accordance with phasing, if any, indic<strong>at</strong>ed in tender document.<br />
You are requested to contact _________ (complete design<strong>at</strong>ion and address of the Project<br />
Coordin<strong>at</strong>or) for carrying out the contract.<br />
You are also requested to <strong>at</strong>tend this office within Twenty Eight days from the d<strong>at</strong>e of issue<br />
of this letter for execution of the formal agreement. It may be noted th<strong>at</strong> no payment shall<br />
be made for any work carried out by you till the Agreement is executed and till such time the<br />
Performance Guarantee and Additional Performance Guarantee (where applicable)<br />
has/have been submitted by you.
This Letter of Acceptance is being sent to you in duplic<strong>at</strong>e and you are requested to return<br />
without delay one copy of the letter duly signed and stamped, as a token of your<br />
acknowledgement.<br />
Kindly note th<strong>at</strong> this Letter of Acceptance thereof shall constitute a binding Contract<br />
between us pending execution of formal Agreement.<br />
Your letters as well as this office letters referred to above shall form part of the Contract.<br />
Yours faithfully,<br />
RITES LIMITED<br />
Agent / Power of Attorney Holder<br />
For and on behalf of______ (The Employer)<br />
Copy to :<br />
1. ___________ (The Employer) for inform<strong>at</strong>ion.<br />
(To be included on the Original sent to the Contractor)<br />
2. Project Coordin<strong>at</strong>or (Complete design<strong>at</strong>ion and address)<br />
3. Associ<strong>at</strong>ed Finance (Not in original)
ANNEXURE VII<br />
FORM OF AGREEMENT<br />
(ON NON JUDICIAL STAMP PAPER OF APPROPRIATE VALUE)<br />
Agreement No. ________ d<strong>at</strong>ed _________<br />
THIS AGREEMENT is made on ________ day of ______ Two thousand ________ between<br />
RITES Ltd. a Government of India Enterprise and a Company registered under Companies<br />
Act, 1956 having its registered office <strong>at</strong> SCOPE Minar, Laxmi Nagar, Delhi - 110092 and its<br />
Corpor<strong>at</strong>e Office <strong>at</strong> RITES BHAWAN, Plot No.1, Sector 29, Gurgaon (Haryana) representing<br />
through ____________, RITES LIMITED acting for and on behalf of and as an Agent<br />
/Power of Attorney Holder of _____ hereinafter called the Employer (which expression<br />
shall, wherever the context so demands or requires, include their successors in office and<br />
assigns) on one part and M/s.______ hereinafter called the Contractor (which expression<br />
shall wherever the context so demands or requires, include his/ their successors and<br />
assigns) of the other part.<br />
WHEREAS the Employer is desirous th<strong>at</strong> certain works should be executed<br />
viz.___________ (brief description of the work) and has by Letter of Acceptance d<strong>at</strong>ed ____<br />
accepted a tender submitted by the Contractor for the execution, completion, remedying of<br />
any defects therein and maintenance of such works <strong>at</strong> a total Contract Price of Rs. ______<br />
(Rupees ______________ only)<br />
NOW THIS AGREEMENT WITNESSETH as follows:-<br />
1. In this Agreement words and expressions shall have the same meaning as are<br />
respectively assigned to them in the Conditions of Contract hereinafter referred to.<br />
2. The following documents in conjunction with addenda/ corrigenda to Tender<br />
Documents shall be deemed to form and be read and construed as part of this<br />
agreement viz.<br />
The Letter of Acceptance d<strong>at</strong>ed______.<br />
Priced Schedule (Bill) of Quantities<br />
Notice Inviting Tender and Instructions to Tenderers.<br />
RITES Tender and Contract Form<br />
Special Conditions<br />
Schedules A to F.<br />
Technical Specific<strong>at</strong>ions<br />
Drawings<br />
Amendments to Tender Documents (List enclosed)<br />
General Conditions of Contract (read with Correction Slip Nos. 1 to --) comprising of<br />
(i) Conditions of Contract<br />
(ii) Clauses of Contract<br />
(iii) RITES Safety Code<br />
(iv) RITES - Model Rules for the protection of Health and Sanitary<br />
arrangements for Workers<br />
(v) RITES – Contractor's Labour Regul<strong>at</strong>ions.
3. In consider<strong>at</strong>ion of the payment to be made by the Employer to the Contractor as<br />
hereinafter mentioned, the Contractor hereby covenants with the Employer to<br />
execute, complete, remedy defects therein and maintain the works in conformity in all<br />
respects with the provisions of the Contract.<br />
4. The Employer hereby covenants to pay to the Contractor in consider<strong>at</strong>ion of the<br />
execution, completion, remedying of any defects therein and maintenance of the<br />
works, the contract price or such other sum as may become payable under the<br />
provisions of the contract <strong>at</strong> the time and in the manner prescribed by the Contract.<br />
IN WITNESS whereof the parties hereto have caused their respective common seals to be<br />
hereinto affixed (or have herewith set their respective hands and seals) the day and year<br />
first above written.<br />
SIGNED, SEALED AND DELIVERED BY<br />
____________________________<br />
In the capacity of _____<br />
On behalf of M/s. _________<br />
(The Contractor)<br />
In the presence of<br />
Witnesses (Sign<strong>at</strong>ure, Name &<br />
Design<strong>at</strong>ion)<br />
1.<br />
______________________________<br />
representing RITES LIMITED<br />
In the capacity of Agent / Power of<br />
Attorney Holder<br />
For and on behalf of _________<br />
(The Employer)<br />
In the presence of<br />
Witnesses (Sign<strong>at</strong>ure, Name &<br />
Design<strong>at</strong>ion)<br />
1.<br />
2.<br />
2.
ANNEXURE VIII<br />
INTEGRITY PACT<br />
Between<br />
RITES LTD. acting for and on behalf of and as an Agent / Power of Attorney Holder of St<strong>at</strong>e<br />
Trading Corpor<strong>at</strong>ion of India Ltd. hereinafter called the “Employer” AND<br />
____________ hereinafter referred to as "The Bidder/Contractor"<br />
Preamble<br />
The Employer intends to award, under laid down organiz<strong>at</strong>ional procedures, contract/s for<br />
“Supply, Erection, Testing & Commissioning of Supply, Erection,Testing & Commissioning<br />
of VRF (Variable Refrigerant Flow) Air Conditioning System work for Bioinform<strong>at</strong>ics &<br />
Madanjeet Singh School of Green Buildings under 11 th Plan Building Projects for<br />
<strong>Pondicherry</strong> <strong>University</strong> <strong>at</strong> <strong>Puducherry</strong>.<br />
The Employer values full compliance with all relevant laws and regul<strong>at</strong>ions, and economic<br />
use of resources, and of fairness and transparency in his rel<strong>at</strong>ions with the Bidder/s and/or<br />
contractor/s.<br />
In order to achieve these goals, the Employer will appoint an Independent External Monitor<br />
(IEM) who will monitor the Tender process and execution of the contract for compliance with<br />
the principles mentioned above.<br />
Section 1 – Commitments of the Employer<br />
(1) The Employer commits himself to take all measures necessary to prevent corruption<br />
and to observe the following principles:-<br />
1. No employee of the Employer, personally or through family members, will in<br />
connection with the tender or for the execution of the contract, demand, take a<br />
promise for or accept, for self or third person, any m<strong>at</strong>erial or imm<strong>at</strong>erial<br />
benefit which the person is not legally entitled to.<br />
2. The Employer will, during the tender process, tre<strong>at</strong> all Bidders with equity and<br />
reason. The Employer will in particular, before and during the tender process,<br />
provide to all Bidders the same inform<strong>at</strong>ion and will not provide to any Bidder<br />
confidential/additional inform<strong>at</strong>ion through which the Bidder could obtain an<br />
advantage in rel<strong>at</strong>ion to the tender process or the contract execution.<br />
3. The Employer will exclude from the process all known prejudiced persons.<br />
(2) If the Employer obtains inform<strong>at</strong>ion on the conduct of any of his employees which is a<br />
criminal offence under the IPC (Indian Penal Code) /PC (Prevention of Corruption)
Act, or if there be a substantive suspicion in this regard, the Employer will inform its<br />
Chief Vigilance Officer and in addition can initi<strong>at</strong>e disciplinary action.<br />
Section 2 – Commitments of the Bidder/Contractor<br />
(1) The Bidder/Contractor commits himself to take all measures necessary to prevent<br />
corruption. He commits himself to observe the following principles during his<br />
particip<strong>at</strong>ion in the tender process and during the contract execution.<br />
1. The Bidder/Contractor will not directly or through any other person or firm,<br />
offer, promise or give to any of the Employer’s employees involved in the<br />
tender process or the execution of the contract or to any third person any<br />
m<strong>at</strong>erial or other benefit which he is not legally entitled to, in order to obtain in<br />
exchange any advantage of any kind wh<strong>at</strong>soever during the tender process or<br />
during the execution of the contract.<br />
2. The Bidder/Contractor will not enter with other Bidders into any undisclosed<br />
agreement or understanding, whether formal or informal. This applies in<br />
particular to prices, specific<strong>at</strong>ions, certific<strong>at</strong>ions, subsidiary contracts,<br />
submission or non-submission of bids or any other actions, to restrict<br />
competitiveness or to introduce carteliz<strong>at</strong>ion in the bidding process.<br />
3. The Bidder/Contractor will not commit any offence under the relevant IPC/PC<br />
Act; further the Bidder/ Contractor will not use improperly, for purposes of<br />
competition or personal gain, or pass on to others, any inform<strong>at</strong>ion or<br />
document provided by the Employer as part of the business rel<strong>at</strong>ionship,<br />
regarding plans, technical proposals and business details, including<br />
inform<strong>at</strong>ion contained or transmitted electronically.<br />
4. The Bidder/Contractor will, when presenting his bid, disclose any and all<br />
payments he has made, is committed to or intends to make to agents, brokers<br />
or any other intermediaries in connection with the award of the contract.<br />
(2) The Bidder/ Contractor will not instig<strong>at</strong>e third persons to commit offences outlined<br />
above or be an accessory to such offences.<br />
Section 3-Disqualific<strong>at</strong>ion from tender process and exclusion from future<br />
contracts<br />
If the Bidder/Contractor, before award or during execution has committed a<br />
transgression through a viol<strong>at</strong>ion of Section 2 above, or in any other form such as to<br />
put his reliability or credibility in question, the Employer is entitled to disqualify the<br />
Bidder/Contractor from the tender process or take action as per the procedure<br />
mentioned in the "Guideline on banning of business dealing" annexed and marked<br />
as Annexure "A".
Section 4- Compens<strong>at</strong>ion for Damages<br />
(1) If the Employer has disqualified in terms of the provisions in Section 3, the<br />
Bidder/Contractor from the tender process prior to the award of contract, the<br />
Employer is entitled to demand and recover the damages equivalent to Earnest<br />
Money Deposit/ Bid Security.<br />
(2) If the Employer has termin<strong>at</strong>ed the contract during execution in terms of the<br />
provisions under Section 3, the Employer shall be entitled to demand and recover<br />
from the Contractor the damages equivalent to Earnest Money Deposit, Security<br />
Deposits already recovered and Performance Guarantee, which shall be absolutely <strong>at</strong><br />
the disposal of the Employer.<br />
Section -5 Previous transgression<br />
(1) The Bidder/ Contractor declares th<strong>at</strong> no previous transgression occurred in the last 3<br />
years with any other Company in any country conforming to the Anti-Corruption<br />
approach or with any other Public Sector Enterprise in India th<strong>at</strong> could justify his<br />
exclusion from the tender process.<br />
(2) If the Bidder/Contractor makes incorrect st<strong>at</strong>ement on this subject, he can be<br />
disqualified from the tender process or action can be taken as per the procedure<br />
mentioned in "Guideline on banning of business dealing".<br />
Section -6 Equal tre<strong>at</strong>ment of all Bidders/Contractors/Sub-Contractors<br />
(1) The Bidder/Contractor undertakes to demand from all partners/sub-contractors (if<br />
permitted under the conditions/ clauses of the contract) a commitment to act in<br />
conformity with this Integrity Pact and to submit it to the Employer before signing the<br />
contract.<br />
(2) The Bidder/ Contractor confirms th<strong>at</strong> any viol<strong>at</strong>ion by any of his partners/subcontractors<br />
to act in conformity with the provisions of this Integrity Pact can be<br />
construed as a viol<strong>at</strong>ion by the Bidder/Contractor himself, leading to possible<br />
Termin<strong>at</strong>ion of Contract in terms of Section 4.<br />
(3) The Employer will disqualify from the tender process all bidders who do not sign this<br />
Pact or viol<strong>at</strong>e its provisions.<br />
Section 7- Criminal charges against viol<strong>at</strong>ing Bidders/Contractors/Sub-Contractors<br />
If the Employer obtains knowledge of conduct of a Bidder, Contractor or Partners/Sub-<br />
Contractor, or of an employee or a represent<strong>at</strong>ive or an associ<strong>at</strong>e of a Bidder, Contractor or<br />
Sub-Contractor, which constitutes corruption, or if the Employer has substantive suspicion in<br />
this regard, the Employer will inform the same to its Chief Vigilance Officer.
Section -8 Independent External Monitor/Monitors<br />
(1) The Employer shall appoint competent and credible Independent External Monitor for<br />
this Pact. The task of the Monitor is to review independently and objectively, whether<br />
and to wh<strong>at</strong> extent the parties comply with the oblig<strong>at</strong>ions under this agreement.<br />
(2) The Monitor is not subject to instructions by the represent<strong>at</strong>ives of the parties and will<br />
perform his functions neutrally and independently. He will report to the MD/RITES<br />
Ltd.<br />
(3) The Bidder/Contractor accepts th<strong>at</strong> the Monitor has the right of access without<br />
restriction to all Project document<strong>at</strong>ion of the Employer including th<strong>at</strong> provided by the<br />
Contractor. The Contractor will also grant the Monitor, upon his request and<br />
demonstr<strong>at</strong>ion of a valid interest, unrestricted and unconditional access to his project<br />
document<strong>at</strong>ion. The same is applicable to Partners/Sub-Contractors. The Monitor is<br />
under contractual oblig<strong>at</strong>ion to tre<strong>at</strong> the inform<strong>at</strong>ion and documents of the<br />
Bidder/Contractor/Partners/Sub-Contractor with confidentiality.<br />
(4) The Employer will provide to the Monitor sufficient inform<strong>at</strong>ion about all meetings<br />
among the parties rel<strong>at</strong>ed to the Project provided such meetings could have an<br />
impact on the contractual rel<strong>at</strong>ions between the Employer and the Contractor. The<br />
parties offer to the Monitor the option to particip<strong>at</strong>e in such meetings.<br />
(5) As soon as the Monitor notices or has reason to believe th<strong>at</strong> viol<strong>at</strong>ion of the<br />
agreement by the Employer or the Bidder/ Contractor, has taken place, he will<br />
request the Party concerned to discontinue or take corrective action , or to take any<br />
other relevant action. The Monitor can in this regard submit non-binding<br />
recommend<strong>at</strong>ions. Beyond this, the Monitor has no right to demand from the parties<br />
th<strong>at</strong> they act in a specific manner or refrain from action or toler<strong>at</strong>e action.<br />
(6) The Monitor will submit a written report to the MD/RITES Ltd. within 8-10 weeks from<br />
the d<strong>at</strong>e of reference or intim<strong>at</strong>ion to him by the Employer and should the occasion<br />
arise, submit proposal for correcting problem<strong>at</strong>ic situ<strong>at</strong>ions.<br />
(7) If the Monitor has reported to the MD/RITES Ltd. of a substanti<strong>at</strong>ed suspicion of an<br />
offence under relevant IPC/PC Act, and the MD/RITES Ltd. has not, within<br />
reasonable time, taken visible action to proceed against such offender or reported it<br />
to the Chief Vigilance Officer, the Monitor may also transmit this inform<strong>at</strong>ion directly<br />
to the Central Vigilance Commissioner.<br />
(8) The word Monitor would include both singular and plural.
Section – 9 Pact Dur<strong>at</strong>ion<br />
This pact begins when both parties have legally signed it. It expires for the Contractor when<br />
his Security Deposit is released on completion of the Maintenance Period and for all other<br />
Tenderers six months after the Contract has been awarded.<br />
If any claim is made/lodged during this time the same shall be binding and continue to be<br />
valid despite the lapse of this pact specified above, unless it is discharged/determined by<br />
MD/RITES Ltd.<br />
Section 10 Other Provisions<br />
(1) This agreement is subject to Indian Law. Place of performance and jurisdiction shall<br />
be as st<strong>at</strong>ed in the Contract Agreement.<br />
(2) Changes and supplements as well as termin<strong>at</strong>ion notices need to be made in writing.<br />
(3) If the Contractor is a partnership or a consortium, this agreement must be signed by<br />
the Partner in charge/ Lead Member nomin<strong>at</strong>ed as being incharge and who holds the<br />
Power of Attorney signed by legally authorised sign<strong>at</strong>ories of all the<br />
partners/Members. The Memorandum of Understanding /Joint Venture Agreement<br />
will incorpor<strong>at</strong>e a provision to the effect th<strong>at</strong> all Members of the Consortium will<br />
comply with the provisions in the Integrity Pact to be signed by the Lead Member on<br />
behalf of the Consortium. Any viol<strong>at</strong>ion of Section 2 above by any of the<br />
Partners/Members will be construed as a viol<strong>at</strong>ion by the consortium leading to<br />
possible Termin<strong>at</strong>ion of Contract in terms of Section 3<br />
(4) Should one or several provisions of this agreement turn out to be invalid, the<br />
remainder of this agreement remains valid. In this case, the parties will strive to<br />
come to an agreement to their original intentions.<br />
RITES Ltd.<br />
Agent / Power of Attorney Holder<br />
_________________________<br />
_________________________<br />
(For & on behalf of the Employer)<br />
(For the Bidder/Contractor)<br />
(Office Seal)<br />
(Office Seal)<br />
Place:…………………………<br />
D<strong>at</strong>e:……………………….<br />
Witness 1:<br />
(Name & Address) -----------------------------
Witness 2<br />
-----------------------------<br />
-----------------------------<br />
-----------------------------<br />
(Name & Address) -----------------------------<br />
-----------------------------<br />
-----------------------------<br />
-----------------------------
ANNEX-A<br />
Guidelines on Banning of Business Dealings<br />
1. Introduction<br />
1.1 RITES, being a Public Sector Enterprise and ‘St<strong>at</strong>e’, within the meaning of Article 12<br />
of Constitution of India, has to ensure preserv<strong>at</strong>ion of rights enshrined in Chapter III<br />
of the Constitution. RITES has also to safeguard its commercial interests. It is not in<br />
the interest of RITES to deal with Agencies who commit deception, fraud or other<br />
misconduct in the execution of contracts awarded / orders issued to them. In order to<br />
ensure compliance with the constitutional mand<strong>at</strong>e, it is incumbent on RITES to<br />
observe principles of n<strong>at</strong>ural justice before banning the business dealings with any<br />
Agency.<br />
1.2 Since banning of business dealings involves civil consequences for an Agency<br />
concerned, it is incumbent th<strong>at</strong> adequ<strong>at</strong>e opportunity of hearing is provided and the<br />
explan<strong>at</strong>ion, if tendered, is considered before passing any order in this regard keeping in<br />
view the facts and circumstances of the case.<br />
2. Scope<br />
2.1 The procedure of (i) Suspension and (ii) Banning of Business Dealing with Agencies,<br />
has been laid down in these guidelines.<br />
2.2 It is clarified th<strong>at</strong> these guidelines do not deal with the decision of the Management<br />
not to entertain any particular Agency due to its poor / inadequ<strong>at</strong>e performance or for<br />
any other reason.<br />
2.3 The banning shall be with prospective effect, i.e., future business dealings.<br />
3. Definitions<br />
In these Guidelines, unless the context otherwise requires:<br />
i) `Bidder / Contractor / Supplier' in the context of these guidelines is indic<strong>at</strong>ed<br />
as ‘Agency’.<br />
ii)<br />
‘Competent Authority’ and ‘Appell<strong>at</strong>e Authority’ shall mean the following:<br />
a) The Director shall be the ‘Competent Authority’ for the purpose of these<br />
guidelines. MD, RITES shall be the ‘Appell<strong>at</strong>e Authority’ in respect of<br />
such cases.<br />
b) MD, RITES shall have overall power to take suo-moto action on any<br />
inform<strong>at</strong>ion available or received by him and pass such order(s) as he<br />
may think appropri<strong>at</strong>e, including modifying the order(s) passed by any<br />
authority under these guidelines.
iii)<br />
‘Investig<strong>at</strong>ing Department’ shall mean any Department, Division or Unit<br />
investig<strong>at</strong>ing into the conduct of the Agency and shall include the Vigilance<br />
Department, Central Bureau of Investig<strong>at</strong>ion, the St<strong>at</strong>e Police or any other<br />
department set up by the Central or St<strong>at</strong>e Government having powers to<br />
investig<strong>at</strong>e.<br />
4. Initi<strong>at</strong>ion of Banning / Suspension:<br />
Action for banning / suspension business dealings with any Agency should be<br />
initi<strong>at</strong>ed by the department/ unit having business dealings with them after noticing the<br />
irregularities or misconduct on their part.<br />
5. Suspension of Business Dealings<br />
5.1 If the conduct of any Agency dealing with RITES is under investig<strong>at</strong>ion by any<br />
department, the Competent Authority may consider whether the alleg<strong>at</strong>ions under<br />
investig<strong>at</strong>ion are of a serious n<strong>at</strong>ure and whether pending investig<strong>at</strong>ion, it would be<br />
advisable to continue business dealing with the Agency. If the Competent Authority,<br />
after consider<strong>at</strong>ion of the m<strong>at</strong>ter including the recommend<strong>at</strong>ion of the Investig<strong>at</strong>ing<br />
Department/Unit, if any, decides th<strong>at</strong> it would not be in the interest to continue<br />
business dealings pending investig<strong>at</strong>ion, it may suspend business dealings with the<br />
Agency. The order to this effect may indic<strong>at</strong>e a brief of the charges under<br />
investig<strong>at</strong>ion. The order of such suspension would oper<strong>at</strong>e for a period not more than<br />
six months and may be communic<strong>at</strong>ed to the Agency as also to the Investig<strong>at</strong>ing<br />
Department.<br />
The Investig<strong>at</strong>ing Department/Unit may ensure th<strong>at</strong> their investig<strong>at</strong>ion is completed<br />
and whole process of final order is over within such period.<br />
5.2 As far as possible, the existing contract(s) with the Agency may be continued unless<br />
the Competent Authority, having regard to the circumstances of the case, decides<br />
otherwise.<br />
5.3 If the Agency concerned asks for detailed reasons of suspension, the Agency may be<br />
informed th<strong>at</strong> its conduct is under investig<strong>at</strong>ion. It is not necessary to enter into<br />
correspondence or argument with the Agency <strong>at</strong> this stage.<br />
5.4 It is not necessary to give any show-cause notice or personal hearing to the Agency<br />
before issuing the order of suspension. However, if investig<strong>at</strong>ions are not complete in<br />
six months time, the Competent Authority may extend the period of suspension by<br />
another three months, during which period the investig<strong>at</strong>ions must be completed.
6. Grounds on which Banning of Business Dealings can be initi<strong>at</strong>ed<br />
6.1 If the security consider<strong>at</strong>ion, including questions of loyalty of the Agency to the St<strong>at</strong>e,<br />
so warrants;<br />
6.2 If the Director / Owner of the Agency, proprietor or partner of the firm, is convicted by<br />
a Court of Law for offences involving moral turpitude in rel<strong>at</strong>ion to its business<br />
dealings with the Government or any other public sector enterprises or RITES, during<br />
the last five years;<br />
6.3 If there is strong justific<strong>at</strong>ion for believing th<strong>at</strong> the Directors, Proprietors, Partners,<br />
owner of the Agency have been guilty of malpractices such as bribery, corruption,<br />
fraud, substitution of tenders, interpol<strong>at</strong>ions, etc;<br />
6.4 If the Agency employs a public servant dismissed / removed or employs a person<br />
convicted for an offence involving corruption or abetment of such offence;<br />
6.5 If business dealings with the Agency have been banned by the Govt. or any other<br />
public sector enterprise;<br />
6.6 If the Agency has resorted to Corrupt, fraudulent practices including<br />
misrepresent<strong>at</strong>ion of facts;<br />
6.7 If the Agency uses intimid<strong>at</strong>ion / thre<strong>at</strong>ening or brings undue outside pressure on the<br />
Company (RITES) or its official in acceptance / performances of the job under the<br />
contract;<br />
6.8 If the Agency indulges in repe<strong>at</strong>ed and / or deliber<strong>at</strong>e use of delay tactics in<br />
complying with contractual stipul<strong>at</strong>ions;<br />
6.9 Based on the findings of the investig<strong>at</strong>ion report of CBI / Police against the Agency<br />
for malafide / unlawful acts or improper conduct on his part in m<strong>at</strong>ters rel<strong>at</strong>ing to the<br />
Company (RITES) or even otherwise;<br />
6.10 Established litigant n<strong>at</strong>ure of the Agency to derive undue benefit;<br />
6.11 Continued poor performance of the Agency in several contracts;<br />
(Note: The examples given above are only illustr<strong>at</strong>ive and not exhaustive. The<br />
Competent Authority may decide to ban business dealing for any good and sufficient<br />
reason).<br />
7. Banning of Business Dealings<br />
7.1 A decision to ban business dealings with any Agency shall apply throughout the<br />
Company.
7.2 If the Competent Authority is prima-facie of view th<strong>at</strong> action for banning business<br />
dealings with the Agency is called for, a show-cause notice may be issued to the<br />
Agency as per paragraph 8.1 and an enquiry held accordingly.<br />
8. Show-cause Notice<br />
8.1 In case where the Competent Authority decides th<strong>at</strong> action against an Agency is<br />
called for, a show-cause notice has to be issued to the Agency. St<strong>at</strong>ement containing<br />
the imput<strong>at</strong>ion of misconduct or mis-behaviour may be appended to the show-cause<br />
notice and the Agency should be asked to submit within 30 days a written st<strong>at</strong>ement<br />
in its defence. If no reply is received, the decision may be taken ex-parte.<br />
8.2 If the Agency requests for inspection of any relevant document in possession of<br />
RITES, necessary facility for inspection of documents may be provided.<br />
8.3 After considering the reply of the Agency and other circumstances and facts of the<br />
case, a final decision for Company-wide banning shall be taken by the Competent<br />
Authority. The Competent Authority may consider and pass an appropri<strong>at</strong>e speaking<br />
order:<br />
a) For exoner<strong>at</strong>ing the Agency if the charges are not established;<br />
b) For banning the business dealing with the Agency.<br />
8.4 The decision should be communic<strong>at</strong>ed to the Agency concerned along with a reasoned<br />
order. If it decided to ban business dealings, the period for which the ban would be<br />
oper<strong>at</strong>ive may be mentioned.<br />
9. Appeal against the Decision of the Competent Authority<br />
9.1 The Agency may file an appeal against the order of the Competent Authority banning<br />
business dealing, etc. The appeal shall lie to Appell<strong>at</strong>e Authority. Such an appeal<br />
shall be preferred within one month from the d<strong>at</strong>e of receipt of the order banning<br />
business dealing, etc.<br />
9.2 Appell<strong>at</strong>e Authority would consider the appeal and pass appropri<strong>at</strong>e order which shall<br />
be communic<strong>at</strong>ed to the Agency as well as the Competent Authority.<br />
10. Review of the Decision by the Competent Authority<br />
Any petition / applic<strong>at</strong>ion filed by the Agency concerning the review of the banning<br />
order passed originally by Competent Authority under the existing guidelines either<br />
before or after filing of appeal before the Appell<strong>at</strong>e Authority or after disposal of<br />
appeal by the Appell<strong>at</strong>e Authority, the review petition can be decided by the<br />
Competent Authority upon disclosure of new facts /circumstances or subsequent<br />
development necessit<strong>at</strong>ing such review.<br />
11. Circul<strong>at</strong>ion of the names of Agencies with whom Business Dealings have been<br />
banned.
11.1 Depending upon the gravity of misconduct established, the Competent Authority of<br />
RITES may circul<strong>at</strong>e the names of Agency with whom business dealings have been<br />
banned, to the Ministry of Railways and PSUs of Railways, for such action as they<br />
deem appropri<strong>at</strong>e.<br />
11.2 If Ministry of Railways or a Public Sector Undertaking of Railways request for more<br />
inform<strong>at</strong>ion about the Agency with whom business dealings have been banned a<br />
copy of the report of Inquiring Authority together with a copy of the order of the<br />
Competent Authority/ Appell<strong>at</strong>e Authority may be supplied.<br />
12. Restor<strong>at</strong>ion<br />
12.1 The validity of the banning order shall be for a specific time & on expiry of the same,<br />
the banning order shall be considered as "withdrawn".<br />
12.2 In case any agency applies for restor<strong>at</strong>ion of business prior to the expiry of the ban<br />
order, depending upon merits of each case, the Competent Authority which had<br />
passed the original banning orders may consider revoc<strong>at</strong>ion of order of suspension of<br />
business/lifting the ban on business dealings <strong>at</strong> an appropri<strong>at</strong>e time. Copies of the<br />
restor<strong>at</strong>ion orders shall be sent to all those offices where copies of Ban Orders had<br />
been sent.
Section - 2<br />
<strong>TENDER</strong> & CONTRACT FORM
SECTION 2<br />
<strong>TENDER</strong> AND CONTRACT FORM FOR WORKS<br />
To<br />
General Manager (Elect-I)<br />
RITES Ltd. Plot No.1<br />
Sector-29, Gurgaon-122001<br />
Sub: <strong>TENDER</strong> FOR THE WORK OF<br />
______________________________________________________<br />
______________<br />
(<strong>TENDER</strong> No. _____________________________ ISSUED BY<br />
________________)<br />
<strong>TENDER</strong><br />
1. I/We have read and examined the Notice Inviting Tender and Instructions to<br />
Tenderers, Special Conditions, Schedules A to F, Technical Specific<strong>at</strong>ions,<br />
Drawings, Schedule / Bill of Quantities and General Conditions of Contract as well as<br />
other documents and rules referred to in GCC and all the details contained in the<br />
Tender Document for the work.<br />
2. I/We hereby tender for the execution and completion of the work and remedy any<br />
defects therein, specified in the Schedule of Quantities within the time specified in<br />
Schedule “F”, and in accordance in all respects with the specific<strong>at</strong>ions, designs,<br />
drawings and instructions in writing referred to in Notice Inviting Tender and<br />
Instructions to Tenderers and in Clause 11 of the Clauses of Contract and with such<br />
m<strong>at</strong>erials as are provided for, by, and in respects in accordance with, such conditions<br />
so far as applicable.<br />
3. We agree th<strong>at</strong> our tender shall remain valid for a period of 90 days from the due d<strong>at</strong>e<br />
for submission of bid or extended d<strong>at</strong>e as stipul<strong>at</strong>ed and not to make any<br />
modific<strong>at</strong>ions in its terms and conditions.<br />
4. A sum of Rs. ___________ (Rupees _________ only) is hereby forwarded in the<br />
form of Banker’s cheque/Pay Order /Demand Draft issued in favour of RITES Ltd.,<br />
payable <strong>at</strong> _________ as the Earnest Money.<br />
5. If I/We withdraw my/our tender during the period of tender validity or before issue of<br />
Letter of Acceptance whichever is earlier or make modific<strong>at</strong>ions in the Terms and
Conditions of the Tender which are not acceptable to the Employer, then the<br />
Employer shall, without prejudice to any other right or remedy, be <strong>at</strong> liberty to forfeit<br />
entire Earnest Money absolutely.<br />
6. If I/We fail to furnish the prescribed Performance Guarantee and Additional<br />
Performance Guarantee (if applicable) within prescribed period, I/We agree th<strong>at</strong> the<br />
said Employer shall, without prejudice to any other right or remedy, be <strong>at</strong> liberty to<br />
forfeit the said Earnest Money absolutely.<br />
7. If, I/We fail to commence the work within the specified period, I/We agree th<strong>at</strong> the<br />
Employer shall, without prejudice to any other right or remedy available in law, be <strong>at</strong><br />
liberty to forfeit the Earnest Money and Performance Guarantee and Additional<br />
Performance Guarantee (if applicable) absolutely.<br />
8. Further, I/We hereby agree th<strong>at</strong> in case of forfeiture of Earnest Money or both<br />
Earnest Money & Performance Guarantee and Additional Performance Guarantee (if<br />
applicable) as aforesaid in paras 5 to 7, I/We shall be debarred from particip<strong>at</strong>ion in<br />
re-tendering process of the work.<br />
9. On issue of Letter of Acceptance by the Employer, I/We agree th<strong>at</strong> the said Earnest<br />
Money shall be retained by the Employer towards Security Deposit, to execute all the<br />
works referred to in the Tender document upon the Terms and Conditions contained<br />
or referred to therein and to carry out such devi<strong>at</strong>ions as may be ordered, upto<br />
maximum of the percentage mentioned in Schedule F <strong>at</strong> r<strong>at</strong>es as stipul<strong>at</strong>ed in<br />
relevant Clauses of contract and those in excess of th<strong>at</strong> limit <strong>at</strong> the r<strong>at</strong>es to be<br />
determined in accordance with the provisions contained in Clauses 12.2 and 12.3 of<br />
the tender form.<br />
10. I/We hereby agree th<strong>at</strong> I/ We shall sign the Formal Agreement with the Employer<br />
within 28 days from the d<strong>at</strong>e of issue of Letter of Acceptance. In case of any delay,<br />
I/We agree th<strong>at</strong> we shall not submit any Bill for Payment till the Contract Agreement<br />
is signed.<br />
11. I/We hereby declare th<strong>at</strong> I/We shall tre<strong>at</strong> the tender documents, drawings and other<br />
records connected with the work as secret/confidential documents and shall not<br />
communic<strong>at</strong>e inform<strong>at</strong>ion derived there from to any person other than a person to<br />
whom I/We am/are authorized to communic<strong>at</strong>e the same or use the inform<strong>at</strong>ion in<br />
any manner prejudicial to the safety of the Employer/St<strong>at</strong>e.<br />
12. I/We hereby declare th<strong>at</strong> I/We have not laid down any condition/devi<strong>at</strong>ion to any<br />
content of Technical Bid and/or Financial Bid. I/We agree th<strong>at</strong> in case any condition<br />
is found to be quoted by us in the Technical and/or Financial Bid, my/our Tender may<br />
be rejected.<br />
13. I/We understand th<strong>at</strong> the Employer is not bound to accept the lowest or any tender<br />
he may receive. I/We also understand th<strong>at</strong> the Employer reserves the right to accept<br />
the whole or any part of the tender and I/We shall be bound to perform the same <strong>at</strong><br />
the r<strong>at</strong>es quoted.
