21<br />

9.6 Each Contractor shall coordinate all work so there shall be no prolonged interruption <strong>of</strong><br />

existing equipment operation. Any existing plumbing, heating, ventilating, air conditioning<br />

or electrical disconnections necessary which affect portions <strong>of</strong> this construction or building<br />

or any other building must be scheduled with the Contract Administrator to minimize or<br />

avoid any disruption <strong>of</strong> facility operations. In no case, unless previously approved in writing<br />

by the Construction Inspector, shall utilities be left disconnected at the end <strong>of</strong> a work day or<br />

over a weekend. Any interruption <strong>of</strong> utilities either intentionally or accidentally shall not<br />

relieve the Contractor responsible for the interruption from repairing and restoring the utility<br />

to normal service. Repairs and restoration shall be made before the workmen responsible<br />

for the repair and restoration leave the job.<br />

9.7 Each Contractor shall be responsible for repair <strong>of</strong> his damage to property on or <strong>of</strong>f the<br />

project occurring during construction <strong>of</strong> project, and all such repairs shall be made to the<br />

satisfaction <strong>of</strong> the property owner.<br />

9.8 Contractors shall not overload, or permit others to overload, any part <strong>of</strong> any structure during<br />

the performance <strong>of</strong> this contract.<br />

9.9 Each Contractor shall be responsible for shoring required to protect his work or adjacent<br />

property and improvements <strong>of</strong> Owner and shall be responsible for shoring or for giving any<br />

required notice to adjacent property owners and shall pay for any damage caused by failure<br />

to shore or by improper shoring or by failure to give proper notice. Shoring shall be<br />

removed only after completion <strong>of</strong> permanent supports.<br />

9.10 During the performance <strong>of</strong> work the Contractor shall be responsible for providing and<br />

maintaining warning signs, lights, signal devices, barricades, guard rails, fences and other<br />

devices appropriately located on site which will give proper and understandable warning to<br />

all persons <strong>of</strong> danger <strong>of</strong> entry onto land, structure or equipment. Such warning and<br />

protective devices shall be removed only when approved by the Contract Administrator or<br />

Designer.<br />

9.11 The Contractor shall be responsible for protection, including weather protection, and proper<br />

maintenance <strong>of</strong> all equipment and materials installed or to be installed by him.<br />

9.12 The Contractor shall be responsible for care <strong>of</strong> his finished work and shall protect same from<br />

damage or defacement until final acceptance by the Owner. If the work is damaged by any<br />

cause, the Contractor shall immediately begin to make repairs in accordance with the<br />

drawings and specifications. Contractor shall be liable for all damage or loss unless<br />

attributable to the acts or omissions <strong>of</strong> the Owner or Designer. Any claim for<br />

reimbursement shall be submitted in accordance with Article 23.<br />

9.13 The Contractor shall be responsible for initiating, maintaining and supervising all safety<br />

precautions and programs in connection with the performance <strong>of</strong> the Contract.<br />

9.13.1 In the event the Contractor encounters on the site material reasonably believed to<br />

be asbestos or polychlorinated biphenyl (PCB) which has not been rendered<br />

harmless, the Contractor shall immediately stop work in the area affected and<br />

report the condition to the Owner. The work in the affected area shall not<br />

thereafter be resumed except by written agreement <strong>of</strong> the Owner and Contractor if<br />

in fact the material is asbestos or polychlorinated biphenyl (PCB) and has not been