WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

9. Testing Program<br />

If equipment that has energies isolated requires testing, jogging or re-positioning during progress of<br />

work, then the following shall occur:<br />

• An authorised Test Program is required and referenced on the <strong>Work</strong> <strong>Permit</strong>. This program shall<br />

specify the designated points for temporary removal of isolations and a Designated Person who<br />

will be in charge and/or performing the testing task<br />

• For routine, low risk single point Testing Programs the Designated Person may manage the<br />

process of re-energisation and re-isolation. However for more complex multi testing point high<br />

risk Programs the process should be managed by the <strong>Permit</strong> Accep<strong>to</strong>r.<br />

• The Designated Person shall be assessed as competent in the Testing Program for the specific<br />

equipment / plant.<br />

• When testing is <strong>to</strong> commence, work team members remove their Personal Danger Tag from the<br />

<strong>Permit</strong> Control Board and for low risk Testing Programs the Designated Person is the last<br />

person <strong>to</strong> remove their Personal Danger Tag prior <strong>to</strong> commencing testing. For high risk Testing<br />

Programs the <strong>Permit</strong> Accep<strong>to</strong>r’s Personal Danger Tag is the last tag removed from the <strong>Permit</strong><br />

Control Board prior <strong>to</strong> testing.<br />

• The Designated Person:<br />

- Removes the isolation keys designated as part of the Testing Program from the <strong>Permit</strong><br />

Control Board<br />

- Removes the Isolation Tag(s) from the points designated for removal of isolations<br />

- Ties Testing Tag(s) <strong>to</strong> each isolation point and on<strong>to</strong> the <strong>Permit</strong> Control Board<br />

- Removes isolations from designated points <strong>to</strong> allow the testing program <strong>to</strong> be completed.<br />

• For high risk Testing Programs the <strong>Permit</strong> Accep<strong>to</strong>r remains at the work site for the duration of<br />

testing.<br />

• Upon completion of Testing Program the Designated Person:<br />

- Removes the Testing Tag and re-attaches the Isolation Tag and lock<br />

- Removes the Testing Tag from the <strong>Permit</strong> Control Board and returns the isolation key(s)<br />

• If work is <strong>to</strong> continue, work team members re-attach their Personal Danger Tags.<br />