WMC Environment, Health & Safety Management System<br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

<strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

MHS-07<br />

DocsOpen Ref: 155520, 23/12/2003<br />

Uncontrolled copy – check web for latest revision<br />

Revision Reviewed Description of Changes Date Approved<br />

2 D Batchler Revised <strong>to</strong> incorporate Confined Spaces, Hot <strong>Work</strong> etc 23/12/2003 P Plavina<br />

1 A Barfield Revised Isolations <strong>Standard</strong> 17/10/2001 P Plavina<br />

0 First Issue of Isolations <strong>Standard</strong> 12/07/2000 K Thomas<br />

© WMC Resources Ltd<br />

WMC has developed this document for internal use, specific <strong>to</strong> circumstances and conditions within its operations. It is<br />

intended <strong>to</strong> provide general information and its applicability <strong>to</strong> external parties may therefore be limited. WMC makes no<br />

representations as <strong>to</strong> the applicability of the information for use by any party other than WMC and should not be relied<br />

upon as such. WMC provides no representation or warranty as <strong>to</strong> safety or business outcomes arising from application<br />

of this document and its requirements by third parties.


EHS<br />

MS<br />

WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

CONTENTS<br />

1 PURPOSE AND SCOPE.....................................................................................................4<br />

1.1 Purpose ..............................................................................................................................4<br />

1.2 Scope .................................................................................................................................4<br />

2 GENERAL ...........................................................................................................................4<br />

3 DOCUMENT STRUCTURE.................................................................................................5<br />

4 SYSTEM OVERVIEW..........................................................................................................5<br />

5 TRAINING AND COMPETENCY ........................................................................................6<br />

6 MONITORING AND AUDITS ..............................................................................................6<br />

7 WORK PERMIT PROCESS ................................................................................................6<br />

7.1 Scope of <strong>Work</strong>....................................................................................................................6<br />

7.2 <strong>Hazard</strong> Identification and Assessment ...............................................................................7<br />

7.3 <strong>Work</strong> <strong>Permit</strong> Document Preparation ...................................................................................7<br />

7.4 <strong>Work</strong>place Preparation .......................................................................................................8<br />

7.5 <strong>Work</strong> <strong>Permit</strong> Issue and Acceptance....................................................................................8<br />

7.5.1 <strong>Work</strong> <strong>Permit</strong>s..........................................................................................................8<br />

7.5.2 <strong>Work</strong> <strong>Permit</strong>s with a Block Isolation .......................................................................8<br />

7.6 <strong>Work</strong> Progression ...............................................................................................................9<br />

7.6.1 <strong>Work</strong> Commencement............................................................................................9<br />

7.6.2 Shift Handover........................................................................................................9<br />

7.6.3 <strong>Work</strong> <strong>Permit</strong> Relinquishment ..................................................................................9<br />

7.6.4 Scope of <strong>Work</strong> Change ........................................................................................10<br />

7.6.5 <strong>Work</strong> <strong>Permit</strong> Suspension ...................................................................................... 10<br />

7.6.6 Testing..................................................................................................................10<br />

7.7 <strong>Work</strong> <strong>Permit</strong> Hand-back ................................................................................................... 10<br />

8 RESPONSIBILITIES .........................................................................................................11<br />

8.1 <strong>Permit</strong> Issuer .................................................................................................................... 11<br />

8.2 Isola<strong>to</strong>r.............................................................................................................................. 12<br />

8.3 Isolation Checker..............................................................................................................12<br />

8.4 Service Provider / <strong>Permit</strong> Reques<strong>to</strong>r ................................................................................ 12<br />

8.5 <strong>Permit</strong> Accep<strong>to</strong>r................................................................................................................12<br />

8.6 <strong>Work</strong> Team Member......................................................................................................... 13<br />

8.7 Site General Manager ...................................................................................................... 13<br />

9 REFERENCES ..................................................................................................................13<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 2 of 59


EHS<br />

MS<br />

WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

10 TABLE 1............................................................................................................................15<br />

Guide for When a <strong>Work</strong> <strong>Permit</strong> is Required............................................................................. 15<br />

APPENDICES ........................................................................................................................16<br />

A PERMIT TO WORK – OVERVIEW FLOWCHART........................................................... 17<br />

B WORK PERMIT................................................................................................................ 18<br />

C WORK PERMIT REGISTER ............................................................................................ 20<br />

D1 ISOLATION PROCEDURE .............................................................................................. 21<br />

D2 ISOLATION CERTIFICATE.............................................................................................. 27<br />

E1 SAFE WORKING IN CONFINED SPACE PROCEDURE ................................................ 28<br />

E2 CONFINED SPACE ENTRY CERTIFICATE .................................................................... 37<br />

E3 REAR OF CONFINED SPACE CERTIFICATE ................................................................ 38<br />

E4 CONFINED SPACE ENTRY/EXIT LOG............................................................................. 39<br />

E5 CONFINED SPACE WORK AUTHORISATION TAG....................................................... 40<br />

E6 CONFINED SPACE EVALUATION.................................................................................. 41<br />

F1 HOT WORK PROCEDURE.............................................................................................. 45<br />

F2 HOT WORK CERTIFICATE ............................................................................................. 49<br />

F3 FIRE WATCH SIGN OFF/ON ( rear of Hot work certificate)............................................. 50<br />

F4 HOT WORK- WORK AUTHORISATION TAG.................................................................. 51<br />

G1 RADIATION PROCEDURE .............................................................................................. 52<br />

G2 RADIATION PROCESS - FLOWCHART.......................................................................... 54<br />

G3 RADIATION CERTIFICATE ............................................................................................. 55<br />

H1 EXCAVATION PROCEDURE........................................................................................... 56<br />

H2 EXCAVATION CERTIFICATE.......................................................................................... 58<br />

H3 EXCAVATION – FLOWCHART........................................................................................ 59<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 3 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

1 PURPOSE AND SCOPE<br />

1.1 Purpose<br />

This <strong>Standard</strong> details the requirements of the<br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong> System for application at all<br />

WMC Resources owned and operated sites.<br />

The purpose is <strong>to</strong>:<br />

• Authorise and control high-risk work<br />

designated as requiring a ‘<strong>Work</strong> <strong>Permit</strong>’<br />

• Provide a process for competent<br />

personnel <strong>to</strong> authorise progress of highrisk<br />

work<br />

• Ensure that all hazards are identified and<br />

that appropriate controls are in place and<br />

communicated prior <strong>to</strong> work commencing<br />

• Provide a formal hand-over process <strong>to</strong><br />

acknowledge that all hazards have been<br />

addressed<br />

• Ensure that personnel carrying out the<br />

work are aware of the exact scope of<br />

work and the hazard controls required<br />

• Ensure the impact of work on other tasks<br />

and the Operations is unders<strong>to</strong>od<br />

• Provide a formal hand-back process <strong>to</strong><br />

ensure the work area is safe <strong>to</strong> return <strong>to</strong><br />

normal duties when the work is<br />

completed<br />

• Provide a process for controlling the<br />

safety of specific types of work that, due<br />

<strong>to</strong> circumstances, have been classified<br />

as lower risk work (e.g. some Hot <strong>Work</strong><br />

and Confined Space inspection activities)<br />

• Provide a record of a safe system of<br />

work.<br />

1.2 Scope<br />

This <strong>Standard</strong> defines a comprehensive <strong>Permit</strong><br />

<strong>to</strong> <strong>Work</strong> System. This document includes<br />

Appendices that describe particular hazard<br />

controls and other requirements that need <strong>to</strong><br />

be considered when establishing work controls<br />

for designated high-risk work activities. This<br />

set of high-risk work activities includes:<br />

• Intrusive work on systems containing<br />

energy (Appendix D1)<br />

• <strong>Work</strong>ing in a Confined Space (Appendix<br />

E1)<br />

• Hot <strong>Work</strong> (Appendix F1)<br />

• <strong>Work</strong>ing with or near Radiation Sources<br />

(Appendix G1)<br />

• Excavation Tasks (Appendix H1).<br />

Not all work in these areas will be designated<br />

as high-risk and require a <strong>Work</strong> <strong>Permit</strong>. The<br />

site is required <strong>to</strong> establish criteria that allows<br />

personnel <strong>to</strong> judge when a <strong>Work</strong> <strong>Permit</strong> is<br />

required versus alternative work controls.<br />

The specific requirements for working at<br />

heights is covered in <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

08 Safe <strong>Work</strong> at Height.<br />

Similarly there may be other activities deriving<br />

from risk assessment processes that will need<br />

a <strong>Work</strong> <strong>Permit</strong>. Typical examples of additional<br />

high-risk work are working with mineral fibres<br />

and removal of grid mesh/platform walkways in<br />

operational areas.<br />

2 GENERAL<br />

The <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> System describes a<br />

rigorous process for managing designated<br />

high-risk work.<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 4 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

Not all high-risk work requires a <strong>Work</strong> <strong>Permit</strong>.<br />

For instance risk assessment can lead <strong>to</strong> a low<br />

risk designation for inspection of certain<br />

confined spaces and some hot work activities.<br />

For such examples, this <strong>Standard</strong> provides for<br />

a simplified process of safe work authorisation<br />

through the use of appropriate stand-alone<br />

‘<strong>Work</strong> Authorisation’ tags. In all cases the use<br />

of a <strong>Work</strong> Authorisation shall require a formal<br />

risk assessment confirming the application of<br />

the tag and the availability of a THA or<br />

<strong>Standard</strong> <strong>Work</strong> Procedure. This simplified<br />

process is covered in respective Appendices<br />

E1 and F1.<br />

Table 1 provides general guidance on when a<br />

<strong>Work</strong> <strong>Permit</strong> is required.<br />

Reference <strong>to</strong> this table can be made, as a<br />

guide for each site <strong>to</strong> decide and document<br />

which types of high-risk work requires a <strong>Work</strong><br />

<strong>Permit</strong>. This analysis shall be formal and<br />

consider the type of activity as well as different<br />

geographical areas of the site in which the<br />

activity takes place. The results of this process<br />

shall be effectively communicated <strong>to</strong> provide<br />

clarity <strong>to</strong> those personnel required <strong>to</strong> decide<br />

whether a <strong>Work</strong> <strong>Permit</strong> is required <strong>to</strong> progress<br />

work.<br />

All work that does not require the higher level<br />

of rigour that a <strong>Work</strong> <strong>Permit</strong> provides shall be<br />

carried out using the Take Time, Take Charge<br />

(TTTC) process, a Task <strong>Hazard</strong> Analysis<br />

(THA), <strong>Standard</strong> <strong>Work</strong> Procedure (SWP) or the<br />

use of a <strong>Work</strong> Authorisation tag, or<br />

combinations of these as appropriate.<br />

3 DOCUMENT STRUCTURE<br />

The <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> System encompasses the<br />

following core documents:<br />

• A <strong>Work</strong> <strong>Permit</strong><br />

• Certificates for designated high-risk<br />

work:<br />

- Isolation of energy (including<br />

reference <strong>to</strong> High Voltage work<br />

under SP 25 Procedures)<br />

- Confined Space Entry<br />

- Hot <strong>Work</strong><br />

- Radiation<br />

- Excavation.<br />

Note: Certificates are documents that<br />

define the core preparations required for<br />

work <strong>to</strong> proceed and do not, by<br />

themselves, authorise work <strong>to</strong> proceed.<br />

They cannot stand-alone and shall<br />

always be accompanied by a covering<br />

<strong>Work</strong> <strong>Permit</strong>.<br />

• <strong>Work</strong> Authorisation tags for inspection of<br />

low risk Confined Spaces and performing<br />

low risk hot work. These tags can standalone<br />

• <strong>Work</strong> <strong>Permit</strong> Register when using a<br />

Block Isolation.<br />

4 SYSTEM OVERVIEW<br />

Core functions of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> System<br />

are summarised in Flow Chart Appendix A.<br />

Following the identification of a work need and<br />

the definition of a scope of work an<br />

assessment of the hazard controls required <strong>to</strong><br />

ensure safe work should be conducted.<br />

If this analysis leads <strong>to</strong> a decision <strong>to</strong> initiate the<br />

full <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> process, the following core<br />

activities shall take place:<br />

• Initial preparation of the <strong>Work</strong> <strong>Permit</strong><br />

(this process is managed by the Service<br />

Provider)<br />

• Final agreement <strong>to</strong> the required hazard<br />

controls and completion of all <strong>Work</strong><br />

<strong>Permit</strong> documentation (this process is<br />

managed by equipment/plant owner)<br />

• Implementation of agreed hazard<br />

controls by authorised personnel<br />

• Authorisation and issue of the <strong>Work</strong><br />

<strong>Permit</strong> by the <strong>Permit</strong> Issuer <strong>to</strong> a<br />

representative of the work team (<strong>Permit</strong><br />

Accep<strong>to</strong>r). This is the hand-over process.<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 5 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

