20.10.2014 Views

Rehabilitation and Expansion of the Existing Wastewater ... - UNDP

Rehabilitation and Expansion of the Existing Wastewater ... - UNDP

Rehabilitation and Expansion of the Existing Wastewater ... - UNDP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Rehabilitation</strong> <strong>and</strong> <strong>Expansion</strong> <strong>of</strong> <strong>the</strong> <strong>Existing</strong> WWTP in Jenin City<br />

Technical Specifications<br />

1-5 Electrical Services<br />

The electrical power system will operate on 220/380 volt, 3-phase, 4-wires, 50 HZ system, with 4%<br />

maximum allowable voltage drop from main power supply panel.<br />

The low current system shall operate on <strong>the</strong> voltage specified or as recommended by <strong>the</strong> manufacturer<br />

to <strong>the</strong> approval <strong>of</strong> <strong>the</strong> Engineer.<br />

1-6 Local Electrical Authorities <strong>and</strong> Infrastructure Network Requirements<br />

The contractor shall attend on <strong>and</strong> afford all facilities to <strong>the</strong> local electrical authorities <strong>and</strong> to<br />

infrastructure electrical network, <strong>and</strong> shall be responsible for preparing any shop drawings for <strong>the</strong><br />

approval <strong>of</strong> <strong>the</strong> authorities.<br />

The contractor shall also be responsible for coordination with all existing infrastructure network<br />

drawings <strong>and</strong> construction.<br />

1-7 Shop Drawings, Samples, <strong>and</strong> O<strong>the</strong>r Submittals<br />

The contractor shall submit shop drawings <strong>and</strong> samples for all <strong>the</strong> equipment or systems for <strong>the</strong><br />

Engineers’ approval, no equipment or system shall be ordered or installed unless all such drawings <strong>and</strong><br />

samples are reviewed <strong>and</strong> approved by <strong>the</strong> Engineer.<br />

The shop drawings shall reflect all necessary adjustments to <strong>the</strong> design to incorporate all requirements<br />

<strong>of</strong> all equipments. These shall be based upon <strong>the</strong> actual equipment to be installed, selected for use by<br />

<strong>the</strong> contractor according to manufacturers subsequently approved by <strong>the</strong> Engineer. The contractor shall<br />

make such adjustments to <strong>the</strong> design as are necessary to accommodate <strong>the</strong> technical <strong>and</strong> physical<br />

requirements <strong>of</strong> <strong>the</strong> selected equipment in <strong>the</strong> preparation <strong>of</strong> <strong>the</strong> shop drawings.<br />

The shop drawings shall be drawn to scale showing exact cable tray, conduit, <strong>and</strong> cable routing,<br />

junction box location, location in relevance to o<strong>the</strong>r equipment such as lighting fixtures or mechanical<br />

equipments, <strong>and</strong> exact heights for implementation, circuit wiring showing phase, neutral, earth, <strong>and</strong> <strong>of</strong>f<br />

lines.<br />

The shop drawings shall be to a minimum scale 1:50 <strong>and</strong> complex area, such as plant rooms, services<br />

ducts, any areas considered by <strong>the</strong> engineer, scales <strong>of</strong> 1:20 <strong>and</strong> 1:10 shall be employed.<br />

Manufacturer’s drawings or catalogue sheet, giving full fitness <strong>and</strong> o<strong>the</strong>r pertinent facts shall be<br />

submitted to <strong>the</strong> engineer for approval before apparatus in question is ordered, built or installed for <strong>the</strong><br />

following systems.<br />

- Panel boards, sub-distribution boards, main distribution boards;<br />

- Lighting fixture, lighting equipments, <strong>and</strong> lamps;<br />

- ATS for st<strong>and</strong> by generator <strong>and</strong> control panel.<br />

The approval <strong>of</strong> drawings will be general, but approval shall not be constructed as permitting any<br />

departure from <strong>the</strong> contract requirements, not relieving <strong>the</strong> contractor <strong>of</strong> <strong>the</strong> responsibility for any<br />

errors, including details, dimensions, materials, etc.<br />

1-8 As-Built Drawings<br />

The contractor shall submit <strong>the</strong> As-built drawings to <strong>the</strong> Engineer <strong>of</strong> every system after installation,<br />

contractor shall include all works, scale, format, <strong>and</strong> number <strong>of</strong> copies is to be to <strong>the</strong> approval <strong>of</strong> <strong>the</strong><br />

Engineer.<br />

Arabtech Jardaneh/Palestine 145 Electrical Works