14. Until a formal agreement is prepared and executed, this bid together with our written<br />
acceptance thereof shall constitute a binding contract between us and RITES.<br />
15. I am/We are signing this Tender offer in my / our capacity as one/those authorized to<br />
sign on behalf of my/our company/as one holding the Power of Attorney issued in my<br />
favour as Lead Member by the Members of the Joint Venture.<br />
Sign<strong>at</strong>ure of Authorized Person/s<br />
D<strong>at</strong>e<br />
Name/s & Title of Sign<strong>at</strong>ory<br />
Name of Tenderer<br />
Postal Address<br />
Seal<br />
Witness<br />
Sign<strong>at</strong>ure<br />
Name<br />
Postal Address<br />
Occup<strong>at</strong>ion
Section - 3<br />
SPECIAL CONDITIONS
1. GENERAL:<br />
SPECIAL CONDITIONS FOR ELECTRICAL WORKS<br />
The following Special Conditions shall be read in conjunction with General Conditions<br />
of Contract. If there are any provisions in these Special Conditions, which are <strong>at</strong><br />
Variance with the provisions in the above-mentioned documents, the Provisions in<br />
this Special Conditions shall take precedence.<br />
The m<strong>at</strong>erials, design and workmanship shall s<strong>at</strong>isfy the specific<strong>at</strong>ions contained<br />
herein and codes referred to. Where the technical specific<strong>at</strong>ions stipul<strong>at</strong>e the<br />
requirement in addition to those contained in the Standard Codes and specific<strong>at</strong>ions<br />
those additional requirements shall also be s<strong>at</strong>isfied. In the absence of any Standard<br />
/ Specific<strong>at</strong>ions covering any part of the work covered in this tender document, the<br />
instructions/directions of engineer-in-charge will be binding on the contractor.<br />
All HVAC install<strong>at</strong>ions shall be of high quality, complete and dully oper<strong>at</strong>ional<br />
including all necessary items and accessories whether or not specified herein. All<br />
HVAC work shall be completed in accordance with the regul<strong>at</strong>ions and standard to<br />
the s<strong>at</strong>isfaction of the Engineer-in-charge.<br />
2. Tenderer, if wishes to associ<strong>at</strong>e sub-contractors for any of the discipline/section of<br />
the work shall st<strong>at</strong>e so in his technical bid. Such sub-contractors should <strong>at</strong> least be<br />
registered with CPWD or MES or Railways or P&T or any other central/st<strong>at</strong>e<br />
Govt/PSU in the appropri<strong>at</strong>e class of contractors eligible for tendering for such<br />
section of the work.<br />
3. PERFORMANCE BOUND CONTRACT<br />
The contract will be a performance bound contract and therefore the Bidder shall make their<br />
independent check for He<strong>at</strong> Load, selection of equipments etc. The drawings enclosed with<br />
the tender documents shall be only tent<strong>at</strong>ive layout plans and for guidance purpose only. The<br />
detailed shop drawings shall be prepared and submitted for approval to the Client /<br />
Consultant.<br />
Bidders have to give their confirm<strong>at</strong>ion on the he<strong>at</strong> load calcul<strong>at</strong>ions considered in the Tender<br />
or may submit their own he<strong>at</strong> load calcul<strong>at</strong>ions for achieving the inside design conditions.<br />
The contractor shall guarantee the specified inside condition <strong>at</strong> specified outside condition<br />
considering the fresh air as detailed in the basis of design of the tender documents.<br />
The contractor shall guarantee th<strong>at</strong> the capacity of various components as well as the whole<br />
system shall be within ± 3% of the specified capacity<br />
4. INSPECTION & APPROVAL OF THE WORK BY LOCAL AUTHORITY<br />
The contractor has to obtain, if required, all clearances & approvals from any st<strong>at</strong>uary<br />
authority/local bodies pertaining to whole air-conditioning Install<strong>at</strong>ion work<br />
install<strong>at</strong>ions, if any. The contractor shall obtain all inform<strong>at</strong>ion rel<strong>at</strong>ing to local
egul<strong>at</strong>ions, Bye- laws, applicable if any and all laws rel<strong>at</strong>ing to his work or profession<br />
and his having to execute work as required. Contractor shall obtain approval of the<br />
install<strong>at</strong>ion from the relevant inspection authorities <strong>at</strong> all stages and on completion of<br />
the install<strong>at</strong>ion work if any. Any fee payable to the st<strong>at</strong>utory authority for obtaining<br />
approvals is required to be paid by the contractor. However the necessary<br />
reimbursement of the fee deposited by the contractor to any st<strong>at</strong>utory authority (as<br />
mentioned above) will be made on production/submission of the valid documentary<br />
proof/evidence.<br />
5. Training:<br />
The contractor has to provide training to the client staff and also oper<strong>at</strong>e the system<br />
(if required) for a period of one month from the d<strong>at</strong>e of handing over free of cost.<br />
6. Pre-delivery Inspection & approval:<br />
The contractor shall offer the pre-delivery inspection of m<strong>at</strong>erials <strong>at</strong> manufacturers<br />
work to the Engineer-in-charge. The intim<strong>at</strong>ion for such inspections shall be given <strong>at</strong><br />
least 15 days in advance from the d<strong>at</strong>e of proposed inspection. RITES along with<br />
CLIENT represent<strong>at</strong>ive may inspect any/all the m<strong>at</strong>erials required in this project. All<br />
the testing facilities and all the consumables including the fuel etc. shall be provided<br />
by the contractor and nothing extra shall be paid on this account.<br />
In case of pre delivery inspection of imported VRF units <strong>at</strong> manufacturer’s works the<br />
expenditure like tour expenses outside India comprising to & fro air tickets, TA, DA<br />
hotel accommod<strong>at</strong>ion and local conveyance of consultant ( RITES ) shall comprise of<br />
2 ( Two ) officers from M/s RITES, will be borne by contractor. The r<strong>at</strong>e of travel/tour<br />
expenses, TA/DA and hotels accommod<strong>at</strong>ion shall be as applicable to the officer as<br />
per RITES extent rules.<br />
7. Tender drawings<br />
The work shall be executed as per l<strong>at</strong>est working drawings to be prepared by the<br />
contractor after award of work and submitted to the Engineer-in-charge for approval.<br />
The Drawings & d<strong>at</strong>a provided are for guidance to the contractor. The exact<br />
dimensions, loc<strong>at</strong>ion, distance & levels etc shall be governed by the site conditions.<br />
The tender drawings are indic<strong>at</strong>ive and are for the guidance of the contractor.<br />
8. SHOP DRAWINGS<br />
On the award of the work, the Contractor shall immedi<strong>at</strong>ely proceed with the<br />
prepar<strong>at</strong>ion of detailed working drawings showing the detail of each equipment th<strong>at</strong><br />
are to be installed and the ancillary works th<strong>at</strong> are to be carried out. All the works are<br />
deemed to be included in various items of bill of quantities as applicable.<br />
Three sets of all such working drawings dully signed by the head of the planning &<br />
design department of the tenderer shall be submitted to the consultants / Engineer-incharge<br />
for approval to ensure th<strong>at</strong> the works will be carried out in accordance with the<br />
specific<strong>at</strong>ions and drawings, including such changes as may have been mutually
agreed upon. All the drawings shall be received by the Consultants/ Engineer-incharge<br />
for approval within 15 days from the d<strong>at</strong>e of award of work. The approval of<br />
the drawings by the Consultants / Engineer-in-charge shall in no way relieve the<br />
Contractor form his oblig<strong>at</strong>ions to provide a complete and s<strong>at</strong>isfactory plant<br />
install<strong>at</strong>ion, testing and commissioning as per intent and purpose as laid down in the<br />
specific<strong>at</strong>ions. It will be the responsibility of the AC contractor to ensure th<strong>at</strong> laid<br />
down inside conditions are maintained <strong>at</strong> all times.<br />
Any omissions and / or errors shall be made good or rectified whether or not the<br />
drawings are approved. Contractor shall obtain written approval for samples (like<br />
grills / diffusers) and other m<strong>at</strong>erials before placing the order. Contractor shall<br />
guarantee the specified inside conditions <strong>at</strong> specified outside conditions. Prior to the<br />
completion of the work, the contractor shall furnish to the employer (2) two sets of a<br />
comprehensive manual for chilling m/c, pumps cooling describing all components<br />
furnishing a list of spare parts and setting forth in details the instructions for the<br />
oper<strong>at</strong>ion and maintenance of the plant.<br />
The Contractor shall also fix in the plant room, ne<strong>at</strong>ly typed and framed, instructions<br />
in details, for the starting and running of the plant.<br />
The following shop drawings shall be prepared by the AC contractor for approval<br />
a) AC Equipment Layout on terrace floor with sectional drawings of each installed<br />
equipment,<br />
b) Schem<strong>at</strong>ic refrigerant piping layout, pipe support details drawing showing the<br />
level of pipes,<br />
c) Indoor & outdoor Units layout plans of all floors with sections, support details<br />
etc.<br />
e) Electrical panel, power & control wiring drawings.<br />
f) Found<strong>at</strong>ion details of all equipments.<br />
g) Any other shop drawings necessary for the project.<br />
9. Completion Drawings:<br />
After completion of work, the contractor shall have to submit the following (Which<br />
pertains to this work) set of drawing to RITES.<br />
4 sets of hard copies + 1 Tracing + 3 Soft Copy (in ‘Auto CAD’ applicable version) in<br />
CD of the drawings rel<strong>at</strong>ed to lift work.<br />
10. <strong>DOCUMENTS</strong> TO BE FURNISHED ON COMPLETION OF INSTALLATION<br />
Six sets of the following shall be furnished to RITES / CLIENT by the contractor on<br />
completion of the work:-<br />
a) Completion Drawings as per Clause 16 above.
) Manufacturer's c<strong>at</strong>alogues of all equipment and accessories, oper<strong>at</strong>ion and<br />
maintenance manuals of all major equipment, detailing all adjustments,<br />
oper<strong>at</strong>ion and maintenance procedure.<br />
c) Manufacturer’s Guarantee / Warrantee certific<strong>at</strong>es of all the equipments &<br />
m<strong>at</strong>erials etc.<br />
d) Clearances/approval of various St<strong>at</strong>utory Bodies/Authorities, if required for this<br />
system.<br />
e) Any other inform<strong>at</strong>ion the Engineer-in-charge may deem fit.<br />
No completion certific<strong>at</strong>e will be issued until the above drawings and documents<br />
are submitted to the Engineer-in-charge.<br />
11. Performance Testing <strong>at</strong> Site:<br />
After completion of erection <strong>at</strong> site & a preliminary warm up period, acceptance trial<br />
run of a minimum period of 7 days dur<strong>at</strong>ion shall be conducted <strong>at</strong> site. The trial shall<br />
be conducted in the presence of the Engineer-in-charge and the test results shall be<br />
recorded in an approved form<strong>at</strong>. All testing instruments th<strong>at</strong> may be required for<br />
taking measurements shall be arranged by working contractor <strong>at</strong> his own cost.<br />
Tests proving the s<strong>at</strong>isfactory performance of all oper<strong>at</strong>ing gear and safety functions<br />
and controls shall be carried out. The contractor shall give ample notice of the test to<br />
the Engineer-in-charge.<br />
The contractor shall guarantee the complete HVAC Install<strong>at</strong>ion for a period of 12<br />
months or as mentioned in DLP from the d<strong>at</strong>e of handing over the plant after<br />
successful initial testing.<br />
12. The contractor shall be fully responsible for the maintenance including w<strong>at</strong>ch<br />
and ward of all the Air-conditioning install<strong>at</strong>ions, equipments provided by him<br />
until the works are handed over to client/<strong>Pondicherry</strong> <strong>University</strong>.<br />
Thereafter, the work can be handed over to the Client along with all inventories,<br />
completion plans etc. as required.<br />
13. CO-ORDINATIONS:<br />
The Contractor shall co-oper<strong>at</strong>e with any other agency working in the same project,<br />
compare plans, specific<strong>at</strong>ions and the time schedules and so arrange his work th<strong>at</strong><br />
there will be no interference. The Contractor shall forward to the Engineer-in-charge<br />
all correspondence and drawings so exchanged. Failure to check plans for conditions<br />
will render the contractor responsible for bearing the cost of any subsequent change<br />
found necessary or damages done.<br />
However, contractor shall afford necessary facilities to execute the work<br />
simultaneously with other agencies executing the works like electrific<strong>at</strong>ion,
horticulture, external services and other building works for the same project.<br />
RITES/PU shall entertain no claim on this account.<br />
The VRF work shall be executed in close Coordin<strong>at</strong>ion with the progress of building work.<br />
This being the essence of the contract, an activity chart clearly showing critical areas should<br />
be furnished before commencing the work for proper monitoring and coordin<strong>at</strong>ion.<br />
14. HANDING OVER THE WORKS ON COMPLETION:<br />
On s<strong>at</strong>isfactory completion of all the works as per the provision of the Contract, the<br />
Contractor shall hand over the works to the client/ PU.The Contractor shall ensure<br />
th<strong>at</strong> all the testing commissioning & trial run oper<strong>at</strong>ion of all the system are<br />
simultaneously carried out so as to make the same functional immedi<strong>at</strong>ely on<br />
completion.<br />
Contractor has to submit the test reports, manufacturer manual, and referred IS code<br />
/CPWD specific<strong>at</strong>ion for inspection of m<strong>at</strong>erial.<br />
15. COMPREHENSIVE ANNUAL MAINTENANCE<br />
The Contractor shall quote for Comprehensive Annual Maintenance service contract<br />
for the system offered by him for a period of 4 years for all items specified in Bill of<br />
Quantities after completion of Guarantee period. Any parts / components consumable<br />
wh<strong>at</strong>soever needs replacement during the above mentioned period shall be supplied<br />
and installed by the vendor without extra cost.<br />
Periodical checking for all parameters for machines oper<strong>at</strong>ion and diagnosis, routine<br />
checking and cleaning oper<strong>at</strong>ions, annual preventive maintenance / overhauling as<br />
required for smooth and trouble free oper<strong>at</strong>ion of the package shall be carried out by<br />
the contractor.<br />
The per year quoted r<strong>at</strong>es and amount of the comprehensive oper<strong>at</strong>ion and<br />
maintenance (Optional item) shall be taken into consider<strong>at</strong>ion during evalu<strong>at</strong>ion of<br />
financial/Price bid of the bidder for deciding the overall lowest bidder.<br />
During defect liability period, it is the responsibility of the contractor to oper<strong>at</strong>e the<br />
entire VRF HVAC system/ install<strong>at</strong>ion free of cost. No extra payment shall be paid to<br />
the contractor for the oper<strong>at</strong>ion of HVAC install<strong>at</strong>ion during the DLP period.<br />
16. The work shall be carried out in a manner complying in all respects with the requirements of<br />
relevant bye-laws of local body under the jurisdiction of which the work is to be<br />
executed or as directed by the Engineer-in-charge and nothing extra shall be paid on<br />
this account.<br />
17. For items, where so required, samples shall be prepared before starting the<br />
particular items of work for prior approval of the engineer-in-charge and<br />
nothing extra shall be payable on this account.
18. TERMS OF PAYMENT:<br />
Progressive on account payment in form of running account Bills will be made to the<br />
Contractor as follows:<br />
a) 70% of quoted r<strong>at</strong>e (on pro-r<strong>at</strong>a basis) as per Contract against supply of m<strong>at</strong>erial<br />
<strong>at</strong> site in good condition accompanied by relevant test certific<strong>at</strong>es and documents<br />
after deducting towards any recovery as per contract.<br />
b) 20% of quoted r<strong>at</strong>e (on pro-r<strong>at</strong>a basis) as per Contract against s<strong>at</strong>isfactory<br />
install<strong>at</strong>ion of equipment <strong>at</strong> site after deducting towards any recovery as per<br />
contract and the payment already made.<br />
c) Balance 10% of quoted r<strong>at</strong>e as per Contract upon successful testing,<br />
commissioning, handing over of install<strong>at</strong>ion including submission of final approval<br />
from the various St<strong>at</strong>utory Bodies/Authorities or any other St<strong>at</strong>utory Body (if<br />
required) after deducting towards any recovery as per contract and the payments<br />
already made.<br />
19. CLARIFICATIONS OF DISCREPANCIES<br />
In the case of Discrepancies between the schedules of quantity, the specific<strong>at</strong>ions<br />
and/ or the Drawings, the following order of preference shall be followed.<br />
1. Description of schedule of quantities.<br />
2. Specific conditions & Technical Specific<strong>at</strong>ions and Special Conditions, if any.<br />
3. Drawings.<br />
4. CPWD Specific<strong>at</strong>ions.<br />
5. Indian standard Specific<strong>at</strong>ions of BIS<br />
20. Additional Performance Guarantee:<br />
The contractor will also be required to deposit additional Performance Guarantee of<br />
an amount as determined by the Employer to take care of the unbalanced bid by the<br />
Contractor in rel<strong>at</strong>ion to the Employer’s estim<strong>at</strong>e of the cost of the work for some<br />
identified items. Clause 1 of Contract will be applicable for the additional<br />
Performance Guarantee on the following:<br />
i) Form in which can be deposited<br />
ii) Period of validity and when it will be refunded to the contractor<br />
iii) Circumstances under which the Employer can make a claim on the<br />
Additional Performance Guarantee.
(When L-1 offer is less than 90% of the justified/market r<strong>at</strong>e analysis cost, the bid<br />
should be tre<strong>at</strong>ed as unbalanced. The workability of the r<strong>at</strong>es should be assessed.<br />
For this purpose, the L-1 bidder shall be advised to produce detailed price analysis<br />
for any or all items on Bill of quantities to demonstr<strong>at</strong>e the inherent consistency of<br />
those prices with the construction methods and schedule proposed. If on evalu<strong>at</strong>ion,<br />
the r<strong>at</strong>e/price analysis is not found to be s<strong>at</strong>isfactory, the L-1 bidder should be asked<br />
to furnish additional performance guarantee to the extent the total quoted cost is<br />
lower than 90% of justified cost/market r<strong>at</strong>e analysis cost.)
Section - 4<br />
SCHEDULES A TO F
SECTION 4<br />
PROFORMA OF SCHEDULES<br />
(Oper<strong>at</strong>ive Schedules to be supplied separ<strong>at</strong>ely to each intending tenderer)<br />
SCHEDULE ‘A’<br />
Schedule of quantities (As per Bill of Quantities <strong>at</strong>tached)<br />
(BOQ to be <strong>at</strong>tached with Financial Bid)<br />
SCHEDULE ‘B’ – Refer Clause 10 of Clauses of Contract<br />
Schedule of m<strong>at</strong>erials to be issued to the contractor.<br />
S.No<br />
Description of<br />
items<br />
Quantit<br />
y<br />
R<strong>at</strong>es in Figures & words<br />
<strong>at</strong> which the m<strong>at</strong>erial will<br />
be charged to the<br />
contractor<br />
Place of Issue<br />
1 2 3 4 5<br />
-Not Applicable-<br />
SCHEDULE ‘C’ – Refer clause 34 of Clauses of Contract.<br />
Tools and plants to be hired to the contractor.<br />
S.No Description Hire charges per day Place of Issue<br />
1 2 3 4<br />
-Not Applicable -<br />
SCHEDULE ‘D’<br />
Extra schedule for specific requirements/documents for the work, if any.<br />
-Not Applicable -<br />
SCHEDULE ‘E’ - Refer Clause 10CC of Clauses of Contract<br />
Schedule of component of Cement, Steel, other m<strong>at</strong>erials, Labour etc. for price escal<strong>at</strong>ion.<br />
(To be worked out and filled by NIT approving authority)<br />
CLAUSE 10 CC
Component of Cement (Xc)<br />
expressed as percent of total value of work _______%<br />
Component of steel (X 5 )<br />
expressed as percent of total value of work ______%<br />
Component of other m<strong>at</strong>erials (X M ) (except cement & steel)<br />
expressed as per cent of total value of work ______%<br />
Component of labour (Y)<br />
expressed as percent of total value of work _______%<br />
Component of P.O.L (Z)<br />
expressed as percent of total value of work _______%<br />
SCHEDULE ‘F’<br />
Reference to General Conditions of Contract<br />
Name of Work “Supply, Erection, Testing & Commissioning of VRF (Variable Refrigerant<br />
Flow) Air Conditioning System work for Bioinform<strong>at</strong>ics & Madanjeet Singh School of Green<br />
Buildings under 11 th Plan Building Projects for <strong>Pondicherry</strong> <strong>University</strong> <strong>at</strong> <strong>Puducherry</strong>”..<br />
Estim<strong>at</strong>ed cost of work Rs. 310.74 Lakhs.<br />
Earnest money: Rs. 3,10,750.00/-.<br />
Performance Guarantee (Ref. Clause 1) 5% of tendered value.<br />
Security Deposit: (Refer clause 1A) 5% of Tendered value<br />
Notice Inviting Tender and Instruction to Tenderers<br />
Officer inviting tender: GM/Elect.<br />
CONDITIONS OF CONTRACT<br />
Definitions<br />
2 (IV) Employers: <strong>Pondicherry</strong> <strong>University</strong>, <strong>Puducherry</strong><br />
2(v) Engineer-in-Charge: GM/Elect.<br />
2(vii) Accepting Authority : GM/Elect.<br />
2(ix) Percentage on cost of m<strong>at</strong>erials<br />
and labour to cover all 15%<br />
Overheads and profits.<br />
2(x) Standard Schedule of R<strong>at</strong>es NOT APPLICABLE Do be filled up as per<br />
ent and as applicable)
9(ii)<br />
Standard RITES Contract Form RITES Tender and Contract Document 2008 as<br />
modified & corrected up to 31.08.2008.<br />
CLAUSES OF CONTRACT<br />
Clause 1<br />
(i)<br />
(ii)<br />
Time allowed for submission of<br />
P.G. from the d<strong>at</strong>e of issue of<br />
Letter of Acceptance<br />
Maximum allowable extension<br />
beyond the period provided in<br />
(i) above<br />
15 days.<br />
7days.<br />
Clause 2<br />
Authority for fixing compens<strong>at</strong>ion under<br />
Clause 2<br />
GM/Elect.<br />
Clause 2A<br />
Whether Clause 2A shall be applicable<br />
NO<br />
Clause 5<br />
5.1 (a) Time allowed for execution of work 9 Months from the d<strong>at</strong>e of start.<br />
D<strong>at</strong>e of Start<br />
15 day from the d<strong>at</strong>e of issue of<br />
Letter of Acceptance or the first<br />
D<strong>at</strong>e of Handing over of site<br />
Which ever is l<strong>at</strong>er. __<br />
_______________________________<br />
TABLE OF MILESTONE(S) (NOT APPLICABLE)<br />
Clause 5A – Shifting of stipul<strong>at</strong>ed d<strong>at</strong>e of completion.<br />
Competent Authority<br />
Accepting Authority as specified<br />
in clause 2(vii) of condition of contract.<br />
Clause 6 A Whether Clause 6 or 6A applicable.<br />
Clause 7<br />
6*/6A*<br />
Clause 6 id applicable
Gross work to be done together with net<br />
Payment/adjustment of advances for<br />
m<strong>at</strong>erial collected, if any, since the last such<br />
payment for being eligible to interim payment<br />
Clause 10 B<br />
Whether Clause 10 B (ii) to (vii) applicable<br />
NO/<br />
Clause 10 CC<br />
Clause 10 CC to be applicable in contract with<br />
Stipul<strong>at</strong>ed period of completion exceeding the<br />
period shown in next column<br />
NO<br />
Clause 11<br />
Specific<strong>at</strong>ions to be followed for execution of work<br />
CPWD General Specific<strong>at</strong>ions for Electrical Works (Internal -2005, External -1994, Lifts and<br />
Escal<strong>at</strong>ors-2003, HVAC-2004, Sub St<strong>at</strong>ions-2007, DG Sets-2006, Wet Riser and Sprinkler System -<br />
2006), all with up to d<strong>at</strong>e Corrections read with Specific<strong>at</strong>ions in Section 5 of Tender Documents.<br />
Clause 12<br />
Clause 12.2 Devi<strong>at</strong>ion Limit beyond which i) For Building Works 25%<br />
12.3 & 12.5 Clauses 12.2, 12.3 & 12.5shall<br />
apply ii) For Found<strong>at</strong>ion Items 100%<br />
Note: For Earthwork individual classific<strong>at</strong>ion Quantity can vary to any extent but overall Devi<strong>at</strong>ion Limits will be<br />
as above.<br />
Clause 16 Competent Authority for GM/RITES<br />
deciding reduced r<strong>at</strong>es<br />
Clause 18<br />
List of mand<strong>at</strong>ory machinery, tools & plants to be deployed by the Contractor<br />
<strong>at</strong> site:-<br />
1._______________ _ 2._________________ 3.____________________<br />
Clause 25<br />
4.________________<br />
Appell<strong>at</strong>e Authority<br />
Appointing Authority<br />
5._________________ 6.____________________<br />
GGM/EE<br />
GM/Elect<br />
Clause 36 (i) Minimum Qualific<strong>at</strong>ions &
Experience required for Principal<br />
Technical Represent<strong>at</strong>ive<br />
(a) Project Manager Gradu<strong>at</strong>e with 5 years experience or<br />
retired Assistant Engineer possessing<br />
<strong>at</strong> least recognized diploma in<br />
Engineering.<br />
b) Discipline to which the Principal Mechanical/ Electrical.<br />
Technical Represent<strong>at</strong>ive should<br />
Belong<br />
Clause 42<br />
i) (a) Schedule/st<strong>at</strong>ement for determining Not applicable<br />
theoretical quantity of cement &<br />
bitumen on the basis of Delhi<br />
Schedule of R<strong>at</strong>es printed by CPWD<br />
ii)<br />
Vari<strong>at</strong>ions permissible on theoretical<br />
Quantities<br />
a) Cement for works with estim<strong>at</strong>ed cost NOT APPLICABLE<br />
put to tender not more than Rs.5 lakhs<br />
for works with estim<strong>at</strong>ed cost put to<br />
tender more than Rs.5 lakhs<br />
NOT APPLICABLE<br />
b) Bitumen for All Works NOT APPLICABLE<br />
c) Steel Reinforcement and structural NOT Applicable<br />
steel sections for each diameter,<br />
section and c<strong>at</strong>egory<br />
d) All other m<strong>at</strong>erials Nil<br />
RECOVERY RATES FOR QUANTITIES BEYOND PERMISSIBLE VARIATION<br />
(NOT APPLICABLE)<br />
Sl.<br />
No.<br />
Description of Item<br />
R<strong>at</strong>es in figures and words <strong>at</strong> which recovery<br />
shall be made from the Contractor.<br />
Excess<br />
beyond<br />
permissibl<br />
e vari<strong>at</strong>ion<br />
Less use beyond the permissible<br />
vari<strong>at</strong>ion
1 Cement<br />
2 Steel reinforcement<br />
3 Structural Sections<br />
4 Bitumen issued free<br />
5 Bitumen issued <strong>at</strong><br />
stipul<strong>at</strong>ed fixed price<br />
Clause 46<br />
Whether Clause 46.10 shall be applicable<br />
Whether Clause 46.11.1A shall be applicable<br />
Whether Clause 46.13A shall be applicable<br />
No<br />
No<br />
No<br />
Clause 46.17<br />
City of Jurisdiction of Court<br />
Clause 47.2.1<br />
Sum for which Third Party<br />
Insurance to be obtained.<br />
Delhi<br />
Rs. 5.0 Lakhs per occurrence<br />
with the number of occurrences limited to four.<br />
Clause 55<br />
Whether clause 55 shall<br />
be applicable.<br />
If yes, time allowed for completion<br />
of sample floor/unit.<br />
No<br />
Not Applicable
Section – 5<br />
TECHNICAL SPECIFICATIONS
The work of this contract is the provision of Air-conditioning design requirements for the<br />
above project. Briefly described, the work includes shop detailing, fabric<strong>at</strong>ion, supply,<br />
installing, examin<strong>at</strong>ion, testing, commissioning and maintenance during liability period of the<br />
whole of the m<strong>at</strong>erials, wiring, cabling, piping, mechanical and rel<strong>at</strong>ed equipments and all<br />
other items and work for completing the mechanical contract works as described hereunder<br />
and indic<strong>at</strong>ed on the drawings accompanying this document. The Contractor shall refer to<br />
commercial documents, technical specific<strong>at</strong>ion sections and drawings for additional details<br />
and further description of the works.<br />
This Report gives conceptual design phase inform<strong>at</strong>ion of AC system, brief outlines, the<br />
basis of selection of AC system, capacity of units and air management selection. Contractor<br />
is to design and install the equipments as per technical and environmental requirements.<br />
It is the intent of these specific<strong>at</strong>ions, th<strong>at</strong> when completed, the Air-conditioning system<br />
shall be suitable in everywhere for the services required and the contractor shall , <strong>at</strong> no<br />
extra cost, supply all m<strong>at</strong>erials and do all the works which may be reasonably implied as<br />
being incidental to the works of this division.<br />
SYNOPSIS AND INSTRUCTIONS TO THE <strong>TENDER</strong>ERS<br />
<strong>Pondicherry</strong> <strong>University</strong> under the Eleventh Plan Building Projects is constructing a<br />
Madanjeet school of green building & Bioinform<strong>at</strong>ics Building. It is proposed by the client to<br />
air-condition most of the space. Based on the applic<strong>at</strong>ion and the n<strong>at</strong>ure of activity it is<br />
proposed for Variable Refrigerant Volume / Flow system (VRV / VRF) to air-condition the<br />
space. The building has two levels. Based on the details provided to us and as enumer<strong>at</strong>ed<br />
in basis of design it is worked out th<strong>at</strong> a total capacity of 325 HP outdoor units ( Green<br />
Building- 195HP & Bioinform<strong>at</strong>ics Building 130HP ) with multiple combin<strong>at</strong>ion to work in<br />
conjunction with Ductable type / Concealed type indoor units will suffice the requirement.<br />
The details of the indoor units are given hereafter and also in the bill of quantity. Vendor<br />
shall offer their outdoor units of their range by m<strong>at</strong>ching the requirement as per tender. The<br />
outdoor units shall be installed <strong>at</strong> the terrace of the building. Fresh air requirements as per<br />
ASHRAE Standard 62.1 is considered along with Energy Recovery Ventil<strong>at</strong>ors (ERV). Kindly<br />
go through the tender drawing for tent<strong>at</strong>ive loc<strong>at</strong>ion and layout of the air conditioning<br />
system.<br />
In Green Building, for easy oper<strong>at</strong>ion and layout the areas to be air-conditioned are grouped<br />
under SYSTEM 1 TO 3 in the green Building. The areas including in each system group is<br />
also furnished. The vendor has to offer the minimum specified capacity for each group. The<br />
vendor has to clearly specify the combin<strong>at</strong>ion considered by them for each group.<br />
In Bio inform<strong>at</strong>ics Building a total capacity of 130 HP is shown in the BOQ however as per<br />
the vendor can offer more than one system. The vendor has to offer the minimum specified<br />
capacity for each group. The vendor has to clearly specify the combin<strong>at</strong>ion considered by<br />
them for each group
DESIGN CRITERIA<br />
Calcul<strong>at</strong>ed capacity of the plant & technological requirements :<br />
The Contractor shall calcul<strong>at</strong>e the he<strong>at</strong> load calcul<strong>at</strong>ion in respect of the rooms to be airconditioned<br />
and should submit a copy of the he<strong>at</strong> load calcul<strong>at</strong>ion along with their offer. The<br />
plant has to work, so as to produce and maintain continuously specified inside temper<strong>at</strong>ure<br />
and humidity conditions irrespective of outside ambient conditions.<br />
Standards and Regul<strong>at</strong>ions :<br />
Generally all works under this contract shall be complied with the following Indian<br />
Standards<br />
IS 277 Galvanized Steel Sheets<br />
IS 325 Three phase induction motors(all motors eff 1-siemens/Grundfos)<br />
IS 655 Metal Air ducts<br />
IS 732 Code of practice for Electrical wiring and fittings for buildings<br />
IS 900 Code of practice for install<strong>at</strong>ion and maintenance of Induction motors<br />
IS 996 Single phase Small AC and universal motors<br />
IS 1239 Mild steel tubes, tubular and other wrought steel fittings<br />
IS 1248 Direct acting electrical indic<strong>at</strong>ing instruments<br />
IS 1554 PVC insul<strong>at</strong>ed (Heavy duty) electric cables for working voltages up to<br />
(Part I) and including 1100 volts<br />
IS 7613 Method of testing panel type air filters for Air-conditioning and Ventil<strong>at</strong>ion<br />
process<br />
IS 1822 Motor starters of voltage not exceeding 1000 volts<br />
IS 2208 HRC cartridge fuse-links up to 650 volts<br />
IS 2516 A.C circuit breakers<br />
IS 4047 Heavy duty air break switches and composite units of air break switches and<br />
fuses for voltages not exceeding 1000 Volts<br />
IS 520 Standard for positive displacement refriger<strong>at</strong>ion compressor and condensing<br />
units<br />
IS 5111 Code for practice and measurement for testing refriger<strong>at</strong>ion compressor<br />
IS 737<br />
Specific<strong>at</strong>ion for wrought aluminium and aluminium sheets and strips<br />
IS 4671 Expanded polystyrene for thermal insul<strong>at</strong>ion purposes<br />
IS 702 Industrial bitumen<br />
IS 8183 Bonded mineral wool<br />
In addition the HVAC system designed shall comply with the following American Society for<br />
He<strong>at</strong>ing, Refriger<strong>at</strong>ing and Air-Conditioning Engineers (ASHRAE) Standards:<br />
ASHRAE Standard 55 – Thermal Environmental Conditions for Human Occupancy<br />
ASHRAE Standard 62 – Ventil<strong>at</strong>ion for acceptable Indoor Air Quality<br />
ASHRAE Standard 90.1 – Energy Standard for Buildings except Low-rise Residential<br />
Buildings<br />
ASHRAE Standard 90.2 – Energy-efficient Design of Low-rise Residential Buildings<br />
The contractor shall make available copies (upon Award of Contract) of the above standards<br />
for reference of the Owner.
All works performed and equipments and m<strong>at</strong>erials supplied under this contract shall comply<br />
in every respect with the Rules and Regul<strong>at</strong>ions of the Local Authorities including but not<br />
limited to<br />
- Electrical supply and inspection regul<strong>at</strong>ion<br />
- Fire Regul<strong>at</strong>ion & Machinery regul<strong>at</strong>ion.<br />
- N<strong>at</strong>ional Environmental Regul<strong>at</strong>ion (NER)<br />
- N<strong>at</strong>ional Fire Protection Associ<strong>at</strong>ion (NFPA)<br />
- The Factory Act<br />
All design and install<strong>at</strong>ion of Air-conditioning shall be in accordance with the Owners l<strong>at</strong>est<br />
requirements and in compliance with the relevant Indian Standard Codes of practice. Where<br />
any of the requirements are <strong>at</strong> variance, the most stringent requirements will control<br />
between the design criteria and the local install<strong>at</strong>ion codes.