• The <strong>Permit</strong> Accep<strong>to</strong>r ensures the work<br />

team understands the extent of hazard<br />

controls in place and assumes control of<br />

work activities for the duration of work.<br />

The <strong>Work</strong> <strong>Permit</strong> hazard controls shall<br />

remain in place whilst work is in<br />

progress.<br />

• When the agreed work is complete the<br />

<strong>Permit</strong> Accep<strong>to</strong>r leaves the work site<br />

clean and safe and hands back the <strong>Work</strong><br />

<strong>Permit</strong> <strong>to</strong> the <strong>Permit</strong> Issuer.<br />

• The <strong>Permit</strong> Issuer resumes control over<br />

the equipment / plant and progresses the<br />

removal of any temporary hazard<br />

controls established for the task before<br />

returning <strong>to</strong> normal operations.<br />

5 TRAINING AND COMPETENCY<br />

Structured competency-based training shall be<br />

given <strong>to</strong> all users of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

System. Competency shall be reassessed at a<br />

maximum interval of two years.<br />

<strong>Standard</strong>ised training modules shall be<br />

established for the following:<br />

• <strong>Permit</strong> Issuer<br />

• Isola<strong>to</strong>r (including Isolation Checker)<br />

• <strong>Permit</strong> Accep<strong>to</strong>r<br />

• Confined Space Entry<br />

• Confined Space Stand-by Person<br />

• Hot <strong>Work</strong> and Fire Safety (including Fire<br />

Watch)<br />

• <strong>Work</strong> Team Member.<br />

<strong>Permit</strong> Issuers and Isola<strong>to</strong>rs require detailed<br />

knowledge of the area in which they are<br />

issuing permits or carrying out isolations. Such<br />

knowledge shall be achieved as a prerequisite<br />

<strong>to</strong> gaining <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> competencies.<br />

Competency records for all personnel shall be<br />

maintained on a site register and the extent of<br />

specific competency for individuals shall be<br />

clearly known <strong>to</strong> users of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

System.<br />

6 MONITORING AND AUDITS<br />

It is a requirement of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

System that <strong>Permit</strong> Issuers, or a competent<br />

delegate, perform regular inspections of active<br />

<strong>Work</strong> <strong>Permit</strong>s in the work site. The frequency<br />

and degree of detail included in this inspection<br />

should be based on the level of risk and<br />

complexity of the task being performed. The<br />

inspection shall include:<br />

• Review of the <strong>Work</strong> <strong>Permit</strong><br />

documentation<br />

• Confirmation that the actual work being<br />

performed is consistent with the defined<br />

hazard controls in place. This does not<br />

require a detailed knowledge of the<br />

technical aspects of work being done.<br />

• Confirmation that the hazard controls<br />

defined in the <strong>Work</strong> <strong>Permit</strong> remain in<br />

place.<br />

Each site shall conduct regular (at least<br />

quarterly) compliance audits of the <strong>Permit</strong> <strong>to</strong><br />

<strong>Work</strong> System.<br />

A person independent of the area in which<br />

<strong>Work</strong> <strong>Permit</strong>s are issued shall carry out a<br />

compliance audit of the over-all functioning of<br />

the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> System at least annually.<br />

7 WORK PERMIT PROCESS<br />

Effective work planning and risk assessment<br />

processes are essential <strong>to</strong> the smooth and<br />

safe execution of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> System.<br />

7.1 Scope of <strong>Work</strong><br />

For any potentially hazardous work activity<br />

there shall be a clearly defined Scope of <strong>Work</strong><br />

(SOW). This SOW shall:<br />

• Be defined by the Service Provider in<br />

consultation as appropriate with a <strong>Permit</strong><br />

Issuer (or another equipment / plant<br />

owner representative)<br />

• Enable identification of all hazards<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 6 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

• Be used <strong>to</strong> determine resource<br />

requirements (people, materials etc.) and<br />

estimated time <strong>to</strong> complete the task<br />

• Enable identification of which particular<br />

hazard control(s) is most appropriate (i.e.<br />

<strong>Work</strong> <strong>Permit</strong>s / Certificates, <strong>Work</strong><br />

Authorisation tags, <strong>Standard</strong> <strong>Work</strong><br />

Procedures or THA).<br />

7.2 <strong>Hazard</strong> Identification and Assessment<br />

Using the scope of work as a basis, the<br />

Service Provider shall make the initial<br />

identification of hazards associated with<br />

conducting the work and determine necessary<br />

controls. Assistance in developing this can be<br />

sought from the <strong>Permit</strong> Issuer or their<br />

representative.<br />

Tools used <strong>to</strong> identify necessary hazard<br />

controls will vary according <strong>to</strong> the risk<br />

exposure and range from application of TTTC<br />

<strong>to</strong> use of a THA and other risk assessments.<br />

Some hazard controls will be defined in a<br />

<strong>Standard</strong> <strong>Work</strong> Procedure and other work<br />

defined <strong>to</strong> be at the high-risk exposure level<br />

will require the increased level of rigour of a<br />

<strong>Work</strong> <strong>Permit</strong> and associated Certificates.<br />

The site criteria established for deciding when<br />

a <strong>Work</strong> <strong>Permit</strong> is required (see guidance in<br />

Table 1) shall be used <strong>to</strong> help in this process.<br />

<strong>Work</strong> that is determined <strong>to</strong> be low risk<br />

inspection of certain confined spaces or low<br />

risk hot work shall proceed with the use of<br />

<strong>Work</strong> Authorisation Tags as described in<br />

respective Appendices E1 and F1.<br />

<strong>Work</strong> that is determined as not requiring a<br />

<strong>Work</strong> <strong>Permit</strong> or a <strong>Work</strong> Authorisation Tag shall<br />

proceed with appropriate use of TTTC / THA /<br />

<strong>Standard</strong> <strong>Work</strong> Procedure controls and<br />

processes.<br />

• The Service Provider confirms that a<br />

THA(s) or <strong>Standard</strong> <strong>Work</strong> Procedure(s) is<br />

available for the defined scope of work<br />

• A final assessment of the number of<br />

<strong>Work</strong> <strong>Permit</strong>s/Certificates required for the<br />

particular scope of work shall be<br />

conducted. Issues <strong>to</strong> be considered are:<br />

- The degree of confidence that the<br />

scope of work is complete<br />

- Whether multiple crews will work<br />

under a common <strong>Work</strong> <strong>Permit</strong> (see<br />

reference following)<br />

- If a Block Isolation is applicable<br />

(see section 7.5.2)<br />

- If Testing or jogging is applicable<br />

(see section 7.6.6).<br />

• <strong>Work</strong> <strong>Permit</strong>s shall be specific <strong>to</strong> the<br />

scope of work. Generally they are raised<br />

for discrete tasks and do not span<br />

several different work crews or unrelated<br />

tasks. However, a <strong>Work</strong> <strong>Permit</strong> can be<br />

raised for multi-disciplined crews<br />

conducting different work on the same<br />

equipment in the same geographical<br />

area, in certain circumstances. For<br />

example crews working on a au<strong>to</strong>clave, a<br />

bank of flotation cells or a conveyor<br />

system with little potential impact on<br />

other work activities can be covered<br />

under one <strong>Work</strong> <strong>Permit</strong>. Separate THA’s<br />

or <strong>Standard</strong> <strong>Work</strong> Procedures would<br />

cover each of the different tasks. (Note<br />

that the <strong>Permit</strong> Accep<strong>to</strong>r shall accept this<br />

<strong>Work</strong> <strong>Permit</strong> on behalf of all separate<br />

work crews and must fulfil all of the<br />

normal accountabilities of the Accep<strong>to</strong>r).<br />

7.3 <strong>Work</strong> <strong>Permit</strong> Document Preparation<br />

If a decision is taken that a <strong>Work</strong> <strong>Permit</strong> is<br />

required <strong>to</strong> authorise progress of defined work,<br />

the following shall occur:<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 7 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

• Using a full knowledge of the scope of<br />

work and hazard controls necessary <strong>to</strong><br />

complete the work, the Service Provider<br />

should commence filling out the first two<br />

Sections of the <strong>Work</strong> <strong>Permit</strong> and submit<br />

<strong>to</strong> the <strong>Permit</strong> Issuer (see Appendix B<br />

<strong>Work</strong> <strong>Permit</strong> form). This is best done as<br />

a consultative process between the<br />

Service Provider and the <strong>Permit</strong> Issuer<br />

(or other equipment/plant owner<br />

representative).<br />

• The <strong>Permit</strong> Issuer shall review the <strong>Work</strong><br />

<strong>Permit</strong> request (including the THA) and<br />

agree the final set of hazard controls.<br />

The <strong>Permit</strong> Issuer can include additional<br />

controls as appropriate.<br />

• If the planned work incorporates any<br />

“change” (as defined in the EHS<br />

Management System <strong>Standard</strong> #5<br />

Management of Change) the <strong>Permit</strong><br />

Issuer shall confirm with the Service<br />

Provider that a ‘Change Management<br />

Plan’ has been implemented. The <strong>Permit</strong><br />

Issuer is not accountable for the<br />

management of the change management<br />

process, simply confirming that a change<br />

implementation plan is in place if<br />

required. If the ‘Change’ has not been<br />

signed off, the <strong>Permit</strong> Issuer shall refer<br />

the <strong>Work</strong> <strong>Permit</strong> request back <strong>to</strong> the<br />

