shall be located as directed and shall include sample panels constructed at site size as<br />

required.<br />

29<br />

16.11 All tests required by the specifications shall be paid for by the Contractor and performed by<br />

testing laboratories approved by the Owner.<br />

17. MATERIALS AND WORKMANSHIP<br />

17.1 Unless otherwise specified, all materials shall be new and both workmanship and materials<br />

shall be <strong>of</strong> the best quality. If required by the Owner, satisfactory evidence shall be<br />

furnished as to the kind and quality <strong>of</strong> the materials and workmanship.<br />

17.2 All materials and workmanship used in the work shall be subject to the inspection <strong>of</strong> the<br />

Designer and Contract Administrator, and any work which is deemed defective shall be<br />

removed, rebuilt or made good. The cost <strong>of</strong> such correction shall be borne by the<br />

Contractor. All condemned materials shall be immediately removed from the site <strong>of</strong> the<br />

work.<br />

17.3 Failure or neglect on the part <strong>of</strong> the Owner to condemn or reject bad or inferior materials or<br />

workmanship shall not be construed to imply an acceptance <strong>of</strong> any work. The work herein<br />

specified to be done is not to be considered as finally accepted until it is so stated in writing<br />

by the Owner.<br />

17.4 Unless otherwise provided and stipulated within these specifications, the Contractor shall<br />

furnish, construct, and/or install and pay for materials, devices, mechanisms, equipment, all<br />

necessary personnel, utilities including, but not limited to water, heat, light and electric<br />

power, transportation services, applicable taxes <strong>of</strong> every nature, and all other facilities<br />

necessary for the proper execution and completion <strong>of</strong> the work.<br />

17.5 All temporary shoring, bracing, etc., required for the removal <strong>of</strong> existing work and/or for the<br />

installation <strong>of</strong> new work shall be included in this contract. This must be done to the entire<br />

satisfaction <strong>of</strong> the Owner but the Contractor must assume full responsibility for the work.<br />

The Contractor shall make good, at no cost to the Owner, any damage caused by improper<br />

support or failure <strong>of</strong> shoring in any respect.<br />

17.6 Contractor shall, at all times, enforce strict discipline and good order among his employees,<br />

and shall not employ on the work any unfit person or anyone not skilled in the work<br />

assigned to him.<br />

17.7 Contractor shall carefully examine the plans and drawings and shall be responsible for the<br />

proper fitting <strong>of</strong> his material, equipment and apparatus into the building.<br />

17.8 Contractor shall base his bid only on materials, method <strong>of</strong> construction and equipment as<br />

indicated.<br />

17.9 Contractor shall promptly remove at his own expense all rejected materials from site <strong>of</strong><br />

work.<br />

17.10 When a material has been approved, no change in brand or make will be permitted unless: