Regional housing services<br />
Corporate Objective 1: Delivering better homes<br />
• In <strong>Ards</strong> Borough, eight new build<br />
schemes completed during<br />
2012/13, delivering 133 social<br />
housing units. Six schemes were<br />
on site at 31 st March <strong>2013</strong> to<br />
deliver 89 social housing units.<br />
During <strong>2013</strong>/14, eight new build<br />
schemes are programmed to<br />
commence in the borough to<br />
deliver 110 social housing units;<br />
• In 2012/13 two renovation grants and 25 repair grants were completed in <strong>Ards</strong><br />
Borough;<br />
• During 2012/13 the Warm Homes scheme facilitated insulation of 216 homes, 9<br />
heating installations, and both heating and insulation in a further 13 homes in<br />
<strong>Ards</strong> Borough. In addition, 26 properties of solid wall construction received<br />
internal dry lining insulation;<br />
• We are managing and delivering a new boiler replacement scheme in the<br />
private sector;<br />
• We will work with DSD to deliver a pilot initiative that aims to bring a number of<br />
long term empty homes back into use for social renting. Census 2011 records<br />
2,055 vacant dwellings in <strong>Ards</strong> Borough, though does not distinguish<br />
second/holiday homes within this figure.<br />
Corporate Objective 2: Supporting independent living<br />
• During 2012/13 in <strong>Ards</strong> Borough, we spent £822,136 funding 26 sheltered and<br />
supported housing schemes, and three floating support services, for a range of<br />
client groups. A budget of £806,299 has been allocated for <strong>2013</strong>/14;<br />
• During 2012/13, we completed 54 disabled facilities grants in <strong>Ards</strong> Borough,<br />
spending £0.954 million on private sector adaptations;<br />
• We continue to assess the need for generic wheelchair units in new build<br />
schemes and aim to facilitate bespoke properties, where possible, for those<br />
clients with complex needs;<br />
• During 2012/13, 676 homeless applications were received and 447 applicants<br />
were assessed as having ‘Full Duty Status’. The new <strong>Housing</strong> Related Support<br />
Strategy (Supporting People) <strong>2013</strong>-15 sets out proposals to address the needs of<br />
three key thematic client groups, including the homeless;<br />
• We continue to review the need for Traveller accommodation. A<br />
comprehensive five year needs assessment will be undertaken in <strong>2013</strong>/14 to<br />
inform a Traveller Accommodation Programme.<br />