Service Provider.<br />

• The <strong>Permit</strong> Issuer shall complete the<br />

necessary <strong>Work</strong> <strong>Permit</strong> document<br />

preparation (including any <strong>Work</strong> <strong>Permit</strong><br />

Certificates) ensuring that all hazards<br />

due <strong>to</strong> workplace interactions or unique<br />

aspects are identified and controls<br />

indicated.<br />

7.4 <strong>Work</strong>place Preparation<br />

The <strong>Permit</strong> Issuer shall initiate implementation<br />

of the workplace hazard controls as identified<br />

in the <strong>Work</strong> <strong>Permit</strong> and Certificates.<br />

<strong>Hazard</strong> controls identified on the <strong>Work</strong><br />

<strong>Permit</strong>/Certificates shall be carried out<br />

according <strong>to</strong> the requirements in their<br />

respective Appendices D1 <strong>to</strong> H1. Authorised<br />

personnel shall establish these preparations.<br />

7.5 <strong>Work</strong> <strong>Permit</strong> Issue and Acceptance<br />

7.5.1 <strong>Work</strong> <strong>Permit</strong>s<br />

The <strong>Permit</strong> Issuer shall confirm that all defined<br />

hazard controls have been established and<br />

that authorised signa<strong>to</strong>ries have completed<br />

Certificate requirements.<br />

The <strong>Permit</strong> Issuer shall confirm that the<br />

workplace is safe <strong>to</strong> commence work. This<br />

may involve a physical check of the work<br />

environment by the <strong>Permit</strong> Issuer or<br />

confirmation via a competent source.<br />

The <strong>Permit</strong> Issuer shall brief the <strong>Permit</strong><br />

Accep<strong>to</strong>r (Service provider’s representative for<br />

the work team) on the hazard controls in place.<br />

The <strong>Permit</strong> Issuer shall sign the <strong>Work</strong> <strong>Permit</strong><br />

Authorisation section of the <strong>Work</strong> <strong>Permit</strong> (Note:<br />

the <strong>Permit</strong> Issuer shall not act as <strong>Permit</strong><br />

Accep<strong>to</strong>r for the same <strong>Work</strong> <strong>Permit</strong>).<br />

Once the <strong>Permit</strong> Accep<strong>to</strong>r understands the<br />

hazard controls in place they shall sign the<br />

<strong>Permit</strong> Acceptance section of the <strong>Work</strong> <strong>Permit</strong><br />

and take the original copy of all permit<br />

documentation (including any Certificates and<br />

THA/SWP) <strong>to</strong> the work site.<br />

The <strong>Work</strong> <strong>Permit</strong> original and associated<br />

documentation shall be clearly displayed in the<br />

<strong>Permit</strong> Control Board (see Section 7 of<br />

Appendix D1) at the work site.<br />

A duplicate copy of the <strong>Work</strong> <strong>Permit</strong> shall be<br />

retained in the <strong>Permit</strong> Office as a record of a<br />

‘live’ permit.<br />

7.5.2 <strong>Work</strong> <strong>Permit</strong>s with a Block Isolation<br />

When a number of different tasks are being<br />

completed under separate <strong>Work</strong> <strong>Permit</strong>s with<br />

all tasks sharing the same Isolation Certificate,<br />

the isolation is called a Block Isolation (see<br />

Appendix D1 Section 4).<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 8 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

All <strong>Work</strong> <strong>Permit</strong>s associated with a Block<br />

Isolation shall be recorded on a <strong>Work</strong> <strong>Permit</strong><br />

Register by the <strong>Permit</strong> Issuer and signed on<br />

when issued and off when the <strong>Work</strong> <strong>Permit</strong> is<br />

closed (see <strong>Work</strong> <strong>Permit</strong> Register in Appendix<br />

C).<br />

No de-isolation of any points within the Block<br />

Isolation shall commence until all <strong>Work</strong> <strong>Permit</strong>s<br />

have been signed off on the <strong>Work</strong> <strong>Permit</strong><br />

Register by the <strong>Permit</strong> Issuer.<br />

Note: If a Testing Program is in place for any<br />

one of the <strong>Work</strong> <strong>Permit</strong>s under a Block<br />

Isolation then all work shall cease and the<br />

procedure as defined in Section 9 of Appendix<br />

D1 followed.<br />

7.6 <strong>Work</strong> Progression<br />

7.6.1 <strong>Work</strong> Commencement<br />

The <strong>Permit</strong> Accep<strong>to</strong>r shall brief the work team<br />

about the hazard controls already in place and<br />

any additional controls required for the job.<br />

The THA and <strong>Work</strong> <strong>Permit</strong> shall be used as a<br />

basis for this briefing. As part of this process<br />

the THA shall be given a final review<br />

The <strong>Permit</strong> Accep<strong>to</strong>r seeks <strong>to</strong> clarify any<br />

issues team members have about the hazard<br />

controls in place and asks them <strong>to</strong> sign on<strong>to</strong><br />

the <strong>Work</strong> <strong>Permit</strong> <strong>to</strong> acknowledge the fact that<br />

they have been briefed, they understand the<br />

hazard controls in place and will comply with<br />

the requirements.<br />

The <strong>Permit</strong> Accep<strong>to</strong>r checks that controls are<br />

maintained during work progress. If any<br />

conditions are breached, all work shall cease<br />

and the <strong>Permit</strong> Accep<strong>to</strong>r shall refer the matter<br />

<strong>to</strong> the <strong>Permit</strong> Issuer.<br />

If the <strong>Permit</strong> Accep<strong>to</strong>r accepts multiple <strong>Work</strong><br />

<strong>Permit</strong>s they should not perform tasks as a<br />

working team member under any one of the<br />

<strong>Work</strong> <strong>Permit</strong>s.<br />

Note: When energies are isolated as part of<br />

hazard controls, each work team member shall<br />

also attach their Personal Danger Tag with a<br />

lock <strong>to</strong> the <strong>Permit</strong> Control Board, as per the<br />

requirements of Appendix D1 – Isolations.<br />

7.6.2 Shift Handover<br />

If work covered by a <strong>Work</strong> <strong>Permit</strong> proceeds<br />

from one work shift <strong>to</strong> another, the following<br />

shall occur:<br />

• The off going <strong>Permit</strong> Accep<strong>to</strong>r shall<br />

check that all work team members<br />

remove their Personal Danger Tag if<br />

energies are isolated<br />

• A formal handover occurs between the<br />

off going and the new <strong>Permit</strong> Accep<strong>to</strong>r<br />

with respective signatures being<br />

recorded on the <strong>Work</strong> <strong>Permit</strong>. During this<br />

handover the new <strong>Permit</strong> Accep<strong>to</strong>r is<br />

briefed on the hazard controls in place<br />

and the status of work<br />

• An informal handover between the off<br />

going and new <strong>Permit</strong> Issuer shall occur<br />

• The new shift <strong>Permit</strong> Accep<strong>to</strong>r seeks <strong>to</strong><br />

clarify any issues team members have<br />

about the hazard controls in place and<br />

asks them <strong>to</strong> sign on<strong>to</strong> the <strong>Work</strong> <strong>Permit</strong><br />

<strong>to</strong> acknowledge their understanding and<br />

acceptance <strong>to</strong> comply with requirements.<br />

7.6.3 <strong>Work</strong> <strong>Permit</strong> Relinquishment<br />

If a face-<strong>to</strong>-face handover from the off going <strong>to</strong><br />

the new <strong>Permit</strong> Accep<strong>to</strong>r is not possible, then<br />

the following shall occur:<br />

• The off going <strong>Permit</strong> Accep<strong>to</strong>r checks<br />

that all work team members have<br />

removed their Personal Danger Tag if<br />

energies are isolated<br />

• The <strong>Permit</strong> Accep<strong>to</strong>r shall return the<br />

<strong>Permit</strong> Control Board <strong>to</strong> the <strong>Permit</strong> Issuer<br />

and provide a formal brief on work status<br />

and sign off in the ‘Change of <strong>Permit</strong><br />

Accep<strong>to</strong>r’ section of <strong>Work</strong> <strong>Permit</strong><br />

• The receiving <strong>Permit</strong> Issuer shall sign in<br />

the ‘Relinquishment <strong>to</strong> <strong>Permit</strong> Issuer’<br />

section of the <strong>Work</strong> <strong>Permit</strong> and indicate<br />

the reason<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 9 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

• The off going / new <strong>Permit</strong> Issuers carry<br />

out a face-<strong>to</strong>-face hand over with a full<br />

brief on hazard controls in place and the<br />

general work status<br />

• When the new shift <strong>Permit</strong> Accep<strong>to</strong>r is<br />

available the new <strong>Permit</strong> Issuer shall<br />

provide a face-<strong>to</strong>-face briefing on the<br />

hazard controls in place and re-issue the<br />

<strong>Work</strong> <strong>Permit</strong> by signing as the issuing<br />

<strong>Permit</strong> Issuer in the ‘Relinquishment <strong>to</strong><br />

<strong>Permit</strong> Issuer’ section. The <strong>Permit</strong><br />

Accep<strong>to</strong>r accepts by signing in the<br />

‘Change of <strong>Permit</strong> Accep<strong>to</strong>r’ section of<br />

<strong>Work</strong> <strong>Permit</strong>.<br />

• The new shift <strong>Permit</strong> Accep<strong>to</strong>r shall brief<br />

the work team members and ask them <strong>to</strong><br />

sign on<strong>to</strong> the <strong>Work</strong> <strong>Permit</strong> prior <strong>to</strong><br />

commencing work.<br />

7.6.4 Scope of <strong>Work</strong> Change<br />

If the scope of work changes during work<br />

progress the <strong>Permit</strong> Accep<strong>to</strong>r shall consult<br />

their line supervisor and the <strong>Permit</strong> Issuer as<br />

necessary and <strong>to</strong>gether consider the impact of<br />

the proposed changes on the existing hazard<br />

controls in place and the potential for additional<br />

hazards. The THA shall be reviewed as part of<br />

this process.<br />

If this analysis indicates a need <strong>to</strong> change an<br />

existing <strong>Work</strong> <strong>Permit</strong> condition or the need for<br />

additional controls and the newly defined work<br />

is ready <strong>to</strong> commence, all work shall cease.<br />

The <strong>Permit</strong> Accep<strong>to</strong>r shall return the <strong>Work</strong><br />

<strong>Permit</strong> <strong>to</strong> the <strong>Permit</strong> Issuer and indicate the<br />

scope of work change (the change is<br />

highlighted in Scope of <strong>Work</strong> section of <strong>Permit</strong>)<br />

and request any additional hazard controls.<br />

The <strong>Permit</strong> Issuer shall vet the request for<br />

additional controls and initiate implementation<br />

as necessary. These are recorded / added <strong>to</strong><br />

the existing <strong>Work</strong> <strong>Permit</strong> and highlighted.<br />

When all additional hazard control preparations<br />

have been completed the <strong>Permit</strong> Issuer shall<br />

sign and date all changes made on the <strong>Work</strong><br />

<strong>Permit</strong>. Authorisation is then provided <strong>to</strong> the<br />

<strong>Permit</strong> Accep<strong>to</strong>r for work <strong>to</strong> proceed.<br />

The <strong>Permit</strong> Accep<strong>to</strong>r shall take <strong>Permit</strong><br />

documents <strong>to</strong> the worksite, brief the work team<br />

members on any changed hazard controls and<br />

indicate that it is safe <strong>to</strong> return <strong>to</strong> work.<br />

7.6.5 <strong>Work</strong> <strong>Permit</strong> Suspension<br />

If there is a need <strong>to</strong> suspend work for a<br />

number of shifts due <strong>to</strong> delays in material or<br />

resource availability the following shall occur:<br />

• <strong>Permit</strong> Accep<strong>to</strong>r leaves the worksite in a<br />

safe state, returns the <strong>Permit</strong> Control<br />

Board and associated documentation <strong>to</strong><br />

the <strong>Permit</strong> Issuer with a briefing on<br />

reason for suspension and signs off the<br />

<strong>Work</strong> <strong>Permit</strong><br />

• The <strong>Permit</strong> Issuer signs in the<br />

‘Relinquishment <strong>to</strong> <strong>Permit</strong> Issuer’ section<br />

of <strong>Work</strong> <strong>Permit</strong> and records the reason<br />

for suspension<br />

• When the <strong>Work</strong> <strong>Permit</strong> is required <strong>to</strong> be<br />

re-instated the, <strong>Permit</strong> Issuer arranges<br />

for an Isolation Checker <strong>to</strong> revalidate the<br />

isolations and sign the original Isolation<br />

Certificate<br />

• The <strong>Permit</strong> Issuer shall re-issue the <strong>Work</strong><br />

