WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

• The off going / new <strong>Permit</strong> Issuers carry<br />

out a face-<strong>to</strong>-face hand over with a full<br />

brief on hazard controls in place and the<br />

general work status<br />

• When the new shift <strong>Permit</strong> Accep<strong>to</strong>r is<br />

available the new <strong>Permit</strong> Issuer shall<br />

provide a face-<strong>to</strong>-face briefing on the<br />

hazard controls in place and re-issue the<br />

<strong>Work</strong> <strong>Permit</strong> by signing as the issuing<br />

<strong>Permit</strong> Issuer in the ‘Relinquishment <strong>to</strong><br />

<strong>Permit</strong> Issuer’ section. The <strong>Permit</strong><br />

Accep<strong>to</strong>r accepts by signing in the<br />

‘Change of <strong>Permit</strong> Accep<strong>to</strong>r’ section of<br />

<strong>Work</strong> <strong>Permit</strong>.<br />

• The new shift <strong>Permit</strong> Accep<strong>to</strong>r shall brief<br />

the work team members and ask them <strong>to</strong><br />

sign on<strong>to</strong> the <strong>Work</strong> <strong>Permit</strong> prior <strong>to</strong><br />

commencing work.<br />

7.6.4 Scope of <strong>Work</strong> Change<br />

If the scope of work changes during work<br />

progress the <strong>Permit</strong> Accep<strong>to</strong>r shall consult<br />

their line supervisor and the <strong>Permit</strong> Issuer as<br />

necessary and <strong>to</strong>gether consider the impact of<br />

the proposed changes on the existing hazard<br />

controls in place and the potential for additional<br />

hazards. The THA shall be reviewed as part of<br />

this process.<br />

If this analysis indicates a need <strong>to</strong> change an<br />

existing <strong>Work</strong> <strong>Permit</strong> condition or the need for<br />

additional controls and the newly defined work<br />

is ready <strong>to</strong> commence, all work shall cease.<br />

The <strong>Permit</strong> Accep<strong>to</strong>r shall return the <strong>Work</strong><br />

<strong>Permit</strong> <strong>to</strong> the <strong>Permit</strong> Issuer and indicate the<br />

scope of work change (the change is<br />

highlighted in Scope of <strong>Work</strong> section of <strong>Permit</strong>)<br />

and request any additional hazard controls.<br />

The <strong>Permit</strong> Issuer shall vet the request for<br />

additional controls and initiate implementation<br />

as necessary. These are recorded / added <strong>to</strong><br />

the existing <strong>Work</strong> <strong>Permit</strong> and highlighted.<br />

When all additional hazard control preparations<br />

have been completed the <strong>Permit</strong> Issuer shall<br />

sign and date all changes made on the <strong>Work</strong><br />

<strong>Permit</strong>. Authorisation is then provided <strong>to</strong> the<br />

<strong>Permit</strong> Accep<strong>to</strong>r for work <strong>to</strong> proceed.<br />

The <strong>Permit</strong> Accep<strong>to</strong>r shall take <strong>Permit</strong><br />

documents <strong>to</strong> the worksite, brief the work team<br />

members on any changed hazard controls and<br />

indicate that it is safe <strong>to</strong> return <strong>to</strong> work.<br />

7.6.5 <strong>Work</strong> <strong>Permit</strong> Suspension<br />

If there is a need <strong>to</strong> suspend work for a<br />

number of shifts due <strong>to</strong> delays in material or<br />

resource availability the following shall occur:<br />

• <strong>Permit</strong> Accep<strong>to</strong>r leaves the worksite in a<br />

safe state, returns the <strong>Permit</strong> Control<br />

Board and associated documentation <strong>to</strong><br />

the <strong>Permit</strong> Issuer with a briefing on<br />

reason for suspension and signs off the<br />

<strong>Work</strong> <strong>Permit</strong><br />

• The <strong>Permit</strong> Issuer signs in the<br />

‘Relinquishment <strong>to</strong> <strong>Permit</strong> Issuer’ section<br />

of <strong>Work</strong> <strong>Permit</strong> and records the reason<br />

for suspension<br />

• When the <strong>Work</strong> <strong>Permit</strong> is required <strong>to</strong> be<br />

re-instated the, <strong>Permit</strong> Issuer arranges<br />

for an Isolation Checker <strong>to</strong> revalidate the<br />

isolations and sign the original Isolation<br />

Certificate<br />

• The <strong>Permit</strong> Issuer shall re-issue the <strong>Work</strong><br />

<strong>Permit</strong> by signing in the ‘Relinquishment<br />

<strong>to</strong> <strong>Permit</strong> Issuer’ section of the <strong>Work</strong><br />

<strong>Permit</strong>.<br />

7.6.6 Testing<br />

When energies are isolated and there is a<br />

need <strong>to</strong> carry out testing or re-positioning of<br />

equipment during work progress and<br />

temporary removal of isolations is required,<br />

reference should be made <strong>to</strong> Appendix D1<br />

Section 9.<br />

7.7 <strong>Work</strong> <strong>Permit</strong> Hand-back<br />

When work defined in the scope of work is<br />

complete or there is a requirement <strong>to</strong> close the<br />

<strong>Work</strong> <strong>Permit</strong>, the following shall occur:<br />

• The <strong>Permit</strong> Accep<strong>to</strong>r ensures the work<br />

site is left in a clean and safe state<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 10 of 59