Tampa Bay Region - Southwest Florida Water Management District
Tampa Bay Region - Southwest Florida Water Management District
Tampa Bay Region - Southwest Florida Water Management District
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
construction activities when available. Enforcement of this ordinance is by designated County personnel and law enforcement<br />
officers. During <strong>Water</strong> Year 2004, 100% of Pasco County Utilities¿ wastewater was reused. The bulk rate currently charged for the<br />
use of reclaimed water is $0.61 per 1,000 gallons and a flat rate of $11.00 per ERU per month for residential irrigation. Pasco<br />
County¿s potable water rates have been adjusted with steeper water conservation inclining block rates. County Ordinance 93-16<br />
requires each new development to construct a reclaimed water distribution system as a condition of wastewater service when the<br />
development is within designated areas in the reclaimed water master plan and providing the development with reclaimed water is<br />
determined to be in the best interest of the County. Pasco County has also adopted Landscape Ordinance 02-04 that restricts the<br />
use of non-drought tolerant turf grass and encourages drought tolerant landscaping. Pasco County participates in the National<br />
Flood Insurance Program administered through the Federal Emergency <strong>Management</strong> Agency. All finished floor elevations are<br />
required to be above the 100-year flood elevation. These elevations are reviewed prior to construction and certified after<br />
construction<br />
Funding Source<br />
Prior Funding<br />
FY2013<br />
Budget<br />
FY2014<br />
Budget<br />
Future<br />
Funding<br />
Total Funding<br />
Applicant Share 1,000,000 3,000,000 4,000,000<br />
Coastal Rivers 1,000,000 3,000,000 4,000,000<br />
Total 2,000,000 6,000,000 8,000,000<br />
Matching Fund Reduction<br />
Check here if requesting a reduction in matching funds requirement pursuant to s.288.06561, F.S.<br />
Timelines<br />
Appraisal of Property 03/31/2014<br />
Property Purchase 09/30/2014<br />
Evaluation/Assessment of Funding Source-Benefitted properties 09/30/2014<br />
Design and Permitting of Additional Retention 03/31/2015<br />
Construction of Additional Retention 09/30/2015<br />
90