<strong>Permit</strong> by signing in the ‘Relinquishment<br />

<strong>to</strong> <strong>Permit</strong> Issuer’ section of the <strong>Work</strong><br />

<strong>Permit</strong>.<br />

7.6.6 Testing<br />

When energies are isolated and there is a<br />

need <strong>to</strong> carry out testing or re-positioning of<br />

equipment during work progress and<br />

temporary removal of isolations is required,<br />

reference should be made <strong>to</strong> Appendix D1<br />

Section 9.<br />

7.7 <strong>Work</strong> <strong>Permit</strong> Hand-back<br />

When work defined in the scope of work is<br />

complete or there is a requirement <strong>to</strong> close the<br />

<strong>Work</strong> <strong>Permit</strong>, the following shall occur:<br />

• The <strong>Permit</strong> Accep<strong>to</strong>r ensures the work<br />

site is left in a clean and safe state<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 10 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

• If energies have been isolated, all work<br />

team members shall remove their<br />

Personal Danger Tags<br />

• The <strong>Permit</strong> Accep<strong>to</strong>r shall return the<br />

<strong>Work</strong> <strong>Permit</strong>/documentation and <strong>Permit</strong><br />

Control Board <strong>to</strong> the <strong>Permit</strong> Issuer and<br />

indicate that the work is complete and<br />

the equipment is fit <strong>to</strong> be returned <strong>to</strong><br />

work or alternately, whether there are<br />

any restrictions on its use<br />

• The <strong>Permit</strong> Accep<strong>to</strong>r shall sign the hand<br />

back section of the <strong>Work</strong> <strong>Permit</strong><br />

• The <strong>Permit</strong> Issuer shall assemble all of<br />

the <strong>Work</strong> <strong>Permit</strong> documentation and<br />

initiate the removal of hazard controls<br />

originally installed for the work <strong>to</strong> take<br />

place<br />

• In the case of work done in a confined<br />

space the <strong>Permit</strong> Issuer shall inspect the<br />

confined space <strong>to</strong> ensure that removal of<br />

isolations and closure can proceed<br />

• Once the work environment status has<br />

been returned <strong>to</strong> a state of readiness for<br />

return <strong>to</strong> normal duties, the <strong>Permit</strong> Issuer<br />

shall sign the permit closure section of<br />

the <strong>Work</strong> <strong>Permit</strong> on both original and<br />

duplicate copy<br />

• The <strong>Permit</strong> Issuer shall file the <strong>Work</strong><br />

<strong>Permit</strong> original and associated<br />

certificates in compliance with WMC<br />

Resources document retention policy.<br />

8 RESPONSIBILITIES<br />

The following general roles have been<br />

identified within the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> System.<br />

Specific other roles have been identified and<br />

described in respective Appendices.<br />

8.1 <strong>Permit</strong> Issuer<br />

Competency required:<br />

• A detailed knowledge of the work<br />

environment and the process and area<br />

related hazards<br />

• A competent knowledge of the isolation<br />

requirements for specific plant or<br />

equipment i.e. competent as an Isola<strong>to</strong>r<br />

• A competent knowledge of the <strong>Permit</strong> <strong>to</strong><br />

<strong>Work</strong> System.<br />

Is responsible for:<br />

• Reviewing the <strong>Work</strong> <strong>Permit</strong> request from<br />

the Service Provider and agreeing the<br />

final set of hazard controls for the<br />

defined scope of work<br />

• Verifying that a change implementation<br />

plan has been implemented for<br />

‘Management of Change’ initiatives<br />

covered by the <strong>Work</strong> <strong>Permit</strong><br />

• Initiating implementation of the <strong>Work</strong><br />

<strong>Permit</strong> hazard controls defined in<br />

Certificates. When isolations are<br />

involved, develop the Isolation<br />

Certificate/Instruction for the specific<br />

scope of work<br />

• Maintaining control over the isolated<br />

equipment (through control of isolation<br />

padlocks)<br />

• Confirming that all agreed hazard<br />

controls have been implemented and all<br />

necessary documentation signed off by<br />

authorised personnel<br />

• Confirming that the work site is safe for<br />

work and that any operational activities<br />

do not compromise safety in the work<br />

area<br />

• Briefing the <strong>Permit</strong> Accep<strong>to</strong>r on the<br />

hazard controls that have been put in<br />

place<br />

• Authorising issue of the <strong>Work</strong> <strong>Permit</strong><br />

• Managing the <strong>Permit</strong> Issuer’s lock and<br />

key cabinet (see Appendix D1 for details)<br />

• Being aware of the work being carried<br />

out and any interactions from adjacent<br />

work activities or hazards<br />

• Ensuring routine inspections of the work<br />

environment are carried out<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 11 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

• Ensuring copies of all <strong>Work</strong> <strong>Permit</strong>s are<br />

maintained in the <strong>Permit</strong> Office<br />

• Handing-over the control of active <strong>Work</strong><br />

<strong>Permit</strong>s <strong>to</strong> a new shift <strong>Permit</strong> Issuer<br />

• Initiating removal of hazard controls<br />

following hand back of the <strong>Work</strong> <strong>Permit</strong><br />

• Authorising closure of the <strong>Work</strong> <strong>Permit</strong><br />

by signing off on both original and<br />

duplicate copies of the <strong>Work</strong> <strong>Permit</strong><br />

• Filing <strong>Work</strong> <strong>Permit</strong> documentation<br />

originals in compliance with WMC<br />

Resources document retention policy.<br />

8.2 Isola<strong>to</strong>r<br />

Competency required:<br />

• Maintaining a technical and / or<br />

legislative ability <strong>to</strong> be able <strong>to</strong> perform<br />

and prove isolations<br />

• A competent knowledge of the isolation<br />

requirements for specific plant or<br />

equipment<br />

• A general knowledge of the <strong>Permit</strong> <strong>to</strong><br />

<strong>Work</strong> System and a competent<br />

knowledge of the Isolations Procedure.<br />

Is responsible for:<br />

• Establishing isolations of plant or<br />

equipment according <strong>to</strong> the Isolation<br />

Certificate/Instruction <strong>to</strong> prevent<br />

inadvertent re-energisation which may<br />

cause injury <strong>to</strong> others or damage <strong>to</strong> plant<br />

or equipment<br />

Note: In the situation in which the <strong>Permit</strong><br />

Issuer performs the role of the Isolation<br />

Checker, the Isola<strong>to</strong>r shall confirm that<br />

the <strong>Permit</strong> Issuer defined Isolation<br />

Certificate/Instruction is appropriate for<br />

the defined scope of work.<br />

• De-isolating equipment according <strong>to</strong><br />

<strong>Permit</strong> Issuer requirements.<br />

8.3 Isolation Checker<br />

Competency required:<br />

• Achieving the competency of an Isola<strong>to</strong>r.<br />

Is responsible for:<br />

• Confirming that the <strong>Permit</strong> Issuer defined<br />

Isolation Certificate / Isolation Instruction<br />

is appropriate for the defined scope of<br />

work<br />

• Validating that isolation of energies has<br />

been completed according <strong>to</strong> the<br />

requirements of the Isolation<br />

Certificate/Isolation Instruction and the<br />

Isolation Procedure.<br />

8.4 Service Provider / <strong>Permit</strong> Reques<strong>to</strong>r<br />

Competency required:<br />

• A knowledge of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

System<br />

• Understanding the work planning<br />

processes.<br />

Is responsible for:<br />

• Developing a clear scope of work<br />

• Making the initial determination of hazard<br />

controls required for work <strong>to</strong> proceed and<br />

initiating <strong>Work</strong> <strong>Permit</strong> documentation.<br />

8.5 <strong>Permit</strong> Accep<strong>to</strong>r<br />

Competency required:<br />

• A competent knowledge of the work <strong>to</strong> be<br />

completed as per the scope of work<br />

• A knowledge of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

System<br />

• A competent knowledge of requirements<br />

for Certificates that they will accept.<br />

Is responsible for:<br />

• Signing the permit acceptance on the<br />

<strong>Work</strong> <strong>Permit</strong> once they understand the<br />

extent of hazard controls that have been<br />

established<br />

• Retaining the original of <strong>Work</strong> <strong>Permit</strong><br />

documentation in the <strong>Permit</strong> Control<br />

Board at the work site<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 12 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

• Briefing the work site team on the hazard<br />

controls in place and reviewing the THA<br />

• Ensuring each work team member signs<br />

on <strong>to</strong> the <strong>Work</strong> <strong>Permit</strong> (and attach their<br />

Personal Danger Tag if energies<br />

isolated)<br />

• Ensuring that work remains within the<br />

defined scope of work<br />

• Ceasing work and informing the <strong>Permit</strong><br />

Issuer when any hazard controls have<br />

been breached<br />

• Handing over the work activity and <strong>Work</strong><br />

<strong>Permit</strong> <strong>to</strong> a new <strong>Permit</strong> Accep<strong>to</strong>r at shift<br />

change or during work progress as<br />

necessary<br />

• Relinquishing and suspending a <strong>Work</strong><br />

<strong>Permit</strong> as required<br />

• Inspecting the work site before<br />

commencing/recommencing work at end<br />

of shift or completion of work<br />

• Confirming that the work site is left in a<br />

clean and safe state when work is<br />

completed<br />

• Checking that all work team members<br />

remove their Personal Danger Tags<br />

when work is complete, if isolations have<br />

been involved<br />

• When work is complete, returning the<br />

<strong>Work</strong> <strong>Permit</strong> documentation and the<br />

<strong>Permit</strong> Control Board <strong>to</strong> the <strong>Permit</strong><br />

Issuer, providing a briefing on the status<br />

of work and signing off the <strong>Work</strong> <strong>Permit</strong>.<br />

8.6 <strong>Work</strong> Team Member<br />

Competency required:<br />

• Having a general understanding of the<br />

site <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> System<br />

• Completed a successful Area Induction.<br />

Is responsible for:<br />

• Understanding the job scope of work and<br />

the hazard controls that have been<br />

implemented for the defined work<br />

• Participating in the review or<br />

development of the job THA<br />

• Signing on <strong>to</strong> the <strong>Work</strong> <strong>Permit</strong> and, if<br />

applicable, attaching their Personal<br />

Danger Tag <strong>to</strong> the lock box within the<br />

<strong>Permit</strong> Control Board<br />

• Ensuring that hazard controls defined in<br />

the <strong>Work</strong> <strong>Permit</strong>/Certificates are strictly<br />

followed<br />

• Leaving a clean and safe work site<br />

• If isolations are involved, removing their<br />

Personal Danger Tag when work is<br />

completed.<br />

8.7 Site General Manager<br />

Is responsible for:<br />

• Authorising the implementation of this<br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong> <strong>Standard</strong> across the site<br />

• Approving the criteria for determining<br />

what work requires a <strong>Work</strong> <strong>Permit</strong><br />

• Approving the necessary competencies<br />

for personnel fulfilling <strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

roles.<br />

9 REFERENCES<br />

AS2865<br />

AS1596<br />

AS1940<br />

AS2430<br />

Safe <strong>Work</strong>ing in Confined Space<br />

SAA LPG Code<br />

SAA Flammable & Combustible<br />

Liquids Code<br />

Classification of <strong>Hazard</strong>ous Areas<br />

AS1674 Safety in Welding & Applied<br />

Processes<br />

AS6124 Electrical Apparatus for use in the<br />

Presence of Combustible Dusts<br />

AS2275 Combustible Gas Detection<br />

Instruments for use in Explosive<br />

Atmospheres<br />

Radiation Safety Act 1975-79<br />

Radiation Safety (Transport of<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 13 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

Radioactive Substances)<br />

Regulations 1992 and various<br />

conditions imposed by the<br />

Radiological Council<br />

SP 25 High Voltage and Access<br />

Procedures<br />

EHS MS Management <strong>Standard</strong> #5 –<br />

Management of Change<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 14 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

10 TABLE 1<br />

Guide for When a <strong>Work</strong> <strong>Permit</strong> is Required<br />

Note: Each site shall decide and document which types of high-risk work require a <strong>Work</strong><br />

<strong>Permit</strong>. This analysis shall be risk based and consider the type of activity as well as<br />

different geographical areas of the site in which the activity takes place.<br />

• Tasks requiring level 2 isolation<br />

• <strong>Work</strong> in Confined Spaces<br />

• <strong>Work</strong> with High Voltage equipment<br />

WORK PERMIT REQUIRED<br />

• Hot work in Classified Areas (Class 1, Zone 0 and 1)<br />

• When isolating safety control systems or devices<br />

• All work on ionising radiation sources and working within 1 metre of radiation source (dosage based<br />

assessment. For example, work in areas or with products that emit natural radiation are excluded)<br />

• Excavation greater than 300mm in vicinity of buried services<br />

The following general criteria is provided <strong>to</strong> assist sites in deciding what other work requires a <strong>Work</strong><br />

<strong>Permit</strong>:<br />

• <strong>Work</strong> at heights<br />

• <strong>Work</strong> in designated areas<br />

• <strong>Work</strong> with special hazards<br />

• Whenever swinging blanks or blinds in hazardous systems<br />

• <strong>Work</strong> of high complexity<br />

• <strong>Work</strong> involving inexperienced personnel.<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 15 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

APPENDICES<br />

APPENDIX A<br />

APPENDIX B<br />

APPENDIX C<br />

APPENDIX D1<br />

APPENDIX D2<br />

APPENDIX E1<br />

APPENDIX E2<br />

APPENDIX E3<br />

APPENDIX E4<br />

APPENDIX F1<br />

APPENDIX F2<br />

APPENDIX F3<br />

APPENDIX G1<br />

APPENDIX G2<br />

APPENDIX G3<br />

APPENDIX H1<br />

APPENDIX H2<br />

APPENDIX H3<br />

PERMIT TO WORK – OVERVIEW FLOWCHART<br />

WORK PERMIT FORM<br />

WORK PERMIT REGISTER<br />

ISOLATION PROCEDURE<br />

ISOLATION CERTIFICATE<br />

SAFE WORKING IN CONFINED SPACE PROCEDURE<br />

CONFINED SPACE ENTRY CERTIFICATE<br />

CONFINED SPACE ENTRY WORK AUTHORISATION TAG<br />

CONFINED SPACE ENTRY EVALUATION<br />

HOT WORK PROCEDURE<br />

HOT WORK CERTIFICATE<br />

HOT WORK – WORK AUTHORISATION TAG<br />

RADIATION PROCEDURE<br />

RADIATION – FLOWCHART<br />

RADIATION CERTIFICATE<br />

EXCAVATION PROCEDURE<br />

EXCAVATION CERTIFICATE<br />

EXCAVATION – FLOWCHART<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 16 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

APPENDIX A<br />

A PERMIT TO WORK – OVERVIEW FLOWCHART<br />

<strong>Work</strong> need<br />

identified<br />

Scope of <strong>Work</strong><br />

developed<br />

including<br />

identification of<br />

hazards<br />

Area made clean<br />

and safe<br />

<strong>Work</strong> complete<br />

<strong>Permit</strong> Accep<strong>to</strong>r<br />

instructs team <strong>to</strong><br />

remove their PDT /<br />

lock (if applicable)<br />

<strong>Permit</strong> Accep<strong>to</strong>r returns<br />

<strong>Permit</strong> Control Board<br />

and briefs <strong>Permit</strong> Issuer<br />

No<br />

Is a <strong>Work</strong> <strong>Permit</strong><br />

required?<br />

Carry out work<br />

using TTTC, <strong>Work</strong><br />

Authorisation Tag<br />

or THA / SWP<br />

<strong>to</strong>ols<br />

Yes<br />

<strong>Hazard</strong> controls<br />

remain in place<br />

during work<br />

progress<br />

<strong>Permit</strong> Accep<strong>to</strong>r signs<br />

off <strong>Work</strong> <strong>Permit</strong><br />

Agree safe work<br />

precautions and<br />

prepare permit<br />

documents<br />

<strong>Work</strong> commences<br />

<strong>Permit</strong> Issuer ensures<br />

all temporary hazard<br />

controls removed<br />

Implement<br />

workplace hazard<br />

controls<br />

<strong>Work</strong>team signs on<strong>to</strong><br />

<strong>Work</strong> <strong>Permit</strong><br />

<strong>Work</strong>team attaches PDT<br />

<strong>to</strong> Lock box (if isolations<br />

involved)<br />

<strong>Permit</strong> Issuer closes<br />

<strong>Work</strong> <strong>Permit</strong><br />

<strong>Permit</strong> Issuer<br />

Briefs <strong>Permit</strong><br />

Accep<strong>to</strong>r on<br />

hazard controls<br />

<strong>Permit</strong> Accep<strong>to</strong>r<br />

briefs workteam<br />

(ie. no briefing, no<br />

work)<br />

Equipment<br />

available for<br />

normal duty<br />

<strong>Work</strong> <strong>Permit</strong> and<br />

any associated<br />

certificates issued<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 17 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

APPENDIX B<br />

B<br />

WORK PERMIT<br />

WORK PERMIT<br />

No:<br />

Plant / Area :<br />

Equipment Description:<br />

Scope of <strong>Work</strong>:<br />

Equipment No.:<br />

<strong>Work</strong> <strong>Permit</strong> Register No.:<br />

THA / SWP No.:<br />

NO WORK OUTSIDE OF THIS SCOPE MAY BE PERFORMED UNDER THIS PERMIT<br />

SPECIAL PRECAUTIONS AND CONDITIONS<br />

<strong>Work</strong> <strong>Permit</strong> certificates Y/N Number Y/N Number<br />

Isolation<br />

Excavation<br />

Confined Space Entry<br />

Radiation<br />

Hot <strong>Work</strong><br />

Testing Program<br />

Plant Change Applicable -------------<br />

Any other conditions<br />

<strong>Work</strong> <strong>Permit</strong> Authorisation<br />

I acknowledge that all prepara<strong>to</strong>ry work has been completed and that work is safe <strong>to</strong> proceed.<br />

<strong>Permit</strong> Issuer:<br />

Signature:<br />

Date:<br />

Time:<br />

I fully understand the hazard controls in place for this work <strong>to</strong> proceed.<br />

<strong>Permit</strong> Accep<strong>to</strong>r:<br />

Signature:<br />

Date:<br />

Time:<br />

<strong>Work</strong> <strong>Permit</strong> Closure<br />

I confirm that the work is complete and the work environment is in a clean and safe state.<br />

<strong>Permit</strong> Accep<strong>to</strong>r:<br />

Signature:<br />

Date:<br />

Time:<br />

I have confirmed that work is complete and the job site is safe <strong>to</strong> return <strong>to</strong> normal duty.<br />

<strong>Permit</strong> Issuer:<br />

Signature:<br />

Date:<br />

Time:<br />

AUTHORITY TRANSFER, WORKER SIGN ON REQUIREMENTS ON REAR OF THIS FORM<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 18 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

WORK PERMIT SIGNATURES (Reverse of <strong>Work</strong> <strong>Permit</strong>)<br />

CHANGE OF PERMIT ACCEPTOR:<br />

I confirm that the hazard controls as stated on this <strong>Work</strong> <strong>Permit</strong> and attached documents will be strictly<br />

observed and all persons in my work team will be informed of them<br />

Dat<br />

e<br />

SIGN ON<br />

SIGN OFF<br />

Time Name Initials Date Time Name Initials<br />

RELINQUISHMENT TO PERMIT ISSUER<br />

All work has ceased and <strong>Work</strong> <strong>Permit</strong> returned <strong>to</strong> <strong>Permit</strong> Issuer for subsequent re-issue<br />

Receiving <strong>Permit</strong> Issuer<br />

Re-Issuing <strong>Permit</strong> Issuer<br />

Date: Name: Initial: Date: Name: Initial:<br />

Reason:<br />

Reason:<br />

Date: Name: Initial: Date: Name: Initial:<br />

Reason:<br />

Reason:<br />

Date: Name: Initial: Date: Name: Initial:<br />

Reason:<br />

Reason:<br />

WORK TEAM MEMBER:<br />

I have read, fully understand and will comply with all conditions stated on this <strong>Work</strong> <strong>Permit</strong><br />

SIGN ON<br />

SIGN ON<br />

Date Name Initials Date Name Initials<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 19 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

APPENDIX C<br />

C WORK PERMIT REGISTER<br />

WORK PERMIT REGISTER<br />

Plant / Area :<br />

Overall Scope of <strong>Work</strong>:<br />

No:<br />

Isolation Certificate No. (Block Isolation):<br />

WORK PERMITS UNDER THIS BLOCK ISOLATION<br />

No. <strong>Work</strong> <strong>Permit</strong> No.<br />

<strong>Work</strong> Commences<br />

<strong>Permit</strong> Issuer<br />

<strong>Work</strong> Completed<br />

<strong>Permit</strong> Issuer<br />

Date Name Initial Date Name Initial<br />

Register Closure<br />

<strong>Permit</strong> Issuer: Signature: Date: Time:<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 20 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

APPENDIX D1<br />

D1 ISOLATION PROCEDURE<br />

PURPOSE AND SCOPE<br />

The purpose of this Procedure is <strong>to</strong> minimise risk of injuries from an uncontrolled release of energy. It<br />

forms an integral part of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> System and shall be read in conjunction with the<br />

requirements of the preceding section of this <strong>Standard</strong>.<br />

Isolation is the act of ceasing the flow of energy and installing a hard barrier <strong>to</strong> maintain integrity of<br />

isolation. This procedure covers isolation and removal of the hard barriers when work is completed. It<br />

does not cover the process of reinstating energies following work completion. This forms part of a<br />

recommissioning process and outside of the scope of this procedure.<br />

This Procedure applies <strong>to</strong>:<br />

• All work with a risk of a hazardous release of energy<br />

• Fixed and mobile equipment (including design, construction, commissioning, operation,<br />

maintenance, cleaning, modification or demolition of equipment)<br />

• WMC Resources owned or controlled sites<br />

DETAILS<br />

1. Levels of Isolation<br />

This Procedure addresses two levels of isolation <strong>to</strong> cater for the wide variation in complexity of plant<br />

and equipment. These are:<br />

Level 1 – Non-recorded isolation<br />

Level 2 – Recorded isolation<br />

Each level has different requirements and a competent and authorised person shall determine which<br />

level is appropriate <strong>to</strong> the work.<br />

1.1 Level 1 – Non Recorded Isolation<br />

This level of isolation is intended for routine work covered by a <strong>Standard</strong> <strong>Work</strong> Procedure or THA that<br />

describes the specific points of isolation as one component of the <strong>to</strong>tal task. Each Site shall identify<br />

what work is covered under a level 1 process<br />

Permission <strong>to</strong> carry out the task is verbal and a person carrying out the work performs the isolation<br />

and proves the integrity of such isolation(s). If more than one work team member is engaged in the<br />

work they shall confirm the integrity of all isolations prior <strong>to</strong> commencing work<br />