BASIS OF DESIGN FOR AIR CONDITIONING WORKS<br />
MADANJEET SCHOOL OF GREEN ENERGY TECHNOLOGIES<br />
SYSTEM- 1 (65 HP)<br />
FLOOR LOCATION AREA-<br />
SQFT<br />
HEIGHT-<br />
FT<br />
OCCU<br />
PANC<br />
Y-NOS<br />
IDU-<br />
TR<br />
QTY<br />
TOTAL-<br />
TR<br />
TYPE OF IDU<br />
GROUND Class Room-1 1184 12.5 60 3.0 3.0 9.0 DUCTED<br />
GROUND Class Room-2 1184 12.5 60 3.0 3.0 9.0 DUCTED<br />
FIRST Class Room-1 1184 12.5 60 3.0 3.0 9.0 DUCTED<br />
FIRST Class Room-2 1184 12.5 60 3.0 3.0 9.0 DUCTED<br />
SECOND Analytical Lab-1 302 12.5 3 2.0 1.0 2.0 CONCEALED<br />
SECOND Analytical Lab-2 302 12.5 3 2.0 1.0 2.0 CONCEALED<br />
SECOND Analytical Lab-3 302 12.5 3 2.0 1.0 2.0 CONCEALED<br />
SECOND Analytical Lab-4 302 12.5 3 2.0 1.0 2.0 CONCEALED<br />
SECOND Analytical Lab-5 302 12.5 3 2.0 1.0 2.0 CONCEALED<br />
SECOND Analytical Lab-6 302 12.5 3 2.0 1.0 2.0 CONCEALED<br />
THIRD Clean Room 819 12.5 10 3.0 2.0 6.0 DUCTED<br />
THIRD Clean Room 819 12.5 10 3.0 2.0 6.0 DUCTED<br />
SYSTEM- 2 (65 HP)<br />
FLOOR LOCATION ARE<br />
A-<br />
SQF<br />
T<br />
HEIGHT<br />
-FT<br />
OCC<br />
UPA<br />
NCY-<br />
NOS<br />
IDU<br />
-TR<br />
QT<br />
Y<br />
TOTA<br />
L-TR<br />
TYPE OF<br />
IDU<br />
GROUND Teaching Lab-1 582 12.5 20 2.0 2.0 4.0 CONCEALED<br />
GROUND Teaching Lab-2 582 12.5 20 2.0 2.0 4.0 CONCEALED<br />
GROUND Teaching Lab-3 582 12.5 20 2.0 2.0 4.0 CONCEALED<br />
GROUND Teaching Lab-4 582 12.5 20 2.0 2.0 4.0 CONCEALED<br />
FIRST<br />
Visiting<br />
Professor-1<br />
582 12.5 20<br />
2.0 2.0 4.0 CONCEALED<br />
FIRST<br />
Visiting<br />
Professor-2<br />
582 12.5 20<br />
2.0 2.0 4.0 CONCEALED<br />
FIRST Teaching Lab-1 582 12.5 20 2.0 2.0 4.0 CONCEALED<br />
FIRST Teaching Lab-2 582 12.5 20 2.0 2.0 4.0 CONCEALED<br />
SECOND Analytical Lab-7 302 12.5 3 2.0 1.0 2.0 CONCEALED<br />
SECOND Analytical Lab-8 302 12.5 3 2.0 1.0 2.0 CONCEALED<br />
SECOND Analytical Lab-9 302 12.5 3 2.0 1.0 2.0 CONCEALED<br />
SECOND Analytical Lab-10 302 12.5 3 2.0 1.0 2.0 CONCEALED<br />
SECOND Analytical Lab-11 302 12.5 3 2.0 1.0 2.0 CONCEALED<br />
SECOND Analytical Lab-12 302 12.5 3 2.0 1.0 2.0 CONCEALED<br />
THIRD Cafeteria 1658 12.5 75 3.0 6.0 18.0 DUCTED
SYSTEM-32 (65 HP)<br />
FLOOR LOCATION ARE<br />
A-<br />
SQF<br />
T<br />
HEIGHT<br />
-FT<br />
OCC<br />
UPA<br />
NCY-<br />
NOS<br />
IDU<br />
-TR<br />
QT<br />
Y<br />
TOTA<br />
L-TR<br />
TYPE OF<br />
IDU<br />
GROUND Office 377 12.5 4 3.0 1.0 3.0 DUCTED<br />
GROUND Proffessor 237 12.5 2 2.0 1.0 2.0 CONCEALED<br />
GROUND Dean 377 12.5 4 3.0 1.0 3.0 DUCTED<br />
GROUND Asst Professor 1184 12.5 12 1.5 6.0 9.0 CONCEALED<br />
FIRST Synthesis Lab-1 786 12.5 5 3.0 2.0 6.0 DUCTED<br />
FIRST Synthesis Lab-2 786 12.5 5 3.0 2.0 6.0 DUCTED<br />
FIRST Synthesis Lab-3 786 12.5 5 3.0 2.0 6.0 DUCTED<br />
SECOND<br />
Space for Resh<br />
scholars<br />
937 12.5 10<br />
2.0 3.0 6.0 CONCEALED<br />
SECOND Conference 937 12.5 60 3.0 3.0 9.0 DUCTED<br />
THIRD Library 819 12.5 15 3.0 2.0 6.0 DUCTED<br />
THIRD Seminar Hall 819 12.5 15 3.0 2.0 6.0 DUCTED<br />
OUTSIDE DESIGN CONDITIONS: 39.44 DEG C DRY BULB / 27.77 DEC C WET BULB.<br />
INSIDE DESIGN CONDITIONS: 24 +/- 1.1 DEG C DRY BULB AND 55 +/- 5 % RELATIVE<br />
HUMIDITY.
BIO-INFORMATICS BUILDING - SYSTEM- 1 (130 HP)<br />
NO<br />
.<br />
FLOOR DESCRIPTION AREA-<br />
SQFT<br />
HEIGH<br />
T-FT<br />
OC<br />
C<br />
IDU-<br />
TR<br />
QTY-<br />
NOS<br />
TOTA<br />
L-TR<br />
TYPE OF<br />
IDU<br />
1<br />
GROUN<br />
D Computer Lab-2 1199.0<br />
13.5<br />
40.0 3.0 4.0 12.0 DUCTED<br />
2<br />
GROUN<br />
D Server Room 353.0<br />
13.5<br />
1.0 2.0 2.0 4.0<br />
CONCEA<br />
LED<br />
3<br />
GROUN<br />
D Office 219.0<br />
13.5<br />
4.0 2.0 1.0 2.0<br />
CONCEA<br />
LED<br />
4<br />
GROUN<br />
D Computer Msc Lab-1 1064.0<br />
13.5<br />
5.0 3.0 4.0 12.0 DUCTED<br />
5<br />
GROUN<br />
D UPS room 217.0<br />
13.5<br />
1.0 2.0 2.0 4.0<br />
CONCEA<br />
LED<br />
6<br />
GROUN<br />
D Library 663.0<br />
13.5<br />
15.0 3.0 2.0 6.0 DUCTED<br />
7<br />
GROUN<br />
D Inform<strong>at</strong>ion Officer 209.0<br />
13.5<br />
2.0 1.5 1.0 1.5<br />
CONCEA<br />
LED<br />
8<br />
GROUN<br />
D Meeting 241.0<br />
13.5<br />
8.0 2.0 1.0 2.0<br />
CONCEA<br />
LED<br />
9<br />
GROUN<br />
D HOD 227.0<br />
13.5<br />
2.0 2.0 1.0 2.0<br />
CONCEA<br />
LED<br />
10<br />
GROUN<br />
D Office 239.0<br />
13.5<br />
4.0 2.0 1.0 2.0<br />
CONCEA<br />
LED<br />
11<br />
GROUN<br />
D<br />
Seminar/Multi purpose<br />
Hall 1648.0<br />
13.5 100.<br />
0 4.0 4.0 16.0 DUCTED<br />
12<br />
GROUN<br />
D<br />
Wet Lab<br />
instrument<strong>at</strong>ion 784.0<br />
13.5<br />
10.0 3.0 2.0 6.0 DUCTED<br />
13 FIRST Wet Lab 1250.0 13.5 10.0 3.0 4.0 12.0 DUCTED<br />
14 FIRST Class Room 3 930.0<br />
13.5<br />
40.0 2.0 4.0 8.0<br />
CONCEA<br />
LED<br />
15 FIRST Research Scholar 445.0<br />
13.5<br />
6.0 2.0 2.0 4.0<br />
CONCEA<br />
LED<br />
16 FIRST Class Room 2 963.0<br />
13.5<br />
40.0 2.0 4.0 8.0<br />
CONCEA<br />
LED<br />
17 FIRST Class Room 1 888.0<br />
13.5<br />
40.0 2.0 4.0 8.0<br />
CONCEA<br />
LED<br />
18 FIRST Research Labs 833.0<br />
13.5<br />
14.0 2.0 4.0 8.0<br />
CONCEA<br />
LED<br />
19 FIRST Work St<strong>at</strong>ion(1-7) 714.0<br />
13.5<br />
12.0 1.0 7.0 7.0<br />
CONCEA<br />
LED<br />
20 FIRST Work St<strong>at</strong>ion(8-13) 1199.0<br />
13.5<br />
40.0 1.0 6.0 6.0<br />
CONCEA<br />
LED<br />
TOTAL<br />
13086.<br />
0 60.0 130.5
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐BIO<br />
INFORMATICS<br />
GROUND<br />
COMP LAB‐2<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 1199 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 13.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 40 x 5 200<br />
Area- 1199 x 0.06 71.94<br />
Air changes / hour 1 269.775 270<br />
Total cfm 354<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 621 x 0.34 x 33 6968<br />
Wall (NE) 260 x 0.34 x 25 2210<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 78 x 0.22 x 11 189 Appar<strong>at</strong>us Dew Point 53 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 165 x 0.264 x 28 1220 Dehumidified Air Qty 3448 cfm<br />
Partition 871 x 0.3 x 23 6010<br />
Ceiling 1199 x 0.4 x 23 11031 Refriger<strong>at</strong>ion Capacity 104421 Btu/hr<br />
Floor 0 x 0.4 x 23 0<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 354 x 0.1296 x 28 1283 8.70 TR<br />
People (active) 40 x 240 x 1 9600<br />
Equipment load (KW) 6 x 1000 x 3.41 20460<br />
Lights (W) 1199 x 1 x 4.26 5111<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 64080 Capacity with 3% margin 9.0 TR<br />
Safety (12.5%) 8010<br />
Total space sensible he<strong>at</strong> gain 72090<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 4 NOS 3.0 TR DUCTED<br />
Ventil<strong>at</strong>ion 354 x 0.080 x 68 1933<br />
People (active) 40 x 160 x 1 6400<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 8333<br />
Safety (5%) 417<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 8749<br />
4 Total Space he<strong>at</strong> 80840<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.89<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 23581<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐BIO<br />
INFORMATICS<br />
GROUND<br />
SERVER<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong>
Area 353 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 13.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 1 x 5 5<br />
Area- 353 x 0.06 21.18<br />
Air changes / hour 1 79.425 79<br />
Total cfm 34<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 238 x 0.34 x 25 2023<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 63 x 0.22 x 11 152 Appar<strong>at</strong>us Dew Point 53 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 63 x 0.264 x 28 466 Dehumidified Air Qty 1599 cfm<br />
Partition 710 x 0.3 x 23 4899<br />
Ceiling 353 x 0.4 x 23 3248 Refriger<strong>at</strong>ion Capacity 36106 Btu/hr<br />
Floor 0 x 0.4 x 23 0<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 34 x 0.1296 x 28 124 3.01 TR<br />
People (active) 1 x 245 x 1 245<br />
Equipment load (KW) 5 x 1000 x 3.41 17050<br />
Lights (W) 353 x 1 x 4.26 1505<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 29711 Capacity with 3% margin 3.1 TR<br />
Safety (12.5%) 3714<br />
Total space sensible he<strong>at</strong> gain 33425<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 2 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 34 x 0.080 x 68 186<br />
People (active) 1 x 205 x 1 205<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 391<br />
Safety (5%) 20<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 411<br />
4 Total Space he<strong>at</strong> 33835<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.99<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 2270<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐BIO<br />
INFORMATICS<br />
GROUND<br />
OFFICE‐1<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 219 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 13.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 4 x 5 20
Area- 219 x 0.06 13.14<br />
Air changes / hour 1 49.275 49<br />
Total cfm 43<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 39 x 0.264 x 28 288 Dehumidified Air Qty 660 cfm<br />
Partition 815 x 0.3 x 23 5624<br />
Ceiling 219 x 0.4 x 23 2015 Refriger<strong>at</strong>ion Capacity 17146 Btu/hr<br />
Floor 0 x 0.4 x 23 0<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 43 x 0.1296 x 28 156 1.43 TR<br />
People (active) 4 x 245 x 1 980<br />
Equipment load (KW) 0.5 x 1000 x 3.41 1705<br />
Lights (W) 219 x 1 x 4.26 933<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 11701 Capacity with 3% margin 1.5 TR<br />
Safety (12.5%) 1463<br />
Total space sensible he<strong>at</strong> gain 13164<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 1 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 43 x 0.080 x 68 236<br />
People (active) 4 x 205 x 1 820<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 1056<br />
Safety (5%) 53<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 1108<br />
4 Total Space he<strong>at</strong> 14272<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.92<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 2874<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐BIO<br />
INFORMATICS<br />
GROUND<br />
COMP LAB‐1<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 1064 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 13.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 40 x 5 200<br />
Area- 1064 x 0.06 63.84<br />
Air changes / hour 1 239.4 239<br />
Total cfm 343<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 435 x 0.34 x 25 3698<br />
Wall(SW) 0 x 0.34 x 29 0
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 117 x 0.22 x 11 283 Appar<strong>at</strong>us Dew Point 53 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 194 x 0.264 x 28 1434 Dehumidified Air Qty 3172 cfm<br />
Partition 1147 x 0.3 x 23 7914<br />
Ceiling 1064 x 0.4 x 23 9789 Refriger<strong>at</strong>ion Capacity 97895 Btu/hr<br />
Floor 0 x 0.4 x 23 0<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 343 x 0.1296 x 28 1245 8.16 TR<br />
People (active) 40 x 240 x 1 9600<br />
Equipment load (KW) 6 x 1000 x 3.41 20460<br />
Lights (W) 1064 x 1 x 4.26 4535<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 58958 Capacity with 3% margin 8.4 TR<br />
Safety (12.5%) 7370<br />
Total space sensible he<strong>at</strong> gain 66327<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 4 NOS 3.0 TR DUCTED<br />
Ventil<strong>at</strong>ion 343 x 0.080 x 68 1875<br />
People (active) 40 x 160 x 1 6400<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 8275<br />
Safety (5%) 414<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 8689<br />
4 Total Space he<strong>at</strong> 75016<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.88<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 22879<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐BIO<br />
INFORMATICS<br />
GROUND<br />
UPS<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 217 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 13.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 1 x 5 5<br />
Area- 217 x 0.06 13.02<br />
Air changes / hour 1 48.825 49<br />
Total cfm 23<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 122 x 0.34 x 25 1037<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 39 x 0.22 x 11 94 Appar<strong>at</strong>us Dew Point 55 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 39 x 0.264 x 28 288 Dehumidified Air Qty 1544 cfm<br />
Partition 632 x 0.3 x 23 4361<br />
Ceiling 217 x 0.4 x 23 1996 Refriger<strong>at</strong>ion Capacity 31254 Btu/hr<br />
Floor 0 x 0.4 x 23 0
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 23 x 0.1296 x 28 85 2.60 TR<br />
People (active) 1 x 245 x 1 245<br />
Equipment load (KW) 5 x 1000 x 3.41 17050<br />
Lights (W) 217 x 1 x 4.26 925<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 26082 Capacity with 3% margin 2.7 TR<br />
Safety (12.5%) 3260<br />
Total space sensible he<strong>at</strong> gain 29342<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 2 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 23 x 0.080 x 68 128<br />
People (active) 1 x 205 x 1 205<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 333<br />
Safety (5%) 17<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 350<br />
4 Total Space he<strong>at</strong> 29692<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.99<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 1563<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐BIO<br />
INFORMATICS<br />
GROUND<br />
LIBRARY<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 663 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 13.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 15 x 5 75<br />
Area- 663 x 0.06 39.78<br />
Air changes / hour 1 149.175 149<br />
Total cfm 149<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 337 x 0.34 x 21 2406 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 266 x 0.34 x 25 2261<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 78 x 0.22 x 11 189 Appar<strong>at</strong>us Dew Point 54 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 102 x 0.264 x 28 754 Dehumidified Air Qty 2465 cfm<br />
Partition 656 x 0.3 x 23 4526<br />
Ceiling 663 x 0.4 x 23 6100 Refriger<strong>at</strong>ion Capacity 63244 Btu/hr<br />
Floor 0 x 0.4 x 23 0<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 149 x 0.1296 x 28 541 5.27 TR<br />
People (active) 15 x 245 x 1 3675<br />
Equipment load (KW) 6 x 1000 x 3.41 20460<br />
Lights (W) 663 x 1 x 4.26 2826<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 43738 Capacity with 3% margin 5.4 TR<br />
Safety (12.5%) 5467<br />
Total space sensible he<strong>at</strong> gain 49206
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
Ventil<strong>at</strong>ion 149 x 0.080 x 68 816<br />
People (active) 15 x 205 x 1 3075<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 3891<br />
Safety (5%) 195<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 4085<br />
4 Total Space he<strong>at</strong> 53291<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.92<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 9953<br />
IDU SELECTED : 2 NOS 3.0 TR DUCTED<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐BIO<br />
INFORMATICS<br />
GROUND<br />
INFORMATION OFFICER<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 209 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 13.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 2 x 5 10<br />
Area- 209 x 0.06 12.54<br />
Air changes / hour 1 47.025 47<br />
Total cfm 29<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 230 x 0.34 x 21 1642 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54.5 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 39 x 0.264 x 28 288 Dehumidified Air Qty 625 cfm<br />
Partition 547 x 0.3 x 23 3774<br />
Ceiling 209 x 0.4 x 23 1923 Refriger<strong>at</strong>ion Capacity 14726 Btu/hr<br />
Floor 0 x 0.4 x 23 0<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 29 x 0.1296 x 28 106 1.23 TR<br />
People (active) 2 x 245 x 1 490<br />
Equipment load (KW) 0.5 x 1000 x 3.41 1705<br />
Lights (W) 209 x 1 x 4.26 891<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 10820 Capacity with 3% margin 1.3 TR<br />
Safety (12.5%) 1352<br />
Total space sensible he<strong>at</strong> gain 12172<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 1 NOS 1.5 TR CONCEALED<br />
Ventil<strong>at</strong>ion 29 x 0.080 x 68 160<br />
People (active) 2 x 205 x 1 410<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 570<br />
Safety (5%) 29<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 599<br />
4 Total Space he<strong>at</strong> 12771<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.95<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 1955
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐BIO<br />
INFORMATICS<br />
GROUND<br />
MEETING<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 241 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 13.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 8 x 5 40<br />
Area- 241 x 0.06 14.46<br />
Air changes / hour 1 54.225 54<br />
Total cfm 71<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 174 x 0.34 x 21 1242 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 53 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 0 x 0.264 x 28 0 Dehumidified Air Qty 695 cfm<br />
Partition 658 x 0.3 x 23 4540<br />
Ceiling 241 x 0.4 x 23 2217 Refriger<strong>at</strong>ion Capacity 20995 Btu/hr<br />
Floor 0 x 0.4 x 23 0<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 71 x 0.1296 x 28 257 1.75 TR<br />
People (active) 8 x 240 x 1 1920<br />
Equipment load (KW) 0.5 x 1000 x 3.41 1705<br />
Lights (W) 241 x 1 x 4.26 1027<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 12909 Capacity with 3% margin 1.8 TR<br />
Safety (12.5%) 1614<br />
Total space sensible he<strong>at</strong> gain 14523<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 1 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 71 x 0.080 x 68 387<br />
People (active) 8 x 160 x 1 1280<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 1667<br />
Safety (5%) 83<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 1750<br />
4 Total Space he<strong>at</strong> 16273<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.89<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 4723<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
PONDY UNIV‐BIO<br />
INFORMATICS<br />
GROUND<br />
OFFICE‐2<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong>
DATE:<br />
PREPARED BY<br />
22/09/2011<br />
DBJ<br />
Area 239 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 13.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 4 x 5 20<br />
Area- 239 x 0.06 14.34<br />
Air changes / hour 1 53.775 54<br />
Total cfm 45<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 167 x 0.34 x 29 1647<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54 F<br />
Sunglass(SW) 39 x 0.22 x 66 566<br />
All glass 39 x 0.264 x 28 288 Dehumidified Air Qty 720 cfm<br />
Partition 611 x 0.3 x 23 4216<br />
Ceiling 239 x 0.4 x 23 2199 Refriger<strong>at</strong>ion Capacity 18474 Btu/hr<br />
Floor 0 x 0.4 x 23 0<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 45 x 0.1296 x 28 162 1.54 TR<br />
People (active) 4 x 245 x 1 980<br />
Equipment load (KW) 0.5 x 1000 x 3.41 1705<br />
Lights (W) 239 x 1 x 4.26 1019<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 12782 Capacity with 3% margin 1.6 TR<br />
Safety (12.5%) 1598<br />
Total space sensible he<strong>at</strong> gain 14379<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 1 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 45 x 0.080 x 68 244<br />
People (active) 4 x 205 x 1 820<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 1064<br />
Safety (5%) 53<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 1117<br />
4 Total Space he<strong>at</strong> 15497<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.93<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 2978<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐BIO<br />
INFORMATICS<br />
GROUND<br />
SEMINAR MULTI<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 1648 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 13.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 100 x 7.5 750<br />
Area- 1648 x 0.06 98.88<br />
Air changes / hour 1 370.8 371<br />
Total cfm 1104<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 599 x 0.34 x 29 5906<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 51.5 F<br />
Sunglass(SW) 155 x 0.22 x 66 2251<br />
All glass 233 x 0.264 x 28 1722 Dehumidified Air Qty 4556 cfm<br />
Partition 1439 x 0.3 x 23 9929<br />
Ceiling 1648 x 0.4 x 23 15162 Refriger<strong>at</strong>ion Capacity 198512 Btu/hr<br />
Floor 0 x 0.4 x 23 0<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 1104 x 0.1296 x 28 4005 16.54 TR<br />
People (active) 100 x 240 x 1 24000<br />
Equipment load (KW) 6 x 1000 x 3.41 20460<br />
Lights (W) 1648 x 1 x 4.26 7025<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 90459 Capacity with 3% margin 17.0 TR<br />
Safety (12.5%) 11307<br />
Total space sensible he<strong>at</strong> gain 101766<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 4 NOS 4.0 TR DUCTED<br />
Ventil<strong>at</strong>ion 1104 x 0.080 x 68 6033<br />
People (active) 100 x 160 x 1 16000<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 22033<br />
Safety (5%) 1102<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 23135<br />
4 Total Space he<strong>at</strong> 124901<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.81<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 73611<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐BIO<br />
INFORMATICS<br />
GROUND<br />
WETLAB INST<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 784 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 13.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 10 x 5 50<br />
Area- 784 x 0.06 47.04<br />
Air changes / hour 1 176.4 176<br />
Total cfm 126<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 406 x 0.34 x 33 4555
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54.5 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 102 x 0.264 x 28 754 Dehumidified Air Qty 2261 cfm<br />
Partition 978 x 0.3 x 23 6748<br />
Ceiling 784 x 0.4 x 23 7213 Refriger<strong>at</strong>ion Capacity 55346 Btu/hr<br />
Floor 0 x 0.4 x 23 0<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 126 x 0.1296 x 28 458 4.61 TR<br />
People (active) 10 x 245 x 1 2450<br />
Equipment load (KW) 4 x 1000 x 3.41 13640<br />
Lights (W) 784 x 1 x 4.26 3342<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 39160 Capacity with 3% margin 4.8 TR<br />
Safety (12.5%) 4895<br />
Total space sensible he<strong>at</strong> gain 44055<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 2 NOS 3.0 TR DUCTED<br />
Ventil<strong>at</strong>ion 126 x 0.080 x 68 690<br />
People (active) 10 x 205 x 1 2050<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 2740<br />
Safety (5%) 137<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 2877<br />
4 Total Space he<strong>at</strong> 46932<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.94<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 8415
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
GROUND<br />
CLASS ROOM‐1<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 1184 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 60 x 5 300<br />
Area- 1184 x 0.06 71.04<br />
Air changes / hour 1 246.6667 247<br />
Total cfm 482<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 532 x 0.34 x 33 5969<br />
Wall (NE) 328 x 0.34 x 25 2788<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 117 x 0.22 x 11 283<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 51.5 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 193.5 x 0.264 x 28 1430 Dehumidified Air Qty 2465 cfm<br />
Partition 677 x 0.3 x 23 4671<br />
Ceiling 1184 x 0.4 x 23 10893 Refriger<strong>at</strong>ion Capacity 100078 Btu/hr<br />
Floor 0 x 0.4 x 23 0<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 482 x 0.1296 x 28 1750 8.34 TR<br />
People (active) 60 x 240 x 1 14400<br />
Equipment load (KW) 0.5 x 1000 x 3.41 1705<br />
Lights (W) 1184 x 1 x 4.26 5047<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 48937 Capacity with 3% margin 8.6 TR<br />
Safety (12.5%) 6117<br />
Total space sensible he<strong>at</strong> gain 55054<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 3 NOS 3.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 482 x 0.080 x 68 2637<br />
People (active) 60 x 160 x 1 9600<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 12237<br />
Safety (5%) 612<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 12849<br />
4 Total Space he<strong>at</strong> 67903<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.81<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 32175<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
GROUND<br />
CLASS ROOM‐2<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong>
Area 1184 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 60 x 5 300<br />
Area- 1184 x 0.06 71.04<br />
Air changes / hour 1 246.6667 247<br />
Total cfm 482<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 532 x 0.34 x 29 5246<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 51.5 F<br />
Sunglass(SW) 117 x 0.22 x 66 1699<br />
All glass 193.5 x 0.264 x 28 1430 Dehumidified Air Qty 2473 cfm<br />
Partition 1005 x 0.3 x 23 6935<br />
Ceiling 1184 x 0.4 x 23 10893 Refriger<strong>at</strong>ion Capacity 100266 Btu/hr<br />
Floor 0 x 0.4 x 23 0<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 482 x 0.1296 x 28 1750 8.36 TR<br />
People (active) 60 x 240 x 1 14400<br />
Equipment load (KW) 0.5 x 1000 x 3.41 1705<br />
Lights (W) 1184 x 1 x 4.26 5047<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 49104 Capacity with 3% margin 8.6 TR<br />
Safety (12.5%) 6138<br />
Total space sensible he<strong>at</strong> gain 55242<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 3 NOS 3.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 482 x 0.080 x 68 2637<br />
People (active) 60 x 160 x 1 9600<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 12237<br />
Safety (5%) 612<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 12849<br />
4 Total Space he<strong>at</strong> 68091<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.81<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 32175<br />
g ‐ He<strong>at</strong> load form<strong>at</strong><br />
DY<br />
PROJECT: UNI<br />
FLOOR: GROUND<br />
AC FOR: CHING LAB‐1<br />
DATE: 22/09/2011<br />
PREPARED BY DBJ<br />
Area 582 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 20 x 5 100<br />
Area- 582 x 0.06 34.92
Air changes / hour 1 121.25 121<br />
Total cfm 175<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 328 x 0.34 x 33 3680<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 254 x 0.34 x 29 2504<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 52.5 F<br />
Sunglass(SW) 58 x 0.22 x 66 842<br />
All glass 97 x 0.264 x 28 717 Dehumidified Air Qty 1483 cfm<br />
Partition 532 x 0.3 x 23 3671<br />
Ceiling 582 x 0.4 x 23 5354 Refriger<strong>at</strong>ion Capacity 48732 Btu/hr<br />
Floor 0 x 0.4 x 23 0<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 175 x 0.1296 x 28 636 4.06 TR<br />
People (active) 20 x 245 x 1 4900<br />
Equipment load (KW) 1 x 1000 x 3.41 3410<br />
Lights (W) 582 x 1 x 4.26 2481<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 28196 Capacity with 3% margin 4.2 TR<br />
Safety (12.5%) 3525<br />
Total space sensible he<strong>at</strong> gain 31721<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain IDU SELECTED : 2 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 175 x 0.080 x 68 959<br />
People (active) 20 x 205 x 1 4100<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 5059<br />
Safety (5%) 253<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 5312<br />
4 Total Space he<strong>at</strong> 37033<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.86<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 11700<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
GROUND<br />
TEACHING LAB‐2<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 582 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 20 x 5 100<br />
Area- 582 x 0.06 34.92<br />
Air changes / hour 1 121.25 121<br />
Total cfm 175<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 254 x 0.34 x 21 1814 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 58 x 0.22 x 148 1888
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 52 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 97 x 0.264 x 28 717 Dehumidified Air Qty 1397 cfm<br />
Partition 860 x 0.3 x 23 5934<br />
Ceiling 582 x 0.4 x 23 5354 Refriger<strong>at</strong>ion Capacity 47538 Btu/hr<br />
Floor 0 x 0.4 x 23 0<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 175 x 0.1296 x 28 636 3.96 TR<br />
People (active) 20 x 245 x 1 4900<br />
Equipment load (KW) 1 x 1000 x 3.41 3410<br />
Lights (W) 582 x 1 x 4.26 2481<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 27135 Capacity with 3% margin 4.1 TR<br />
Safety (12.5%) 3392<br />
Total space sensible he<strong>at</strong> gain 30527<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 2 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 175 x 0.080 x 68 959<br />
People (active) 20 x 205 x 1 4100<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 5059<br />
Safety (5%) 253<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 5312<br />
4 Total Space he<strong>at</strong> 35838<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.85<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 11700<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
GROUND<br />
TEACHING LAB‐3<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 582 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 20 x 5 100<br />
Area- 582 x 0.06 34.92<br />
Air changes / hour 1 121.25 121<br />
Total cfm 175<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 254 x 0.34 x 21 1814 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 58 x 0.22 x 148 1888<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 52 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 97 x 0.264 x 28 717 Dehumidified Air Qty 1397 cfm<br />
Partition 860 x 0.3 x 23 5934<br />
Ceiling 582 x 0.4 x 23 5354 Refriger<strong>at</strong>ion Capacity 47538 Btu/hr<br />
Floor 0 x 0.4 x 23 0<br />
Roof 0 x 0.12 x 53 0
Ventil<strong>at</strong>ion 175 x 0.1296 x 28 636 3.96 TR<br />
People (active) 20 x 245 x 1 4900<br />
Equipment load (KW) 1 x 1000 x 3.41 3410<br />
Lights (W) 582 x 1 x 4.26 2481<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 27135 Capacity with 3% margin 4.1 TR<br />
Safety (12.5%) 3392<br />
Total space sensible he<strong>at</strong> gain 30527<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 2 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 175 x 0.080 x 68 959<br />
People (active) 20 x 205 x 1 4100<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 5059<br />
Safety (5%) 253<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 5312<br />
4 Total Space he<strong>at</strong> 35838<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.85<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 11700<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
GROUND<br />
TEACHING LAB‐4<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 582 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 20 x 5 100<br />
Area- 582 x 0.06 34.92<br />
Air changes / hour 1 121.25 121<br />
Total cfm 175<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 254 x 0.34 x 21 1814 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 328 x 0.34 x 25 2788<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 58 x 0.22 x 148 1888<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 52 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 97 x 0.264 x 28 717 Dehumidified Air Qty 1424 cfm<br />
Partition 532 x 0.3 x 23 3671<br />
Ceiling 582 x 0.4 x 23 5354 Refriger<strong>at</strong>ion Capacity 48128 Btu/hr<br />
Floor 0 x 0.4 x 23 0<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 175 x 0.1296 x 28 636 4.01 TR<br />
People (active) 20 x 245 x 1 4900<br />
Equipment load (KW) 1 x 1000 x 3.41 3410<br />
Lights (W) 582 x 1 x 4.26 2481<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 27660 Capacity with 3% margin 4.1 TR<br />
Safety (12.5%) 3457<br />
Total space sensible he<strong>at</strong> gain 31117<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 2 NOS 2.0 TR CONCEALED
Ventil<strong>at</strong>ion 175 x 0.080 x 68 959<br />
People (active) 20 x 205 x 1 4100<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 5059<br />
Safety (5%) 253<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 5312<br />
4 Total Space he<strong>at</strong> 36429<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.85<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 11700<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
GROUND<br />
OFFICE<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 377 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 4 x 5 20<br />
Area- 377 x 0.06 22.62<br />
Air changes / hour 1 78.54167 79<br />
Total cfm 55<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 171 x 0.34 x 25 1454<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 39 x 0.22 x 11 94 Appar<strong>at</strong>us Dew Point 54.5 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 58 x 0.264 x 28 429 Dehumidified Air Qty 991 cfm<br />
Partition 801 x 0.3 x 23 5527<br />
Ceiling 377 x 0.4 x 23 3468 Refriger<strong>at</strong>ion Capacity 24191 Btu/hr<br />
Floor 0 x 0.4 x 23 0<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 55 x 0.1296 x 28 201 2.02 TR<br />
People (active) 4 x 245 x 1 980<br />
Equipment load (KW) 1 x 1000 x 3.41 3410<br />
Lights (W) 377 x 1 x 4.26 1607<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 17170 Capacity with 3% margin 2.1 TR<br />
Safety (12.5%) 2146<br />
Total space sensible he<strong>at</strong> gain 19316<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 1 NOS 3.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 55 x 0.080 x 68 303<br />
People (active) 4 x 205 x 1 820<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 1123<br />
Safety (5%) 56<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 1179<br />
4 Total Space he<strong>at</strong> 20495<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.94<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 3696
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
GROUND<br />
PROFESSOR<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 237 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 2 x 5 10<br />
Area- 237 x 0.06 14.22<br />
Air changes / hour 1 49.375 49<br />
Total cfm 31<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54.5 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 20 x 0.264 x 28 148 Dehumidified Air Qty 554 cfm<br />
Partition 572 x 0.3 x 23 3947<br />
Ceiling 237 x 0.4 x 23 2180 Refriger<strong>at</strong>ion Capacity 13505 Btu/hr<br />
Floor 0 x 0.4 x 23 0<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 31 x 0.1296 x 28 114 1.13 TR<br />
People (active) 2 x 245 x 1 490<br />
Equipment load (KW) 0.5 x 1000 x 3.41 1705<br />
Lights (W) 237 x 1 x 4.26 1010<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 9595 Capacity with 3% margin 1.2 TR<br />
Safety (12.5%) 1199<br />
Total space sensible he<strong>at</strong> gain 10794<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 1 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 31 x 0.080 x 68 172<br />
People (active) 2 x 205 x 1 410<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 582<br />
Safety (5%) 29<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 611<br />
4 Total Space he<strong>at</strong> 11405<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.95<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 2100<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
GROUND<br />
DEAN<br />
22/09/2011<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong>
PREPARED BY<br />
DBJ<br />
Area 377 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 4 x 5 20<br />
Area- 377 x 0.06 22.62<br />
Air changes / hour 1 78.54167 79<br />
Total cfm 55<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 171 x 0.34 x 25 1454<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 39 x 0.22 x 11 94 Appar<strong>at</strong>us Dew Point 54.5 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 58 x 0.264 x 28 429 Dehumidified Air Qty 991 cfm<br />
Partition 801 x 0.3 x 23 5527<br />
Ceiling 377 x 0.4 x 23 3468 Refriger<strong>at</strong>ion Capacity 24191 Btu/hr<br />
Floor 0 x 0.4 x 23 0<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 55 x 0.1296 x 28 201 2.02 TR<br />
People (active) 4 x 245 x 1 980<br />
Equipment load (KW) 1 x 1000 x 3.41 3410<br />
Lights (W) 377 x 1 x 4.26 1607<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 17170 Capacity with 3% margin 2.1 TR<br />
Safety (12.5%) 2146<br />
Total space sensible he<strong>at</strong> gain 19316<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 1 NOS 3.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 55 x 0.080 x 68 303<br />
People (active) 4 x 205 x 1 820<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 1123<br />
Safety (5%) 56<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 1179<br />
4 Total Space he<strong>at</strong> 20495<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.94<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 3696<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
GROUND<br />
CLASS ROOM‐2<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 1184 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion
People (not smoking) 12 x 5 60<br />
Area- 1184 x 0.06 71.04<br />
Air changes / hour 1 246.6667 247<br />
Total cfm 170<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 328 x 0.34 x 33 3680<br />
Wall (NE) 532 x 0.34 x 25 4522<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 117 x 0.22 x 11 283 Appar<strong>at</strong>us Dew Point 54.5 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 193.5 x 0.264 x 28 1430 Dehumidified Air Qty 2358 cfm<br />
Partition 677 x 0.3 x 23 4671<br />
Ceiling 1184 x 0.4 x 23 10893 Refriger<strong>at</strong>ion Capacity 60307 Btu/hr<br />
Floor 0 x 0.4 x 23 0<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 170 x 0.1296 x 28 618 5.03 TR<br />
People (active) 12 x 240 x 1 2880<br />
Equipment load (KW) 2 x 1000 x 3.41 6820<br />
Lights (W) 1184 x 1 x 4.26 5047<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 40845 Capacity with 3% margin 5.2 TR<br />
Safety (12.5%) 5106<br />
Total space sensible he<strong>at</strong> gain 45950<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 6 NOS 1.5 TR CONCEALED<br />
Ventil<strong>at</strong>ion 170 x 0.080 x 68 931<br />
People (active) 12 x 160 x 1 1920<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 2851<br />
