is planted with Phragmites karka<br />
<strong>and</strong> (see Photo<br />
<br />
<br />
5-6). The treated greywater is<br />
then collected <strong>in</strong> a 700-litre tank<br />
<br />
range range average average<br />
before it is used for irrigation,<br />
wash<strong>in</strong>g vehicles <strong>and</strong> toilet<br />
<br />
of greywater is treated daily.<br />
Hydraulic retention time (HRT)<br />
5<br />
<br />
<br />
mg/l<br />
100–400<br />
177–687<br />
52–188<br />
mg/l<br />
0–12<br />
7–72<br />
1–6<br />
mg/l (SD)<br />
200 (93)<br />
411 (174)<br />
98 (53)<br />
mg/l (SD)<br />
5 (4.6)<br />
29 (20)<br />
3 (2)<br />
<strong>in</strong> the settl<strong>in</strong>g tank averages 24<br />
NH 4<br />
-N 4–26 0–2 13 (8) 0.5 (0.6)<br />
hours <strong>and</strong> hydraulic load<strong>in</strong>g rate<br />
<br />
(HLR) of the constructed wetl<strong>and</strong><br />
4<br />
1–5 1–4 3 (1) 2 (1)<br />
amounts to 8.3 cm/d. Assum<strong>in</strong>g<br />
an average BOD removal rate of 40–50% <strong>in</strong> the settl<strong>in</strong>g tank, the organic<br />
load<strong>in</strong>g rate of the constructed wetl<strong>and</strong> totals 8–12 g BOD 5/m 2 /d.<br />
<br />
<br />
4-N is transformed<br />
to nitrate (NO 3 <br />
<br />
<br />
<br />
<br />
The system has been <strong>in</strong> operation s<strong>in</strong>ce April 1998 <strong>and</strong> monitored from<br />
<br />
The follow<strong>in</strong>g ma<strong>in</strong>tenance was performed to ensure proper operation of<br />
the system:<br />
•<br />
•<br />
Annual sludge removal from the settl<strong>in</strong>g tank.<br />
Regular <strong>in</strong>spection of dos<strong>in</strong>g chamber to ensure operation of the siphon<br />
<strong>and</strong> <strong>in</strong>termittently greywater-charged bed.<br />
•<br />
•<br />
Annual plant cutt<strong>in</strong>g.<br />
<br />
<br />
cleaned.<br />
<br />
<br />
Costs<br />
The construction costs of the system, <strong>in</strong>clud<strong>in</strong>g ma<strong>in</strong> treatment unit, settl<strong>in</strong>g,<br />
dos<strong>in</strong>g <strong>and</strong> storage tank amounted to USD 430 (i.e. USD 61/p). System costs are<br />
<br />
to be negligible. The 500 litres of dr<strong>in</strong>k<strong>in</strong>g water saved every day leads to an<br />
annual reduction <strong>in</strong> household expenditure of USD 40 (water price <strong>in</strong> Kathm<strong>and</strong>u:<br />
USD 0.23/m 3 ). Such a reduction <strong>in</strong> expenditure allows payback of the construction<br />
<strong>Greywater</strong> <strong>Management</strong> <strong>in</strong> <strong>Low</strong> <strong>and</strong> <strong>Middle</strong>-<strong>Income</strong> <strong>Countries</strong><br />