07.09.2014 Views

Tampa Bay Region - Southwest Florida Water Management District

Tampa Bay Region - Southwest Florida Water Management District

Tampa Bay Region - Southwest Florida Water Management District

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Return to TOC<br />

Project Name<br />

Project Number<br />

Cooperator<br />

Department<br />

Contact Person<br />

Address<br />

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT<br />

FY2014 COOPERATIVE FUNDING INITIATIVE APPLICATION FORM<br />

Design & Construction - FGUA Wet Weather Reclaimed <strong>Water</strong> Interconnect, Storage and Pumping<br />

Project<br />

N370<br />

<strong>Florida</strong> Governmental Utility Authority<br />

Jerry Connolly<br />

280 Wekiva Springs Road<br />

City Sate Zip Longwood, FL 327796026<br />

Phone # 407-629-6900<br />

Email<br />

jconnolly@govmserv.com<br />

Project Type:<br />

X <strong>Water</strong> Supply <strong>Water</strong> Quality Flood Protection Natural Systems<br />

Strategic Initiatives:<br />

<strong>Water</strong> Quality Maintenance and Improvement <strong>Water</strong> Quality Monitoring<br />

Alternative <strong>Water</strong> Supply Conservation<br />

X Reclaimed <strong>Water</strong> <strong>Region</strong>al <strong>Water</strong> Supply Planning<br />

Emergency Flood Response Floodplain <strong>Management</strong><br />

Minimum Flows and Level Establishment and Monitoring Minimum Flows and Levels Recovery<br />

Natural Systems Conservation and Restoration Natural Systems Identification and Monitoring<br />

Indicate All Counties to Benefit From Project:<br />

Charlotte Citrus Desoto Hardee Hernando Highlands Hillsborough Lake<br />

Levy Manatee Marion X Pasco Pinellas Sarasota Sumter Polk<br />

Project Description:<br />

This multi-year FY2012, FY 2013, and FY2014 project will design and construct a 3 million gallon reclaimed water storage tank, a<br />

transfer pump station and approximately 200 LF of 24-inch diameter reclaimed water transmission line to interconnect FGUA's<br />

Aloha/Seven Springs reclaimed water system to Pasco County's reclaimed water system. The project will also include<br />

approximately 2,000 LF of 4-inch reclaimed water connection to serve the Trinity Oaks sudivision common area irrigation in FGUA's<br />

service area.<br />

Describe your organizations efforts in developing, implementing and enforcing water conservation and flood protection<br />

ordinances.<br />

This project is the result of a past cooperatively funded FGUA feasibility study (N334) to make the best use of approximately 2 mgd<br />

of available reclaimed water flows from the FGUA Seven Springs Wastewater Treatment Plant in New Port Richey, <strong>Florida</strong>. The<br />

feasibility study included: (1) Providing for interconnections to Pasco County reclaimed water system to allow for the redistribution<br />

of the resource, (2) Investigating projects that maximize the reduction of potable water use in the Seven Springs Service Area by<br />

providing reclaimed water for public access irrigation to areas of high potable water demand where reclaimed water is currently not<br />

available, (3) Investigating projects reducing the amount of effluent being discharged into surrounding FGUA reclaim water<br />

sprayfields, and storage/pumping improvements to maximize water utilization, such as adding diurnal and seasonal storage, and<br />

(4) additional transmission of distribution system projects to expand distribution and transmission delivery and availability to new<br />

customer groups. The FGUA has entered into an agreement with Pasco County for the selected interconnection between the two<br />

reclaimed water systems. Furthermore, the FGUA has entered into an agreement with the Trinity Oaks Home Owners' Association<br />

to provide reuse service to irrigate common areas.<br />

Funding Source<br />

Prior Funding<br />

FY2013<br />

Budget<br />

FY2014<br />

Budget<br />

Future<br />

Funding<br />

Total Funding<br />

Applicant Share 500,000 350,000 350,000 1,200,000<br />

Pinellas Anclote 500,000 350,000 350,000 1,200,000<br />

Total 1,000,000 700,000 700,000 2,400,000<br />

Matching Fund Reduction<br />

23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!