WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
• The off going / new <strong>Permit</strong> Issuers carry<br />
out a face-<strong>to</strong>-face hand over with a full<br />
brief on hazard controls in place and the<br />
general work status<br />
• When the new shift <strong>Permit</strong> Accep<strong>to</strong>r is<br />
available the new <strong>Permit</strong> Issuer shall<br />
provide a face-<strong>to</strong>-face briefing on the<br />
hazard controls in place and re-issue the<br />
<strong>Work</strong> <strong>Permit</strong> by signing as the issuing<br />
<strong>Permit</strong> Issuer in the ‘Relinquishment <strong>to</strong><br />
<strong>Permit</strong> Issuer’ section. The <strong>Permit</strong><br />
Accep<strong>to</strong>r accepts by signing in the<br />
‘Change of <strong>Permit</strong> Accep<strong>to</strong>r’ section of<br />
<strong>Work</strong> <strong>Permit</strong>.<br />
• The new shift <strong>Permit</strong> Accep<strong>to</strong>r shall brief<br />
the work team members and ask them <strong>to</strong><br />
sign on<strong>to</strong> the <strong>Work</strong> <strong>Permit</strong> prior <strong>to</strong><br />
commencing work.<br />
7.6.4 Scope of <strong>Work</strong> Change<br />
If the scope of work changes during work<br />
progress the <strong>Permit</strong> Accep<strong>to</strong>r shall consult<br />
their line supervisor and the <strong>Permit</strong> Issuer as<br />
necessary and <strong>to</strong>gether consider the impact of<br />
the proposed changes on the existing hazard<br />
controls in place and the potential for additional<br />
hazards. The THA shall be reviewed as part of<br />
this process.<br />
If this analysis indicates a need <strong>to</strong> change an<br />
existing <strong>Work</strong> <strong>Permit</strong> condition or the need for<br />
additional controls and the newly defined work<br />
is ready <strong>to</strong> commence, all work shall cease.<br />
The <strong>Permit</strong> Accep<strong>to</strong>r shall return the <strong>Work</strong><br />
<strong>Permit</strong> <strong>to</strong> the <strong>Permit</strong> Issuer and indicate the<br />
scope of work change (the change is<br />
highlighted in Scope of <strong>Work</strong> section of <strong>Permit</strong>)<br />
and request any additional hazard controls.<br />
The <strong>Permit</strong> Issuer shall vet the request for<br />
additional controls and initiate implementation<br />
as necessary. These are recorded / added <strong>to</strong><br />
the existing <strong>Work</strong> <strong>Permit</strong> and highlighted.<br />
When all additional hazard control preparations<br />
have been completed the <strong>Permit</strong> Issuer shall<br />
sign and date all changes made on the <strong>Work</strong><br />
<strong>Permit</strong>. Authorisation is then provided <strong>to</strong> the<br />
<strong>Permit</strong> Accep<strong>to</strong>r for work <strong>to</strong> proceed.<br />
The <strong>Permit</strong> Accep<strong>to</strong>r shall take <strong>Permit</strong><br />
documents <strong>to</strong> the worksite, brief the work team<br />
members on any changed hazard controls and<br />
indicate that it is safe <strong>to</strong> return <strong>to</strong> work.<br />
7.6.5 <strong>Work</strong> <strong>Permit</strong> Suspension<br />
If there is a need <strong>to</strong> suspend work for a<br />
number of shifts due <strong>to</strong> delays in material or<br />
resource availability the following shall occur:<br />
• <strong>Permit</strong> Accep<strong>to</strong>r leaves the worksite in a<br />
safe state, returns the <strong>Permit</strong> Control<br />
Board and associated documentation <strong>to</strong><br />
the <strong>Permit</strong> Issuer with a briefing on<br />
reason for suspension and signs off the<br />
<strong>Work</strong> <strong>Permit</strong><br />
• The <strong>Permit</strong> Issuer signs in the<br />
‘Relinquishment <strong>to</strong> <strong>Permit</strong> Issuer’ section<br />
of <strong>Work</strong> <strong>Permit</strong> and records the reason<br />
for suspension<br />
• When the <strong>Work</strong> <strong>Permit</strong> is required <strong>to</strong> be<br />
re-instated the, <strong>Permit</strong> Issuer arranges<br />
for an Isolation Checker <strong>to</strong> revalidate the<br />
isolations and sign the original Isolation<br />
Certificate<br />
• The <strong>Permit</strong> Issuer shall re-issue the <strong>Work</strong><br />
<strong>Permit</strong> by signing in the ‘Relinquishment<br />
<strong>to</strong> <strong>Permit</strong> Issuer’ section of the <strong>Work</strong><br />
<strong>Permit</strong>.<br />
7.6.6 Testing<br />
When energies are isolated and there is a<br />
need <strong>to</strong> carry out testing or re-positioning of<br />
equipment during work progress and<br />
temporary removal of isolations is required,<br />
reference should be made <strong>to</strong> Appendix D1<br />
Section 9.<br />
7.7 <strong>Work</strong> <strong>Permit</strong> Hand-back<br />
When work defined in the scope of work is<br />
complete or there is a requirement <strong>to</strong> close the<br />
<strong>Work</strong> <strong>Permit</strong>, the following shall occur:<br />
• The <strong>Permit</strong> Accep<strong>to</strong>r ensures the work<br />
site is left in a clean and safe state<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 10 of 59