Safety (5%) 143<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 2994<br />
4 Total Space he<strong>at</strong> 48944<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.94<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 11363
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐BIO<br />
INFORMATICS<br />
FIRST FLOOR<br />
WET LAB<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 1250 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 13.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 10 x 5 50<br />
Area- 1250 x 0.06 75<br />
Air changes / hour 1 281.25 281<br />
Total cfm 163<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 508 x 0.34 x 25 4318<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 141 x 0.22 x 11 341 Appar<strong>at</strong>us Dew Point 53 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 180 x 0.264 x 28 1331 Dehumidified Air Qty 3029 cfm<br />
Partition 1282 x 0.3 x 23 8846<br />
Ceiling 0 x 0.4 x 23 0 Refriger<strong>at</strong>ion Capacity 77255 Btu/hr<br />
Floor 1250 x 0.4 x 23 11500<br />
Roof 1250 x 0.12 x 53 7950<br />
Ventil<strong>at</strong>ion 163 x 0.1296 x 28 590 6.44 TR<br />
People (active) 10 x 245 x 1 2450<br />
Equipment load (KW) 4 x 1000 x 3.41 13640<br />
Lights (W) 1250 x 1 x 4.26 5328<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 56293 Capacity with 3% margin 6.6 TR<br />
Safety (12.5%) 7037<br />
Total space sensible he<strong>at</strong> gain 63330<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 4 NOS 3.0 TR DUCTED<br />
Ventil<strong>at</strong>ion 163 x 0.080 x 68 888<br />
People (active) 10 x 205 x 1 2050<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 2938<br />
Safety (5%) 147<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 3085<br />
4 Total Space he<strong>at</strong> 66415<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.95<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 10839<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐BIO<br />
INFORMATICS<br />
FIRST FLOOR<br />
CLASS ROOM‐3<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong>
Area 930 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 13.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 40 x 7.5 300<br />
Area- 930 x 0.06 55.8<br />
Air changes / hour 1 209.25 209<br />
Total cfm 463<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 380 x 0.34 x 25 3230<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 102 x 0.22 x 11 247 Appar<strong>at</strong>us Dew Point 53 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 165 x 0.264 x 28 1220 Dehumidified Air Qty 2440 cfm<br />
Partition 1092 x 0.3 x 23 7535<br />
Ceiling 0 x 0.4 x 23 0 Refriger<strong>at</strong>ion Capacity 91253 Btu/hr<br />
Floor 930 x 0.4 x 23 8556<br />
Roof 930 x 0.12 x 53 5915<br />
Ventil<strong>at</strong>ion 463 x 0.1296 x 28 1678 7.60 TR<br />
People (active) 40 x 240 x 1 9600<br />
Equipment load (KW) 1 x 1000 x 3.41 3410<br />
Lights (W) 930 x 1 x 4.26 3964<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 45355 Capacity with 3% margin 7.8 TR<br />
Safety (12.5%) 5669<br />
Total space sensible he<strong>at</strong> gain 51024<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 4 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 463 x 0.080 x 68 2529<br />
People (active) 40 x 160 x 1 6400<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 8929<br />
Safety (5%) 446<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 9375<br />
4 Total Space he<strong>at</strong> 60399<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.84<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 30853<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐BIO<br />
INFORMATICS<br />
FIRST FLOOR<br />
RESEARCH SCHOLAR<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 445 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 13.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 6 x 5 30
Area- 445 x 0.06 26.7<br />
Air changes / hour 1 100.125 100<br />
Total cfm 74<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 226 x 0.34 x 21 1614 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 0 x 0.264 x 28 0 Dehumidified Air Qty 1232 cfm<br />
Partition 910 x 0.3 x 23 6279<br />
Ceiling 0 x 0.4 x 23 0 Refriger<strong>at</strong>ion Capacity 31225 Btu/hr<br />
Floor 445 x 0.4 x 23 4094<br />
Roof 445 x 0.12 x 53 2830<br />
Ventil<strong>at</strong>ion 74 x 0.1296 x 28 267 2.60 TR<br />
People (active) 6 x 245 x 1 1470<br />
Equipment load (KW) 1 x 1000 x 3.41 3410<br />
Lights (W) 445 x 1 x 4.26 1897<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 21861 Capacity with 3% margin 2.7 TR<br />
Safety (12.5%) 2733<br />
Total space sensible he<strong>at</strong> gain 24594<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 2 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 74 x 0.080 x 68 403<br />
People (active) 6 x 205 x 1 1230<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 1633<br />
Safety (5%) 82<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 1715<br />
4 Total Space he<strong>at</strong> 26308<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.93<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 4917<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐BIO<br />
INFORMATICS<br />
FIRST FLOOR<br />
CLASS ROOM‐2<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 963 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 13.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 40 x 7.5 300<br />
Area- 963 x 0.06 57.78<br />
Air changes / hour 1 216.675 217<br />
Total cfm 465<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 339 x 0.34 x 29 3343
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 53 F<br />
Sunglass(SW) 102 x 0.22 x 66 1481<br />
All glass 165 x 0.264 x 28 1220 Dehumidified Air Qty 2566 cfm<br />
Partition 1140 x 0.3 x 23 7866<br />
Ceiling 0 x 0.4 x 23 0 Refriger<strong>at</strong>ion Capacity 94073 Btu/hr<br />
Floor 963 x 0.4 x 23 8860<br />
Roof 963 x 0.12 x 53 6125<br />
Ventil<strong>at</strong>ion 465 x 0.1296 x 28 1688 7.84 TR<br />
People (active) 40 x 240 x 1 9600<br />
Equipment load (KW) 1 x 1000 x 3.41 3410<br />
Lights (W) 963 x 1 x 4.26 4105<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 47696 Capacity with 3% margin 8.1 TR<br />
Safety (12.5%) 5962<br />
Total space sensible he<strong>at</strong> gain 53658<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 4 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 465 x 0.080 x 68 2543<br />
People (active) 40 x 160 x 1 6400<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 8943<br />
Safety (5%) 447<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 9390<br />
4 Total Space he<strong>at</strong> 63048<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.85<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 31025<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐BIO<br />
INFORMATICS<br />
FIRST FLOOR<br />
CLASS ROOM‐1<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 888 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 13.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 40 x 7.5 300<br />
Area- 888 x 0.06 53.28<br />
Air changes / hour 1 199.8 200<br />
Total cfm 459<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 329 x 0.34 x 29 3244<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 52 F<br />
Sunglass(SW) 78 x 0.22 x 66 1133<br />
All glass 117 x 0.264 x 28 865 Dehumidified Air Qty 2332 cfm<br />
Partition 1130 x 0.3 x 23 7797<br />
Ceiling 0 x 0.4 x 23 0 Refriger<strong>at</strong>ion Capacity 90973 Btu/hr
Floor 888 x 0.4 x 23 8170<br />
Roof 888 x 0.12 x 53 5648<br />
Ventil<strong>at</strong>ion 459 x 0.1296 x 28 1667 7.58 TR<br />
People (active) 40 x 240 x 1 9600<br />
Equipment load (KW) 1 x 1000 x 3.41 3410<br />
Lights (W) 888 x 1 x 4.26 3785<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 45317 Capacity with 3% margin 7.8 TR<br />
Safety (12.5%) 5665<br />
Total space sensible he<strong>at</strong> gain 50982<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 4 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 459 x 0.080 x 68 2511<br />
People (active) 40 x 160 x 1 6400<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 8911<br />
Safety (5%) 446<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 9356<br />
4 Total Space he<strong>at</strong> 60338<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.84<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 30635<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐BIO<br />
INFORMATICS<br />
FIRST FLOOR<br />
RESEARCH LABS<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 888 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 13.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 40 x 7.5 300<br />
Area- 888 x 0.06 53.28<br />
Air changes / hour 1 199.8 200<br />
Total cfm 459<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 329 x 0.34 x 29 3244<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 52 F<br />
Sunglass(SW) 78 x 0.22 x 66 1133<br />
All glass 117 x 0.264 x 28 865 Dehumidified Air Qty 2332 cfm<br />
Partition 1130 x 0.3 x 23 7797<br />
Ceiling 0 x 0.4 x 23 0 Refriger<strong>at</strong>ion Capacity 90973 Btu/hr<br />
Floor 888 x 0.4 x 23 8170<br />
Roof 888 x 0.12 x 53 5648<br />
Ventil<strong>at</strong>ion 459 x 0.1296 x 28 1667 7.58 TR<br />
People (active) 40 x 240 x 1 9600<br />
Equipment load (KW) 1 x 1000 x 3.41 3410<br />
Lights (W) 888 x 1 x 4.26 3785<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 45317 Capacity with 3% margin 7.8 TR<br />
Safety (12.5%) 5665
Total space sensible he<strong>at</strong> gain 50982<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
Ventil<strong>at</strong>ion 459 x 0.080 x 68 2511<br />
People (active) 40 x 160 x 1 6400<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 8911<br />
Safety (5%) 446<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 9356<br />
4 Total Space he<strong>at</strong> 60338<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.84<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 30635<br />
IDU SELECTED : 4 NOS 2.0 TR CONCEALED<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐BIO<br />
INFORMATICS<br />
FIRST FLOOR<br />
CABIN TYPICAL<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 119 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 13.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 2 x 5 10<br />
Area- 119 x 0.06 7.125<br />
Air changes / hour 1 26.71875 27<br />
Total cfm 22<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 117 x 0.34 x 25 997<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 39 x 0.22 x 11 94 Appar<strong>at</strong>us Dew Point 54.5 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 39 x 0.264 x 28 288 Dehumidified Air Qty 488 cfm<br />
Partition 355 x 0.3 x 23 2448<br />
Ceiling 0 x 0.4 x 23 0 Refriger<strong>at</strong>ion Capacity 11557 Btu/hr<br />
Floor 119 x 0.4 x 23 1093<br />
Roof 119 x 0.12 x 53 755<br />
Ventil<strong>at</strong>ion 22 x 0.1296 x 28 81 0.96 TR<br />
People (active) 2 x 245 x 1 490<br />
Equipment load (KW) 0.5 x 1000 x 3.41 1705<br />
Lights (W) 119 x 1 x 4.26 506<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 8457 Capacity with 3% margin 1.0 TR<br />
Safety (12.5%) 1057<br />
Total space sensible he<strong>at</strong> gain 9514<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 13 NOS 1.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 22 x 0.080 x 68 122<br />
People (active) 2 x 205 x 1 410<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 532<br />
Safety (5%) 27<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 558<br />
4 Total Space he<strong>at</strong> 10072<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.94
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 1485
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
FIRST FLOOR<br />
CLASS ROOM‐1<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 1184 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 60 x 5 300<br />
Area- 1184 x 0.06 71.04<br />
Air changes / hour 1 246.6667 247<br />
Total cfm 482<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 532 x 0.34 x 33 5969<br />
Wall (NE) 328 x 0.34 x 25 2788<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 117 x 0.22 x 11 283<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 193.5 x 0.264 x 28 1430 Dehumidified Air Qty 3372 cfm<br />
Partition 677 x 0.3 x 23 4671<br />
Ceiling 1184 x 0.4 x 23 10893 Refriger<strong>at</strong>ion Capacity 112332 Btu/hr<br />
Floor 1184 x 0.4 x 23 10893<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 482 x 0.1296 x 28 1750 9.36 TR<br />
People (active) 60 x 240 x 1 14400<br />
Equipment load (KW) 0.5 x 1000 x 3.41 1705<br />
Lights (W) 1184 x 1 x 4.26 5047<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 59830 Capacity with 3% margin 9.6 TR<br />
Safety (12.5%) 7479<br />
Total space sensible he<strong>at</strong> gain 67308<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 3 NOS 3.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 482 x 0.080 x 68 2637<br />
People (active) 60 x 160 x 1 9600<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 12237<br />
Safety (5%) 612<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 12849<br />
4 Total Space he<strong>at</strong> 80157<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.84<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 32175<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
FIRST FLOOR<br />
CLASS ROOM‐2<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong>
Area 1184 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 60 x 5 300<br />
Area- 1184 x 0.06 71.04<br />
Air changes / hour 1 246.6667 247<br />
Total cfm 482<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 532 x 0.34 x 29 5246<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54 F<br />
Sunglass(SW) 117 x 0.22 x 66 1699<br />
All glass 193.5 x 0.264 x 28 1430 Dehumidified Air Qty 3382 cfm<br />
Partition 1005 x 0.3 x 23 6935<br />
Ceiling 1184 x 0.4 x 23 10893 Refriger<strong>at</strong>ion Capacity 112520 Btu/hr<br />
Floor 1184 x 0.4 x 23 10893<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 482 x 0.1296 x 28 1750 9.38 TR<br />
People (active) 60 x 240 x 1 14400<br />
Equipment load (KW) 0.5 x 1000 x 3.41 1705<br />
Lights (W) 1184 x 1 x 4.26 5047<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 59997 Capacity with 3% margin 9.7 TR<br />
Safety (12.5%) 7500<br />
Total space sensible he<strong>at</strong> gain 67497<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 3 NOS 3.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 482 x 0.080 x 68 2637<br />
People (active) 60 x 160 x 1 9600<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 12237<br />
Safety (5%) 612<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 12849<br />
4 Total Space he<strong>at</strong> 80346<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.84<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 32175<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
FIRST FLOOR<br />
VISITING PROF‐1<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 582 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 20 x 5 100
Area- 582 x 0.06 34.92<br />
Air changes / hour 1 121.25 121<br />
Total cfm 175<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 328 x 0.34 x 33 3680<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 254 x 0.34 x 29 2504<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54 F<br />
Sunglass(SW) 58 x 0.22 x 66 842<br />
All glass 97 x 0.264 x 28 717 Dehumidified Air Qty 1891 cfm<br />
Partition 532 x 0.3 x 23 3671<br />
Ceiling 582 x 0.4 x 23 5354 Refriger<strong>at</strong>ion Capacity 54756 Btu/hr<br />
Floor 582 x 0.4 x 23 5354<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 175 x 0.1296 x 28 636 4.56 TR<br />
People (active) 20 x 245 x 1 4900<br />
Equipment load (KW) 1 x 1000 x 3.41 3410<br />
Lights (W) 582 x 1 x 4.26 2481<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 33551 Capacity with 3% margin 4.7 TR<br />
Safety (12.5%) 4194<br />
Total space sensible he<strong>at</strong> gain 37744<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 2 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 175 x 0.080 x 68 959<br />
People (active) 20 x 205 x 1 4100<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 5059<br />
Safety (5%) 253<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 5312<br />
4 Total Space he<strong>at</strong> 43056<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.88<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 11700<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
FIRST FLOOR<br />
VISITING PROF‐2<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 582 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 20 x 5 100<br />
Area- 582 x 0.06 34.92<br />
Air changes / hour 1 121.25 121<br />
Total cfm 175<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 254 x 0.34 x 21 1814 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 0 x 0.34 x 29 0
Sunglass(NW) 58 x 0.22 x 148 1888<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 97 x 0.264 x 28 717 Dehumidified Air Qty 1831 cfm<br />
Partition 860 x 0.3 x 23 5934<br />
Ceiling 582 x 0.4 x 23 5354 Refriger<strong>at</strong>ion Capacity 53562 Btu/hr<br />
Floor 582 x 0.4 x 23 5354<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 175 x 0.1296 x 28 636 4.46 TR<br />
People (active) 20 x 245 x 1 4900<br />
Equipment load (KW) 1 x 1000 x 3.41 3410<br />
Lights (W) 582 x 1 x 4.26 2481<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 32489 Capacity with 3% margin 4.6 TR<br />
Safety (12.5%) 4061<br />
Total space sensible he<strong>at</strong> gain 36550<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 2 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 175 x 0.080 x 68 959<br />
People (active) 20 x 205 x 1 4100<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 5059<br />
Safety (5%) 253<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 5312<br />
4 Total Space he<strong>at</strong> 41862<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.87<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 11700<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
FIRST FLOOR<br />
TEACHING LAB‐1<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 582 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 20 x 5 100<br />
Area- 582 x 0.06 34.92<br />
Air changes / hour 1 121.25 121<br />
Total cfm 175<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 254 x 0.34 x 21 1814 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 58 x 0.22 x 148 1888<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 97 x 0.264 x 28 717 Dehumidified Air Qty 1831 cfm<br />
Partition 860 x 0.3 x 23 5934<br />
Ceiling 582 x 0.4 x 23 5354 Refriger<strong>at</strong>ion Capacity 53562 Btu/hr<br />
Floor 582 x 0.4 x 23 5354
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 175 x 0.1296 x 28 636 4.46 TR<br />
People (active) 20 x 245 x 1 4900<br />
Equipment load (KW) 1 x 1000 x 3.41 3410<br />
Lights (W) 582 x 1 x 4.26 2481<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 32489 Capacity with 3% margin 4.6 TR<br />
Safety (12.5%) 4061<br />
Total space sensible he<strong>at</strong> gain 36550<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 2 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 175 x 0.080 x 68 959<br />
People (active) 20 x 205 x 1 4100<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 5059<br />
Safety (5%) 253<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 5312<br />
4 Total Space he<strong>at</strong> 41862<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.87<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 11700<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
FIRST FLOOR<br />
TEACHING LAB‐2<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 582 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 20 x 5 100<br />
Area- 582 x 0.06 34.92<br />
Air changes / hour 1 121.25 121<br />
Total cfm 175<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 254 x 0.34 x 21 1814 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 328 x 0.34 x 25 2788<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 58 x 0.22 x 148 1888<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 97 x 0.264 x 28 717 Dehumidified Air Qty 1861 cfm<br />
Partition 532 x 0.3 x 23 3671<br />
Ceiling 582 x 0.4 x 23 5354 Refriger<strong>at</strong>ion Capacity 54152 Btu/hr<br />
Floor 582 x 0.4 x 23 5354<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 175 x 0.1296 x 28 636 4.51 TR<br />
People (active) 20 x 245 x 1 4900<br />
Equipment load (KW) 1 x 1000 x 3.41 3410<br />
Lights (W) 582 x 1 x 4.26 2481<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 33014 Capacity with 3% margin 4.6 TR<br />
Safety (12.5%) 4127<br />
Total space sensible he<strong>at</strong> gain 37141
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
Ventil<strong>at</strong>ion 175 x 0.080 x 68 959<br />
People (active) 20 x 205 x 1 4100<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 5059<br />
Safety (5%) 253<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 5312<br />
4 Total Space he<strong>at</strong> 42453<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.87<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 11700<br />
IDU SELECTED : 2 NOS 2.0 TR CONCEALED<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
FIRST FLOOR<br />
SYNTHESIS LAB‐1<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 786 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 5 x 5 25<br />
Area- 786 x 0.06 47.16<br />
Air changes / hour 1 163.75 164<br />
Total cfm 94<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 345 x 0.34 x 25 2933<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 78 x 0.22 x 11 189 Appar<strong>at</strong>us Dew Point 54 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 136 x 0.264 x 28 1005 Dehumidified Air Qty 2065 cfm<br />
Partition 914 x 0.3 x 23 6307<br />
Ceiling 786 x 0.4 x 23 7231 Refriger<strong>at</strong>ion Capacity 49082 Btu/hr<br />
Floor 786 x 0.4 x 23 7231<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 94 x 0.1296 x 28 340 4.09 TR<br />
People (active) 5 x 245 x 1 1225<br />
Equipment load (KW) 2 x 1000 x 3.41 6820<br />
Lights (W) 786 x 1 x 4.26 3350<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 36631 Capacity with 3% margin 4.2 TR<br />
Safety (12.5%) 4579<br />
Total space sensible he<strong>at</strong> gain 41210<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 2 NOS 3.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 94 x 0.080 x 68 513<br />
People (active) 5 x 205 x 1 1025<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 1538<br />
Safety (5%) 77<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 1615<br />
4 Total Space he<strong>at</strong> 42825<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.96<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 6257
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
FIRST FLOOR<br />
SYNTHESIS LAB‐2<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 786 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 5 x 5 25<br />
Area- 786 x 0.06 47.16<br />
Air changes / hour 1 163.75 164<br />
Total cfm 94<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 345 x 0.34 x 25 2933<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 78 x 0.22 x 11 189 Appar<strong>at</strong>us Dew Point 54 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 136 x 0.264 x 28 1005 Dehumidified Air Qty 2065 cfm<br />
Partition 914 x 0.3 x 23 6307<br />
Ceiling 786 x 0.4 x 23 7231 Refriger<strong>at</strong>ion Capacity 49082 Btu/hr<br />
Floor 786 x 0.4 x 23 7231<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 94 x 0.1296 x 28 340 4.09 TR<br />
People (active) 5 x 245 x 1 1225<br />
Equipment load (KW) 2 x 1000 x 3.41 6820<br />
Lights (W) 786 x 1 x 4.26 3350<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 36631 Capacity with 3% margin 4.2 TR<br />
Safety (12.5%) 4579<br />
Total space sensible he<strong>at</strong> gain 41210<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 2 NOS 3.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 94 x 0.080 x 68 513<br />
People (active) 5 x 205 x 1 1025<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 1538<br />
Safety (5%) 77<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 1615<br />
4 Total Space he<strong>at</strong> 42825<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.96<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 6257<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
FIRST FLOOR<br />
SYNTHESIS LAB‐3<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong>
DATE:<br />
PREPARED BY<br />
22/09/2011<br />
DBJ<br />
Area 786 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 5 x 5 25<br />
Area- 786 x 0.06 47.16<br />
Air changes / hour 1 163.75 164<br />
Total cfm 94<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 345 x 0.34 x 25 2933<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 328 x 0.22 x 11 794<br />
Sunglass(NE) 78 x 0.22 x 11 189 Appar<strong>at</strong>us Dew Point 54 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 58 x 0.264 x 28 429 Dehumidified Air Qty 1944 cfm<br />
Partition 573 x 0.3 x 23 3954<br />
Ceiling 786 x 0.4 x 23 7231 Refriger<strong>at</strong>ion Capacity 46680 Btu/hr<br />
Floor 786 x 0.4 x 23 7231<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 94 x 0.1296 x 28 340 3.89 TR<br />
People (active) 5 x 245 x 1 1225<br />
Equipment load (KW) 2 x 1000 x 3.41 6820<br />
Lights (W) 786 x 1 x 4.26 3350<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 34496 Capacity with 3% margin 4.0 TR<br />
Safety (12.5%) 4312<br />
Total space sensible he<strong>at</strong> gain 38808<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 2 NOS 3.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 94 x 0.080 x 68 513<br />
People (active) 5 x 205 x 1 1025<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 1538<br />
Safety (5%) 77<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 1615<br />
4 Total Space he<strong>at</strong> 40422<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.96<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 6257
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
SECOND FLOOR<br />
ANALYTICAL LAB‐1<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 302 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 3 x 5 15<br />
Area- 302 x 0.06 18.12<br />
Air changes / hour 1 62.91667 63<br />
Total cfm 43<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 171 x 0.34 x 33 1919<br />
Wall (NE) 267 x 0.34 x 25 2270<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 39 x 0.22 x 11 94<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54.5 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 58 x 0.264 x 28 429 Dehumidified Air Qty 982 cfm<br />
Partition 416 x 0.3 x 23 2870<br />
Ceiling 302 x 0.4 x 23 2778 Refriger<strong>at</strong>ion Capacity 22756 Btu/hr<br />
Floor 302 x 0.4 x 23 2778<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 43 x 0.1296 x 28 156 1.90 TR<br />
People (active) 3 x 240 x 1 720<br />
Equipment load (KW) 0.5 x 1000 x 3.41 1705<br />
Lights (W) 302 x 1 x 4.26 1287<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 17007 Capacity with 3% margin 2.0 TR<br />
Safety (12.5%) 2126<br />
Total space sensible he<strong>at</strong> gain 19133<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 1 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 43 x 0.080 x 68 235<br />
People (active) 3 x 160 x 1 480<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 715<br />
Safety (5%) 36<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 751<br />
4 Total Space he<strong>at</strong> 19884<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.96<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 2872<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
SECOND FLOOR<br />
ANALYTICAL LAB‐2<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong>
Area 302 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 3 x 5 15<br />
Area- 302 x 0.06 18.12<br />
Air changes / hour 1 62.91667 63<br />
Total cfm 43<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 171 x 0.34 x 33 1919<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 39 x 0.22 x 11 94<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54.5 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 58 x 0.264 x 28 429 Dehumidified Air Qty 968 cfm<br />
Partition 707 x 0.3 x 23 4878<br />
Ceiling 302 x 0.4 x 23 2778 Refriger<strong>at</strong>ion Capacity 22620 Btu/hr<br />
Floor 302 x 0.4 x 23 2778<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 43 x 0.1296 x 28 156 1.89 TR<br />
People (active) 3 x 245 x 1 735<br />
Equipment load (KW) 0.5 x 1000 x 3.41 1705<br />
Lights (W) 302 x 1 x 4.26 1287<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 16760 Capacity with 3% margin 1.9 TR<br />
Safety (12.5%) 2095<br />
Total space sensible he<strong>at</strong> gain 18855<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 1 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 43 x 0.080 x 68 235<br />
People (active) 3 x 205 x 1 615<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 850<br />
Safety (5%) 43<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 893<br />
4 Total Space he<strong>at</strong> 19748<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.95<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 2872<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
SECOND FLOOR<br />
ANALYTICAL LAB‐3<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 302 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 3 x 5 15
Area- 302 x 0.06 18.12<br />
Air changes / hour 1 62.91667 63<br />
Total cfm 43<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 171 x 0.34 x 33 1919<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 39 x 0.22 x 11 94<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54.5 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 58 x 0.264 x 28 429 Dehumidified Air Qty 958 cfm<br />
Partition 683 x 0.3 x 23 4713<br />
Ceiling 302 x 0.4 x 23 2778 Refriger<strong>at</strong>ion Capacity 22434 Btu/hr<br />
Floor 302 x 0.4 x 23 2778<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 43 x 0.1296 x 28 156 1.87 TR<br />
People (active) 3 x 245 x 1 735<br />
Equipment load (KW) 0.5 x 1000 x 3.41 1705<br />
Lights (W) 302 x 1 x 4.26 1287<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 16595 Capacity with 3% margin 1.9 TR<br />
Safety (12.5%) 2074<br />
Total space sensible he<strong>at</strong> gain 18669<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 1 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 43 x 0.080 x 68 235<br />
People (active) 3 x 205 x 1 615<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 850<br />
Safety (5%) 43<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 893<br />
4 Total Space he<strong>at</strong> 19562<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.95<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 2872<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
SECOND FLOOR<br />
ANALYTICAL LAB‐4<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 302 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 3 x 5 15<br />
Area- 302 x 0.06 18.12<br />
Air changes / hour 1 62.91667 63<br />
Total cfm 43<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 171 x 0.34 x 29 1686
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54.5 F<br />
Sunglass(SW) 39 x 0.22 x 66 566<br />
All glass 58 x 0.264 x 28 429 Dehumidified Air Qty 972 cfm<br />
Partition 682 x 0.3 x 23 4706<br />
Ceiling 302 x 0.4 x 23 2778 Refriger<strong>at</strong>ion Capacity 22696 Btu/hr<br />
Floor 302 x 0.4 x 23 2778<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 43 x 0.1296 x 28 156 1.89 TR<br />
People (active) 3 x 245 x 1 735<br />
Equipment load (KW) 0.5 x 1000 x 3.41 1705<br />
Lights (W) 302 x 1 x 4.26 1287<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 16827 Capacity with 3% margin 1.9 TR<br />
Safety (12.5%) 2103<br />
Total space sensible he<strong>at</strong> gain 18931<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 1 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 43 x 0.080 x 68 235<br />
People (active) 3 x 205 x 1 615<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 850<br />
Safety (5%) 43<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 893<br />
4 Total Space he<strong>at</strong> 19824<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.95<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 2872<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
SECOND FLOOR<br />
ANALYTICAL LAB‐5<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 302 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 3 x 5 15<br />
Area- 302 x 0.06 18.12<br />
Air changes / hour 1 62.91667 63<br />
Total cfm 43<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 171 x 0.34 x 29 1686<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54.5 F<br />
Sunglass(SW) 39 x 0.22 x 66 566<br />
All glass 58 x 0.264 x 28 429 Dehumidified Air Qty 982 cfm<br />
Partition 707 x 0.3 x 23 4878<br />
Ceiling 302 x 0.4 x 23 2778 Refriger<strong>at</strong>ion Capacity 22890 Btu/hr<br />
Floor 302 x 0.4 x 23 2778
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 43 x 0.1296 x 28 156 1.91 TR<br />
People (active) 3 x 245 x 1 735<br />
Equipment load (KW) 0.5 x 1000 x 3.41 1705<br />
Lights (W) 302 x 1 x 4.26 1287<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 17000 Capacity with 3% margin 2.0 TR<br />
Safety (12.5%) 2125<br />
Total space sensible he<strong>at</strong> gain 19125<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 1 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 43 x 0.080 x 68 235<br />
People (active) 3 x 205 x 1 615<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 850<br />
Safety (5%) 43<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 893<br />
4 Total Space he<strong>at</strong> 20018<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.96<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 2872<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
SECOND FLOOR<br />
ANALYTICAL LAB‐6<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 302 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 3 x 5 15<br />
Area- 302 x 0.06 18.12<br />
Air changes / hour 1 62.91667 63<br />
Total cfm 43<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 171 x 0.34 x 29 1686<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54.5 F<br />
Sunglass(SW) 39 x 0.22 x 66 566<br />
All glass 58 x 0.264 x 28 429 Dehumidified Air Qty 972 cfm<br />
Partition 682 x 0.3 x 23 4706<br />
Ceiling 302 x 0.4 x 23 2778 Refriger<strong>at</strong>ion Capacity 22696 Btu/hr<br />
Floor 302 x 0.4 x 23 2778<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 43 x 0.1296 x 28 156 1.89 TR<br />
People (active) 3 x 245 x 1 735<br />
Equipment load (KW) 0.5 x 1000 x 3.41 1705<br />
Lights (W) 302 x 1 x 4.26 1287<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 16827 Capacity with 3% margin 1.9 TR<br />
Safety (12.5%) 2103<br />
Total space sensible he<strong>at</strong> gain 18931
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
Ventil<strong>at</strong>ion 43 x 0.080 x 68 235<br />
People (active) 3 x 205 x 1 615<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 850<br />
Safety (5%) 43<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 893<br />
4 Total Space he<strong>at</strong> 19824<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.95<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 2872<br />
IDU SELECTED : 1 NOS 2.0 TR CONCEALED<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
SECOND FLOOR<br />
ANALYTICAL LAB‐7<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 302 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 3 x 5 15<br />
Area- 302 x 0.06 18.12<br />
Air changes / hour 1 62.91667 63<br />
Total cfm 43<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 267 x 0.34 x 33 2996<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 171 x 0.34 x 29 1686<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54.5 F<br />
Sunglass(SW) 39 x 0.22 x 66 566<br />
All glass 58 x 0.264 x 28 429 Dehumidified Air Qty 1045 cfm<br />
Partition 432 x 0.3 x 23 2981<br />
Ceiling 302 x 0.4 x 23 2778 Refriger<strong>at</strong>ion Capacity 24125 Btu/hr<br />
Floor 302 x 0.4 x 23 2778<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 43 x 0.1296 x 28 156 2.01 TR<br />
People (active) 3 x 245 x 1 735<br />
Equipment load (KW) 0.5 x 1000 x 3.41 1705<br />
Lights (W) 302 x 1 x 4.26 1287<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 18098 Capacity with 3% margin 2.1 TR<br />
Safety (12.5%) 2262<br />
Total space sensible he<strong>at</strong> gain 20360<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 1 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 43 x 0.080 x 68 235<br />
People (active) 3 x 205 x 1 615<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 850<br />
Safety (5%) 43<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 893<br />
4 Total Space he<strong>at</strong> 21253<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.96<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 2872
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
SECOND FLOOR<br />
ANALYTICAL LAB‐8<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 302 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 3 x 5 15<br />
Area- 302 x 0.06 18.12<br />
Air changes / hour 1 62.91667 63<br />
Total cfm 43<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 171 x 0.34 x 29 1686<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54.5 F<br />
Sunglass(SW) 39 x 0.22 x 66 566<br />
All glass 58 x 0.264 x 28 429 Dehumidified Air Qty 992 cfm<br />
Partition 732 x 0.3 x 23 5051<br />
Ceiling 302 x 0.4 x 23 2778 Refriger<strong>at</strong>ion Capacity 23084 Btu/hr<br />
Floor 302 x 0.4 x 23 2778<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 43 x 0.1296 x 28 156 1.92 TR<br />
People (active) 3 x 245 x 1 735<br />
Equipment load (KW) 0.5 x 1000 x 3.41 1705<br />
Lights (W) 302 x 1 x 4.26 1287<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 17172 Capacity with 3% margin 2.0 TR<br />
Safety (12.5%) 2147<br />
Total space sensible he<strong>at</strong> gain 19319<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 1 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 43 x 0.080 x 68 235<br />
People (active) 3 x 205 x 1 615<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 850<br />
Safety (5%) 43<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 893<br />
4 Total Space he<strong>at</strong> 20212<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.96<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 2872<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
SECOND FLOOR<br />
ANALYTICAL LAB‐9<br />
22/09/2011<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong>
PREPARED BY<br />
DBJ<br />
Area 302 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 3 x 5 15<br />
Area- 302 x 0.06 18.12<br />
Air changes / hour 1 62.91667 63<br />
