13.10.2014 Views

INVITATION FOR BID - University of Central Missouri

INVITATION FOR BID - University of Central Missouri

INVITATION FOR BID - University of Central Missouri

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PART I<br />

3<br />

1. MANDATORY PRE-<strong>BID</strong> CONFERENCE<br />

INSTRUCTIONS TO <strong>BID</strong>DERS<br />

1.1 All prospective bidders are invited to attend the MANDATORY pre-bid conference to be held on<br />

Tuesday, March 13, 2012 at_10:00 a.m. in the Procurement Office Conference Room, General<br />

Services Buildings, 102 W. South Street, Warrensburg, MO 64093 for the purpose <strong>of</strong> clarifying<br />

any questions or comments pertaining to the plans and specifications.<br />

2. <strong>BID</strong>DERS’ OBLIGATION<br />

2.1 Bidders must carefully examine the entire site <strong>of</strong> the work and shall make all reasonable and<br />

necessary investigations to inform themselves thoroughly as to the facilities available as well as<br />

to all the difficulties involved in the completion <strong>of</strong> all work in accordance with the specifications<br />

and the plans. Bidders are also required to examine all maps, plans and data mentioned in the<br />

specifications. No plea <strong>of</strong> ignorance concerning observable existing conditions or difficulties that<br />

may be encountered in the execution <strong>of</strong> the work under this contract will be accepted as a excuse<br />

for any failure or omission on the part <strong>of</strong> the contractor to fulfill in every detail all <strong>of</strong> the<br />

requirements <strong>of</strong> the contract, nor accepted as a basis for any claims for extra compensation.<br />

2.2 Under no circumstances will a contractor give his plans and specifications to another contractor.<br />

Any bid received from a contractor whose name does not appear on the list <strong>of</strong> bidders having<br />

been mailed and/or paid for the plans and specifications will be subject to rejection.<br />

3. INTERPRETATIONS/SUBSTITUTIONS<br />

3.1 No oral interpretations will be made to any bidder as to the meaning <strong>of</strong> the plans and<br />

specifications or the acceptability <strong>of</strong> alternate products, materials, form or type <strong>of</strong> construction.<br />

Every request for interpretation or substitution shall be made in writing and submitted<br />

with all supporting documents by no later than 2:00 p.m. CDST on Tuesday, March 20,<br />

1012. The request shall be sent directly to the Buyer <strong>of</strong> Record (whose name appears on the first<br />

page <strong>of</strong> this Invitation for Bid), <strong>University</strong> <strong>of</strong> <strong>Central</strong> <strong>Missouri</strong>, Procurement Office,<br />

Warrensburg, MO, 64093 or it may be faxed to the Buyer’s attention at 660-543-8345. Every<br />

interpretation made to a bidder will be in the form <strong>of</strong> an addendum and will be sent as promptly<br />

as practicable to all persons to whom plans and specifications have been issued. All such<br />

addenda shall become part <strong>of</strong> the contract documents.<br />

4. <strong>BID</strong>S AND <strong>BID</strong>DING PROCEDURE<br />

4.1 The bid procedure is a two-step submittal process over a 24 hour period. Bidders shall submit all<br />

first submission forms and accompanying documents by the stated time or their bid will be<br />

rejected for being non-responsive. If the second submission is not received within the 24 hours <strong>of</strong><br />

bid opening, the entire bid will be rejected for being non-responsive. See the list below and the<br />

“Table <strong>of</strong> Contents” for when bid forms are to be submitted.<br />

4.1.1 Depending on the specific project requirements, the following lists <strong>of</strong> bid forms and<br />

times when they are due:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!