Download - Autosim Autosim
Download - Autosim Autosim
Download - Autosim Autosim
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
THE AUTOSIM PROJECT<br />
For a reasonable cost estimation and the achievement of target costs (=<br />
budget) a lot of parameters are vital. But as approximately 80 % of the life<br />
cycle cost of a new car body design is fixed by engineering and design, cost<br />
as a constraint offers the maximum influence on cost assessment with<br />
respect to the best engineering option or best performance effectiveness<br />
(Fig 4.5.7.2). An aim of the planned ASCS project therefore is to consider<br />
both concurrently.<br />
SIXTH FRAMEWORK PROGRAMME PRIORITY [6.2] [SUSTAINABLE SURFACE TRANSPORT]<br />
012497 AUTOSIM<br />
59 |