The isolation is not recorded on an Isolation Certificate. However it is recommended that a log of such<br />

work activities is maintained by the work environment owner<br />

An isolation tag is not required and instead a Personal Danger Tag shall be attached by a lock <strong>to</strong><br />

each isolation point by all work team members<br />

Note: By itself Level 1 isolation does not require a <strong>Work</strong> <strong>Permit</strong>. However, some of the tasks carried<br />

out in association with Level 1 isolation may require a <strong>Work</strong> <strong>Permit</strong>.<br />

1.2 Level 2 – Recorded Isolation<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 21 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

All isolations are performed by an Isola<strong>to</strong>r and checked by an Isolation Checker. This is a recorded<br />

isolation performed under the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> System. A written record is required on an ‘Isolation<br />

Certificate‘ and forms part of the documentation attached <strong>to</strong> the covering <strong>Work</strong> <strong>Permit</strong>.<br />

Note: When High Voltage or radiation sources are involved there is a need for specialist help and a<br />

need <strong>to</strong> demonstrate compliance with a legislated requirement then a High Voltage (HV) <strong>Permit</strong><br />

according <strong>to</strong> requirements of SP 25 or Radiation Certificate will be required in addition <strong>to</strong> the Isolation<br />

Certificate.<br />

2. Isolation Documents<br />

2.1 Isolation Certificate<br />

An Isolation Certificate is a checklist and permanent record showing nominated isolation points and<br />

the precautions that have been taken <strong>to</strong> address special hazards associated with performing Level 2<br />

Isolation (see Appendix D2).<br />

These can be manually generated or produced in electronic document controlled form (using the<br />

same Isolation Certificate format) for frequently executed isolations.<br />

For work on High Voltage equipment an additional SP 25 <strong>Permit</strong>(s) is required and a Radiation<br />

Certificate for work on or near radiation sources (See Appendix G3). These serve as checklists and<br />

permanent records indicating safe work precautions have been taken <strong>to</strong> address special hazards as<br />

per legislated requirements. When HV or radiation isolations are conducted the specific points are<br />

also recorded on the Isolation Certificate/Instruction.<br />

2.2 Isolation Instruction<br />

An additional ‘Isolation Instruction’ can be used for a complex isolation or an isolation that has <strong>to</strong> be<br />

done in a sequential order <strong>to</strong> bring the equipment <strong>to</strong> a state of zero energy for work <strong>to</strong> commence. It<br />

is attached <strong>to</strong> the Isolation Certificate that records the Instruction reference number. The Instruction<br />

shall include:<br />

• The limits and extent of the isolation<br />

• Any special conditions <strong>to</strong> be met (beyond those already specified in <strong>Work</strong> <strong>Permit</strong>)<br />

• Specialist isolations required (eg. HV or Radiation)<br />

• Isolation point information in the same format as the Isolation Certificate<br />

This Instruction shall be produced following a risk assessment, authorised by a senior line person and<br />

controlled within the sites document control system. It shall not be altered without proper authorisation<br />

by a senior line person. A procedure for authorising alteration shall be developed by the site.<br />

3. Performing an Isolation<br />

Following advice from a <strong>Permit</strong> Issuer that as part of implementing agreed <strong>Work</strong> <strong>Permit</strong> hazard<br />

controls, isolation of energies is required:<br />

• An Isola<strong>to</strong>r shall confirm that the <strong>Permit</strong> Issuer prepared Isolation Certificate (and Isolation<br />

Instruction if attached) is appropriate for the defined scope of work (in the situation in which the<br />

<strong>Permit</strong> Issuer performs the role of an Isolation Checker)<br />

• An Isola<strong>to</strong>r shall carry out isolation of energies they are authorised <strong>to</strong> perform. Positive isolation<br />

of each isolation point must be proved<br />

• An Isola<strong>to</strong>r shall padlock each isolation point with a uniquely keyed isolation lock(s) and<br />

isolation tag cross referenced <strong>to</strong> the <strong>Work</strong> <strong>Permit</strong> number<br />

• An Isola<strong>to</strong>r shall sign the Isolation Certificate indicating that isolations have been achieved and<br />

proved. Isola<strong>to</strong>rs who isolate multiple isolation points on one Certificate may sign once only <strong>to</strong><br />

acknowledge their work<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 22 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

• A <strong>Permit</strong> Issuer shall arrange for an Isolation Checker <strong>to</strong> check completed isolations and sign<br />

on the Isolation Certificate (checking for correct isolation point as per Certificate/Instruction and<br />

that tag / lock are in place). If the <strong>Permit</strong> Issuer also performed the isolations as Isola<strong>to</strong>r, then<br />

the Isolation Checker shall additionally confirm that the Isolation Certificate/Instruction as<br />

defined by the <strong>Permit</strong> Issuer is appropriate for the scope of work. Because the competency of<br />

the Checker is equal <strong>to</strong> the Isola<strong>to</strong>r it is anticipated that the Checker will check isolation integrity<br />

as a part of the process<br />

The Isolation Checker shall be a different person from the person who performed the isolations (this<br />

person can be the <strong>Permit</strong> Issuer if they did not perform the isolations).<br />

An Isola<strong>to</strong>r shall return the completed Isolation Certificate <strong>to</strong> the <strong>Permit</strong> Issuer and place the isolation<br />

lock key(s) in the <strong>Permit</strong> Control Board (see Section 7).<br />

A <strong>Permit</strong> Issuer shall ensure that all isolation key(s) are locked in place with an isolation tag (with the<br />

<strong>Work</strong> <strong>Permit</strong> number recorded) and uniquely keyed <strong>Permit</strong> Issuers lock.<br />

When a Testing Program (see Section 9) forms part of the defined scope of work, the following shall<br />

occur:<br />

• The Isola<strong>to</strong>r performs isolations following the standard method, but uses a different uniquely<br />

keyed lock(s) for the nominated testing points.<br />

• The <strong>Permit</strong> Issuer places all non-testing point isolation key(s) in a separate lock box, apply an<br />

isolation tag and lock in place with a <strong>Permit</strong> Issuer lock. This lock box is placed inside the<br />

<strong>Permit</strong> Control Board. The remaining ‘testing point’ isolation key(s) are placed in the <strong>Permit</strong><br />

Control Board.<br />

4. Performing a Block Isolation<br />

When a number of different tasks are being completed under separate <strong>Work</strong> <strong>Permit</strong>s with all tasks<br />

sharing the same Isolation Certificate the isolation is called a Block Isolation.<br />

If the need for a Block Isolation has been established by the scope of work/hazard control analysis<br />

conducted by the Service Provider, the <strong>Permit</strong> Issuer initiates the standard isolation process. The<br />

<strong>Permit</strong> Issuer shall draw up a <strong>Work</strong> <strong>Permit</strong> Register and the number of this document is recorded on<br />

the Isolation Tag for use during isolations.<br />

Note: The <strong>Permit</strong> Control Board resulting from this isolation should be placed centrally as close <strong>to</strong> the<br />

common worksite as possible.<br />

When a large number of personnel are involved in work associated with a Block Isolation, additional<br />

<strong>Permit</strong> Control Boards may be used and placed closer <strong>to</strong> the specific worksite. In this situation the<br />

following shall occur:<br />

• The <strong>Permit</strong> Issuer shall attach an additional Isolation Tag annotated with the specific <strong>Work</strong><br />

<strong>Permit</strong> number and secured in place by a uniquely keyed Isolation lock <strong>to</strong> the central <strong>Permit</strong><br />

Control board<br />

• The key for this lock is placed in an additional <strong>Permit</strong> Control Board that is taken <strong>to</strong> the specific<br />

work site<br />

• Following a <strong>Permit</strong> Accep<strong>to</strong>r briefing, each work team member shall attach their Personal<br />

Danger Tag and lock <strong>to</strong> the worksite located <strong>Permit</strong> Control Board prior <strong>to</strong> commencing work.<br />

5. Cancelling an Isolation<br />

When work is complete and the <strong>Permit</strong> Issuer initiates the requirement <strong>to</strong> remove the isolation, the<br />

following shall occur:<br />

• The <strong>Permit</strong> Issuer removes the <strong>Permit</strong> Issuer lock and Isolation Tag and provides the isolation<br />

key(s) <strong>to</strong> the Isola<strong>to</strong>r<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 23 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

• The Isola<strong>to</strong>r commences removal of the isolations lock/tag(s)<br />

• When all isolation locks/tags have been removed, the Isola<strong>to</strong>r shall return the Isolation<br />

Certificate <strong>to</strong>gether with all locks/tags <strong>to</strong> the <strong>Permit</strong> Issuer<br />

• The <strong>Permit</strong> Issuer shall confirm the number of locks/tags matches the Isolation Certificate<br />

requirements<br />

6. Tags<br />

Isolation procedures shall use the following four tags:<br />

• Isolation Tag<br />

• Personal Danger Tag<br />

• Testing Tag<br />

• Out of Service Tag<br />

6.1 Isolation Tag<br />

This is an instruction tag that indicates the equipment is in a state that prevents the flow of energy.<br />

The tag shall refer the reader <strong>to</strong> the person(s) or position(s) who are authorised <strong>to</strong> change the status<br />

of the equipment.<br />

The tag shall be locked in place at an isolation point with an isolation lock.<br />

When used <strong>to</strong> secure the isolation key(s) in the <strong>Permit</strong> Control Board, it is locked in place with a<br />

<strong>Permit</strong> Issuers lock.<br />

6.2 Personal Danger Tag (PDT)<br />

This is an instruction tag indicating that there shall be no change in equipment status while this tag is<br />

in place.<br />

The tag shall be locked in place with a uniquely keyed lock<br />

All persons working on isolated equipment shall affix their PDT <strong>to</strong> the <strong>Permit</strong> Control Board before<br />

commencing work. Whilst any PDT remains in place removal of isolations shall not take place.<br />

Any person may place their PDT on any or all isolation point(s) affecting their safety.<br />

A PDT shall be removed by the owner before they leave the work site e.g. at shift end.<br />

Only the tag owner shall remove their PDT. If this is not possible, the site shall have a procedure in<br />

place for the removal of a PDT without risk <strong>to</strong> personnel. .This procedure shall be authorised by the<br />

General Manager (or equivalent).<br />

6.3 Testing Tag<br />

This is an instruction tag indicating <strong>to</strong> the reader that the isolations associated with the tag have been<br />

temporarily removed <strong>to</strong> allow testing <strong>to</strong> be carried out.<br />

The tag shall be tied on<strong>to</strong> the <strong>Permit</strong> Control Board and on<strong>to</strong> isolation points whilst testing.<br />

6.4 Out of Service Tag<br />

This is an informational tag, indicating <strong>to</strong> the reader the equipment item shall not be used until cleared<br />

for safe operation by a competent person.<br />

When Out of Service tags are used, they must be secured in place.<br />

7. <strong>Permit</strong> Control Board<br />

A <strong>Permit</strong> Control Board has the dual function of housing the <strong>Work</strong> <strong>Permit</strong> documentation and securing<br />

the isolation key(s) in a lock box.<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 24 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