Total cfm 43<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 171 x 0.34 x 21 1221 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 39 x 0.22 x 148 1270<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54.5 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 58 x 0.264 x 28 429 Dehumidified Air Qty 987 cfm<br />
Partition 687 x 0.3 x 23 4740<br />
Ceiling 302 x 0.4 x 23 2778 Refriger<strong>at</strong>ion Capacity 23003 Btu/hr<br />
Floor 302 x 0.4 x 23 2778<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 43 x 0.1296 x 28 156 1.92 TR<br />
People (active) 3 x 245 x 1 735<br />
Equipment load (KW) 0.5 x 1000 x 3.41 1705<br />
Lights (W) 302 x 1 x 4.26 1287<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 17100 Capacity with 3% margin 2.0 TR<br />
Safety (12.5%) 2138<br />
Total space sensible he<strong>at</strong> gain 19238<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 1 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 43 x 0.080 x 68 235<br />
People (active) 3 x 205 x 1 615<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 850<br />
Safety (5%) 43<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 893<br />
4 Total Space he<strong>at</strong> 20131<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.96<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 2872<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
SECOND FLOOR<br />
ANALYTICAL LAB‐10<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 302 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion
People (not smoking) 3 x 5 15<br />
Area- 302 x 0.06 18.12<br />
Air changes / hour 1 62.91667 63<br />
Total cfm 43<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 171 x 0.34 x 21 1221 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 39 x 0.22 x 148 1270<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54.5 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 58 x 0.264 x 28 429 Dehumidified Air Qty 992 cfm<br />
Partition 699 x 0.3 x 23 4823<br />
Ceiling 302 x 0.4 x 23 2778 Refriger<strong>at</strong>ion Capacity 23096 Btu/hr<br />
Floor 302 x 0.4 x 23 2778<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 43 x 0.1296 x 28 156 1.92 TR<br />
People (active) 3 x 245 x 1 735<br />
Equipment load (KW) 0.5 x 1000 x 3.41 1705<br />
Lights (W) 302 x 1 x 4.26 1287<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 17183 Capacity with 3% margin 2.0 TR<br />
Safety (12.5%) 2148<br />
Total space sensible he<strong>at</strong> gain 19331<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 1 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 43 x 0.080 x 68 235<br />
People (active) 3 x 205 x 1 615<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 850<br />
Safety (5%) 43<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 893<br />
4 Total Space he<strong>at</strong> 20224<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.96<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 2872<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
SECOND FLOOR<br />
ANALYTICAL LAB‐11<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 302 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 3 x 5 15<br />
Area- 302 x 0.06 18.12<br />
Air changes / hour 1 62.91667 63<br />
Total cfm 43<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 171 x 0.34 x 21 1221 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 0 x 0.34 x 25 0
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 39 x 0.22 x 148 1270<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54.5 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 58 x 0.264 x 28 429 Dehumidified Air Qty 1010 cfm<br />
Partition 744 x 0.3 x 23 5134<br />
Ceiling 302 x 0.4 x 23 2778 Refriger<strong>at</strong>ion Capacity 23445 Btu/hr<br />
Floor 302 x 0.4 x 23 2778<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 43 x 0.1296 x 28 156 1.95 TR<br />
People (active) 3 x 245 x 1 735<br />
Equipment load (KW) 0.5 x 1000 x 3.41 1705<br />
Lights (W) 302 x 1 x 4.26 1287<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 17493 Capacity with 3% margin 2.0 TR<br />
Safety (12.5%) 2187<br />
Total space sensible he<strong>at</strong> gain 19680<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 1 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 43 x 0.080 x 68 235<br />
People (active) 3 x 205 x 1 615<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 850<br />
Safety (5%) 43<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 893<br />
4 Total Space he<strong>at</strong> 20573<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.96<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 2872<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
SECOND FLOOR<br />
ANALYTICAL LAB‐12<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 302 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 3 x 5 15<br />
Area- 302 x 0.06 18.12<br />
Air changes / hour 1 62.91667 63<br />
Total cfm 43<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 171 x 0.34 x 21 1221 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 267 x 0.34 x 25 2270<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 39 x 0.22 x 148 1270<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54.5 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 58 x 0.264 x 28 429 Dehumidified Air Qty 1012 cfm<br />
Partition 420 x 0.3 x 23 2898<br />
Ceiling 302 x 0.4 x 23 2778 Refriger<strong>at</strong>ion Capacity 23483 Btu/hr
Floor 302 x 0.4 x 23 2778<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 43 x 0.1296 x 28 156 1.96 TR<br />
People (active) 3 x 245 x 1 735<br />
Equipment load (KW) 0.5 x 1000 x 3.41 1705<br />
Lights (W) 302 x 1 x 4.26 1287<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 17527 Capacity with 3% margin 2.0 TR<br />
Safety (12.5%) 2191<br />
Total space sensible he<strong>at</strong> gain 19718<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 1 NOS 2.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 43 x 0.080 x 68 235<br />
People (active) 3 x 205 x 1 615<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 850<br />
Safety (5%) 43<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 893<br />
4 Total Space he<strong>at</strong> 20611<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.96<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 2872<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
SECOND FLOOR<br />
RESEARCH SCHOLARS<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 937 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 10 x 5 50<br />
Area- 937 x 0.06 56.22<br />
Air changes / hour 1 195.2083 195<br />
Total cfm 138<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 532 x 0.34 x 25 4522<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 117 x 0.22 x 11 283 Appar<strong>at</strong>us Dew Point 54 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 213 x 0.264 x 28 1574 Dehumidified Air Qty 2443 cfm<br />
Partition 863 x 0.3 x 23 5955<br />
Ceiling 937 x 0.4 x 23 8620 Refriger<strong>at</strong>ion Capacity 60914 Btu/hr<br />
Floor 937 x 0.4 x 23 8620<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 138 x 0.1296 x 28 501 5.08 TR<br />
People (active) 10 x 245 x 1 2450<br />
Equipment load (KW) 2 x 1000 x 3.41 6820<br />
Lights (W) 937 x 1 x 4.26 3994<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 43340 Capacity with 3% margin 5.2 TR<br />
Safety (12.5%) 5418
Total space sensible he<strong>at</strong> gain 48758<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
Ventil<strong>at</strong>ion 138 x 0.080 x 68 755<br />
People (active) 10 x 205 x 1 2050<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 2805<br />
Safety (5%) 140<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 2945<br />
4 Total Space he<strong>at</strong> 51703<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.94<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 9211<br />
IDU SELECTED : 3 NOS 2.0 TR CONCEALED<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
SECOND FLOOR<br />
CONFERENCE<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 937 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 60 x 7.5 450<br />
Area- 937 x 0.06 56.22<br />
Air changes / hour 1 195.2083 195<br />
Total cfm 658<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 267 x 0.34 x 33 2996<br />
Wall (NE) 532 x 0.34 x 25 4522<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 117 x 0.22 x 11 283 Appar<strong>at</strong>us Dew Point 54.5 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 213 x 0.264 x 28 1574 Dehumidified Air Qty 3137 cfm<br />
Partition 597 x 0.3 x 23 4119<br />
Ceiling 937 x 0.4 x 23 8620 Refriger<strong>at</strong>ion Capacity 116353 Btu/hr<br />
Floor 937 x 0.4 x 23 8620<br />
Roof 0 x 0.12 x 53 0<br />
Ventil<strong>at</strong>ion 658 x 0.1296 x 28 2388 9.70 TR<br />
People (active) 60 x 230 x 1 13800<br />
Equipment load (KW) 1 x 1000 x 3.41 3410<br />
Lights (W) 937 x 1 x 4.26 3994<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 54328 Capacity with 3% margin 10.0 TR<br />
Safety (12.5%) 6791<br />
Total space sensible he<strong>at</strong> gain 61118<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 3 NOS 3.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 658 x 0.080 x 68 3598<br />
People (active) 60 x 120 x 1 7200<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 10798<br />
Safety (5%) 540<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 11338<br />
4 Total Space he<strong>at</strong> 72456<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.84
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 43897
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
THIRD FLOOR<br />
CLEAN ROOM‐1<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 819 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 10 x 5 50<br />
Area- 819 x 0.06 49.14<br />
Air changes / hour 1 170.625 171<br />
Total cfm 129<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 532 x 0.34 x 33 5969<br />
Wall (NE) 236 x 0.34 x 25 2006<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 117 x 0.22 x 11 283<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54.5 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 213 x 0.264 x 28 1574 Dehumidified Air Qty 2293 cfm<br />
Partition 566 x 0.3 x 23 3905<br />
Ceiling 0 x 0.4 x 23 0 Refriger<strong>at</strong>ion Capacity 56163 Btu/hr<br />
Floor 819 x 0.4 x 23 7535<br />
Roof 819 x 0.12 x 53 5209<br />
Ventil<strong>at</strong>ion 129 x 0.1296 x 28 468 4.68 TR<br />
People (active) 10 x 245 x 1 2450<br />
Equipment load (KW) 2 x 1000 x 3.41 6820<br />
Lights (W) 819 x 1 x 4.26 3491<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 39710 Capacity with 3% margin 4.8 TR<br />
Safety (12.5%) 4964<br />
Total space sensible he<strong>at</strong> gain 44674<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 2 NOS 3.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 129 x 0.080 x 68 705<br />
People (active) 10 x 205 x 1 2050<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 2755<br />
Safety (5%) 138<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 2892<br />
4 Total Space he<strong>at</strong> 47567<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.94<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 8597<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
THIRD FLOOR<br />
CLEAN ROOM‐2<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong>
Area 819 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 10 x 5 50<br />
Area- 819 x 0.06 49.14<br />
Air changes / hour 1 170.625 171<br />
Total cfm 129<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 0 x 0.34 x 25 0<br />
Wall(SW) 532 x 0.34 x 29 5246<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 54.5 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 213 x 0.264 x 28 1574 Dehumidified Air Qty 2213 cfm<br />
Partition 802 x 0.3 x 23 5534<br />
Ceiling 0 x 0.4 x 23 0 Refriger<strong>at</strong>ion Capacity 54606 Btu/hr<br />
Floor 819 x 0.4 x 23 7535<br />
Roof 819 x 0.12 x 53 5209<br />
Ventil<strong>at</strong>ion 129 x 0.1296 x 28 468 4.55 TR<br />
People (active) 10 x 245 x 1 2450<br />
Equipment load (KW) 2 x 1000 x 3.41 6820<br />
Lights (W) 819 x 1 x 4.26 3491<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 38326 Capacity with 3% margin 4.7 TR<br />
Safety (12.5%) 4791<br />
Total space sensible he<strong>at</strong> gain 43117<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 2 NOS 3.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 129 x 0.080 x 68 705<br />
People (active) 10 x 205 x 1 2050<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 2755<br />
Safety (5%) 138<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 2892<br />
4 Total Space he<strong>at</strong> 46009<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.94<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 8597<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
THIRD FLOOR<br />
CAFTERIA<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 1658 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 75 x 7.5 562.5
Area- 1658 x 0.18 298.44<br />
Air changes / hour 1 345.4167 345<br />
Total cfm 1119<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 469 x 0.34 x 21 3349 ADP 55.2 54 52 50<br />
Wall (S) 246 x 0.34 x 31 2593<br />
Wall (NE) 236 x 0.34 x 25 2006<br />
Wall(W) 469 x 0.34 x 27 4305<br />
Sunglass(NW) 155 x 0.22 x 148 5047<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 0 x 0.22 x 11 0 Appar<strong>at</strong>us Dew Point 51 F<br />
Sunglass(W) 155 x 0.22 x 158 5388<br />
All glass 465 x 0.264 x 28 3437 Dehumidified Air Qty 4725 cfm<br />
Partition 715 x 0.3 x 23 4934<br />
Ceiling 0 x 0.4 x 23 0 Refriger<strong>at</strong>ion Capacity 210125 Btu/hr<br />
Floor 1658 x 0.4 x 23 15254<br />
Roof 1658 x 0.12 x 53 10545<br />
Ventil<strong>at</strong>ion 1119 x 0.1296 x 28 4061 17.51 TR<br />
People (active) 75 x 280 x 1 21000<br />
Equipment load (KW) 2 x 1000 x 3.41 6820<br />
Lights (W) 1658 x 1 x 4.26 7067<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 95805 Capacity with 3% margin 18.0 TR<br />
Safety (12.5%) 11976<br />
Total space sensible he<strong>at</strong> gain 107781<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 6 NOS 3.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 1119 x 0.080 x 68 6119<br />
People (active) 75 x 270 x 1 20250<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 26369<br />
Safety (5%) 1318<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 27687<br />
4 Total Space he<strong>at</strong> 135469<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.80<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 74657<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
THIRD FLOOR<br />
LIBRARY<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 819 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 15 x 5 75<br />
Area- 819 x 0.06 49.14<br />
Air changes / hour 1 170.625 171<br />
Total cfm 161<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 0 x 0.34 x 33 0<br />
Wall (NE) 532 x 0.34 x 25 4522<br />
Wall(SW) 0 x 0.34 x 29 0
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 117 x 0.22 x 11 283 Appar<strong>at</strong>us Dew Point 54 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 194 x 0.264 x 28 1434 Dehumidified Air Qty 2119 cfm<br />
Partition 585 x 0.3 x 23 4037<br />
Ceiling 0 x 0.4 x 23 0 Refriger<strong>at</strong>ion Capacity 57210 Btu/hr<br />
Floor 819 x 0.4 x 23 7535<br />
Roof 819 x 0.12 x 53 5209<br />
Ventil<strong>at</strong>ion 161 x 0.1296 x 28 586 4.77 TR<br />
People (active) 15 x 245 x 1 3675<br />
Equipment load (KW) 2 x 1000 x 3.41 6820<br />
Lights (W) 819 x 1 x 4.26 3491<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 37591 Capacity with 3% margin 4.9 TR<br />
Safety (12.5%) 4699<br />
Total space sensible he<strong>at</strong> gain 42290<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 2 NOS 3.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 161 x 0.080 x 68 882<br />
People (active) 15 x 205 x 1 3075<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 3957<br />
Safety (5%) 198<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 4155<br />
4 Total Space he<strong>at</strong> 46445<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.91<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 10765<br />
PROJECT:<br />
FLOOR:<br />
AC FOR:<br />
DATE:<br />
PREPARED BY<br />
PONDY UNIV‐GREEN<br />
BUILDING<br />
THIRD FLOOR<br />
LIBRARY<br />
22/09/2011<br />
DBJ<br />
Air conditioning ‐ He<strong>at</strong> load form<strong>at</strong><br />
Area 819 Sqft Summer DB %RH WB GR/Lb<br />
AHU room area 0 Sqft Outside 103 82 133<br />
Full height 12.5 ft Inside 75 50 65<br />
F/c height 0 ft Difference 28 68<br />
By pass factor 0.12<br />
1 Ventil<strong>at</strong>ion or Infiltr<strong>at</strong>ion<br />
People (not smoking) 40 x 7.5 300<br />
Area- 819 x 0.06 49.14<br />
Air changes / hour 1 170.625 171<br />
Total cfm 454<br />
2 Internal space sensible he<strong>at</strong> gain 75/50<br />
Structure Sqft. x Factor x T.D Btu/hr SHR 1 0.92 0.84 0.78<br />
Wall (NW) 0 x 0.34 x 21 0 ADP 55.2 54 52 50<br />
Wall (SE) 236 x 0.34 x 33 2648<br />
Wall (NE) 532 x 0.34 x 25 4522<br />
Wall(SW) 0 x 0.34 x 29 0<br />
Sunglass(NW) 0 x 0.22 x 148 0<br />
Sunglass(SE) 0 x 0.22 x 11 0<br />
Sunglass(NE) 117 x 0.22 x 11 283 Appar<strong>at</strong>us Dew Point 53 F<br />
Sunglass(SW) 0 x 0.22 x 66 0<br />
All glass 194 x 0.264 x 28 1434 Dehumidified Air Qty 2336 cfm<br />
Partition 585 x 0.3 x 23 4037<br />
Ceiling 0 x 0.4 x 23 0 Refriger<strong>at</strong>ion Capacity 86763 Btu/hr<br />
Floor 819 x 0.4 x 23 7535
Roof 819 x 0.12 x 53 5209<br />
Ventil<strong>at</strong>ion 454 x 0.1296 x 28 1647 7.23 TR<br />
People (active) 40 x 230 x 1 9200<br />
Equipment load (KW) 1 x 1000 x 3.41 3410<br />
Lights (W) 819 x 1 x 4.26 3491<br />
AHU fan Load 0 x 1000 x 3.41 0<br />
Sensible he<strong>at</strong> sub total 43415 Capacity with 3% margin 7.4 TR<br />
Safety (12.5%) 5427<br />
Total space sensible he<strong>at</strong> gain 48842<br />
3 Internal space l<strong>at</strong>ent he<strong>at</strong> gain<br />
IDU SELECTED : 2 NOS 3.0 TR CONCEALED<br />
Ventil<strong>at</strong>ion 454 x 0.080 x 68 2481<br />
People (active) 40 x 120 x 1 4800<br />
L<strong>at</strong>ent he<strong>at</strong> sub total 7281<br />
Safety (5%) 364<br />
Total space l<strong>at</strong>ent he<strong>at</strong> gain 7646<br />
4 Total Space he<strong>at</strong> 56488<br />
5 Sensible He<strong>at</strong> R<strong>at</strong>io 0.86<br />
6 Ventil<strong>at</strong>ion air he<strong>at</strong> 30276
S.No.<br />
Description<br />
A EQUIPMENT-VRF<br />
1 Supply,install<strong>at</strong>ion,testing and commissioning(SITC) of<br />
Modular type Variable Refrigerant Volume Outdoor units<br />
comprising of variable speed compressors. The unit shall<br />
comprise of high efficiency condenser fan, he<strong>at</strong> exchanger<br />
and co<strong>at</strong>ed fins for increased durability suitable for<br />
interconnecting with any type of indoor units with cordless<br />
remote controller. The ODU & IDU shall be integr<strong>at</strong>ed with<br />
special super wiring system with the central monitoring<br />
control. The unit shall be factory wired and tested before<br />
desp<strong>at</strong>ch.Configur<strong>at</strong>ion of Module capacity shall be as follows<br />
or as per GFC drawings Bioinform<strong>at</strong>ics Building: 130 HP &<br />
Green Building: 195 HP.<br />
BIO-<br />
INFORMATICS<br />
QUANTITY<br />
GREEN<br />
BUILDING<br />
TECH<br />
TOTAL<br />
a System -1:- 130 HP 1 1<br />
b System -2,3,4:- 65 HP 0 3 3<br />
Note 1: Bidder shall quote configur<strong>at</strong>ion meeting the minimum<br />
total requirement or more.<br />
1) Refrigerant / Oil /consumables charging will form part of the<br />
unit cost and it will not be tre<strong>at</strong>ed as a separ<strong>at</strong>e entity.<br />
2) The prices of outdoor units are inclusive of Pressure<br />
Testing & Charging of R410A refrigerant as required and<br />
nothing shall be paid extra on any account.<br />
2 SITC of Indoor units as specified. The Indoor unit shall have<br />
independent electronic control valve to control the refrigerant<br />
flow r<strong>at</strong>e. The unit shall be operable with cordless remote<br />
controller and should have auxiliary contact for remote On/Off.<br />
The Noise level for the rooms indoor unit shall be not<br />
exceeding 38DB. The indoor unit capacity shall be r<strong>at</strong>ed <strong>at</strong><br />
24°C DB and 18°C WB<br />
a) 4.0TR Ceiling mounted ductable unit 4 4<br />
b) 3.0TR Ceiling mounted ductable unit 16 37 53<br />
c) 2.0TR Ceiling mounted concealed unit 26 32 58<br />
e) 1.5TR Ceiling mounted concealed unit 1 6 7<br />
f) 1.0TR Celing mounted concealed unit 13 13<br />
3 Supply testing of cordless remote control 60 75 135<br />
4 Supply, Install<strong>at</strong>ion of copper refrigerant pipe insul<strong>at</strong>ed with<br />
tubular nitrile rubber insul<strong>at</strong>ion and finished with poly shield<br />
co<strong>at</strong>ing Including supports for copper pipes such as angles,<br />
tray, rods, etc. The r<strong>at</strong>e should include supply and fixing of<br />
uvco<strong>at</strong>ing to protect nitrile rubber insul<strong>at</strong>ion of outdoor<br />
installed copper piping from degrad<strong>at</strong>ion due to ultra voilet<br />
rays and <strong>at</strong>mospheric condition, it shall be recovered with<br />
polyshield co<strong>at</strong>ing of <strong>at</strong> least two co<strong>at</strong>s of resin and hardner<br />
(Polybond make or equivalent) fiber glass tape shall be<br />
helically wound with adequ<strong>at</strong>e overlap & co<strong>at</strong>ed with two co<strong>at</strong>s<br />
of resin with hardner to live smooth and plain finish.<br />
a 6.35 mm with 13 mm thick insul<strong>at</strong>ion 55 40 95<br />
b 9.52 mm with 13 mm thick insul<strong>at</strong>ion 175 400 575<br />
c 12.7 mm with 13 mm thick insul<strong>at</strong>ion 75 125 200
S.No.<br />
Description<br />
BIO-<br />
INFORMATICS<br />
QUANTITY<br />
GREEN<br />
BUILDING<br />
TECH<br />
TOTAL<br />
d 15.88 mm with 13 mm thick insul<strong>at</strong>ion 185 475 660
S.No.<br />
Description<br />
BIO-<br />
INFORMATICS<br />
QUANTITY<br />
GREEN<br />
BUILDING<br />
TECH<br />
TOTAL<br />
e 19.08 mm with 13 mm thick insul<strong>at</strong>ion 95 140 235<br />
f 22.22 mm with 13 mm thick insul<strong>at</strong>ion 55 80 135<br />
g 25.40 mm with 13 mm thick insul<strong>at</strong>ion 5 80 85<br />
h 28.58 mm with 19 mm thick insul<strong>at</strong>ion 40 300 340<br />
i 31.1 mm with 19 mm thick insul<strong>at</strong>ion 15 40 55<br />
j 35 mm with 19 mm thick insul<strong>at</strong>ion 40 40 80<br />
k 38.1 mm with 19 mm thick insul<strong>at</strong>ion 15 0 15<br />
l 41.27 mm with 19 mm thick insul<strong>at</strong>ion 50 100 150<br />
m 44.5 mm with 19 mm thick insul<strong>at</strong>ion 15 25 40<br />
n 53.98 mm with 19 mm thick insul<strong>at</strong>ion 70 25 95<br />
5 Supply and install<strong>at</strong>ion of communic<strong>at</strong>ion cable carried out<br />
with 2 core x 0.75sqmm shielded cable including PVC conduit,<br />
650 1000 1650<br />
between indoor unit to outdoor unit<br />
6 Switch & Socket<br />
a Supply and laying of 600 V grade power cabling out 3 core 1.5<br />
sqmm copper cable between indoor unit (VRF & ERV) and the<br />
MCB which is provided <strong>at</strong> 1 rmt distance from the indoor unit.<br />
60 75 135<br />
b<br />
Supply, Install<strong>at</strong>ion, Testing & Commissioning of 6 Amp<br />
Switch & 3- Pin socket outlet on surface or in recess, suitable<br />
for complete as required.<br />
5 5 10<br />
7 Supply and laying of following sizes of cables in existing<br />
trenches / trays, on wall with necessary clamping for supply of<br />
outdoor units as required:<br />
a 4 core x 16 Sq. mm. PVC copper XLPE<br />
b<br />
4 core x 25 Sq. mm. PVC copper XLPE<br />
50 50 100<br />
50 50 100<br />
c 4 core x 35 Sq. mm. PVC copper XLPE 50 50 100<br />
d 4 core x 70 Sq. mm. PVC copper XLPE 100 100 200<br />
8 Supply and laying 8 SWG Copper wire <strong>at</strong> on the surface or<br />
below ground level for conductor earth electrode, including<br />
clamp, soldering etc. as required<br />
100 120 220<br />
9 Laying of PVC insul<strong>at</strong>ed and PVC she<strong>at</strong>hed / XLPE power<br />
cable of 1.1 grade of size direct in to ground including<br />
excav<strong>at</strong>ion, sand cushioning, protective covering and refilling<br />
the trench etc. as required.<br />
50 50 100<br />
10 Providing & fixing of we<strong>at</strong>her-Proof Isol<strong>at</strong>or for each Outdoor<br />
unit with 63 Amp. R<strong>at</strong>ing, 4 pole ELCB 100 mA Sensitivity. 4 7 11<br />
11 Supply and laying of 24 G GI tray covered with GI sheet<br />
whereever exposed for running copper tubes and cables.<br />
a 200mm wide x 100 mm height 30 50 80<br />
12 Supply and install<strong>at</strong>ion of centralised controller touch screen<br />
function 1 3 4<br />
13 Supply and install<strong>at</strong>ion of REFNET joints 1<br />
1<br />
14 Supply and install<strong>at</strong>ion of UPVC heavy class drain piping for<br />
Indoor unit condens<strong>at</strong>e w<strong>at</strong>er with necessary fittings,<br />
Supports, 'U' trap etc of following sizes. The pipe shall be<br />
insul<strong>at</strong>ed with 6 mm thick nitrile rubber<br />
a 25mm 250 350 600
S.No.<br />
Description<br />
BIO-<br />
INFORMATICS<br />
QUANTITY<br />
GREEN<br />
BUILDING<br />
TECH<br />
TOTAL<br />
b 32mm 250 400 650<br />
c 40mm 25 50 75<br />
15<br />
Energy Recovery Ventil<strong>at</strong>ors (ERV) incorpor<strong>at</strong>ing He<strong>at</strong><br />
Recovery Wheel complete with forward curved centrifugal fan<br />
with drive & motors, supply & exhaust filter section with<br />
synthetic pre filters, closed cell insul<strong>at</strong>ion, 3 Angstrom<br />
molecular sieve co<strong>at</strong>ed with HRW & suitable for sensible<br />
recovery <strong>at</strong> least 65% and l<strong>at</strong>ent recovery <strong>at</strong> least 65%. On<br />
site assembly of the unit is not acceptable.<br />
a SITC of 900cfm Energy recovery ventil<strong>at</strong>or 0 1 1<br />
b SITC of 600cfm Energy recovery ventil<strong>at</strong>or 2 2 4<br />
c SITC of 500cfm Energy recovery ventil<strong>at</strong>or 6 13 19<br />
d SITC of 300cfm Energy recovery ventil<strong>at</strong>or 2 4 6<br />
e SITC of 150cfm Energy recovery ventil<strong>at</strong>or 3 0 3<br />
16<br />
SITC of ducting made out of approved make of GP sheet with<br />
supporting arrangement, gasket, rivets, fasteners, cavass<br />
connection etc including painting of support angle, angle<br />
frame complete as per Specific<strong>at</strong>ion of following thickness<br />
a 24G/0.63mm 360 650 1010<br />
b 22G/0.8mm 10 10 20<br />
17 Supply , Install<strong>at</strong>ion, testing and commissioning of canvass of<br />
fire resisting m<strong>at</strong>erial. 20 37 57<br />
18 Supply , Install<strong>at</strong>ion, testing and commissioning of insul<strong>at</strong>ed<br />
flexible duct of 200mm Dia 75 175 250<br />
19 SITC of Thermal insul<strong>at</strong>ion out of closed cell nitrile rubber<br />
m<strong>at</strong>erial of approved make as per specific<strong>at</strong>ion 9mm thick 15 15 30<br />
20 SITC of Thermal insul<strong>at</strong>ion out of Cross linked polyethylene<br />
(XLPE) with factory lamin<strong>at</strong>ed aluminium foil of approved<br />
make as per specific<strong>at</strong>ion - 9 mm thick<br />
21 SITC Acoustic insul<strong>at</strong>ion for the ducts out of 15mm thick<br />
elastomeric nitrile rubber absorbing m<strong>at</strong>erial of approved<br />
make as per the specific<strong>at</strong>ion<br />
325 650 975<br />
50 75 125<br />
22 SITC of fixed bar type linear grill of 15/30/45 deg deflection<br />
aluminum powder co<strong>at</strong>ed of approved colour 30 40 70<br />
23 SITC of GI collar dampers for supply air grilles 4 6 10<br />
24 SITC of 8 mm thick Sun Mica ply board of any ISI Brand for<br />
trap doors as directed by engineer incharge. 100 150 250<br />
25 Minor civil works such as making opening in<br />
walls/floors/ceiling for taking duct, cables, piping, Tray etc.,<br />
and making good of the openings, Pedestals for ODU.<br />
1<br />
1<br />
26 Providing and Fixing Suspended ceiling carried out of 8mm<br />
thick Calcium silic<strong>at</strong>e board with G.I.Framework complete as<br />
per specific<strong>at</strong>ions.<br />
27 Supply, Install<strong>at</strong>ion, Testing & Commissioning of LT Panel<br />
with (0-500 V) Voltmeter, (0 - 100A) ammeter with three CT<br />
& selector switch, on / off / trip indic<strong>at</strong>ion light with protection<br />
fuses. i). The construction shall be of OUTDOOR FEEDER<br />
PILLAR TYPE. The Feeder pillar shall be of floor/channel<br />
mounting, free standing type, suitable for outdoor install<strong>at</strong>ion<br />
in dust, vermin and we<strong>at</strong>her proof construction as per<br />
ifi ti<br />
600 900 1500<br />
2 3 5
S.No.<br />
Incomer Feeder<br />
Description<br />
BIO-<br />
INFORMATICS<br />
QUANTITY<br />
GREEN<br />
BUILDING<br />
TECH<br />
TOTAL
S.No.<br />
Description<br />
QUANTITY<br />
1 No.- 250 A, 25 KA, 4P MCCCB ) 0-50% Overload protection<br />
Setting) with overload<br />
Outgoing Feeder<br />
4 Nos. - 63 A, 25 kA, 4P MCCB (0-50% overload protection<br />
settings)<br />
BIO-<br />
INFORMATICS<br />
GREEN<br />
BUILDING<br />
TECH<br />
TOTAL<br />
Grand Total (A+B+C)<br />
Add Contigency @ 3% on Total Amount<br />
Total Amount (Rs.)<br />
Note: 1) The main power supply for HVAC units - 2P- 5 A<br />
MCB of for each Indoor unit will be provided within 1 meter<br />
near the indoor unit , by other agency. The interconnecting<br />
cabling from the MCB to the indoor units (VRF & ERV) shall<br />
be executed by the HVAC Contractor.<br />
Power supply to the distribution boards for the outdoor unit<br />
shall be shall be executed by the Electrical vendor
VARIABLE REFRIGERANT VOLUME SYSTEM:<br />
Air-cooled Variable Refrigerant Flow System Units<br />
1.1 SCOPE<br />
1.2 TYPE<br />
The scope of this section comprises the supply, erection testing and commissioning<br />
of Variable Refrigerant Flow System conforming to these specific<strong>at</strong>ions and in<br />
accordance with the requirements of Drawing and Schedule of Quantities.<br />
General Specific<strong>at</strong>ions :<br />
The system selected is a modular, air cooled, variable refrigerant volume air<br />
conditioner consisting of one outdoor unit and multiple indoor units. Each indoor units<br />
having capability to cool independently for the requirement of the rooms. Number of<br />
indoors will be connected to centrally loc<strong>at</strong>ed outdoor units, as per detail designing<br />
given in the tender. The outdoor units for all the system shall mounted on terrace of<br />
the building or on respective floors. Indoor units in various areas shall be as per<br />
enclosed drawings/ Bill of Quantities.<br />
All Variable Refrigerant Flow (VRF) Air Conditioning System shall be fully Factory<br />
assembled, wired, piped and tested. The System shall comprise of Air Cooled<br />
Outdoor Units, and a variety of Indoor units connected by common Refrigerant Piping<br />
and Power and Control Cabling. The appropri<strong>at</strong>e Indoor Units as per the BOQ shall<br />
be offered.<br />
The outdoor unit shall be precharged with first charge of R 410A refrigerant.<br />
Additional charge shall be added as per refrigerant piping <strong>at</strong> site. All the units shall be<br />
suitable for oper<strong>at</strong>ion with 415 V + 10%, 50 Hz + 3%, 3 Phase supply for outdoor<br />
units & 220 V + 10%, 50 Hz + 3%, 1 Phase supply for indoor units.<br />
The VRV system shall provide stable, trouble free & safe oper<strong>at</strong>ion, with flexibility of<br />
oper<strong>at</strong>ing desired indoor units. The outdoor units must be capable of delivering exact<br />
capacity proportional to the number of indoor units switched on & the he<strong>at</strong> load in the<br />
air conditioned area. The proportional oper<strong>at</strong>ion shall be achieved by varying speed<br />
of the compressor in the outdoor units. The oper<strong>at</strong>ion of the VRV system shall be<br />
through independent wireless remote controllers as specified.<br />
General Requirements:-<br />
• The VRF System shall provide stable, trouble free and safe oper<strong>at</strong>ions, and provide<br />
flexibility in oper<strong>at</strong>ion of Indoor Units with independent control of each Indoor Unit,<br />
including partial oper<strong>at</strong>ion.<br />
• It shall be possible to switch on only those Indoor Units th<strong>at</strong> require Cooling in<br />
individual Areas.<br />
• The System shall be capable of autom<strong>at</strong>ic oper<strong>at</strong>ion even with varying Outdoor and<br />
Indoor requirements and make use of low Outdoor Temper<strong>at</strong>ures to achieve lower<br />
Power Consumption, without any manual adjustments.
• All Systems shall be modular in n<strong>at</strong>ure, and easily upgradable / inter connectable for<br />
larger capacities.<br />
• Modular System shall incorpor<strong>at</strong>e all required controls for parallel oper<strong>at</strong>ion of<br />
Compressors, Condensers, Fans, and Indoor Units as well as Refrigerant liquid<br />
control.<br />
• All Systems shall be designed for proper oil return to Compressor System, along with<br />
the distribution of oil to individual Compressors.<br />
The indoor units on any circuit can be of different type and also controlled<br />
individually. Following type of indoor units shall be connected to the system:<br />
‣ Ceiling mounted concealed type<br />
‣ Ceiling mounted Duct type<br />
Compressor installed in each modular outdoor unit shall be equipped with multi<br />
inverter compressors for higher reliability, improved life, better backup and duty<br />
cycling purpose. The system shall be capable of changing the rot<strong>at</strong>ing speed of<br />
inverter compressor by inverter controller to follow vari<strong>at</strong>ions in cooling load.<br />
Outdoor unit shall be suitable for mix m<strong>at</strong>ch connection of all type of indoor units.<br />
The refrigerant piping between indoor units and outdoor unit shall be possible to<br />
extend up to 175m with maximum 50m level difference without any oil traps.<br />
Both indoor units and outdoor unit shall be factory assembled, tested and filled with<br />
first charge of refrigerant before delivering <strong>at</strong> site.<br />
1.3 OUTDOOR UNIT<br />
Outdoor units of the VRV system shall be compact air cooled type and working on<br />
environmental friendly refrigerant R-410A.<br />
All the compressors of the outdoor units must be inverter based hermetically sealed<br />
scroll type / DC twin rotary compressor.Anticorrosion tre<strong>at</strong>ment for He<strong>at</strong> Exchanger<br />
Coils should be suitable for areas of high pollution as well as salt laden Air.<br />
The outdoor units must be suitable for up to 165 m( straight length ) refrigerant piping<br />
between outdoor unit & the farthest indoor units, total piping of 1000 m for all the<br />
indoor units. Allowable level difference between outdoor unit & indoor units shall be<br />
50 m in case of outdoor unit on top & 40 m in case of outdoor unit <strong>at</strong> bottom and<br />
extendable upon 90m. Allowable level difference between various indoor units<br />
connected to one out door unit shall be up to 15 m.<br />
Back up oper<strong>at</strong>ion, in case of failure of one of the compressors of outdoor unit, for<br />
single module outdoor units or failure of one of the modules in case of multiple<br />
module outdoor units shall be possible. The VRV outdoor unit shall always be<br />
supplying <strong>at</strong> least 33% of back up oper<strong>at</strong>ion, of the full load capacity.<br />
The outdoor unit shall employ system of equal run time for all the compressors,<br />
inverter or on/ off type, within each outdoor unit – Single Module or Multi Module.
The outdoor units shall be suitable to oper<strong>at</strong>e within an ambient temper<strong>at</strong>ure range to<br />
suit the requirement of <strong>Pondicherry</strong> clim<strong>at</strong>e and conditions. The compressor of<br />
outdoor units shall be of OEM make only.<br />
Air cooled condenser shall have Axial Flow, upward throw fan, directly coupled to fan<br />
motors with minimum IP 55 protection. The outdoor unit condenser fan shall be able<br />
to develop external st<strong>at</strong>ic pressure up to 8 mm of H2O.<br />
The entire oper<strong>at</strong>ion of outdoor units shall be through independent remotes of indoor<br />
units. No separ<strong>at</strong>e Start/ Stop function shall be required.<br />
Starter for the Outdoor Unit compressor shall “Direct on Line” type. Inverter<br />
compressor of the unit shall start first & <strong>at</strong> the minimum frequency, to reduce the<br />
inrush current during starting.<br />
Refrigerant control in the outdoor unit shall be through Electronic Expansion Valve.<br />
Complete refrigerant circuit, oil balancing/ equalizing circuit shall be factory<br />
assembled & tested.<br />
Noise level of outdoor units shall within permissible limit as per the norms and<br />
standard practice <strong>at</strong> a distance of 1.5 m from the unit.<br />
Outdoor units shall be complete with following safety devices:<br />
• High pressure switch<br />
• Fan driver overload protector<br />
• Over current relay<br />
• Inverter Overload Protector<br />
• Fusible Plug<br />
Unit shall be supplied with<br />
• Install<strong>at</strong>ion manual<br />
• Oper<strong>at</strong>ion Manual<br />
• Connection Pipes<br />
• Clamps<br />
The outdoor unit shall be factory assembled, we<strong>at</strong>her proof casing, constructed from<br />
heavy gauge mild steel panels and co<strong>at</strong>ed with baked enamel finish. The unit should<br />
be completely factory wired, tested with all necessary controls:<br />
Each modular inverter outdoor shall be DC twin rotary compressor/ Inverter Scroll<br />
compressor.<br />
• Individual sizes of Outdoor Units should be limited, so as to be accommod<strong>at</strong>ed in a<br />
normal Lift for ease of install<strong>at</strong>ion.<br />
• Each outdoor units shall have minimum 1 no. variable capacity scroll compressor.<br />
• Outdoor Units shall be able to oper<strong>at</strong>e over a range of Outdoor Ambient<br />
Temper<strong>at</strong>ures upto 50 0 C.<br />
• Outdoor Units shall have back-up Systems built into the Units, to prevent total shut<br />
down of System, in case of individual Component failures, even when part of the<br />
Outdoor Units is out of Order.<br />
• All provision in Piping, cabling and Controls shall be available for repair of part of the<br />
System when the rest of the System is oper<strong>at</strong>ional.<br />
• Outdoor Units shall have multiple Piping and Cabling connection options, for ease of<br />
install<strong>at</strong>ion and flexibility.
