ordinance is by designated County personnel and law enforcement officers. During <strong>Water</strong> Year 2012, 100% of Pasco County<br />

Utilities' wastewater was reused. The bulk rate charged for the use of reclaimed water is $0.47 per 1,000 gallons (normal rate),<br />

$0.21 per 1,000 gallons (surplus rate), and a flat rate of $10.26 per month residential irrigation. Pasco County's potable water rates<br />

are applied in a water conservation inclining block rate. County Ordinance 93-16 requires each new development to construct a<br />

reclaimed water distribution system as a condition of wastewater service when the development is within designated areas in the<br />

Reclaimed <strong>Water</strong> Master Plan and when providing the development with reclaimed water supply is determined in the best interest<br />

of the County. Pasco County participates in the National Flood Insurance Program, administered through FEMA. All finished floor<br />

elevations are required to be above the 100-year flood elevation. These elevations are reviewed prior to construction and certified<br />

after construction. Fill Ordinance, adopted 3/05, requires permit applications and review for placement of fill greater than 5 CY on<br />

properties.<br />

Funding Source<br />

Prior Funding<br />

FY2013<br />

Budget<br />

FY2014<br />

Budget<br />

Future<br />

Funding<br />

Total Funding<br />

Applicant Share 633,300 633,300<br />

Coastal Rivers 633,300 633,300<br />

Total 1,266,600 1,266,600<br />

Matching Fund Reduction<br />

Check here if requesting a reduction in matching funds requirement pursuant to s.288.06561, F.S.<br />

Timelines<br />

1/1/2014<br />

Milestone<br />

Projected Date<br />

Bid Phase 01/01/2014<br />

10/1/2013<br />

Milestone<br />

Projected Date<br />

Design start 10/01/2013<br />

2/15/14<br />

Milestone<br />

Projected Date<br />

Construction start 02/15/2014<br />

9/15/14<br />

Milestone<br />

Projected Date<br />

Project closeout 09/15/2014<br />