The continuity of the cut-off is assured by re-penetrating into the inner elements of<br />
freshly installed panels, or “strokes.” Grout volume ratios of 30 to over 100% are used,<br />
depending on the ground conditions, the desired properties of the soilcrete, and the<br />
particular requirements of each DMM variant. Grout volume ratio is defined as the<br />
volume of grout injected divided by the volume of wall.<br />
There tends not to be a great deal of vertical movement of the native soil in many cases<br />
during mixing, and so “conventional” DMM panels tend to have a range of strengths<br />
which will reflect stratigraphic variation. In particularly dense or obstructed ground,<br />
predrilling or pre-excavation may be necessary to allow efficient DMM cut-off<br />
construction. DMM machines are, by nature, massive and so require wide and stable<br />
access and unrestricted headroom (Photograph 1).<br />
Photograph 1. DMM machine (triple axis) operating in river conditions<br />
(Courtesy of Raito Inc.).