• The Outdoor Units shall be capable of being mounted without structural modific<strong>at</strong>ions<br />
to Slab.<br />
• The outdoor unit shall have compulsorily multi compressors so th<strong>at</strong> the oper<strong>at</strong>ion is<br />
not disrupted with failure of any compressor and if one compressor malfunctions,<br />
other continues to oper<strong>at</strong>e till the completion of servicing.<br />
• It should also be provided with duty cycling for multiple compressor switching starting<br />
sequence for better stability and prolonging equipment life.<br />
• The outdoor unit shall be modular in design and should be allowed for side by side<br />
install<strong>at</strong>ion<br />
• The unit shall be provided with its own microprocessor control panel.<br />
• The outdoor units should have anti-corrosion paint free galbarium base pl<strong>at</strong>e for easy<br />
mounting of unit.<br />
• The machine must have a sub cool fe<strong>at</strong>ure to use coil surface more effectively thru<br />
proper circuit/bridge so th<strong>at</strong> it prevents the flushing of refrigerant from long piping due<br />
to this effect thereby achieving energy savings.<br />
• The outdoor unit should be fitted with low noise, aero spiral design fan with aero<br />
fitting grill for spiral discharge airflow to reduce pressure loss and should be fitted with<br />
DC fan motor inverter type for better efficiency.<br />
• The condensing unit shall be designed to oper<strong>at</strong>e safely when connected to multiple<br />
indoor units.<br />
• Anticorrosion tre<strong>at</strong>ment for He<strong>at</strong> Exchanger Coils is mand<strong>at</strong>ory. The tre<strong>at</strong>ment should<br />
be suitable for areas of high pollution as well as salt laden Air as per the<br />
manufactures standard.<br />
• All Casings, Fans, Motors, etc. shall also be with anticorrosion tre<strong>at</strong>ment as a<br />
standard fe<strong>at</strong>ure, suitable for Areas with salt laden Air and high pollution.<br />
• All Outdoor Units shall be suitable for mounting Outdoors, without any covers, etc.<br />
• Outdoor Units shall be suitable for connection to multiple Indoor Units of different<br />
capacities.<br />
• All Equipment loc<strong>at</strong>ed Outdoors shall withstand Rain, Wind, and Solar Radi<strong>at</strong>ion as<br />
prevailant in Tropical Countries.<br />
• The Casing, etc. shall be suitably UV Stabilized.<br />
• Units shall have standard Antivibr<strong>at</strong>ions connectors, mounts, etc.<br />
• Noise level of Outdoor Units shall not exceed the minimum prescribed limit as per<br />
norms and standard <strong>at</strong> a distance of 1 M.<br />
• Air Cooled Condensers shall have Axial flow, upward/side throw Fan, directly coupled<br />
to Fan Motors with IP 55 protection.<br />
• Air Cooled Condensers shall have sub Cooling section.<br />
• Air Cooled Condensers shall have copper tubes with bonded Aluminum Fins using<br />
proper contact and large surface Areas.<br />
• All Outdoor Units shall be field serviceable.<br />
• All Units shall be factory assembled, wired, piped and tested.
• Outdoor Units mounted on Balconies shall have Acoustically lined outlet Fan Hoods<br />
to direct Air Horizontally outwards.<br />
INDOOR UNITS :-<br />
• All Indoor Units shall be factory assembled, wired, piped and tested.<br />
• All Indoor Units shall have DX Coils with Copper Tubes and bonded Aluminum Fins<br />
for highly efficient He<strong>at</strong> transfer.<br />
• Indoor Units shall have Centrifugal/axial Fans for proper amount of Air circul<strong>at</strong>ion and<br />
low Noise.<br />
• Indoor Units shall have Inlet Filters, which are easily cleanable or replaceable.<br />
• All components of Indoor Units shall be easily accessible for connection, repairs and<br />
maintenance.<br />
• All Indoor Units shall have very low noise, not exceeding the prescribed limit as per<br />
norms and standard practice for maximum capacity and size.<br />
• Indoor Units shall have provision for connecting Fresh Air Ducts.<br />
• Provision of Drain Pump is necessary for cassette type indoor units.<br />
• All Cassette / hiwall units’ Grilles shall have auto swing fe<strong>at</strong>ure for proper Air<br />
distribution.<br />
• All Units shall be controlled by Electronic Expansion Valves only.<br />
• All Units mounted inside the Ceiling shall have Fans capable of sustaining Duct<br />
connections, and special Filters if necessary.<br />
• Visible Indoor Units shall have wireless remotes.<br />
• Anticorrosion tre<strong>at</strong>ment for avoiding corrosion of Coils is mand<strong>at</strong>ory.<br />
• All Units shall have adequ<strong>at</strong>e Insul<strong>at</strong>ion or Lining to avoid condens<strong>at</strong>ion.<br />
1.4 COMPRESSOR<br />
The compressor shall be highly efficient Twin Rotary type/ Inverter Scroll type and<br />
capable of inverter control. The inverter compressor shall alter the speed in<br />
accordance to the load requirement:<br />
‣ All outdoor units shall have multiple steps of capacity control to meet load<br />
fluctu<strong>at</strong>ion and indoor unit individual control. All parts of compressor shall be<br />
sufficiently lubric<strong>at</strong>ed stock. Forced lubric<strong>at</strong>ion may also be employed.<br />
‣ Oil he<strong>at</strong>er shall be provided in the compressor casing.<br />
‣ The Inverter compressor shall preferably be Reluctance DC inverter compressor<br />
for higher efficiency and improved reliability.<br />
1.5 HEAT EXCHANGER<br />
The he<strong>at</strong> exchanger shall be constructed with copper tubes mechanically bonded to<br />
aluminum fins to form a cross fin coil.<br />
‣ The aluminum fins shall be covered by anti-corrosion resin film.<br />
‣ The unit should be with e-pass he<strong>at</strong> exchanger to optimize the p<strong>at</strong>h of he<strong>at</strong><br />
exchanger and for better efficiency of condenser.<br />
‣ The unit shall be provided with necessary number of direct driven low noise level<br />
propeller type fans arranged for vertical discharge. Each fan shall have a safety<br />
guard.
1.6 REFRIGERANT CIRCUIT<br />
The refrigerant circuit shall include liquid & gas shut-off valves and a solenoid valves<br />
<strong>at</strong> condenser end.<br />
The equipment must have in built refrigerant stabiliz<strong>at</strong>ion control for proper refrigerant<br />
distribution.<br />
All necessary safety devices shall be provided to ensure the safely oper<strong>at</strong>ion of the<br />
system.<br />
Refrigerant should be R410A Only.<br />
1.7 SAFETY DEVICES<br />
All necessary safety devices shall be provided to ensure safe oper<strong>at</strong>ion of the<br />
system.<br />
Following safety devices shall be part of outdoor unit; high pressure switch, fuse, fan<br />
drive overload protector, fusible plug, over load relay, overload protection for inverter.<br />
1.8 OIL RECOVERY SYSTEM<br />
Unit shall be equipped with an oil recovery system to ensure stable oper<strong>at</strong>ion with<br />
long refriger<strong>at</strong>ion piping lengths.<br />
The system must be provided with oil balancing circuit to avoid poor lubric<strong>at</strong>ion.<br />
POWER SUPPLY :-<br />
• All the units shall be suitable for oper<strong>at</strong>ion with 415 V + 10 %, 50 Hz + 3 %, 3 Phase, 4<br />
Wire A.C. Supply.<br />
1.9 CONTROLS: -<br />
• All Units shall have Microprocessor Controls.<br />
• Setting of addresses for each Unit should be autom<strong>at</strong>ic, and need not be programmed.<br />
• Microprocessor should have ‘Auto Check Function’ to indic<strong>at</strong>e Piping and Cabling errors<br />
to avoid malfunction.<br />
• Control wiring shall be in FR grade, and simple with control and transmission wiring<br />
being common.<br />
• Control Units shall be central, suitable for ON / OFF and Temper<strong>at</strong>ure control of zones,<br />
including scheduling.<br />
Malfunction and st<strong>at</strong>us display shall be available.<br />
• Control Units shall be comp<strong>at</strong>ible with BMS of standard makes.(Optional fe<strong>at</strong>ure)<br />
• Individual Controllers with wired or wireless remote for oper<strong>at</strong>ion, st<strong>at</strong>us, etc. shall be<br />
used.<br />
• Precision Temper<strong>at</strong>ure Control shall be mand<strong>at</strong>ory with Electronic Expansion Valves<br />
adjusting to Load fluctu<strong>at</strong>ion and oper<strong>at</strong>ing load fluctu<strong>at</strong>ion as per norms and standard<br />
practice.<br />
• Microprocessor to control speed or switching or by pass of Compressors, Condensers,<br />
Fans and Liquid management functions along with the System for proper oil Return and<br />
Stable and safe oper<strong>at</strong>ion of System, shall be part of standard control System.<br />
• Microprocessor shall have pre set memory, which shall not be erased on power failures.
• All Units shall have “Self-Diagnostic Function” to pre warn of failures or problems, with<br />
function codes.<br />
• All Controllers shall have digital indic<strong>at</strong>ion.<br />
• Power to the Control System shall be gener<strong>at</strong>ed inside the Units from common Power<br />
source only, with UPS if required.<br />
• Control / communic<strong>at</strong>ion wiring shall run in 25 mm PVC conduits with markers, Indoor<br />
only.<br />
• Outdoor Cabling will be in appropri<strong>at</strong>ed Cable Trays with covers.<br />
2.0 PIPING :-<br />
• All connections of Refrigerant Piping shall be in high grade Copper of Refriger<strong>at</strong>ion<br />
quality.<br />
• All connections, Tees, Reducers, etc. shall be Copper, suitable for Brazing.<br />
• Insul<strong>at</strong>ion of Cold lines shall be carried out with 19 mm thickness closed cell nitrile<br />
rubber or equal insul<strong>at</strong>ion Sheets and Tubes.<br />
• Cold sticking compounds of “Foster” make shall be used for sticking Insul<strong>at</strong>ion, if<br />
required.<br />
• For Individual Piping 50μ , 100 mm wide Aluminum Tape shall be used <strong>at</strong> joints of Piping<br />
with Bands for identific<strong>at</strong>ion.<br />
• For Outdoor Piping, the finish shall be woven 100 GSM GRP M<strong>at</strong>, finished with coloured<br />
Epoxy paints to withstand outside Ambient conditions, and UV Radi<strong>at</strong>ion.<br />
• The Piping, if required, may also be routed in a G. I. Trays with cover, to run below<br />
Outdoor Unit for ease of Connection.<br />
2.1 CONDENSATE DRAIN PIPING :-<br />
1” dia hard FRLS Grade PVC Drain Pipe shall be used to remove condens<strong>at</strong>e from<br />
Evapor<strong>at</strong>or Unit to Drain point. The joints shall be properly sealed so th<strong>at</strong> there is no<br />
w<strong>at</strong>er leakage . U trap shall be provided <strong>at</strong> the end. Additional insul<strong>at</strong>ed Drain tray shall<br />
be provided below the Evapor<strong>at</strong>or Unit, if required.<br />
All Drain Pipes shall be insul<strong>at</strong>ed, with 6 mm nitrile rubber or equal Insul<strong>at</strong>ion.<br />
2.2 MOUNTING :-<br />
• All Indoor Units shall be mounted on walls for wall mounted units or with Hangers for<br />
ductable /cassette indoor units, etc. with proper size anchor Fasteners.<br />
• All Outdoor Units, if required to be raised above Floor Level for routing of Pipes and<br />
Cables, shall be mounted on Civil pedestals or MS Stands of adequ<strong>at</strong>e Height.
INDOOR UNITS AND CONTROLS<br />
This section deals with supply, install<strong>at</strong>ion, testing, commissioning of various type of<br />
indoor units confirming to general specific<strong>at</strong>ion and suitable for the duty selected. The<br />
type, capacity and size of indoor units shall be as specified in detailed Bill Of Quantities<br />
3.0 GENERAL<br />
Indoor units shall be either ceiling mounted cassette type / ceiling mounted ductable<br />
type / Wall mounted type or other as specified in BOQ. Each unit shall have electronic<br />
control valve to control refrigerant flow r<strong>at</strong>e respond to load vari<strong>at</strong>ions of the room.<br />
a) The address of the indoor unit shall be set autom<strong>at</strong>ically in case of individual and group<br />
control.<br />
b) In case of centralized control, it shall be set by liquid crystal remote controller<br />
The fan shall be dual suction, aerodynamically designed turbo, multi blade type, st<strong>at</strong>ically<br />
& dynamically balanced to ensure low noise and vibr<strong>at</strong>ion free oper<strong>at</strong>ion of the system.<br />
The fan shall be direct driven type, mounted directly on motor shaft having supported<br />
from housing.<br />
The cooling coil shall be made out of seamless copper tubes and have continuous<br />
aluminum fins. The fins shall be spaced by collars forming an integral part. The tubes<br />
shall be staggered in the direction of airflow. The tubes shall be hydraulically/<br />
mechanically expanded for minimum thermal contact resistance with fins. Each coils<br />
shall be factory tested <strong>at</strong> 21kg/sqm air pressure under w<strong>at</strong>er.<br />
Unit shall have cleanable type filter fixed to an integrally moulded plastic/aluminium<br />
frame. The filter shall be easily serviceable.<br />
Each indoor unit shall have computerized PID control for maintaining design room<br />
temper<strong>at</strong>ure. Each unit shall be provided with microprocessor thermost<strong>at</strong> for cooling or<br />
cooling and he<strong>at</strong>ing.<br />
Each unit shall be with wired LCD type remote controller. The remote controller shall<br />
memorize the l<strong>at</strong>est malfunction code for easy maintenance. The controller shall have<br />
self-diagnostic fe<strong>at</strong>ures for easy and quick maintenance and service. The controller shall<br />
be able to change fan speed and angle of swing flap individually as per requirement.<br />
3.2 CEILING MOIUNTED CASSETTE TYPE UNIT (MULTI FLOW TYPE)<br />
The unit shall be ceiling mounted type. The unit shall include pre-filter, fan section and<br />
DX-coil section. The housing of the unit shall be powder co<strong>at</strong>ed galvanized steel. The<br />
body shall be light in weight and shall be able to suspend from four corners. The fan shall<br />
be aerodynamically designed diffuser turbo fan type.<br />
Unit shall have an external <strong>at</strong>tractive panel for supply and return air. Unit shall have four<br />
way supply air grilles on sides and return air grille in center.<br />
Each unit shall have high lift drain pump, fresh air intake provision, Low gas detection<br />
system and very low oper<strong>at</strong>ing sound.<br />
All the indoor units regardless of their difference in capacity should have same<br />
decor<strong>at</strong>ive panel size. It should have provision of connecting branch ducts.
These units shall be installed between the bottom of finished slab & top of false ceiling.<br />
The cassette units shall have 360 degree / 4 way airflow (airflow from 4 sides) which will<br />
ensure uniform distribution of air and better cooling efficiency and saving in energy,<br />
thereby maintaining comfortable living environment.<br />
The unit must have in built drain pump, suitable for vertical lift of 850 mm. The drain pan<br />
shall have antibacterial tre<strong>at</strong>ment th<strong>at</strong> uses silver ions preventing growth of slime, mould<br />
and bacteria th<strong>at</strong> cause blockages and odors. The unit casing shall be Galvanized Steel<br />
Pl<strong>at</strong>e.<br />
Unit must be insul<strong>at</strong>ed with sound absorbing thermal insul<strong>at</strong>ion m<strong>at</strong>erial, Polyurethane<br />
foam. The noise level of unit <strong>at</strong> the highest oper<strong>at</strong>ing level shall be within the prescribed<br />
limit as per norms and standard practice, <strong>at</strong> a vertical distance of 1.5 m from the grille of<br />
the unit.<br />
Unit shall have provision of connecting fresh air without any special chamber & without<br />
increasing the total height of the unit.<br />
The unit shall be supplied with suitable decor<strong>at</strong>ive panel tre<strong>at</strong>ed with a dirt-repellant<br />
co<strong>at</strong>ing.<br />
The unit shall be supplied with Resin Net filter with Mold Resistance. The filter shall have<br />
antibacterial tre<strong>at</strong>ment th<strong>at</strong> prevents the growth of mould gener<strong>at</strong>ed from dust or<br />
moisture th<strong>at</strong> may adhere to filter. It shall be easy to remove, clean & re install. It should<br />
be as per manufacturers standard.<br />
The unit will be connected in series to a suitable outdoor unit & it must be possible to<br />
oper<strong>at</strong>e the unit independently, through corded/ cordless remote specified in the “Bill of<br />
quantities”.<br />
The unit shall be supplied with following from the factory<br />
Oper<strong>at</strong>ion Manual<br />
Install<strong>at</strong>ion Manual<br />
Paper p<strong>at</strong>tern for install<strong>at</strong>ion<br />
Drain hose/ Clamp metal/ Washer fixing pl<strong>at</strong>e/ Sealing pads/ Clamps/ Screws/<br />
Washer for hanging bracket/ Insul<strong>at</strong>ion for fitting<br />
3.3 CEILING MOUNTED DUCTABLE TYPE UNIT<br />
Unit shall be suitable for ceiling mounted type. The unit shall include pre filter, fan section<br />
& DX coil section .The housing of unit shall be light weight powder co<strong>at</strong>ed galvanized<br />
steel. The unit shall have high st<strong>at</strong>ic fan for Ductable arrangement.<br />
These units shall be ceiling suspended with suitable supports to take care of oper<strong>at</strong>ing<br />
weight of the unit, without causing any excessive vibr<strong>at</strong>ion & noise. The cold air supplied<br />
by these units will be supplied to the area to be air conditioned, through duct system<br />
specified in the tender.<br />
Each indoor unit must have electronic expansion valve oper<strong>at</strong>ed by microprocessor<br />
thermost<strong>at</strong> based temper<strong>at</strong>ure control to deliver cooling/ he<strong>at</strong>ing as per the he<strong>at</strong> load of<br />
the room.<br />
The unit casing shall be Galvanized Steel Pl<strong>at</strong>e.<br />
Unit must be insul<strong>at</strong>ed with sound absorbing thermal insul<strong>at</strong>ion m<strong>at</strong>erial, Glass Fiber.<br />
The noise level of unit <strong>at</strong> the highest oper<strong>at</strong>ing level shall not exceed 49 dB(A), <strong>at</strong> a<br />
vertical distance of 1.5 m below the units with duct connected to the unit.
The unit must be able to develop external st<strong>at</strong>ic pressure of 22 mm, <strong>at</strong> the specified air<br />
quantities.<br />
Unit must have Thermal Fuse for fan motor protection, in case of motor he<strong>at</strong>ing.<br />
The unit will be connected in series to a suitable outdoor unit & it must be possible to<br />
oper<strong>at</strong>e the unit independently, through corded/ cordless remote specified in the bill of<br />
quantities.<br />
The unit shall be supplied with following from the factory<br />
Oper<strong>at</strong>ion Manual<br />
Install<strong>at</strong>ion Manual<br />
Paper p<strong>at</strong>tern for install<strong>at</strong>ion<br />
Drain hose/ Clamp metal/ Insul<strong>at</strong>ion for fitting/ Sealing pads/ Clamps/ Screws<br />
3.4 CEILING SUSPENDED TYPE<br />
Unit shall be suitable for ceiling suspended arrangement below false ceiling.<br />
The unit includes pre filter, fan section & DX coil section. The housing of unit shall be light<br />
weight powder co<strong>at</strong>ed galvanized steel.<br />
Unit shall have an <strong>at</strong>tractive external casing for supply and return air.<br />
Each indoor unit must have electronic expansion valve oper<strong>at</strong>ed by microprocessor<br />
thermost<strong>at</strong> based temper<strong>at</strong>ure control to deliver cooling/ he<strong>at</strong>ing as per the he<strong>at</strong> load of<br />
the room.<br />
The unit casing shall be Galvanized Steel Pl<strong>at</strong>e.<br />
Unit must be insul<strong>at</strong>ed with sound absorbing thermal insul<strong>at</strong>ion m<strong>at</strong>erial, Glass Fiber.<br />
The noise level of unit <strong>at</strong> the highest oper<strong>at</strong>ing level shall not exceed 49 dB(A), <strong>at</strong> a<br />
vertical distance of 1.5 m below the units with duct connected to the unit.<br />
Unit must have Thermal Fuse for fan motor protection, in case of motor he<strong>at</strong>ing.<br />
The unit will be connected in series to a suitable outdoor unit & it must be possible to<br />
oper<strong>at</strong>e the unit independently, through corded/ cordless remote specified in the bill of<br />
quantities.<br />
The unit shall be supplied with following from the factory<br />
Oper<strong>at</strong>ion Manual<br />
Install<strong>at</strong>ion Manual<br />
Paper p<strong>at</strong>tern for install<strong>at</strong>ion<br />
Drain hose/ Clamp metal/ Insul<strong>at</strong>ion for fitting/ Sealing pads/ Clamps/ Screws<br />
3.5 Wired Remote Controller.<br />
Wired remote controller shall be supplied as specified in the “Bill of Quantities”<br />
The controller must have large crystal display screen, which displays complete oper<strong>at</strong>ing<br />
st<strong>at</strong>us.<br />
The digital display must allow setting of temper<strong>at</strong>ure with 1 Deg C interval.<br />
Remote must be equipped with thermost<strong>at</strong> sensor in the remote controller th<strong>at</strong> will make<br />
possible more comfortable room temper<strong>at</strong>ure control<br />
The remote shall be able to monitor room temper<strong>at</strong>ure & preset temper<strong>at</strong>ure by<br />
microcomputer & can select cool/ he<strong>at</strong> oper<strong>at</strong>ion mode autom<strong>at</strong>ically.
The remote must constantly monitor malfunctions in the system & must be equipped with<br />
a “self diagnosis function” th<strong>at</strong> let know by a message immedi<strong>at</strong>ely when a malfunction<br />
occurs.<br />
It shall be possible to wire the remote up to 500 RMT.<br />
3.6 Wireless Remote Controller.<br />
Wireless remote controller shall be supplied as specified in the “Bill of Quantities”<br />
The same oper<strong>at</strong>ion modes & settings as with wired remote controllers must be possible.<br />
Compact light receiving unit to be mounted into wall or ceiling shall be included.<br />
3.7CENTRALIZED TYPE REMOTE CONTROLLER<br />
A multifunctional coloured compact centralized controller shall be provided with the<br />
system.<br />
It shall be able to control up to 64 groups of indoor units with the following functions: -<br />
a) Starting/stopping of Air-conditioners as a zone or group or individual unit.<br />
b) Temper<strong>at</strong>ure setting for each indoor unit or zone.<br />
c) Switching between temper<strong>at</strong>ure control modes, switching of fan speed and direction of<br />
airflow, enabling/disabling of individual remote controller oper<strong>at</strong>ion.<br />
d) Monitoring of oper<strong>at</strong>ion st<strong>at</strong>us such as oper<strong>at</strong>ion mode & temper<strong>at</strong>ure setting of<br />
individual indoor units, maintenance inform<strong>at</strong>ion, trouble shooting inform<strong>at</strong>ion.<br />
e) Display of air conditioner oper<strong>at</strong>ion history.<br />
f) Daily management autom<strong>at</strong>ion through yearly schedule function with possibility of<br />
various schedules.<br />
The controller shall have wide screen user friendly display and can be wired by a non<br />
polar 2 wire transmission cable to a distance of 1 km. away from indoor unit.<br />
3.8 Communic<strong>at</strong>ion Cable<br />
Use only 2C x 0.75 sq.mm shielded cable only. Do not run communic<strong>at</strong>ion and power<br />
cabling together.<br />
Always maintain a gap of 300 mm between the power and communic<strong>at</strong>ion. Use PVC<br />
Conduting for laying the communic<strong>at</strong>ion cable.
REFRIGERANT PIPING:<br />
4.0 SCOPE<br />
5.0<br />
The section comprises the general requirements for the design, workmanship, quality of<br />
m<strong>at</strong>erials and accessories to be used for refriger<strong>at</strong>ion piping and the tests to be carried<br />
out on the same. Tenderer shall prepare drawing for the layout and work as per the<br />
approved drawing.<br />
6.0 PIPING<br />
5.1 MATERIALS:<br />
5.1.1 COPPER PIPING:<br />
If specified in tender schedule copper piping shall be used for refriger<strong>at</strong>ion piping, tubing<br />
up to 15mm diameter shall be bright-annealed copper tube. Over 15mm hard drawn<br />
seamless copper tubing shall be used. Fittings like bends, tees, and sockets shall be of<br />
copper or brass and shall be suitable for duty involved. Flare type compression fittings<br />
shall be allowed up to 15mm size for which annealed copper tubing is used. Tubes up to<br />
and including 15mm size may bent to form 90deg. Bends with inside radius not less than<br />
3 tube diameters. For bigger sizes, bend fittings as mentioned above shall be used.<br />
Valves shall be of packed, back se<strong>at</strong>ing type, and shall be forged or cast brass<br />
construction.<br />
6.0 JOINTS:<br />
6.1 JOINTS IN COPPER PIPING:<br />
Joints between pipes or pipes and fittings shall be of the socketed or flanged type.<br />
Brazing alloy of the silver-copper-phosphorous type shall be used and joints shall made<br />
by the flow of brazing alloy by capillary action along the annular space between the two<br />
m<strong>at</strong>ing surfaces. Ends of m<strong>at</strong>ing tubes shall be square cut and cleaned properly to<br />
remove burrs and dirt or oxide. For flare type fittings, tubes shall be fully annealed <strong>at</strong> the<br />
flare before and after flaring.<br />
7.0 REFRIGERANT CIRCUIT:<br />
7.1 GENERAL:<br />
The vendor shall design the piping and prepare install<strong>at</strong>ion drawings showing full details<br />
of piping arrangement, pipe sizes and thickness, methods of supporting pipes and<br />
connections in various components for approval of Engineer-in-charge. Work shall<br />
commence only after approval. Piping shall be able to withstand the thermal stresses<br />
and vibr<strong>at</strong>ions encountered during normal oper<strong>at</strong>ions. While designing the piping<br />
particular care shall be taken in respect of the following.<br />
7.1.1 HOT GAS LINE:
a) Oil entrainment by hot gas shall be achieved under all load conditions likely to be<br />
encountered during normal oper<strong>at</strong>ion.<br />
b) Horizontal lines shall have a grading of <strong>at</strong> least 1:250 away from the compressor and<br />
towards condenser to permit gravity draining of oil to condenser.<br />
c) Where specified in tender schedule, oil separ<strong>at</strong>or of centrifugal type shall be provided<br />
with each compressor and oil shall return to the compressor crankcase or to the oil<br />
receiver if provided. The oil separ<strong>at</strong>or shall have steel or copper shell and copper or<br />
copper alloy packing.<br />
d) When one or more compressors are connected to one or more condensers,<br />
discharges piping shall be joined in ‘Y’ or loop connections to avoid bull heading of gas<br />
from the compressor.<br />
e) Equalizer lines shall be provided if called for in tender schedule. These shall be<br />
horizontal and have the same size as the discharge line of the largest compressor for hot<br />
gas and oil equalizers. Gas and oil equalizers shall be provided with brass valves as<br />
described in para2.1.1.<br />
f) Hot gas mufflers shall be installed in vertical position or in horizontal position graded<br />
away from the compressors. Mufflers shall be designed to prevent oil trapping.<br />
7.1.2. LIQUID LINE:<br />
a) Liquid lines shall be sized to ensure th<strong>at</strong> flashing of liquid refrigerant does not occur.<br />
b) Liquid line solenoid valves shall be provided with test switches to enable manual<br />
energizing.<br />
c) A full flow brass liquid strainer with bronze screens and permanent magnet shall be<br />
provided in a readily accessible position with isol<strong>at</strong>ing valves and valved by pass line.<br />
Screens shall be easily removable.<br />
d) Each liquid shall be provided with a permanently installed refrigerant drier or<br />
rechargeable type. Drier shall be installed in valved by pass line.<br />
e) Liquid cum moisture indic<strong>at</strong>or shall be installed on all liquid lines.<br />
f) Wherever liquid receiver is provided, it shall be fabric<strong>at</strong>ed from electric welded steel<br />
and have a total capacity to hold not less than 1.25times the volume, in liquid st<strong>at</strong>e, of<br />
the refrigerant in the system. Liquid level indic<strong>at</strong>or shall be provided with the receiver.<br />
g) Suction trap of adequ<strong>at</strong>e capacity shall be provided before each compressor or<br />
grouped compressors connected in parallel to collect all oil and refrigerant slugs.<br />
7.1.3 SUCTION LINE:<br />
a) Oil shall be entrained by the suction gas under all conditions of load likely to be<br />
encountered in normal oper<strong>at</strong>ion.<br />
b) Horizontal suction lines having suction trap or suction line <strong>at</strong> separ<strong>at</strong>or shall be<br />
pitched <strong>at</strong> least 1:250 in the direction of flow of refrigerant.<br />
c) Piping should be so designed as to ensure th<strong>at</strong> oil would not separ<strong>at</strong>e from gas and<br />
drain to compressor in slugs.<br />
d) Piping shall have loops and direction changes to absorb normally encountered<br />
vibr<strong>at</strong>ions.<br />
e) All suctions line shall be insul<strong>at</strong>ed as specified in Section IX paragraph 5.0,<br />
‘Insul<strong>at</strong>ion’. Insul<strong>at</strong>ion shall be carried out only after pressure testing is completed.
8.0 LINE ACCESSORIES:<br />
8.1 ISOLATING VALVES:<br />
If required isol<strong>at</strong>ing valves shall be provided to isol<strong>at</strong>e each compressor, liquid receivers<br />
if provided, evapor<strong>at</strong>ors, strainers, drier and any other component requiring proper<br />
o[oper<strong>at</strong>ion and maintenance.<br />
8.2 THERMOSTATIC EXPANSION VALVES:<br />
Each cooling coil shall be provided with its thermost<strong>at</strong>ic expansion valve to ensure th<strong>at</strong><br />
specified accuracy of temper<strong>at</strong>ure control of the system can be achieved. No valve shall<br />
oper<strong>at</strong>e 35% below its r<strong>at</strong>ed capacity. Adjustable superhe<strong>at</strong> control and external<br />
equalizer port shall be provided for each valve. Each expansion valve be easily<br />
removable for cleaning and adjusting. Expansion valve bulb shall be loc<strong>at</strong>ed immedi<strong>at</strong>ely<br />
after the evapor<strong>at</strong>or outlet on the suction line 45” above bottom of pipe. Valve should be<br />
set so th<strong>at</strong> overfeeding does not occur <strong>at</strong> partial load conditions.<br />
9.0 PIPING INSTALLATION:<br />
The entire refrigerant piping shall be installed in a workmanship like manner, true to<br />
alignment and grade as required. Tube ends shall be kept plugged or kept closed <strong>at</strong> all<br />
times before install<strong>at</strong>ion and where practical, during construction, to prevent ingress of<br />
moisture and foreign m<strong>at</strong>ter. All duct and welding flux should be removed before<br />
install<strong>at</strong>ion. Piping supports shall be spaced not more than 2 meters apart and<br />
substantial enough to prevent bending stresses. The supports, shall be rigid type, either<br />
ceiling hung/wall bracketed angle iron or vertical drop of GI pipe. Each support shall be<br />
isol<strong>at</strong>ed from pipe by providing anti-vibr<strong>at</strong>ion springs or neoprene rubber liner. Valves<br />
shall be supported separ<strong>at</strong>ely to avoid transmission of stresses to connected pipes.<br />
10.0 TESTING:<br />
10.1 PRESSURE TEST:<br />
After completion of piping install<strong>at</strong>ion, entire piping install<strong>at</strong>ion shall be pressure tested<br />
with dry nitrogen or carbon dioxide <strong>at</strong> the following pressures.<br />
a) For systems using Freon-12 High side pressure shall be not less than 15kg/cm2 and low<br />
side pressure not less than 7kg/cm2<br />
b) For systems using Freon-22 high pressure shall be not less than 21kg/cm2 and low<br />
side pressure not less than 11kg/cm2. Testing shall be carried out as follows.<br />
i) Systems shall be charged with inert gas (nitrogen) to 1kg/cm2 gauge pressure and all<br />
joints shall be checked for large leakages with soap solution. Leaks shall be marked,<br />
pressure released and repairs carried out. Brazed joints th<strong>at</strong> leak shall be opened and<br />
redone. These shall not be required by addition of brazing alloy to the joint.<br />
ii) System shall be charged with nitrogen or carbon dioxide to the pressure specified as<br />
above. Leak detection and repairs to leaks shall be carried out till no leak exists.
iii) After all leaks have been repaired, system shall be retested with test pressure<br />
maintained for not less than 8 hours. No measurable drop in pressure should be<br />
detected after pressure readings are adjusted for temper<strong>at</strong>ure changes. Pressure<br />
gauges and controls may be closed during pressure testing.<br />
10.2 EVACUATION AND CHARGING:<br />
After pressure testing is completed, evacu<strong>at</strong>ion shall be carried out as follows after<br />
releasing pressure.<br />
a) A 2 stage rotary vane vacuum pump shall be connected to the refriger<strong>at</strong>ion system.<br />
On no account should the compressor be used for purpose of cre<strong>at</strong>ing vacuum.<br />
b) Vacuum pump shall be oper<strong>at</strong>ed to reduce the pressure to 250microns absolute and<br />
allowed to oper<strong>at</strong>e <strong>at</strong> this pressure for 6hrs. System shall then be isol<strong>at</strong>ed and allowed<br />
to stand for 6hrs.<br />
c) Vacuum shall be broken with a mixture of dry nitrogen and a small quantity of<br />
refrigerant to be used. System shall be evacu<strong>at</strong>ed to 100microns and allowed to stand<br />
for 24hrs. Leak detection with halide torch or electronic leak detector shall be carried<br />
out.<br />
d) If no leak exists correct quantity refrigerant and oil shall be charged into the system.<br />
Final leak detection should be carried out once again to ensure leak tightness.<br />
11.0 GENERAL:<br />
AIR DISTRIBUTION SYSTEM<br />
The scope of work consists of supply, fabric<strong>at</strong>ion, install<strong>at</strong>ion, testing and<br />
commissioning of all sheet metal ducts and supply, install<strong>at</strong>ion, testing, commissioning<br />
and balancing of all grilles, registers and diffusers, in accordance with the specific<strong>at</strong>ions<br />
and the general arrangement as shown in the drawings.<br />
Ductwork shall mean all ducts, casings, dampers, access doors, joints, vanes,<br />
stiffeners, hangers and supports, etc to be included in the item.<br />
All ducts shall be fabric<strong>at</strong>ed from galvanized steel sheets of the following thickness as<br />
indic<strong>at</strong>ed in schedule of quantities & as per the l<strong>at</strong>est industrial practice with l<strong>at</strong>est<br />
edition i.e. specific<strong>at</strong>ion of metal air duct out of class VIII sheet.<br />
12.0 RECTANGULAR DUCT:<br />
Duct Size G.I Al. Type of Joint Type of Bracing<br />
Upto 600 24 22 GI Flange <strong>at</strong> 2.5mtr. Center Cross Bracings<br />
601 – 750 24 22 25x25x3mm angle iron frame<br />
with 6mm dia nuts and bolts<br />
25x25x3mm MS angle<br />
bracing <strong>at</strong> 1500mm from<br />
joints<br />
751 - 1000 22 20 25x25x3mm angle iron frame<br />
with 6mm dia nuts and bolts<br />
25x25x3mm MS angle<br />
bracing <strong>at</strong> 1500mm from<br />
joints<br />
1001-1500 22 20 40x40x5mm angle iron frame 40x40x3mm MS angle
with 8mm dia nuts and bolts<br />
1501 - 2250 20 16 40x40x5mm angle iron to be<br />
braced diagonally with 10mm<br />
dia nuts & bolts<br />
2250 & above 18 14 50x50x6mm angle iron frame<br />
with 10mm dia nuts and bolts <strong>at</strong><br />
125mm center<br />
bracing <strong>at</strong> 1500mm from<br />
joints<br />
40x40x3 MS angle<br />
bracing <strong>at</strong> 1200mm from<br />
joints/40x40x3mm MS<br />
angle diagonal bracing<br />
50x50x3mm MS angle<br />
bracing <strong>at</strong> 1200mm from<br />
joints<br />
Sheet metal ducts shall be fabric<strong>at</strong>ed out of galvanized steel sheets conforming to<br />
BIS 655, BIS 277, BIS 737 & SMACNA where it is called for. Sheets used shall be<br />
manufactured by Hot dip process ad galvanizing shall be Class VIII – Minimum<br />
Average Co<strong>at</strong>ing 120gm/sq.m as per BIS 277:1992<br />
13.0 SUPPORTING OF DUCTS:<br />
Duct Size<br />
(mm)<br />
Spacing<br />
(M)<br />
Size of MS angle<br />
(mm x mm)<br />
Size of rod dia<br />
(mm)<br />
Upto 750<br />
751 to 1500<br />
1501 to 2250<br />
2251 & above<br />
2.5<br />
2.0<br />
2.0<br />
2.0<br />
40x3<br />
40x3<br />
50x3<br />
50x3<br />
8<br />
10<br />
15<br />
15<br />
• Full length threaded rod with suitably sized Anchor fasteners, nuts and washers<br />
made of GI shall only be used for hanging the ducts. In case of round ducts the<br />
contractor shall use 4mm thick multi strand GI wire with suitable hold on type clips on<br />
both ends.<br />
14.0 FABRICATION:<br />
All ducts shall be fabric<strong>at</strong>ed and installed in workman like manner, generally<br />
conforming to IS 655. Round exposed ducts shall be die formed for achieving perfect<br />
circle configur<strong>at</strong>ion.<br />
a) Ducts so identified on the drawings shall be acoustically lined with insul<strong>at</strong>ion as<br />
described in the section ‘Insul<strong>at</strong>ion’ and as indic<strong>at</strong>ed in schedule of quantities. Duct<br />
dimensions shall be designed to accommod<strong>at</strong>e the thickness of the acoustic lining,<br />
where required and indic<strong>at</strong>ed in schedule of quantities.<br />
b) Ducts shall be straight and smooth on the inside with ne<strong>at</strong>ly finished joints. All joints<br />
shall be made airtight.
