ordinance is by designated County personnel and law enforcement officers. During <strong>Water</strong> Year 2012, 100% of Pasco County<br />
Utilities' wastewater was reused. The bulk rate charged for the use of reclaimed water is $0.47 per 1,000 gallons (normal rate),<br />
$0.21 per 1,000 gallons (surplus rate), and a flat rate of $10.26 per month residential irrigation. Pasco County's potable water rates<br />
are applied in a water conservation inclining block rate. County Ordinance 93-16 requires each new development to construct a<br />
reclaimed water distribution system as a condition of wastewater service when the development is within designated areas in the<br />
Reclaimed <strong>Water</strong> Master Plan and when providing the development with reclaimed water supply is determined in the best interest<br />
of the County. Pasco County participates in the National Flood Insurance Program, administered through FEMA. All finished floor<br />
elevations are required to be above the 100-year flood elevation. These elevations are reviewed prior to construction and certified<br />
after construction. Fill Ordinance, adopted 3/05, requires permit applications and review for placement of fill greater than 5 CY on<br />
properties.<br />
Funding Source<br />
Prior Funding<br />
FY2013<br />
Budget<br />
FY2014<br />
Budget<br />
Future<br />
Funding<br />
Total Funding<br />
Applicant Share 633,300 633,300<br />
Coastal Rivers 633,300 633,300<br />
Total 1,266,600 1,266,600<br />
Matching Fund Reduction<br />
Check here if requesting a reduction in matching funds requirement pursuant to s.288.06561, F.S.<br />
Timelines<br />
1/1/2014<br />
Milestone<br />
Projected Date<br />
Bid Phase 01/01/2014<br />
10/1/2013<br />
Milestone<br />
Projected Date<br />
Design start 10/01/2013<br />
2/15/14<br />
Milestone<br />
Projected Date<br />
Construction start 02/15/2014<br />
9/15/14<br />
Milestone<br />
Projected Date<br />
Project closeout 09/15/2014<br />