07.09.2014 Views

Tampa Bay Region - Southwest Florida Water Management District

Tampa Bay Region - Southwest Florida Water Management District

Tampa Bay Region - Southwest Florida Water Management District

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Return to TOC<br />

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT<br />

FY2014 COOPERATIVE FUNDING INITIATIVE APPLICATION FORM<br />

Project Name<br />

Pasco County - Wesley Center Reclaimed <strong>Water</strong> Pump Station<br />

Project Number N507<br />

Cooperator<br />

Pasco County<br />

Department<br />

Utilities<br />

Contact Person Pamela Wright<br />

Address<br />

7536 State Street<br />

City Sate Zip New Port Richey, FL 34654<br />

Phone #<br />

727-847-8145 ext7825<br />

Email<br />

pwright@pascocountyfl.net<br />

Project Type:<br />

X <strong>Water</strong> Supply <strong>Water</strong> Quality Flood Protection Natural Systems<br />

Strategic Initiatives:<br />

<strong>Water</strong> Quality Maintenance and Improvement <strong>Water</strong> Quality Monitoring<br />

Alternative <strong>Water</strong> Supply Conservation<br />

X Reclaimed <strong>Water</strong> <strong>Region</strong>al <strong>Water</strong> Supply Planning<br />

Emergency Flood Response Floodplain <strong>Management</strong><br />

Minimum Flows and Level Establishment and Monitoring Minimum Flows and Levels Recovery<br />

Natural Systems Conservation and Restoration Natural Systems Identification and Monitoring<br />

Indicate All Counties to Benefit From Project:<br />

Charlotte Citrus Desoto Hardee Hernando Highlands Hillsborough Lake<br />

Levy Manatee Marion X Pasco Pinellas Sarasota Sumter Polk<br />

Project Description:<br />

With the construction of the Boyette Reclaimed <strong>Water</strong> Reservoir, it has been determined that it is necessary to upgrade the<br />

reclaimed water pump station located at the Wesley Center Wastewater Treatment Facility. This upgrade will allow the County to<br />

more efficiently pump reclaimed water from the reservoir through the plant into the reclaimed water system. This proposed project<br />

will consist of the renovation of four of the reuse pumps which provide reclaimed water to the reclaimed water system. The<br />

renovation is intended to return these pumps to their design flow rates by rebuilding seals, replacing worn parts and rebuilding or<br />

replacing with high efficiency motors. Additionally, two of the existing reuse pumps will either be replaced or upgraded to match the<br />

above four pumps' flow rates. This work will require upgrades to the existing electrical feeder circuits, the motor control center and<br />

pump controls (i.e., VFDs). These upgrades will in turn necessitate that the reuse pump electrical building is enlarged and its HVAC<br />

system is increased to handle the additional sensible heat load. The existing tank isolation, pump manifold, and system valves will<br />

also need to be rebuilt or replaced as part of this project.<br />

The project cost is estimated to be $1,300,000. The County is requesting 50 percent funding from <strong>District</strong> ($650,000) in FY 2014.<br />

Describe your organizations efforts in developing, implementing and enforcing water conservation and flood protection<br />

ordinances.<br />

Pasco County adopted Ordinance 01-08 requiring the following: one day/week irrigation restrictions for potable water; curtailed use<br />

of potable water for irrigation when rain has occurred within 24 hours; scheduled availability and restricted use of reclaimed water<br />

irrigation to distribute limited supply to as many customers as possible; washing of non-business, personal vehicles only using low<br />

volume methods and over non-impervious surfaces; prohibiting aesthetic uses of water unless such use also provides a necessary<br />

aeration or water quality benefit; and the use of reclaimed water for road construction activities when available. Enforcement of this<br />

ordinance is by designated County personnel and law enforcement officers. During <strong>Water</strong> Year 2012, 100% of Pasco County<br />

Utilities' wastewater was reused. The bulk rate charged for the use of reclaimed water is $0.47 per 1,000 gallons (normal rate),<br />

$0.21 per 1,000 gallons (surplus rate), and a flat rate of $10.26 per month residential irrigation. Pasco County's potable water rates<br />

are applied in a water conservation inclining block rate. County Ordinance 93-16 requires each new development to construct a<br />

reclaimed water distribution system as a condition of wastewater service when the development is within designated areas in the<br />

Reclaimed <strong>Water</strong> Master Plan and when providing the development with reclaimed water supply is determined in the best interest<br />

of the County. Pasco County participates in the National Flood Insurance Program, administered through FEMA. All finished floor<br />

63

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!