c) All exposed ducts within conditioned spaces shall have slip joints – no flanged joints.<br />
The internal ends of slip joints shall be made in the direction of airflow.<br />
Exposed ducts, where required or as indic<strong>at</strong>ed in Schedule of quantities, shall be<br />
painted with two co<strong>at</strong>s, of enamel paint of approved colour. Ducts and accessories<br />
within ceiling spaces, visible from air-conditioned areas shall be provided with two<br />
co<strong>at</strong>s of m<strong>at</strong> black finish paint.<br />
d) Changes in dimensions and shape of ducts shall be gradual. Curved elbows, unless<br />
otherwise indic<strong>at</strong>ed, shall have a centerline radius equal to one and a half times the<br />
width of the duct. Air turns shall be installed with vanes, arranged to permit the air to<br />
make the turn without appreciable turbulence. Suitable vanes shall be provided in<br />
duct collar to have uniform/ proper air distribution.<br />
e) Duct shall be fabric<strong>at</strong>ed as per details shown on drawings. All ducts shall be rigid and<br />
shall be adequ<strong>at</strong>ely supported and braced where required with standing seams, tees,<br />
or angles of sample size to keep the ducts true to shape and to prevent bulking,<br />
vibr<strong>at</strong>ion and bre<strong>at</strong>hing.<br />
f) All sheet metal connections, partitions and plenums required to confine the flow of air<br />
to and through 18g GI/16 gauge aluminium thoroughly stiffened with<br />
25mmx25mmx3mm angle iron braces and fitted with all necessary doors as required<br />
to give access to all parts of the appar<strong>at</strong>us. Access Doors shall be not less than<br />
450mm x 450mm in size.<br />
15.0 INSTALLATION:<br />
All ducts shall be installed generally as per the drawings and in strict accordance with<br />
approved shop drawings to be prepared by the Contractor.<br />
i) The contractor shall provide and ne<strong>at</strong>ly erect all sheet metal work as may be required<br />
as per specific<strong>at</strong>ions and drawings. The work shall meet with the approval of Owner’s<br />
site represent<strong>at</strong>ive in all its parts and details.<br />
ii) Necessary allowance and provision should be made by the contractor towards beam,<br />
pipe or any other obstruction in the building, irrespective of the same is shown on the<br />
drawings or not. Where necessary to avoid beams or other structural work, plumbing<br />
or other pipes, and /or conduits, the ducts shall be transformed, divided or curved to<br />
one side, provided the required area being maintained as per the design<br />
requirements.<br />
iii) If duct cannot be run as shown on the drawings, the contractor shall install the duct<br />
between the required points by any p<strong>at</strong>h available, in accordance with other services<br />
and as per approval of Owners site represent<strong>at</strong>ives.<br />
iv) All ductwork shall be independently supported from building structure. All horizontal<br />
ducts shall be rigidly and securely supported, in approved manner with trapeze<br />
hangers formed of MS rods and angle iron under ducts <strong>at</strong> not gre<strong>at</strong>er than 2meter<br />
centers. All the vertical ductwork to be supported by structural members in every<br />
floor. Air-conditioning contractor shall supply and install 50mm cube MS boxes with<br />
10mmdia steel rod passing through box, all given two co<strong>at</strong>s of red oxide paint, the<br />
MS rod tied with reinforcement bar <strong>at</strong> point of suspension shall be nearly exposed
and opening subsequently filled with plastic compound after duct hangers are<br />
installed.<br />
If duct passes through such areas where space between ceiling slab to false ceiling<br />
is more than 1500mm then duct should be supported by wall mounted brackets of<br />
size 40mm x 40mm x 3mm thick MS angle frame.<br />
v) Ducting over furred ceiling shall be supported from the slab above or from beams,<br />
after obtaining approval of Owner’s site represent<strong>at</strong>ive. In no case shall any duct by<br />
supported from false ceiling hangers or be permitted to rest on false ceiling.<br />
All metal work in dead or furred down spaces shall be erected in time to avoid delay<br />
of work of other contractors working in the building.<br />
vi) Where metal ducts or sleeves termin<strong>at</strong>e in woodwork, tight joints shall be made by<br />
means of closely fitted heavy flanged collars. Where ducts pass through brick or<br />
masonry opening a wooden framework shall be provided within the opening and<br />
crossing ducts provided with heavy flanged collars on each side of wooden<br />
framework, so th<strong>at</strong> duct crossing is made leak-proof.<br />
vii) All ducts shall be totally free from vibr<strong>at</strong>ion under all conditions of oper<strong>at</strong>ion.<br />
Whenever duct work is connected to fans, air handling units, fan coil units or ductable<br />
split units th<strong>at</strong> may cause vibr<strong>at</strong>ions in the ducts shall be provided of closely woven,<br />
rubber impregn<strong>at</strong>ed double layer asbestos/canvas or neoprene co<strong>at</strong>ed fiber glass fire<br />
resistant flexible connection. The flexible connections loc<strong>at</strong>ed close to the unit, in<br />
mutually perpendicular directions. The flexible sleeve <strong>at</strong> least 10cm long securely<br />
bonded and bolted on both sides. Sleeve shall be made smooth and the connecting<br />
ductwork rigidly held by independent supports on both ends. The flexible connection<br />
shall be suitable for pressures <strong>at</strong> the point of install<strong>at</strong>ion.<br />
viii) Airconditioning unit or any other unit shall be connected to duct work by inserting <strong>at</strong><br />
air inlet and air outlet a double canvass sleeve. Each sleeve shall minimum 150mm<br />
securely bolted to duct and the connecting ductwork rigidly held in line with unit inlet<br />
or outlet.<br />
16.0 SPLITTERS AND DAMEPRS:<br />
All dampers shall be opposed blade type dampers of robust construction and tight<br />
fitting. They shall be made of G.S. sheet minimum 16g thick and shall have brass<br />
bushes. The design, method of handling, and control shall be suitable for the loc<strong>at</strong>ion<br />
and service required.<br />
Dampers shall be provided with suitable links, levers and quadrants as required for<br />
their proper oper<strong>at</strong>ion control or setting devices shall be made robust, easy to<br />
oper<strong>at</strong>e and accessible through suitable access doors in the ducts. Every damper<br />
shall have an indic<strong>at</strong>ing device clearly showing the damper position <strong>at</strong> all times.<br />
Handles will be provided with extended arms to account for insul<strong>at</strong>ion thickness.<br />
Dampers shall be placed in ducts and <strong>at</strong> every branch supply or return air duct<br />
connection, whether or not indic<strong>at</strong>ed on the drawings, for the proper volume control<br />
and balancing of the system.<br />
17.0 FIRE DAMPER:
All supply/return air duct or p<strong>at</strong>h <strong>at</strong> AHU room wall or slab crossing shall be provided<br />
with fusible link type fire damper. The fore r<strong>at</strong>ing shall be of 90 minutes fire damper<br />
blades and outer frame shall be formed of 1.6mm galvanized sheet steel. The<br />
damper blade shall be pivoted Spindles in self lubric<strong>at</strong>ed bronze bushes, stop seals<br />
shall be provided on top and bottom of the damper housing made of 16g galvanized<br />
sheet steel. Side seal shall be provided to prevent fire leakages.<br />
18.0 SUPPLY AND RETURN AIR GRILLES:<br />
Supply and return air grilles shall be anodized extruded aluminium construction with<br />
individually adjustable bars as shown on drawings and indic<strong>at</strong>ed in schedule of<br />
quantities. Supply air grilles shall be generally double deflection type, with removable<br />
key oper<strong>at</strong>ed volume control dampers. Return air grilles shall be generally double<br />
deflection type similar to supply air grilles but without dampers.<br />
All supply and return air grilles behind wooden frame shall be single deflection type<br />
with one-way bars only, the supply air grilles being provided with removable key<br />
oper<strong>at</strong>ed volume control dampers. Aluminium supply and return air grilles shall be<br />
powder co<strong>at</strong>ed and to have colour of client’s choice or extruded aluminium as per bill<br />
of quantities.<br />
For fixing of grilles in the walls HVAC contractor has to provide 50mm x 50mm<br />
wooden frame of good quality wood. The frames have to be given co<strong>at</strong>ing of fire<br />
retardant paint. Nothing extra shall be paid on this account.<br />
19.0 SUPPLY AND RETURN AIR DIFFUSERS:<br />
Supply and return air diffusers shall be shown on the drawings and indic<strong>at</strong>ed in<br />
schedule of quantities. The supply air diffuser shall be provided with removable key<br />
oper<strong>at</strong>ive volume control dampers. Aluminium supply and return air diffusers shall be<br />
powder co<strong>at</strong>ed and to have colour of client’s choice or shall be extruded aluminium.<br />
i) Round or Rectangular Diffusers:<br />
Supply/return air linear diffuser shall be Extruded aluminium construction, square,<br />
rectangular, or round diffusers with flush fixed p<strong>at</strong>tern or adjustable flow p<strong>at</strong>tern.<br />
Diffusers for different spaces shall be selected in consult<strong>at</strong>ion with the<br />
Architect/Consultant. Supply air diffusers may be equipped with fixed air distribution<br />
grids, removable key-oper<strong>at</strong>ed volume control dampers, and anti smudge rings as<br />
per requirements of schedule of quantities.<br />
ii) Linear Supply air/Return Air Grilles:<br />
This shall be extruded aluminium construction with fixed horizontal bars <strong>at</strong> 15deg<br />
inclin<strong>at</strong>ion and flanged on both side. The thickness of fixed bar louvers shall be <strong>at</strong><br />
least 5.5mm and angle shall be 20mm/30mm inside. The grilles shall be suitable for<br />
concealed fixing volume control damper of extruded. Aluminium construction with<br />
black anodized finished shall be provided in SA duct collars.
20. LINEAR DIFFUSER:<br />
Linear diffuser shall be extruded aluminium construction multi-slot type with air<br />
p<strong>at</strong>tern controlled provided in each slot. Supply air diffusion shall be provided with<br />
volume damper in each slot of the supply air diffuser. Plenum shall be provided for<br />
each supply air diffuser.<br />
The m<strong>at</strong>erial of the grill shall be as follows:<br />
i) All grilles shall be selected in consult<strong>at</strong>ion with the Client/Architect/Consultant.<br />
Different spaces shall require horizontal or vertical face bars, and different width of<br />
margin frame.<br />
ii) All grilles shall have a soft, continuous rubber gasket between the periphery of the<br />
registers and the surface on which it has to be mounted. The effective area of the<br />
registers shall not be less than 75%.<br />
iii) Grilles shall be adjustable p<strong>at</strong>tern as each grilles bar be pivotable to provide p<strong>at</strong>tern<br />
with 0 to 100 deg. horizontal are and upto 30deg deflection up or down. Bars shall<br />
hold deflection settings under all conditions of velocity and pressure. Extruded<br />
aluminium grilles shall have fixed bars.<br />
iv) Bars longer than 45cm shall be reinforced by set-back vertical members of approved<br />
thickness.<br />
The m<strong>at</strong>erials thickness of grilles, diffusers, damper shall be as follows:<br />
DIFFUSER<br />
A) Frame<br />
B) Louvers<br />
GRILLERS:<br />
A) Frame<br />
B) Louvers<br />
TYPE MS ALUMINIUM<br />
20G<br />
20G<br />
20G<br />
26G<br />
18G<br />
18G<br />
18G<br />
24G<br />
V.C.DAMPER:<br />
A) Frame<br />
B) Louver<br />
20G<br />
26G<br />
18G<br />
24G<br />
v) Fresh air intake and exhaust louvers:<br />
All the louvers shall be rain protection type and shall be fabric<strong>at</strong>ed from extruded<br />
aluminium section. The louvers shall additionally be provided with heavy duty<br />
expanded metal (aluminium-alloy) bird screen and also 20micron filter for fresh air<br />
intake.
vi) Testing & Balancing:<br />
After the install<strong>at</strong>ion of the entire air distribution system in all respects all the ducts<br />
shall be tested for leaks before painting the interiors. It is also mand<strong>at</strong>ory to run the air<br />
distribution system continuously for 48hrs for driving away any dust or foreign m<strong>at</strong>erial<br />
logged within ducts during install<strong>at</strong>ion before final painting is done.<br />
21.0 GENERAL:<br />
THERMAL / ACOUSTIC INSULATION:<br />
The Scope of this specific<strong>at</strong>ion consists of supplying, install<strong>at</strong>ion, testing and<br />
commissioning of insul<strong>at</strong>ion on ducts, copper piping, and duct lining wherever<br />
applicable.<br />
22.0 DUCT INSULATION:<br />
Insul<strong>at</strong>ion shall be closed cell structure rubber insul<strong>at</strong>ion as per thickness as specified<br />
in the bill of quantities and as per specific<strong>at</strong>ion. The thermal conductivity of insul<strong>at</strong>ing<br />
m<strong>at</strong>erial shall not exceed 0.035 W/(m.k) <strong>at</strong> 0 deg C confirms to class 0, self<br />
extinguishing, does not drip due to reaction with fire, dust,CFC,HCFC and fibre free<br />
with zero ODB.<br />
22.1 THICKNESS OF INSULATION:<br />
a) For Duct passing surrounding the return air - 9mm<br />
b) For Duct passing through non air-conditioned space - 13mm<br />
c) Tre<strong>at</strong>ed fresh air duct - 19mm<br />
22.2 APPLICATION:<br />
• Clean the surface of duct and apply a co<strong>at</strong> of approved make adhesive uniformly over<br />
the duct surface as recommended by the manufacturer.<br />
• Fix the insul<strong>at</strong>ion m<strong>at</strong>erial of required thickness before adhesive dries up. All<br />
longitudinal joints shall be sealed out of 75mm width sticking tape as recommended<br />
by the manufacturer to seal transverse & longitudinal joints.<br />
• Tighten the insul<strong>at</strong>ion out of GI chicken wire mesh ne<strong>at</strong>ly.<br />
NOTE:- 1. The specific<strong>at</strong>ion of items/ equipments described above is generalized in n<strong>at</strong>ure.<br />
Accesories/ components/colour of the items/ equipments shall be as per<br />
Manufacturer standard meeting the technical requirements.<br />
2. The procedures for doing the works mentioned above are also generalize in<br />
n<strong>at</strong>ure and shall be as per the actual standard practice and site conditions/<br />
requirements meeting the technical requirement.
MODE OF MEASUREMENTS:<br />
Mode of Measurement for payment of items for ducting, piping and their insul<strong>at</strong>ion,<br />
grilles, dampers and for all variable items shall be as follows.<br />
23.0 DUCTING:<br />
Payment for ducting shall be on the basis of the external surface area of the ducting<br />
including all m<strong>at</strong>erial and labour for installed duct and it includes flanges, vanes,<br />
splitters etc.<br />
The r<strong>at</strong>e per Sq. meter of the external surface shall include all wastage flanges,<br />
gaskets for joints, bolts and nuts, duct supports and hanger vibr<strong>at</strong>ion isol<strong>at</strong>ion pads or<br />
suspenders, flexible connections, inspection doors, dampers, running vanes, straight<br />
vanes, and any item which will be required to complete the external insul<strong>at</strong>ion and<br />
acoustic lining.<br />
The external area shall be calcul<strong>at</strong>ed by measuring the over all width and depth<br />
(including the corner joints) in the center of the duct section from flange face to flange<br />
face in case of ducts length with uniform cross section. Total areas will be arrived <strong>at</strong>,<br />
by adding up the area of all duct sections.<br />
In case of taper pieces average width and depth will be worked out as follows:<br />
W1 = Width of small cross section<br />
W2 = Width of large cross section<br />
D1 = Depth of small cross section<br />
D2 = Depth of large cross section<br />
Average depth = (W1+W2)/2<br />
Average Depth = (D1+D2)/2<br />
Width and depth in the case of taper piece shall be measured <strong>at</strong> the edge of the<br />
collar of the flange for duct sections fl<strong>at</strong>ted with angle iron flanges, otherwise <strong>at</strong> the<br />
bottom of the flange where the flanges are of duct sheet.<br />
For circular pieces the diameter of the section midway between large and small<br />
diameters shall be measured and adopted as the mean diameter for calcul<strong>at</strong>ing the<br />
surface area of the taper piece. Duct measurements for calcul<strong>at</strong>ion of area shall be<br />
taken before applic<strong>at</strong>ions of insul<strong>at</strong>ion.<br />
For the special pieces like bends, branches, and tees etc., same principle of areas<br />
measurements as for liner and outer periphery along the curv<strong>at</strong>ure angle of the piece<br />
shall apply.<br />
24.0 GRILLE/DIFFUSER:
Payment for Grille/ Diffuser shall be on the basis of internal (effective) surface area of<br />
the Grille/Diffuser including all m<strong>at</strong>erial and labour for installed Grille/Diffuser.<br />
The r<strong>at</strong>e per sq.mtr. of surface shall include all flanges, gaskets, bolts and nuts, etc.<br />
25.0 PIPING:<br />
Shall be measured in units of length along the center line of installed pipes including<br />
all pipe fittings, flanges, (with gaskets and nuts and bolts for jointing), unions, bends,<br />
elbows, tees, concentric and/or eccentric reducers, inspection pieces, expansion<br />
loops, etc. The above accessories shall be measured as part of piping length along<br />
the centerline of installed pipes and no special r<strong>at</strong>es for these accessories shall be<br />
permitted.<br />
The quoted unit r<strong>at</strong>es for center line linear measurements of piping shall include all<br />
wastage allowances, pipe supports includes hangers, MS channel, wooden b<strong>at</strong>tens,<br />
nuts and check nuts, vibr<strong>at</strong>ion isol<strong>at</strong>or suspension where specified or required, and<br />
cost of excav<strong>at</strong>ion bedding back filling and finishing as required to complete the<br />
piping install<strong>at</strong>ion as per the specific<strong>at</strong>ion. None of these items will be separ<strong>at</strong>ely<br />
measured not paid for. However, all valves<br />
(g<strong>at</strong>e/globe/balancing/butterfly/check/purge/drain, etc.), strainers, orifice pl<strong>at</strong>es,<br />
temper<strong>at</strong>ure gauge, pressure gauges shall be separ<strong>at</strong>ely measured and paid as per<br />
their individual unit r<strong>at</strong>es, which shall also include their insul<strong>at</strong>ion as per specific<strong>at</strong>ion,<br />
piping measurements shall be taken before applic<strong>at</strong>ion of the insul<strong>at</strong>ion. The cost<br />
shall also include any excav<strong>at</strong>ions and making masonry valve chamber with steel<br />
cover, etc.<br />
26.0 PIPING INSULATION:<br />
Shall be measured in units of length along the center line of the installed pipe, strictly<br />
on the same basis as the piping measurements described above.<br />
The linear measurements shall be taken before the applic<strong>at</strong>ion of the insul<strong>at</strong>ion, it<br />
may be noted th<strong>at</strong> for piping measurements, all valves, orifice pl<strong>at</strong>es and strainers<br />
are separ<strong>at</strong>ely measurable and their quoted unit r<strong>at</strong>es shall include the insul<strong>at</strong>ion cost<br />
in the valve required and as specified.<br />
27.0 DUCT, THERMAL INSULAITON/ACOUSTIC INSULATION:<br />
This item is provided separ<strong>at</strong>ely for various thick and shall be paid on the basis of<br />
insul<strong>at</strong>ed duct prior to insul<strong>at</strong>ion of duct. In other words the area of the insul<strong>at</strong>ed duct<br />
shall be measured before the applic<strong>at</strong>ion of insul<strong>at</strong>ion.
Technical specific<strong>at</strong>ions – Energy Recovery Ventil<strong>at</strong>or.<br />
28.0 CASING :<br />
Casing shall be made of 18/20/22 gauge CNC manufactured powder co<strong>at</strong>ed steel.<br />
Casing shall be insul<strong>at</strong>ed with 13 mm high density insul<strong>at</strong>ion. Access panel to the<br />
components shall be provided. The access panel shall be easily openable and tightly<br />
sealed by means standard gaskets.<br />
28.1 FANS :<br />
Compact radial blowers. The blades shall be designed for maximum efficiency &<br />
quiet oper<strong>at</strong>ion. Impeller shall be st<strong>at</strong>ically & dynamically balanced.<br />
28.2 TOTAL ENERGY RECOVERY WHEEL :<br />
The substr<strong>at</strong>e : The substr<strong>at</strong>e or wheel m<strong>at</strong>rix is to be of pure aluminum foil so as to allow:<br />
a) Quick and efficient uptake of thermal energy.<br />
b) Sufficient mass for optimum he<strong>at</strong> transfer<br />
c) Maximum sensible he<strong>at</strong> recovery <strong>at</strong> a rel<strong>at</strong>ively low rot<strong>at</strong>ional speed of 20 to 35<br />
rpm.<br />
The wheel m<strong>at</strong>rix should not make use of any non metallic substr<strong>at</strong>es made from<br />
paper, plastic, synthetic or glass fibre media.<br />
The substr<strong>at</strong>e m<strong>at</strong>rix is to be made from m<strong>at</strong>erials which neither are combustible nor<br />
support combustion.<br />
The Desiccant : The desiccant is w<strong>at</strong>er molecule selective and non-migr<strong>at</strong>ory.<br />
The desiccant is co<strong>at</strong>ed/used on the aluminum substr<strong>at</strong>es as it helps to limit the cross<br />
contamin<strong>at</strong>ion to absolute minimum, and to ensure the exclusion of contaminants in<br />
the air stream, while transferring w<strong>at</strong>er vapour molecules. For higher diffusion r<strong>at</strong>e<br />
and slightly improved l<strong>at</strong>ent recovery without substantially sacrificing cross<br />
contamin<strong>at</strong>ion, desiccant co<strong>at</strong>ed/used.<br />
The desiccant should have sufficient mass, and is to be co<strong>at</strong>ed with a non masking<br />
porous binder adhesive on the aluminum substr<strong>at</strong>e and must allow quick and easy<br />
uptake and release of w<strong>at</strong>er vapour. The m<strong>at</strong>rix should not have desiccants<br />
impregn<strong>at</strong>ed in a non metallic substr<strong>at</strong>e, such as synthetic fibre, glass fibre, etc., as<br />
the substr<strong>at</strong>e is to be made from aluminum foil.<br />
The rotor/wheel m<strong>at</strong>rix should have equal sensible and l<strong>at</strong>ent recovery.<br />
The weight of desiccant co<strong>at</strong>ing and the mass of aluminum foil should be in a specific<br />
r<strong>at</strong>io so as to ensure equal recovery of both sensible and l<strong>at</strong>ent he<strong>at</strong> over the<br />
oper<strong>at</strong>ing range. The rotor m<strong>at</strong>rix must not have an etched or oxidized surface to<br />
make a desiccant on a metal foil as th<strong>at</strong> would result in insufficient l<strong>at</strong>ent recovery
and hence unequal recovery; also the rotor m<strong>at</strong>rix is not made by imtregn<strong>at</strong>ing the<br />
desiccant in a synthetic fibre m<strong>at</strong>rix as th<strong>at</strong> would result in insufficient sensible<br />
recovery, high rot<strong>at</strong>ion speed, and unequal recovery, which is generally not<br />
acceptable.<br />
Rotor : As optimum he<strong>at</strong> and mass transfer takes place via the m<strong>at</strong>rix formed by<br />
desiccant, which has sufficient mass, being co<strong>at</strong>ed on an aluminum foil, the rotor<br />
typically rot<strong>at</strong>es <strong>at</strong> lower than 20 to 35 rpm, thereby also ensuring long life of belts<br />
and reduced wear and tear of seals.<br />
The rotor should be made of altern<strong>at</strong>e fl<strong>at</strong> and corrug<strong>at</strong>ed aluminum foil of uniform<br />
width. The rotor honeycomb m<strong>at</strong>rix foil is to be so wound and adhered th<strong>at</strong> it makes a<br />
structurally very strong and rigid media which does not get cracked, deformed etc.<br />
due to change of temper<strong>at</strong>ure or humidity.<br />
The surface of the wheel/rotor should be specially and highly polished and ensures<br />
th<strong>at</strong> the vertical run out does not exceed + 1 mm, thereby ensuring, negligible<br />
leakage.<br />
The radial run out also should not exceed + 1 mm, thereby minimising the<br />
leakage/drag on the radial seals, and minimising the fluctu<strong>at</strong>ions in the tension of the<br />
drive belt.<br />
The number of wraps (of altern<strong>at</strong>ive corrug<strong>at</strong>ed and fl<strong>at</strong> foil) for every inch of rotor<br />
radii should be extremely consistent and this ensures uniform air flow and<br />
performance over the entire face in the air stream. Flute height and pitch should be<br />
consistent to a very tight tolerance and this ensures uniform pressure drop and<br />
uniform airflows across the rotor face.<br />
The rotor should be non clogging aluminum media, having a multitude of narrow<br />
aluminum foil channels, thus ensuring a laminar flow, and will allow particles upto 600<br />
microns to pass through it.<br />
The media is cleanable with compressed air, or low pressure steam or light<br />
detergent, without degrading the l<strong>at</strong>ent recovery.<br />
28.3 ROTOR/WHEEL CASSETTE :<br />
The rotor/wheel cassette is made of galvanised steel / powder co<strong>at</strong>ed sheet<br />
framework which limits the deflection of rotor/wheel due to air pressure loss.<br />
29.1 FILTERS:<br />
Filter shall be 25mm thick washable type.<br />
29.2 ELECTRICALS:<br />
Power connection requirement: 220 volt/1 ph/50 Hz.<br />
TESTING, BALANCING & COMMISSIONING
30.0 Compressors/Condensers/Evapor<strong>at</strong>ors etc.<br />
• Complete unit shall be factory tested for leaks.<br />
• Complete unit shall be factory tested for performance <strong>at</strong> r<strong>at</strong>ed conditions.<br />
• All controls shall be tested for proper functioning and set for design value.<br />
•<br />
31.0 Indoor Units :<br />
31.1 Blowers<br />
• Dynamic/st<strong>at</strong>ic balancing of impeller.<br />
• Performance test as per applicable codes.<br />
31.2 Coils<br />
• Pneum<strong>at</strong>ic test or as per manufacturer.<br />
31.3 Instruments and Controls<br />
• Visual examin<strong>at</strong>ion.<br />
31.4 For Associ<strong>at</strong>es Works <strong>at</strong> Site :<br />
• Inspection of raw m<strong>at</strong>erials to be used for fabric<strong>at</strong>ion and assembly and<br />
inspection of manufacturer’s certific<strong>at</strong>es.<br />
• Pressure testing of pipe fit used for the refrigerant and w<strong>at</strong>er services.<br />
• Pressure testing, leak testing of complete piping network. Condenser for<br />
refrigerant/ services.<br />
• Checking of electrical circuits (power & controls) and checking functioning of<br />
controls of refrigerant systems and other circuits of air conditioning system.<br />
• Checking of calibr<strong>at</strong>ion of controls and instrument<strong>at</strong>ion<br />
• Checking of assemblies for electrical control panel, instruments panels,<br />
local panels (dimensional and functional) annunci<strong>at</strong>or panels etc.<br />
• Inspection of complete electrical install<strong>at</strong>ion <strong>at</strong> site.<br />
• Install<strong>at</strong>ion of main equipments like compressor, condenser, evapor<strong>at</strong>or.<br />
• Performance testing of complete A.C. systems as per specific<strong>at</strong>ions.<br />
31.5 Duct Work :<br />
• All branches and outlets shall be tested for air quantity, and the total of the<br />
air quantities shall be within plus five percent (5%) of fan capacity.<br />
• Volume dampers shall be tested for proper oper<strong>at</strong>ion.<br />
31.6 Electrical Equipment :<br />
• All electrical equipment shall be cleaned and adjusted on site before applic<strong>at</strong>ion<br />
of power.<br />
• The following tests shall be carried out :<br />
• Wire and cable continuity tests.<br />
• Insul<strong>at</strong>ion resistance tests, phase to phase and phase to earth, on all circuits<br />
and equipment, using a 500 Volts megger. The megger reading shall be not less<br />
than one meg ohm.<br />
• Earth resistance between conduit system and earth must not exceed half (1/2)<br />
CMH.<br />
• Phasing out and phase rot<strong>at</strong>ion tests.
• Oper<strong>at</strong>ing tests on all protective relays to prove their correct oper<strong>at</strong>ion before<br />
energising the main equipment.<br />
• Oper<strong>at</strong>ing tests on all MCB’s.<br />
31.7 Performance Tests :<br />
• The install<strong>at</strong>ion as a whole shall be balanced and tested upon completion,<br />
and all relevant inform<strong>at</strong>ion, including the following shall be submitted to the<br />
architects.<br />
• Electrical current readings, in amperes of full and average load running, and<br />
starting, together with name pl<strong>at</strong>e current of each electrical motor.<br />
• Continuous recording over a specified period, of ambient wet and dry bulb<br />
temper<strong>at</strong>ures under varying degrees of internal he<strong>at</strong> loads and use and<br />
occup<strong>at</strong>ion, in each zone of each part of the building.<br />
• Daily records should be maintained of hourly readings, taken under varying<br />
degrees of internal he<strong>at</strong> load and use and occup<strong>at</strong>ion, of wet and dry bulb<br />
temper<strong>at</strong>ures. The current and voltage drawn by each machine.<br />
• Any other readings shall be taken which may subsequently be specified by the<br />
architect.<br />
31.8 Miscellaneous :<br />
• The above tests are mentioned herein for general guidance and inform<strong>at</strong>ion<br />
only but not by way of limit<strong>at</strong>ion to the provisions of conditions of contract and<br />
specific<strong>at</strong>ion.<br />
• The d<strong>at</strong>e of commencement of all tests listed above shall be subject to the<br />
approval of the Engineer and in accordance with the requirements of this<br />
specific<strong>at</strong>ion.<br />
• The contractor shall supply the skilled staff and all necessary instruments and<br />
carry out any test of any kind on a piece of equipment, appar<strong>at</strong>us, part of<br />
system or on a complete system if the architect requests such a test for<br />
determining specified or guaranteed d<strong>at</strong>a as given in the specific<strong>at</strong>ion or on the<br />
drawings.<br />
• Any damage resulting from the tests shall be repaired and/or damaged<br />
m<strong>at</strong>erial replaced, all the s<strong>at</strong>isfaction of the Engineer.<br />
• In the event of any repair or any adjustment having to be made, other than<br />
normal running adjustment, the tests shall be void and shall be recommended<br />
after the adjustment or repairs have been completed.<br />
• The contractor must inform the Engineer when such tests are to be made, giving<br />
sufficient notice, in order th<strong>at</strong> the Engineer or his nomin<strong>at</strong>ed represent<strong>at</strong>ive may<br />
be present.<br />
• Complete records of all tests must be kept and 3 copies of these and loc<strong>at</strong>ion<br />
drawings must be furnished to the Engineer.<br />
• The contractor may be required to repe<strong>at</strong> the test as required, should the<br />
ambient conditions <strong>at</strong> the time not given, in the opinion of the architect,<br />
sufficient and suitable indic<strong>at</strong>ion of the effect and performance of the install<strong>at</strong>ion<br />
as a whole or of any part, as required.
Handing over of the VRV system<br />
Following reading/ d<strong>at</strong>a shall be gener<strong>at</strong>ed as a part of handing over of the VRV<br />
air conditioning system, apart from the handing over d<strong>at</strong>a for air side & indoor<br />
design conditions.<br />
Out door units<br />
Inlet temper<strong>at</strong>ure<br />
Discharge pipe temper<strong>at</strong>ure<br />
Suction pipe temper<strong>at</strong>ure<br />
Oil pressure<br />
Condensing Pressure<br />
Evapor<strong>at</strong>ing Pressure<br />
Power supply voltage<br />
Inverter compressor frequency<br />
Inverter current<br />
Fan oper<strong>at</strong>ing current<br />
Total ODU current<br />
Indoor Units<br />
Indoor unit oper<strong>at</strong>ion – On/ off from remote<br />
Indoor unit oper<strong>at</strong>ion – On/ off from thermost<strong>at</strong><br />
Remote control presser temper<strong>at</strong>ure<br />
Suction temper<strong>at</strong>ure<br />
Indoor liquid pipe temper<strong>at</strong>ure<br />
Indoor gas pipe temper<strong>at</strong>ure<br />
Electronic expansion valve opening<br />
Fan oper<strong>at</strong>ing current
LIST OF APPROVED MAKES:<br />
S.No. Item Acceptable makes<br />
1. Inverter based VRF System / Indoor &<br />
Outdoor Units<br />
Daikin, Toshiba, Hitachi, LG, Midea,<br />
Mitsubishi,<br />
2. Energy Recovery Ventil<strong>at</strong>or DRI / Greenheck<br />
3. PIPES<br />
3.1 COPPER PIPE Mandev / Rajco / Kwality / Pallavi / Sai<br />
Forge<br />
4. GI Sheets TATA / SAIL/JINDAL/ Nippon<br />
4.1 Aluminium Grilles and Diffusers GI<br />
Volume Control Damper<br />
Airmaster, Cosmic , Carryair, Ravistar,<br />
Servex, Mapro, Dynacraft,<br />
5. INSULATION:<br />
5.1 Cross linked polythelene - XLPE Supreme / Thermobreak/<br />
5.2 Expanded polystyrene Lloyd Insul<strong>at</strong>ion, Beard Sell Ltd,<br />
Styrene packing.<br />
5.3 Closed Cell / Open Cell Nitrile Rubber Armacell / Vidoflex / Aeroflex /Gulfoflex<br />
/ K-Flex / Armaflex<br />
6. Electric Motors Siemens, Kirloskar, Crompton, ABB<br />
7. Power Cable (Al/ Cu) Delton / Polycab / Gloster / Skytone /<br />
Universal / Grandlay<br />
8. Communic<strong>at</strong>ion Cable Neolex / Fusion / Grandlay / Delton<br />
9. Refrigerant Dupont / Honeywell<br />
10 Conduit Pipes ( PVC/ MS) Avon Plast, AKG, BEC, Precision<br />
11 Electrical Panels CPRI approved Vendor. Contractor has<br />
to take prior approval for the vendor.<br />
12. MCB/MCCB L&T, Siemens, ABB, Crabtree<br />
13 Cu wires Finolex, Polycab, KEI, B<strong>at</strong>ra Henley,<br />
Skytone, Grandlay, Havells<br />
14 Switch & Sockets L&T, Siemens, ABB, Crabtree, GE,<br />
Note-1:-<br />
a) Above makers of m<strong>at</strong>erials are approved subject to their meeting the tender specific<strong>at</strong>ion & site<br />
requirements.<br />
b) The samples of the m<strong>at</strong>erial shall in either case have to be got approved from the Engineer-incharge.<br />
c) M<strong>at</strong>erial where no make/brand has been mentioned, in this case ISI marked samples shall be<br />
submitted by the contractor for approval of Engineer.<br />
d) Contractor will be responsible to ensure the quality of products listed in approved list of<br />
makes/brands. Contractor will have to replace the defective and sub-standard m<strong>at</strong>erials <strong>at</strong> his<br />
own cost.