• Following isolations, all isolation keys common <strong>to</strong> locks used at specific isolation points shall be<br />

placed in the lock box section of the <strong>Permit</strong> Control Board<br />

• The lock box shall be locked with an Isolation Tag and a <strong>Permit</strong> Issuer’s lock prior <strong>to</strong> work team<br />

members attaching their Personal Danger Tags<br />

• The key <strong>to</strong> the <strong>Permit</strong> Issuer’s lock shall remain in a <strong>Permit</strong> Issuers key cabinet under control of<br />

<strong>Permit</strong> Issuers at all times<br />

• The <strong>Permit</strong> Issuer shall not remove the Isolation Tag and <strong>Permit</strong> Issuer Lock from the <strong>Permit</strong><br />

Control Board until the <strong>Work</strong> <strong>Permit</strong> has been handed back and signed off by the <strong>Permit</strong><br />

Accep<strong>to</strong>r<br />

• Removal of isolations shall not commence before all Personal Danger Tags have been removed<br />

from the <strong>Permit</strong> Control Board<br />

8. Achieving and Securing Positive Isolation<br />

All equipment requiring isolation and all isolation points shall be uniquely and clearly identified<br />

Isolation shall always be applied <strong>to</strong> the energy source and not rely on control circuitry. Push but<strong>to</strong>ns,<br />

s<strong>to</strong>p switches, interlocks, emergency s<strong>to</strong>ps, pilot circuitry lanyards, etc. shall not be used as a means<br />

of isolation<br />

To achieve positive isolation the following steps shall be followed:<br />

• Isolate and prove (By Isola<strong>to</strong>r)<br />

• Tag and lock (By Isola<strong>to</strong>r)<br />

• Test (By <strong>Permit</strong> Accep<strong>to</strong>r/<strong>Work</strong> team member)<br />

Effective mechanical and process isolations shall be achieved <strong>to</strong> a particular standard for all intrusive<br />

work. Energies associated with mechanical, kinetic, pressure and chemical processes shall be<br />

isolated <strong>to</strong> an acceptable standard. The method used shall be based upon risk assessment with the<br />

objective being <strong>to</strong> ensure that the risk of release of energies is reduced <strong>to</strong> as low as is reasonably<br />

practicable (ALARP).<br />

All parts of isolation shall be proved during installation <strong>to</strong> confirm that they do prevent the flow of<br />

energy. During the period that the isolation is in place it may be necessary <strong>to</strong> confirm that the integrity<br />

has not been compromised, by moni<strong>to</strong>ring bleeds or vents for isolation breach.<br />

Isolation methods range from physical disconnection and insertion of blanks/spades <strong>to</strong> double block<br />

valve and bleed through <strong>to</strong> single block valve. Each method has advantages/disadvantages and the<br />

risk assessment shall be used <strong>to</strong> determine the most effective method.<br />

Proof of electrical isolation requires evidence of a physical break in the electrical supply. If the use of<br />

a de-contac<strong>to</strong>r, visible break contac<strong>to</strong>r or phase lights is not possible, electrician continuity testing is<br />

required <strong>to</strong> establish proof of isolation.<br />

All isolations shall be secured by use of a locking device and these locking devices shall require the<br />

use of a key or special <strong>to</strong>ol <strong>to</strong> achieve removal.<br />

Isolation locks are uniquely keyed or keyed alike in sets.<br />

Personal Danger locks shall be uniquely keyed.<br />

<strong>Permit</strong> Issuers locks shall be uniquely keyed (Note: these locks and keys are best secured in a <strong>Permit</strong><br />

Issuers cabinet with <strong>Permit</strong> Issuers retaining a common key <strong>to</strong> cabinet).<br />

Coloured padlock systems shall not be used under this procedure.<br />

A system of locking device and key management shall be defined by the site.<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 25 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

9. Testing Program<br />

If equipment that has energies isolated requires testing, jogging or re-positioning during progress of<br />

work, then the following shall occur:<br />

• An authorised Test Program is required and referenced on the <strong>Work</strong> <strong>Permit</strong>. This program shall<br />

specify the designated points for temporary removal of isolations and a Designated Person who<br />

will be in charge and/or performing the testing task<br />

• For routine, low risk single point Testing Programs the Designated Person may manage the<br />

process of re-energisation and re-isolation. However for more complex multi testing point high<br />

risk Programs the process should be managed by the <strong>Permit</strong> Accep<strong>to</strong>r.<br />

• The Designated Person shall be assessed as competent in the Testing Program for the specific<br />

equipment / plant.<br />

• When testing is <strong>to</strong> commence, work team members remove their Personal Danger Tag from the<br />

<strong>Permit</strong> Control Board and for low risk Testing Programs the Designated Person is the last<br />

person <strong>to</strong> remove their Personal Danger Tag prior <strong>to</strong> commencing testing. For high risk Testing<br />

Programs the <strong>Permit</strong> Accep<strong>to</strong>r’s Personal Danger Tag is the last tag removed from the <strong>Permit</strong><br />

Control Board prior <strong>to</strong> testing.<br />

• The Designated Person:<br />

- Removes the isolation keys designated as part of the Testing Program from the <strong>Permit</strong><br />

Control Board<br />

- Removes the Isolation Tag(s) from the points designated for removal of isolations<br />

- Ties Testing Tag(s) <strong>to</strong> each isolation point and on<strong>to</strong> the <strong>Permit</strong> Control Board<br />

- Removes isolations from designated points <strong>to</strong> allow the testing program <strong>to</strong> be completed.<br />

• For high risk Testing Programs the <strong>Permit</strong> Accep<strong>to</strong>r remains at the work site for the duration of<br />

testing.<br />

• Upon completion of Testing Program the Designated Person:<br />

- Removes the Testing Tag and re-attaches the Isolation Tag and lock<br />

- Removes the Testing Tag from the <strong>Permit</strong> Control Board and returns the isolation key(s)<br />

• If work is <strong>to</strong> continue, work team members re-attach their Personal Danger Tags.<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 26 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

APPENDIX D2<br />

D2 ISOLATION CERTIFICATE<br />

ISOLATION CERTIFICATE<br />

This certificate must be accompanied by a <strong>Work</strong> <strong>Permit</strong><br />

Plant / Area:<br />

Equipment Description:<br />

<strong>Work</strong> <strong>Permit</strong> Reference No.:<br />

No. of Isolation Keys used:<br />

SPECIAL INSTRUCTIONS:<br />

No:<br />

Equipment No.:<br />

Is Radiation Certificate required? □ Yes □ No No:<br />

Is HV <strong>Permit</strong> required? □ Yes □ No No:<br />

Testing Program required? □ Yes □ No No:<br />

Isolation Instruction No : DRW No :<br />

Isola<strong>to</strong>r<br />

Checker<br />

No. Isolation Point Description Method<br />

Name Initial Name Initial<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 27 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

APPENDIX E1<br />

E1 SAFE WORKING IN CONFINED SPACE PROCEDURE<br />

PURPOSE AND SCOPE<br />

This Procedure covers requirements for:<br />

• Identifying and registering all defined confined spaces at each WMC Resources site<br />

• Ensuring that all work conducted in or on confined spaces complies with the specific controls<br />

determined by the WMC <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> <strong>Standard</strong>. (Note – Certain types of work performed “on”<br />

a confined space has the potential <strong>to</strong> affect a person working within the space and shall be<br />

considered when conducting the risk assessment)<br />

• Conducting regular audits of work within confined spaces<br />

• Designing, manufacturing, constructing, maintaining and inspecting plant, equipment and<br />

structures <strong>to</strong> ensure where practicable, the need for entry in<strong>to</strong> confined spaces is eliminated<br />

This procedure should be read as a component of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> <strong>Standard</strong>.<br />

DETAILS<br />

1. Responsibilities<br />

The General Manager or equivalent is responsible for ensuring:<br />

• All confined spaces are identified (sign posted where practicable) and placed on a register<br />

• In preparation for any potential future work within these spaces, a hazard identification and risk<br />

assessment of the inherent hazards of each confined space itself has been competently<br />

conducted and the results also recorded on the register<br />

• A specific risk assessment (THA as a minimum) is conducted for work <strong>to</strong> be completed within<br />

the space that identifies all hazards and determines the control measures prior <strong>to</strong> the<br />

commencement of the work<br />

• All confined space entries are conducted under a specific <strong>Work</strong> <strong>Permit</strong> and a Confined Space<br />

Entry Certificate<br />

• All low risk confined space inspections are conducted under a specific confined space entry<br />

<strong>Work</strong> Authorisation process<br />

• There is a rescue plan that is capable of execution for each entry in<strong>to</strong> a confined space<br />

• Where practicable the need for entry in<strong>to</strong> confined spaces is eliminated.<br />

2. Definition<br />

A Confined Space is:<br />

• An enclosed or partially enclosed space that is at atmospheric pressure during occupancy and<br />

is not intended or designed primarily as a place of work, and:<br />

(a) is liable at any time <strong>to</strong>:<br />

(i) have an atmosphere which contains potentially harmful levels of contaminant;<br />

(ii) have an oxygen deficiency or excess; or<br />

(iii) cause engulfment; and<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 28 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

(b) could have a restricted means for entry and exit.<br />

Note 1: where an enclosed or partially enclosed space is <strong>to</strong> be at atmospheric pressure during<br />

occupancy and it is not intended or designed primarily as a place of work and the content of oxygen in<br />

atmosphere is liable at any time <strong>to</strong> be below or above 20.9% by volume under normal atmospheric<br />

pressure, the space must be considered <strong>to</strong> be a confined space.<br />

Note 2: when a person’s head, i.e. breathing zone, or upper body is within the boundary of the<br />

confined space they are considered <strong>to</strong> have entered the space. Inserting an arm for atmospheric<br />

testing purposes is not considered an entry <strong>to</strong> a confined space.<br />

3. Confined Space Entry<br />

3.1 General<br />

Allowance has been made within the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> <strong>Standard</strong> for a two-tiered <strong>Work</strong> <strong>Permit</strong> process<br />

for inspection and for full entry in<strong>to</strong> confined spaces. The two-tiered work permits are:<br />

• Confined Space <strong>Work</strong> Authorisation<br />

This level is for a low risk inspection only in<strong>to</strong> a atmospherically safe environment and requires<br />

the use of a <strong>Work</strong> Authorisation Tag<br />

• Confined Space Entry permit<br />

This level is for all work within all confined spaces and requires the use of a <strong>Work</strong> <strong>Permit</strong> and<br />

Confined space Entry Certificate<br />

3.2 Confined Space Inspection (Low Risk)<br />

A confined space inspection only can be managed on site providing that all of the following criteria<br />

determined by the risk assessment are complied with:<br />

• Head or head and shoulders entry (for inspection only)<br />

• The atmosphere is safe and is expected <strong>to</strong> remain safe at all times during inspection<br />

• Any isolation required enabling inspection shall be done by a qualified Level 1 Isola<strong>to</strong>r<br />

• There is a purpose designed Inspection/access way (e.g. a purpose designed inspection hatch<br />

in<strong>to</strong> a transfer chute)<br />

• There is no expected risk of contamination occurring<br />

• Appropriate lighting is available<br />

• Whilst conducting the inspection there is no expected chance of a person being overcome by<br />

extremes of temperature<br />

• There is no requirement <strong>to</strong> have rescue equipment at the job site<br />

