19.06.2014 Views

4 - Hofmann Megaplan

4 - Hofmann Megaplan

4 - Hofmann Megaplan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

0121- 29<br />

9 - ROUTINE MAINTENANCE<br />

9.1 - SCHEDULED MAINTENANCE<br />

Switch off the machine from the mains before carrying out any operation.<br />

9.2 - TO REPLACE THE FUSES<br />

Remove the weight holder shelf to gain access to the power supply board where the 4 fuses are<br />

located (see Exploded Drawings). If fuses require replacement, use ones of the same<br />

current rating. If the fault persists, contact Technical Service.<br />

9.3 - ADAPTER END-PIECE, SPINDLE P<br />

- Keep the internal felt ring constantly lubricated.<br />

NONE OF THE OTHER MACHINE PARTS REQUIRE MAINTENANCE.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!