Section - 6<br />
DRAWINGS
LIST OF DRAWINGS ENCLOSED<br />
Sl. No.<br />
DRAWING TITLE<br />
Madanjeet School of Green Energy Technologies<br />
1 Ground Floor Air-Conditioning Layout<br />
2 First Floor Air-Conditioning Layout<br />
3 Second Floor Air-Conditioning Layout<br />
4 Third Floor Air-Conditioning Layout<br />
5 Terrace Floor Air-Conditioning Layout<br />
Bio Inform<strong>at</strong>ics Building<br />
6 Ground Floor Air-Conditioning Layout<br />
7 First Floor Air-Conditioning Layout<br />
8 Terrace Floor Air-Conditioning Layout
<strong>Pondicherry</strong> <strong>University</strong> <strong>at</strong> <strong>Puducherry</strong><br />
<strong>TENDER</strong> <strong>DOCUMENTS</strong><br />
FOR THE WORK OF<br />
Supply, Erection, Testing & Commissioning of VRF<br />
(Variable Refrigerant Flow) Air Conditioning System<br />
work for Bioinform<strong>at</strong>ics & Madanjeet Singh School of<br />
Green Buildings under 11 th Plan Building for<br />
<strong>Pondicherry</strong> <strong>University</strong> <strong>at</strong> <strong>Puducherry</strong>.<br />
<strong>TENDER</strong>NO:RITES/CO/B&A/EE/PU/VRF/BIO&GB/2011<br />
PART-II<br />
(PRICE BID)<br />
Tender Document issued to<br />
_________________ (Name of tenderer)<br />
________________________ (Address of Tenderer)<br />
RITES LTD<br />
(A Government of India Enterprise)<br />
ELECTRICAL ENGINEERING DIVISION<br />
5 TH FLOOR, LEFT WING, RITES BHAWAN<br />
1, SECTOR-29, GURGAON-122001 (HARYANA)<br />
December - 2011
CERTIFICATE<br />
Certified th<strong>at</strong> this part-II, financial bid, of tender documents contains serially<br />
machined numbered pages from S.No. 01 to .<br />
AM / Manager (Electrical)<br />
RITES LTD.
GUIDELINES TO THE <strong>TENDER</strong>ERS FOR FILLING IN FINANCIAL BID<br />
1.0 GENERAL<br />
1.1 The Tenders should be filled in properly and carefully. They should avoid quoting<br />
absurd r<strong>at</strong>es and making too many corrections in the Tenders. In this connection, Item<br />
No.11 of General Rules and Directions may be referred to.<br />
1.2 Each page of the Financial Bid should be signed by the Tenderer. In the last page of<br />
Financial Bid, <strong>at</strong> the end, the Tenderer should sign in full with the name of the<br />
Company, Seal of the Company and D<strong>at</strong>e.<br />
1.3 Each Correction, Cutting, Addition and overwriting should be initialled by the Tenderer.<br />
1.4 If there are any items in the Schedule of Quantities with Quantity not indic<strong>at</strong>ed, no r<strong>at</strong>es<br />
should be quoted for such items. If any r<strong>at</strong>es are quoted, they shall be ignored for<br />
evalu<strong>at</strong>ion of Tenders.<br />
1.5 If the same item figures in more than one section / part of Schedule of Quantities, the<br />
Tenderer should quote the same r<strong>at</strong>e for th<strong>at</strong> item in all sections / parts. If different<br />
r<strong>at</strong>es are quoted for the same item, the least of the different r<strong>at</strong>es quoted only shall be<br />
considered for evalu<strong>at</strong>ion of th<strong>at</strong> item in all sections / parts of the Schedule of Quantities.<br />
1.6 While filling in the Financial Bid, Detailed instructions contained in Rule No.12 and 12A<br />
of General Rules and Directions should be followed carefully, respectively for Item R<strong>at</strong>e<br />
Tenders and Percentage R<strong>at</strong>e Tenders.<br />
2.0 PROCEDURE THAT WILL BE ADOPTED IN CASE OF DISCREPANCY IN THE<br />
OFFER IN FINANCIAL BID<br />
Detailed provisions contained in Rule No. 10 and 10A of General Rules and Directions<br />
shall be followed respectively for Item R<strong>at</strong>e Tenders and Percentage R<strong>at</strong>e Tenders.
RITES LIMITED<br />
General Rules & Directions<br />
1. All work proposed for execution by contract will be notified in a form of Notice<br />
Inviting Tender and Instructions to Tenderers (NIT & IT) issued to the<br />
Contractors who apply for the same. An abridged version will also be published<br />
in the Newspapers.<br />
2. This form will st<strong>at</strong>e the work to be carried out, as well as the d<strong>at</strong>e for submitting<br />
and opening tenders and the time allowed for carrying out the work, the amount<br />
of Earnest Money to be deposited with the tender, the amount of the Performance<br />
Guarantee to be deposited by the successful tenderer and the percentage, if any,<br />
to be deducted from bills towards Security Deposit. Copies of the specific<strong>at</strong>ions,<br />
designs and drawings and any other documents required in connection with the<br />
work signed for the purpose of identific<strong>at</strong>ion by the officer inviting tender shall<br />
also be open for inspection by the Contractor <strong>at</strong> the office of officer inviting tender<br />
during office hours during the period mentioned in the NIT and IT.<br />
3. The tender must be signed by the person / persons competent to sign as indic<strong>at</strong>ed<br />
in the NIT and IT. Same stipul<strong>at</strong>ions will also apply in the case of Receipt for<br />
payments made on account of work to the successful Contractor who has signed<br />
the Contract Agreement.<br />
4. Applicable for Item R<strong>at</strong>e Tender only<br />
Any person who submits a tender shall fill up the Tender form, st<strong>at</strong>ing <strong>at</strong> wh<strong>at</strong><br />
r<strong>at</strong>e he is willing to undertake each item of the work. Tenders, which propose<br />
any alter<strong>at</strong>ion in the work specified in the said form of invit<strong>at</strong>ion to tender, or in<br />
the time allowed for carrying out the work, or which contain any other conditions<br />
of any sort, will be liable to rejection. No single tender shall include more than<br />
one work, but contractors who wish to tender for two or more works shall submit<br />
separ<strong>at</strong>e tender for each. Tender shall have the name and number of the works<br />
to which they refer, written on the envelopes. The r<strong>at</strong>e(s) must be quoted in<br />
decimal coinage. Amounts must be quoted in full rupees by ignoring fifty paise<br />
and less and considering more than fifty paise as rupee one.
4A Applicable for percentage R<strong>at</strong>e Tender only (Not applicable )<br />
In case of Percentage R<strong>at</strong>e Tenders, Tenderer shall fill up the Tender form, st<strong>at</strong>ing<br />
<strong>at</strong> wh<strong>at</strong> percentage below / above (in figures as well as in words) the total<br />
estim<strong>at</strong>ed cost given in Schedule of Quantities he will be willing to execute the<br />
work, Tenders, which propose any alter<strong>at</strong>ion in the work specified in the said form<br />
of invit<strong>at</strong>ion to tender, or in the time allowed for carrying out the work, or which<br />
contain any other conditions of any sort, will be liable to rejection. No single tender<br />
shall include more than one work but contractors who wish to tender for two or<br />
more works shall submit separ<strong>at</strong>e tender for each. Tender shall have the name<br />
and number of the works to which they refer, written on the envelopes.<br />
5AThe officer inviting tender of his duly authorized assistant, will open tenders in the<br />
presence of any intending contractors who may be present <strong>at</strong> the time, and will<br />
enter the amounts of the several tenders in a compar<strong>at</strong>ive st<strong>at</strong>ement in a suitable<br />
form. In the event of a tender being accepted, a receipt for the earnest money<br />
forwarded therewith shall thereupon be given to the contractor. In the event of a<br />
tender being rejected, the earnest money forwarded with such unaccepted tender<br />
shall thereupon be returned to the contractor remitting the same, without any<br />
interest.<br />
5B In the case of a Two Packet System, the Officer inviting the Tender or his duly<br />
authorized represent<strong>at</strong>ive, will open Technical Bids in the presence of any<br />
Contractors who may be present <strong>at</strong> the time and will check if the Earnest Money is<br />
for the correct amount in the correct form. The Financial Bids of those whose<br />
Earnest Money is not acceptable will be returned to them unopened then and<br />
there. After scrutiny of Technical Bids, the Financial Bids of those whose<br />
Technical Bids are in order will be opened and the procedure indic<strong>at</strong>ed in Para 5(A)<br />
above will be followed. The Financial Bids of those Tenderers whose Technical Bids<br />
have not been found acceptable will be returned to them unopened.<br />
6. The officer inviting tenders shall have the right of rejecting all or any of the tenders<br />
and will not be bound to accept the lowest or any other tender.
7. The receipt of an accountant or clerk for any money paid by the contractor will not<br />
be considered as any acknowledgement or payment to the officer inviting tender<br />
and the contractor shall be responsible for seeing th<strong>at</strong> he procures a receipt signed<br />
by the officer inviting tender or a duly authorized cashier.<br />
8. The memorandum of work tendered for and the schedule of m<strong>at</strong>erials to be<br />
supplied by the Employer and their issue r<strong>at</strong>es, shall be filled and completed in the<br />
office of the officer inviting tender before the tender form is issued. If a form is<br />
issued to an intending tenderer without having been so filled in and incomplete, he<br />
shall request the officer to have this done before he completes and delivers his<br />
tender.<br />
9. The tenderers shall sign a declar<strong>at</strong>ion under the officials Secret Act 1923, for<br />
maintaining secrecy of the tender documents drawings or other records connected<br />
with the work given to them. The unsuccessful tenderers shall return all the<br />
drawings given to them.<br />
10. Applicable for Item R<strong>at</strong>e Tender only<br />
In the case of Item R<strong>at</strong>e Tenders, only r<strong>at</strong>es quoted shall be considered. Any tender<br />
containing percentage below / above the r<strong>at</strong>es quoted is liable to be rejected.<br />
R<strong>at</strong>es quoted by the contractor in item r<strong>at</strong>e tender in figures and words shall be<br />
accur<strong>at</strong>ely filled in so th<strong>at</strong> there is no discrepancy in the r<strong>at</strong>es written in figures<br />
and words. However, if a discrepancy is found, the r<strong>at</strong>es which correspond with<br />
the amount worked out by the contractor shall unless otherwise proved be taken<br />
as correct. If the amount of an item is not worked out by the contractor or it<br />
does not correspond with the r<strong>at</strong>es written either in figures or in words then the<br />
r<strong>at</strong>es quoted by the contractor in words shall be taken as correct. Where the<br />
r<strong>at</strong>es quoted by the contractor in figures and in words tally but the amount is<br />
not worked out correctly, the r<strong>at</strong>es quoted by the contractor will unless<br />
otherwise provided be taken as correct and not the amount. . In the event th<strong>at</strong><br />
no r<strong>at</strong>e has been quoted for any item(s), leaving space both in figure (s) or<br />
word(s) and the amount blank, it will be presumed th<strong>at</strong> the Tenderer has<br />
included the cost of this/ these item (s) in other items and r<strong>at</strong>e for such item (s)<br />
will be considered as zero and work will be required to be executed accordingly.<br />
10 A Applicable for Percentage R<strong>at</strong>e Tender only ( not applicable)<br />
In case of Percentage R<strong>at</strong>e Tenders only percentage quoted shall be considered.<br />
Any tender containing item r<strong>at</strong>es is liable to be rejected. Percentage quoted by the<br />
contractor in percentage r<strong>at</strong>e tender shall be accur<strong>at</strong>ely filled in figures and words,
so th<strong>at</strong> there is no discrepancy. However if the contractor has worked out the<br />
amount of the tender and if any discrepancy is found in the percentage quoted in<br />
words and figures, the percentage which corresponds with the amount worked out<br />
by the contractor shall, unless otherwise proved, be taken as correct. If the amount<br />
of the tender is not worked out by the contractor or it does not correspond with the<br />
percentage written either in figures or in words then the percentage quoted by the<br />
contractor in words shall be taken as correct. Where the percentage quoted by the<br />
contractor in figures and in words tally but the amount is not worked out correctly,<br />
the percentage quoted by the contractor will, unless otherwise proved, be taken as<br />
correct and not the amount.<br />
11. In the case of any tender where unit r<strong>at</strong>e of any item / items appears unrealistic,<br />
such tender will be considered as unbalanced and in case the tenderer is unable to<br />
provide s<strong>at</strong>isfactory explan<strong>at</strong>ion such a tender is liable to be disqualified and<br />
rejected.<br />
12. Applicable for Item R<strong>at</strong>e Tender only<br />
All r<strong>at</strong>es shall be quoted on the tender form. The amount for each item should be<br />
worked out and requisite totals given. Special care should be taken to write the<br />
r<strong>at</strong>es in figures as well as in words and the amount in figures only, in such a way<br />
th<strong>at</strong> interpol<strong>at</strong>ion is not possible. The total amount should be written both in<br />
figures and in words. In case of figures, the word ‘Rs.’ should be written before the<br />
figure of rupees and word ‘P’ after the decimal figures, e.g. Rs.2.15 P and in case of<br />
words, the word, ‘Rupees’ should precede and the word ‘Paise’ should be written <strong>at</strong><br />
the end. Unless the r<strong>at</strong>e is in whole rupees and followed by the word ‘only’ it<br />
should invariably be upto two decimal places. While quoting the r<strong>at</strong>e in schedule of<br />
quantities, the word ‘only’ should be written closely following the amount and it<br />
should not be written in the next line.<br />
12A Applicable for Percentage R<strong>at</strong>e Tender only (not applicable)<br />
In Percentage R<strong>at</strong>e Tender, the tenderer shall quote percentage below / above (in<br />
figures as well as in words) <strong>at</strong> which he will be willing to execute the work. He<br />
shall also work out the total amount of his offer and the same should be written in<br />
figures as well as in words in such a way th<strong>at</strong> no interpol<strong>at</strong>ion is possible. In case<br />
of figures, the word ‘Rs.’ should be written before the figure of rupees and word P
after the decimal figures, e.g. Rs.2.15p and in case of words, the word ‘Rupees’<br />
should precede and the word ‘Paise’ should be written <strong>at</strong> the end.<br />
13. The Contractor whose tender is accepted will be required to submit an irrevocable<br />
Performance Guarantee of 5% (Five Percent) of the tendered amount in any of the<br />
forms stipul<strong>at</strong>ed in Clause 1 of Clauses of Contract. In addition, towards Security<br />
Deposit a sum <strong>at</strong> the r<strong>at</strong>e of 10% of the gross amount of each running bill will be<br />
deducted till the sum along with the sum already deposited as Earnest Money will<br />
amount to Security Deposit of 5% of the tendered value of the work.<br />
14. On acceptance of the tender, the name of the accredited represent<strong>at</strong>ive(s) of the<br />
Contractor who would be responsible for taking instructions from the Engineer in<br />
Charge shall be communic<strong>at</strong>ed in writing to the Engineer in Charge.<br />
15. Sales-tax/VAT (except Service Tax), purchase tax, turnover tax or any other tax/<br />
Cess on m<strong>at</strong>erial, labour and Works in respect of this Contract shall be payable by<br />
the Contractor and the Employer will not entertain any claim wh<strong>at</strong>soever in<br />
respect of the same. However, in respect of Service Tax, same shall be paid by the<br />
Contractor to the concerned department on demand and it will be reimbursed to<br />
him by the Engineer-in-Charge after s<strong>at</strong>isfying th<strong>at</strong> it has been actually and<br />
genuinely paid by the Contractor.<br />
16. The Contractor shall give a list of both gazetted and non-gazetted employees of the<br />
Employer rel<strong>at</strong>ed to him.<br />
17. The tender for the work shall not be witnessed by a Contractor or Contractors who<br />
himself / themselves has/ have tendered for the same work. Failure to observe this<br />
condition would render tenders of the Contractors tendering, as well as witnessing<br />
the tender, liable to summary rejection.<br />
18. The tender for this work includes in addition to building work all other works such<br />
as sanitary and w<strong>at</strong>er supply install<strong>at</strong>ions, drainage install<strong>at</strong>ion, electrical work,<br />
landscaping work, roads and p<strong>at</strong>hs etc. The tenderer must associ<strong>at</strong>e himself with<br />
agencies of appropri<strong>at</strong>e class Government Licensed Agencies for appropri<strong>at</strong>e value<br />
which are eligible to tender for sanitary and w<strong>at</strong>er supply, drainage, electrical and<br />
landscaping works.
19. The Contractor shall comply with the provisions of the Apprentices Act 1961, and<br />
the rules and order issued there under from time to time. If he fails to do so his<br />
failure will be a breach of the Contract and the Engineer in Charge / the Employer<br />
may in his discretion without prejudice to any other right or remedy available in<br />
law cancel the Contract. The Contractor shall also be liable for any pecuniary<br />
liability arising on account of any viol<strong>at</strong>ion by him of the provisions of the said Act.
PREAMBLE – B.O.Q.<br />
These preambles apply to all the sections of schedule of quantities and tendered r<strong>at</strong>es<br />
shall take into account all the provisions specific<strong>at</strong>ions and Schedule of Quantities.<br />
1. The quantities in this schedule are provisional. The Contractor will be paid for<br />
the actual quantity of work executed <strong>at</strong> site <strong>at</strong> the r<strong>at</strong>es quoted in his tender.<br />
The Owner reserves the right to increase or decrease any of the quantities or to<br />
totally omit any item of work and any claims by the Contractor in these<br />
accounts will not be entertained.<br />
2. The Contractor shall visit the site and shall s<strong>at</strong>isfy himself as to conditions<br />
under which the work is to be performed. No extra claim on consequence of<br />
ignorance or on grounds of insufficient description will be allowed <strong>at</strong> a l<strong>at</strong>er<br />
d<strong>at</strong>e.<br />
3. No alter<strong>at</strong>ion wh<strong>at</strong>soever is to be made to the text or quantities of this schedule<br />
of quantities unless alter<strong>at</strong>ion is authorized in writing by the Engineer-incharge.<br />
Any such alter<strong>at</strong>ions, notes or additions shall, unless authorized in<br />
writing be disregarded when tender documents are considered.
BILL OF QUANTITIES (Part - A)<br />
Name of Work: Supply, Erection, Testing and Commissioning of VRF (Variable Refrigerant Flow) Air Conditioning System work for Bioinform<strong>at</strong>ics & Madanjeet Singh School of Green<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
Buildings under 11th Plan Building Projects for <strong>Pondicherry</strong> <strong>University</strong>.<br />
Tender No. RITES/CO/B&A/ EE/PU/VRF/GB&BIO/2011<br />
Technical Specific<strong>at</strong>ions<br />
Special Condition of contract<br />
Tender Drawings<br />
The quantity mentioned is indic<strong>at</strong>ive only. Payment shall be made only for the quantity executed.<br />
Guide Lines for filling the financial bid.<br />
The quoted r<strong>at</strong>es for every item in the BOQ are inclusive of charges incurred in civil work like breaking of holes, making of holes, found<strong>at</strong>ion work etc. required for<br />
install<strong>at</strong>ion , testing and commissioning of the equipments/system.<br />
This BOQ should be read in conjuction with the enclosed Technical Specific<strong>at</strong>ion, Tender Drawing and Tender Documents (Part-I)<br />
S.N<br />
DESCRIPTION UNIT QUANTITY RATE<br />
AMOUNT<br />
VRV HVAC system with Inverter based compressor<br />
A EQUIPMENT-VRF<br />
1 Supply,install<strong>at</strong>ion,testing and commissioning(SITC) of<br />
Modular type Variable Refrigerant Volume Outdoor units<br />
comprising of variable speed compressors. The unit shall<br />
comprise of high efficiency condenser fan, he<strong>at</strong> exchanger<br />
and co<strong>at</strong>ed fins for increased durability suitable for<br />
interconnecting with any type of indoor units with cordless<br />
remote controller. The ODU & IDU shall be integr<strong>at</strong>ed with<br />
special super wiring system with the central monitoring<br />
control. The unit shall be factory wired and tested before<br />
desp<strong>at</strong>ch.Configur<strong>at</strong>ion of Module capacity shall be as follows<br />
or as per GFC drawings.<br />
In Words<br />
In Figure<br />
a System -1:- 130 HP (Cooling only) No 1<br />
b System -2,3,4:- 65 HP(Cooling only) No 3
S.N<br />
DESCRIPTION UNIT QUANTITY RATE<br />
AMOUNT<br />
In Words<br />
In Figure<br />
Note 1: Bidder shall quote configur<strong>at</strong>ion meeting the minimum<br />
total requirement or more. Bidder has to quote against the<br />
specific BOQ item only. The capacities mentioned are the<br />
minimum required capacity. However, the bidder can offer the<br />
next higher size unit (if the required capacity unit is not<br />
manufactured by them) against th<strong>at</strong> particular item without<br />
any extra cost.The minimum capacity for Bioinform<strong>at</strong>ics<br />
Building and Green Building is 130 HP & 195 HP respectively.<br />
2) Refrigerant / Oil /consumables charging will form part of the<br />
unit cost and it will not be tre<strong>at</strong>ed as a separ<strong>at</strong>e entity.<br />
3) The prices of outdoor units are inclusive of Pressure<br />
Testing & Charging of R410A refrigerant as required and<br />
nothing shall be paid extra on any account.<br />
2 SITC of Indoor units as specified. The Indoor unit shall have<br />
independent electronic control valve to control the refrigerant<br />
flow r<strong>at</strong>e. The unit shall be operable with cordless remote<br />
controller and should have auxiliary contact for remote On/Off.<br />
The Noise level for the rooms indoor unit shall be not<br />
exceeding the limit as prescribed by standard norms/ rule.<br />
a) 4.0TR Ceiling mounted ductable unit Nos 4<br />
b) 3.0TR Ceiling mounted ductable unit Nos 53<br />
c) 2.0TR Ceiling mounted concealed unit Nos 58<br />
e) 1.5TR Ceiling mounted concealed unit Nos 7<br />
f) 1.0TR Celing mounted concealed unit Nos 13<br />
NOTE: -Bidder has to quote against the specific BOQ item<br />
only. The capacities mentioned are the minimum required<br />
capacity. However, the bidder can offer the next higher size<br />
unit (if the required capacity unit is not manufactured by them)<br />
against th<strong>at</strong> particular item without any extra cost.<br />
3 Supply testing of cordless remote control Nos 135
S.N<br />
DESCRIPTION UNIT QUANTITY RATE<br />
AMOUNT<br />
4 Supply, Install<strong>at</strong>ion of copper refrigerant pipe insul<strong>at</strong>ed with<br />
tubular nitrile rubber insul<strong>at</strong>ion and finished with poly shield<br />
co<strong>at</strong>ing Including supports for copper pipes such as angles,<br />
tray, rods, etc. The r<strong>at</strong>e should include supply and fixing of<br />
uvco<strong>at</strong>ing to protect nitrile rubber insul<strong>at</strong>ion of outdoor<br />
installed copper piping from degrad<strong>at</strong>ion due to ultra voilet<br />
rays and <strong>at</strong>mospheric condition, it shall be recovered with<br />
polyshield co<strong>at</strong>ing of <strong>at</strong> least two co<strong>at</strong>s of resin and hardner<br />
(Polybond make or equivalent) fiber glass tape shall be<br />
helically wound with adequ<strong>at</strong>e overlap & co<strong>at</strong>ed with two co<strong>at</strong>s<br />
of resin with hardner to live smooth and plain finish.<br />
a 6.35 mm with 13 mm thick insul<strong>at</strong>ion Rmt 95<br />
b 9.52 mm with 13 mm thick insul<strong>at</strong>ion Rmt 575<br />
c 12.7 mm with 13 mm thick insul<strong>at</strong>ion Rmt 200<br />
d 15.88 mm with 13 mm thick insul<strong>at</strong>ion Rmt 660<br />
e 19.08 mm with 13 mm thick insul<strong>at</strong>ion Rmt 235<br />
f 22.22 mm with 13 mm thick insul<strong>at</strong>ion Rmt 135<br />
g 25.40 mm with 13 mm thick insul<strong>at</strong>ion Rmt 85<br />
h 28.58 mm with 19 mm thick insul<strong>at</strong>ion Rmt 340<br />
i 31.1 mm with 19 mm thick insul<strong>at</strong>ion Rmt 55<br />
j 35 mm with 19 mm thick insul<strong>at</strong>ion Rmt 80<br />
k 38.1 mm with 19 mm thick insul<strong>at</strong>ion Rmt 15<br />
l 41.27 mm with 19 mm thick insul<strong>at</strong>ion Rmt 150<br />
m 44.5 mm with 19 mm thick insul<strong>at</strong>ion Rmt 40<br />
n 53.98 mm with 19 mm thick insul<strong>at</strong>ion Rmt 95<br />
5 Supply and install<strong>at</strong>ion of communic<strong>at</strong>ion cable carried out<br />
with 2 core x 0.75sqmm shielded cable including PVC conduit,<br />
between indoor unit to outdoor unit<br />
Rmt 1650<br />
6 Wiring & Sockets<br />
a Supply and laying of 600 V grade power cabling out 3 core 1.5<br />
sqmm copper cable between indoor unit (VRF & ERV) and the<br />
MCB which is provided <strong>at</strong> 1 rmt distance from the indoor unit.<br />
Rmt 135<br />
In Words<br />
In Figure
S.N<br />
DESCRIPTION UNIT QUANTITY RATE<br />
AMOUNT<br />
b<br />
Supply, Install<strong>at</strong>ion, Testing & Commissioning of 6 Amp<br />
Switch & 3- Pin socket outlet on surface or in recess, suitable<br />
for complete as required.<br />
7 Supply and laying of following sizes of cables in existing<br />
trenches / trays, on wall with necessary clamping for supply of<br />
outdoor units as required:<br />
a 4 core x 16 Sq. mm. copper XLPE<br />
b<br />
4 core x 25 Sq. mm. copper XLPE<br />
c 4 core x 35 Sq. mm. copper XLPE<br />
4 core x 70 Sq. mm. copper XLPE<br />
8 Supply and laying 8 SWG Copper wire on surface or below<br />
ground level for conductor earth electrode, including clamp,<br />
soldering etc. as required<br />
9 Laying of PVC insul<strong>at</strong>ed and PVC she<strong>at</strong>hed / XLPE power<br />
cable of 1.1 grade of size direct in to ground including<br />
excav<strong>at</strong>ion, sand cushioning, protective covering and refilling<br />
the trench etc. as required.<br />
10 Providing & fixing of we<strong>at</strong>her-Proof Isol<strong>at</strong>or for each Outdoor<br />
unit with 63 Amp. R<strong>at</strong>ing, 4 pole ELCB 100 mA Sensitivity.<br />
Nos. 10<br />
Rmt 100<br />
Rmt 100<br />
Rmt 100<br />
Rmt 200<br />
Rmt 220<br />
Rmt 100<br />
Each 11<br />
11 Supply and laying of 24 G GI tray covered with GI sheet<br />
whereever exposed for running copper tubes and cables.<br />
a 200mm wide x 100 mm height Rmt 80<br />
12 Supply and install<strong>at</strong>ion of centralised controller coloured touch<br />
screen function<br />
Nos 4<br />
13 Supply and install<strong>at</strong>ion of REFNET joints<br />
LOT 1<br />
14 Supply and install<strong>at</strong>ion of UPVC heavy class drain piping for<br />
Indoor unit condens<strong>at</strong>e w<strong>at</strong>er with necessary fittings,<br />
Supports, 'U' trap etc of following sizes. The pipe shall be<br />
insul<strong>at</strong>ed with 6 mm thick nitrile rubber<br />
a 25mm Rmt 600<br />
b 32mm Rmt 650<br />
In Words<br />
In Figure
S.N<br />
DESCRIPTION UNIT QUANTITY RATE<br />
AMOUNT<br />
In Words<br />
In Figure<br />
c 40mm Rmt 75<br />
15 Energy Recovery Ventil<strong>at</strong>ors (ERV) incorpor<strong>at</strong>ing He<strong>at</strong><br />
Recovery Wheel complete with forward curved centrifugal fan<br />
with drive & motors, supply & exhaust filter section with<br />
synthetic pre filters, closed cell insul<strong>at</strong>ion, 3 Angstrom<br />
molecular sieve co<strong>at</strong>ed with HRW & suitable for sensible<br />
recovery <strong>at</strong> least 65% and l<strong>at</strong>ent recovery <strong>at</strong> least 65%. On<br />
site assembly of the unit is not acceptable.<br />
a SITC of 900cfm Energy recovery ventil<strong>at</strong>or Nos 1<br />
b SITC of 600cfm Energy recovery ventil<strong>at</strong>or Nos 4<br />
c SITC of 500cfm Energy recovery ventil<strong>at</strong>or Nos 19<br />
d SITC of 300cfm Energy recovery ventil<strong>at</strong>or Nos 6<br />
e SITC of 150cfm Energy recovery ventil<strong>at</strong>or Nos 3<br />
16<br />
SITC of ducting made out of approved make of GP/GI sheet<br />
with supporting arrangement, gasket, rivets, fasteners, cavass<br />
connection etc including painting of support angle, angle<br />
frame complete as per Specific<strong>at</strong>ion of following thickness<br />
a 24G/0.63mm Sqmt 1010<br />
b 22G/0.8mm Sqmt 20<br />
17 Supply , Install<strong>at</strong>ion, testing and commissioning of canvass of<br />
fire resisting m<strong>at</strong>erial.<br />
Nos 57<br />
18 Supply , Install<strong>at</strong>ion, testing and commissioning of insul<strong>at</strong>ed<br />
flexible duct of 200mm Dia<br />
Rmt 250<br />
19 SITC of Thermal insul<strong>at</strong>ion out of closed cell nitrile rubber<br />
m<strong>at</strong>erial of approved make as per specific<strong>at</strong>ion 9mm thick<br />
Sqmt 30<br />
20 SITC of Thermal insul<strong>at</strong>ion out of Cross linked polyethylene<br />
(XLPE) with factory lamin<strong>at</strong>ed aluminium foil of approved<br />
make as per specific<strong>at</strong>ion - 9 mm thick<br />
Sqmt 975<br />
21 SITC Acoustic insul<strong>at</strong>ion for the ducts out of 15mm thick<br />
elastomeric nitrile rubber absorbing m<strong>at</strong>erial of approved<br />
make as per the specific<strong>at</strong>ion<br />
Sqmt 125<br />
22 SITC of fixed bar type linear grill of 15/30/45 deg deflection<br />
aluminum powder co<strong>at</strong>ed of approved colour<br />
Sqmt 70<br />
23 SITC of GI collar dampers for supply air grilles Sqmt 10
S.N<br />
DESCRIPTION UNIT QUANTITY RATE<br />
AMOUNT<br />
24 SITC of 8 mm thick Sun Mica ply board of any ISI Brand for<br />
trap doors as directed by engineer incharge.<br />
Sq.m 250<br />
25 Minor civil works such as making opening in<br />
walls/floors/ceiling including core cutting if required for taking<br />
duct, cables, piping, Tray etc., and making good of the<br />
openings, Pedestals for ODU.<br />
Lot 1<br />
26 Providing and Fixing Suspended ceiling carried out of 8mm<br />
thick Calcium silic<strong>at</strong>e board with G.I.Framework complete as<br />
per specific<strong>at</strong>ions.<br />
Sqmt 1500<br />
27 Supply, Install<strong>at</strong>ion, Testing & Commissioning of LT Panel<br />
with (0-500 V) Voltmeter, (0 - 100A) ammeter with three CT<br />
& selector switch, on / off / trip indic<strong>at</strong>ion light with protection<br />
fuses. i). The construction shall be of OUTDOOR FEEDER<br />
PILLAR TYPE. The Feeder pillar shall be of floor/channel<br />
mounting, free standing type, suitable for outdoor install<strong>at</strong>ion<br />
in dust, vermin and we<strong>at</strong>her proof construction as per<br />
specific<strong>at</strong>ions. Nos 5<br />
Incomer Feeder<br />
1 No.- 250 A, 25 KA, 4P MCCCB ) 0-50% Overload protection<br />
Setting) with overload<br />
Outgoing Feeder<br />
4 Nos. - 63 A, 25 kA, 4P MCCB (0-50% overload protection<br />
settings)<br />
In Words<br />
In Figure<br />
Total<br />
Note: 1) The main power supply for HVAC units - 2P- 5 A<br />
MCB of for each Indoor unit will be provided within 1 meter<br />
near the indoor unit , by other agency. The interconnecting<br />
cabling from the MCB to the indoor units (VRF & ERV) shall<br />
be executed by the HVAC Contractor.
Estim<strong>at</strong>e (Part - B) - Optional Item<br />
Name of Work: Supply, Erection, Testing and Commissioning of VRF (Variable Refrigerant Flow) Air Conditioning System work for Bioinform<strong>at</strong>ics & Madanjeet Singh School of Green Buildings under<br />
11th Plan Building Projects for <strong>Pondicherry</strong> <strong>University</strong>.<br />
S.NO Description Unit Quantity R<strong>at</strong>e<br />
Amount<br />
In Figure<br />
In Words<br />
Annual Maintanence Contract<br />
1<br />
All inclusive Comprehensive Oper<strong>at</strong>ion & Maintainence Contract of<br />
VRF System only for the period of four years after the completion<br />
of Defect Liabilities Period .<br />
Note: The per Year r<strong>at</strong>es to be quoted by the bidders as given<br />
below.<br />
a 1 st year after warranty period LOT 1<br />
b 2 nd year after warranty period LOT 1<br />
c 3 rd year after warranty period LOT 1<br />
d 4 rd year after warranty period LOT 1<br />
Total Amount (Rs.)<br />
NOTE:<br />
1<br />
2<br />
3<br />
The AC agency/ contractor has to provide the bank gurantee of the equivalent per year quoted amount to be kept valid for the 4 years plus three months from the d<strong>at</strong>e of<br />
completion of 1st year of defect liability period. This BG is required to be submitted by the sucess full bidder before release of the final bill payments after the sucessful<br />
completion of work. However a seper<strong>at</strong>e supplementry aggrement/contract shall be executed (after the sucessful completion of the VRF HVAC work given in Section/ Part- A<br />
of BOQ) between the <strong>Pondicherry</strong> <strong>University</strong> and AC agency towards comprehensive oper<strong>at</strong>ion and maintenance of the VRF system for the next 4 years after completion of<br />
1st one year of defect liability period.<br />
The per year quoted r<strong>at</strong>es and amount of the comprehensive oper<strong>at</strong>ion and maintenance ( Optional item ) shall be taken into consider<strong>at</strong>ion during evalu<strong>at</strong>ion of financial/Price<br />
bid of the bidder for deciding the overall lowest bidder.<br />
During defect liability period contractor has to oper<strong>at</strong>e the entire VRF HVAC system/ install<strong>at</strong>ion for which no extra payment shall be paid to the contractor for the oper<strong>at</strong>ion of<br />
whole HVAC install<strong>at</strong>ion and his quoted r<strong>at</strong>e in the price bid should be deemed to be inclusive of the oper<strong>at</strong>ion of the HVAC system during the DLP period of Ist one year from<br />
the d<strong>at</strong>e of completion of the work.