31.08.2014 Views

Greywater Management in Low and Middle-Income Countries - SSWM

Greywater Management in Low and Middle-Income Countries - SSWM

Greywater Management in Low and Middle-Income Countries - SSWM

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

is planted with Phragmites karka<br />

<strong>and</strong> (see Photo<br />

<br />

<br />

5-6). The treated greywater is<br />

then collected <strong>in</strong> a 700-litre tank<br />

<br />

range range average average<br />

before it is used for irrigation,<br />

wash<strong>in</strong>g vehicles <strong>and</strong> toilet<br />

<br />

of greywater is treated daily.<br />

Hydraulic retention time (HRT)<br />

5<br />

<br />

<br />

mg/l<br />

100–400<br />

177–687<br />

52–188<br />

mg/l<br />

0–12<br />

7–72<br />

1–6<br />

mg/l (SD)<br />

200 (93)<br />

411 (174)<br />

98 (53)<br />

mg/l (SD)<br />

5 (4.6)<br />

29 (20)<br />

3 (2)<br />

<strong>in</strong> the settl<strong>in</strong>g tank averages 24<br />

NH 4<br />

-N 4–26 0–2 13 (8) 0.5 (0.6)<br />

hours <strong>and</strong> hydraulic load<strong>in</strong>g rate<br />

<br />

(HLR) of the constructed wetl<strong>and</strong><br />

4<br />

1–5 1–4 3 (1) 2 (1)<br />

amounts to 8.3 cm/d. Assum<strong>in</strong>g<br />

an average BOD removal rate of 40–50% <strong>in</strong> the settl<strong>in</strong>g tank, the organic<br />

load<strong>in</strong>g rate of the constructed wetl<strong>and</strong> totals 8–12 g BOD 5/m 2 /d.<br />

<br />

<br />

4-N is transformed<br />

to nitrate (NO 3 <br />

<br />

<br />

<br />

<br />

The system has been <strong>in</strong> operation s<strong>in</strong>ce April 1998 <strong>and</strong> monitored from<br />

<br />

The follow<strong>in</strong>g ma<strong>in</strong>tenance was performed to ensure proper operation of<br />

the system:<br />

•<br />

•<br />

Annual sludge removal from the settl<strong>in</strong>g tank.<br />

Regular <strong>in</strong>spection of dos<strong>in</strong>g chamber to ensure operation of the siphon<br />

<strong>and</strong> <strong>in</strong>termittently greywater-charged bed.<br />

•<br />

•<br />

Annual plant cutt<strong>in</strong>g.<br />

<br />

<br />

cleaned.<br />

<br />

<br />

Costs<br />

The construction costs of the system, <strong>in</strong>clud<strong>in</strong>g ma<strong>in</strong> treatment unit, settl<strong>in</strong>g,<br />

dos<strong>in</strong>g <strong>and</strong> storage tank amounted to USD 430 (i.e. USD 61/p). System costs are<br />

<br />

to be negligible. The 500 litres of dr<strong>in</strong>k<strong>in</strong>g water saved every day leads to an<br />

annual reduction <strong>in</strong> household expenditure of USD 40 (water price <strong>in</strong> Kathm<strong>and</strong>u:<br />

USD 0.23/m 3 ). Such a reduction <strong>in</strong> expenditure allows payback of the construction<br />

<strong>Greywater</strong> <strong>Management</strong> <strong>in</strong> <strong>Low</strong> <strong>and</strong> <strong>Middle</strong>-<strong>Income</strong> <strong>Countries</strong><br />

67

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!