Continued from previous page<br />

A Reflection on the San Diego County High Precision Geodetic Network<br />

and the Start of the Statewide HPGN Survey<br />

A Trimble 4000 SST GPS receiver borrowed from MIT at station SDGPS<br />

15, a station set to replace the mark on Volcan Mountain which was<br />

inaccessible due to snow.<br />

Two of the NGS operators who were assigned existing<br />

NAD83 network stations on mountaintops were late<br />

getting started on the first day after having to slog thru<br />

the snow to get to their respective stations.<br />

One of the County of Orange surveyors was delayed<br />

due to a helicopter crash on the freeway near his<br />

assigned station.<br />

One of the borrowed Trimble receivers was set to log<br />

to an external data collector, so no data was collected<br />

for that station on Friday. A call to Trimble on Saturday<br />

morning corrected the problem.<br />

The crew at a station by the Old Point Loma<br />

Lighthouse, found themselves answering questions<br />

from 10,000 tourists and 200 2 nd graders.<br />

On Saturday and Sunday, the County Party Chief<br />

occupying a station in a desert campground east of<br />

Borrego Springs found himself surrounded by participants<br />

in what is the annual Peg Leg Liars Contest.<br />

When he told them he was making measurements to<br />

satellites, they did not really believe him and thought it<br />

an elaborate setup for a contest entry.<br />

Mike Binge at station Junction Azimuth mark near the Tecate border<br />

crossing during the 1991 San Diego-HPGN survey.<br />

which is really too close together to achieve “A” order relative<br />

accuracy (1:10,000,000 over 20km is smaller than the<br />

expected setup error), however every effort was made to<br />

achieve the highest accuracy possible. Not only were all 34<br />

stations observed simultaneously, the observations were<br />

repeated on 3 days, meteorological observations were<br />

observed at most stations several times during the sessions<br />

and plumb-bobs were used to verify optical plummet<br />

tribrachs. The schedule for operations was set for Friday,<br />

Saturday and Sunday, April 5, 6, & 7, 1991 to minimize<br />

impacts on existing projects and deadlines. Miraculously,<br />

the rain stopped as this start date approached.<br />

With all of the careful planning and preparation, the<br />

actual field operations went off relatively trouble free. Of<br />

course, there were some issues, such as:<br />

22<br />

Once all of the data was downloaded and backed-up to<br />

multiple 3.5” diskettes (I still have memories of formatting<br />

hundreds of diskettes for hours on end…the County IT<br />

department saved 6 cents apiece purchasing unformatted<br />

diskettes), the data was then delivered to Yehuda Bock’s<br />

group at Scripps Institution of Oceanography (SIO) for processing.<br />

Dr. Bock is one of the developers for the GAMIT<br />

software (GPS at MIT) along with scientists at the<br />

Massachusetts Institute of Technology. The GAMIT software<br />

is a true multiple baseline processor in that instead of<br />

looking at one base and rover GPS receiver pair at a time<br />

to determine a vector or baseline, GAMIT looks at all<br />

receivers and double difference combinations available to<br />

determine unknown station coordinate parameters in one<br />

least-squares solution. With 34 simultaneous data sets,<br />

that makes for a lot of double difference combinations and<br />

requires a fair amount of computational power.<br />

Continued on next page<br />