07.09.2014 Views

Tampa Bay Region - Southwest Florida Water Management District

Tampa Bay Region - Southwest Florida Water Management District

Tampa Bay Region - Southwest Florida Water Management District

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• Allow for increased system reliability (and utilization) of the reclaimed water system<br />

• Increased energy efficiency through variable frequency drive and control systems for the pumping system<br />

• Allow for additional stormwater storage and treatment capacity at the golf course (onsite ponds currently serve dual purpose<br />

of stormwater treatment and reclaimed water storage for irrigation)<br />

Describe your organizations efforts in developing, implementing and enforcing water conservation and flood protection<br />

ordinances.<br />

The City of Tarpon Springs has a Stormwater Division, <strong>Water</strong> Distribution Division, and <strong>Water</strong> Meter Repair Division, which are<br />

responsible for maintaining and evaluating the operating conditions of each component. Each Division performs any required<br />

repairs and performs specific preventative maintenance tasks to ensure conservation of our water supply. The City of Tarpon<br />

Springs Law Enforcement Officers are responsible for enforcing the mandated water restrictions within the City. City conservation<br />

efforts, including inverted rate structures (ordinance attached), an extensive and popular reclaimed water program, and former toilet<br />

rebate program through Pinellas County Utilities have resulted in a measurable reduction in our per capita water consumption to<br />

less than 110 gal/capita/day. City leadership remains committed to water conservation and has maintained watering restrictions<br />

that are more stringent than currently required by the <strong>District</strong>.<br />

Funding Source<br />

Prior Funding<br />

FY2013<br />

Budget<br />

FY2014<br />

Budget<br />

Future<br />

Funding<br />

Total Funding<br />

Applicant Share 119,814 1,483,393 681,790 2,284,997<br />

Pinellas Anclote 119,814 1,483,393 681,790 2,284,997<br />

Total 239,628 2,966,786 1,363,580 4,569,994<br />

Matching Fund Reduction<br />

Check here if requesting a reduction in matching funds requirement pursuant to s.288.06561, F.S.<br />

Timelines<br />

RW Pumping System (Future Request)<br />

Milestone<br />

Projected Date<br />

Begin Construction 08/30/2015<br />

Complete and Certify Construction 06/30/2016<br />

RW Storage System (FY2014 CFI Request)<br />

Milestone<br />

Projected Date<br />

Complete and Certify Construction 08/30/2015<br />

RW Storage System (FY2014 CFI Request)<br />

Milestone<br />

Projected Date<br />

Begin Construction 10/30/2014<br />

RW Storage and Pumping System (FY 2014 CFI Request)<br />

Milestone<br />

Projected Date<br />

Complete Design 07/30/2014<br />

RW Storage and Pumping System (FY2014 CFI Request)<br />

Milestone<br />

Projected Date<br />

Begin Design 10/30/2013<br />

RW Valves and Telemetry (FY2013 Funded)<br />

Milestone<br />

Projected Date<br />

Begin Design 10/30/2012<br />

Complete Design 04/30/2013<br />

Begin Construction 06/30/2013<br />

Complete and Certify Construction 12/21/2013<br />

60

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!