• The inspection cannot change any of the above conditions<br />

3.3 Confined Space Entry (High Risk)<br />

All entry in<strong>to</strong> confined spaces shall comply with the full requirements of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> <strong>Standard</strong><br />

with the issue of a <strong>Work</strong> <strong>Permit</strong> and Confined Space Entry Certificate (see Appendix E2).<br />

4. Evaluation, Identification and Registration Of Confined Spaces<br />

A confined space inherent hazard evaluation (refer <strong>to</strong> Appendix E4) shall be conducted on any<br />

potential confined space in preparation for any future work within that space being required.<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 29 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

The evaluation of the space will also determine if the space meets all of the requirements <strong>to</strong> allow for<br />

an inspection only <strong>to</strong> be completed under a low risk <strong>Work</strong> Authorisation Tag.<br />

These potential confined spaces can be in existence or be created by new construction or<br />

modifications <strong>to</strong> existing structures, equipment etc.<br />

The evaluation assesses the risk of the inherent hazards of the space itself.<br />

To assess if the space can be managed under a low risk inspection process the evaluation shall<br />

establish that the space will not have any potential unsafe atmosphere at all times during the<br />

inspection.<br />

The confined space evaluation shall be referred <strong>to</strong> when performing or reviewing a <strong>Standard</strong> <strong>Work</strong><br />

Procedure/THA for any task <strong>to</strong> be performed within that space.<br />

In all cases the need for entry <strong>to</strong> the confined space shall be evaluated as a first consideration with<br />

the work conducted from outside the space if practicable.<br />

4.1 Identification<br />

The site shall identify and assign a unique identification <strong>to</strong> each confined space.<br />

4.2 Register<br />

The site shall maintain a register and a record of the evaluation for all identified confined spaces. The<br />

register as a minimum shall contain:<br />

• The unique identification number<br />

• Separate identification of all designated low risk inspection only confined spaces<br />

• The confined space location<br />

• A description of the space and its inherent foreseeable hazards<br />

The register and evaluation of the space shall be reviewed and updated by competent persons at<br />

appropriate intervals but in any case not exceeding two years.<br />

4.3 Signage<br />

Each entry point <strong>to</strong> a confined space shall have a sign of appropriate material and size stating<br />

“Danger Confined Space - Entry by <strong>Permit</strong> Only”. The sign should be mounted as close as is<br />

practicable <strong>to</strong> the entry point. Where it is impracticable <strong>to</strong> place and maintain signs on every entry,<br />

alternate warning systems shall be implemented <strong>to</strong> prevent unauthorised entry in<strong>to</strong> any confined<br />

space.<br />

The placement and condition of signs shall be included on regular inspection checklists.<br />

5. Requirements To Inspect a Low Risk Confined Space<br />

All inspections conducted for a low risk confined space shall be in compliance with the following<br />

details:<br />

• The identification and evaluation of the inherent hazards of the space s<strong>to</strong>red on the site<br />

database must be retrieved and reviewed before completion of a Confined Space <strong>Work</strong><br />

Authorisation Tag<br />

• A SWP for the inspection, or a new THA for the inspection <strong>to</strong> be performed must be reviewed<br />

or completed detailing all precautions and controls required <strong>to</strong> maintain safe inspection<br />

• The confined space ID number, SWP or THA number, entrants name and Authorising Persons<br />

signature be recorded on the confined space entry <strong>Work</strong> Authorisation Tag<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 30 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

• The completed lower tear off portion of the tag (Confined Space inspection in progress section)<br />

must be left with the supervisor controlling work within that area<br />

• All control measures and precautions detailed on the SWP or THA shall be established and<br />

confirmed before commencement of the inspection (checklist on the tag completed)<br />

• Persons performing the inspection shall sign the SWP or THA confirming they understand and<br />

will comply with the hazards control requirements for the task<br />

• Isolations must be in compliance with level 1 requirement<br />

• Once the task is finished, the completion of work sections of the tag shall be signed off and both<br />

portions kept and filed as part of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> documentation.<br />

6. Requirements <strong>to</strong> <strong>Work</strong> in a Confined Space<br />

6.1 General<br />

All work conducted in or on confined spaces shall be in compliance with the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> <strong>Standard</strong><br />

defined in this document. A specific Confined Space Entry Certificate (see Appendix E2) shall be<br />

completed and attached <strong>to</strong> the relevant <strong>Work</strong> <strong>Permit</strong>.<br />

No person shall enter a confined space unless:<br />

• They have been trained, and assessed as competent <strong>to</strong> do so<br />

• They have signed on <strong>to</strong> the <strong>Work</strong> <strong>Permit</strong> confirming they have read and unders<strong>to</strong>od the<br />

requirements of the current THA, <strong>Work</strong> <strong>Permit</strong> and Confined Space Entry Certificate for the<br />

work <strong>to</strong> be performed<br />

• They sign on and off the Entry/Exit log each time they enter and exit the confined space<br />

• It has been determined that there is either a safe atmosphere inside the space or that adequate<br />

protective measures are implemented <strong>to</strong> ensure their safety<br />

• There is a system <strong>to</strong> ensure that where there is more than one entry <strong>to</strong> the confined space, the<br />

other entry points are sign posted and barricaded in a way that shall prevent involuntary entry<br />

but will allow emergency egress.<br />

A <strong>Work</strong> <strong>Permit</strong> and a Confined Space Entry Certificate is required <strong>to</strong> enter a confined space and shall<br />

include provision for the recording of:<br />

• The risk assessment for the task <strong>to</strong> be performed within/on the space (i.e. THA as a minimum)<br />

has been completed and is available<br />

• Evidence that isolation of contaminants and energy sources has been completed by an<br />

authorised person and in accordance with the requirements of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> <strong>Standard</strong><br />

• The location of the job<br />

• The description of work (scope of work)<br />

• Atmospheric testing requirements and results if applicable<br />

• An emergency rescue plan<br />

• Any special instructions that may be required<br />

• The authority <strong>to</strong> enter signed by an authorised person (<strong>Permit</strong> Issuer)<br />

• Acceptance of the permit signed by the <strong>Permit</strong> Accep<strong>to</strong>r<br />

• Nominated Stand-by Person(s)<br />

• Provision for signing in and out of persons who may enter and exit the confined space<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 31 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

• The completion of the work and cancellation of the <strong>Work</strong> <strong>Permit</strong> and Certificate by the<br />

authorised person.<br />

The Confined Space Entry Certificate shall be prominently displayed in the <strong>Permit</strong> Control Board at<br />

the entry point <strong>to</strong> a confined space.<br />

Should any site alarms, outside of normal site testing requirements, require evacuation of the space<br />

then the confined space shall be re-gas tested prior <strong>to</strong> re-entry.<br />

When work is completed the <strong>Work</strong> <strong>Permit</strong> shall be cancelled by the <strong>Permit</strong> Issuer only after that<br />

person has:<br />

• Ensured that all persons who entered the space have signed off the Entry/Exit Log and<br />

removed their Personal Danger Tag from the <strong>Permit</strong> Control Board<br />

• Visually checked the confined space <strong>to</strong> ensure that all personnel are clear and that all<br />

equipment & <strong>to</strong>ols have been removed from the confined space<br />

• Checked that the work area is clear and that the equipment can safely be returned <strong>to</strong> service.<br />

6.2 Atmosphere<br />

Before a person enters a confined space, it shall be ensured where it is technically feasible <strong>to</strong> do so,<br />

that:<br />

• The confined space contains an oxygen level within the safe oxygen range<br />

• The atmospheric contaminants in the confined space are reduced <strong>to</strong> below the relevant<br />

exposure standards<br />

• The concentration of flammable contaminant in the atmosphere of the confined space is below<br />

5% of its LEL.<br />

Each site shall have systems <strong>to</strong> ensure that:<br />

• Risk assessments identify appropriate control measures where any activity in or on a confined<br />

space may introduce atmospheric contaminants (<strong>to</strong>xic or flammable) or affect the level of<br />

oxygen inside the space<br />

• Atmospheric testing, re-testing & moni<strong>to</strong>ring of confined spaces on each site is conducted<br />

consistent with the inherent nature of the space and the hazards identified in the risk<br />

assessment for the work <strong>to</strong> be performed<br />

• Atmospheric testing is only performed by trained and competent persons authorised <strong>to</strong> do so. A<br />

register of authorised Gas Testers shall be kept and maintained on each site<br />

• Atmospheric testing is performed from outside the space if practicable and technically feasible.<br />

If it is necessary <strong>to</strong> enter the space <strong>to</strong> test the atmosphere, a risk assessment that stipulates the<br />

safe testing procedure and a <strong>Work</strong> <strong>Permit</strong> and a Confined Space Entry Certificate is required<br />

prior <strong>to</strong> entry<br />

• Where persons have entered a confined space and the level of flammable contaminant in the<br />

atmosphere of the confined space has been found <strong>to</strong> be greater than 5% but less than 10% of<br />

its LEL, all persons are <strong>to</strong> be removed from the space unless continuous moni<strong>to</strong>ring is used in<br />

accordance with AS 2865<br />

• Where the concentration of flammable contaminant in the atmosphere of the confined space is<br />

greater than 10% of its LEL, no person shall enter or remain in the confined space<br />

• Where there is a presence of flammable contaminants, there shall be a system implemented <strong>to</strong><br />

control all potential ignition sources including static electricity<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 32 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

• Where it is not technically feasible <strong>to</strong> ensure an oxygen level in the atmosphere greater than<br />

19.5% (and less than 23.5%), or the atmospheric contaminants cannot be reduced <strong>to</strong> below the<br />

relevant exposure standards, no person shall enter the confined space unless they are<br />

equipped with suitable personal protective equipment including appropriate air supplied<br />

respira<strong>to</strong>ry protective equipment.<br />

6.3 Cleaning and Purging<br />

There shall be a system <strong>to</strong> ensure that identified confined spaces are cleaned and purged, consistent<br />

with the risk assessment.<br />

Purging and cleaning should be performed from outside the space if reasonably practicable. If it is<br />

necessary <strong>to</strong> enter the space <strong>to</strong> purge or clean the space, a <strong>Work</strong> <strong>Permit</strong> and a Confined Space Entry<br />

Certificate in accordance with this standard is required prior <strong>to</strong> entry.<br />

6.4 Hot <strong>Work</strong><br />

Any hot work that must be performed within or on a confined space shall be in compliance with the<br />

requirements of Appendix F1 of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> <strong>Standard</strong>.<br />

A detailed risk assessment for any hot work performed within or on confined spaces shall consider<br />

the potential <strong>to</strong> affect the safety of the atmosphere.<br />

Good working practices include:<br />

• Identifying the flammability and thermal decomposition products of coatings, scale, sludge and<br />

metals (alloys) generated from hot work<br />

• Switching off the power source <strong>to</strong> equipment when arc welding is suspended for crew breaks or<br />

at end of shift. All electrodes shall be removed from holders and placed so that accidental<br />

arcing or contact cannot occur<br />

• Closing <strong>to</strong>rch and cylinder valves, de-pressure and remove the whole <strong>to</strong>rch and assembly hose<br />

when oxy acetylene cutting, heating or welding is suspended for breaks or shift change<br />

• Not taking compressed gas cylinders or associated manifolds, other than those used for<br />

breathing apparatus, inside the confined space.<br />

6.5 Ventilation<br />

Ventilation of confined spaces can include natural, forced air or mechanical means <strong>to</strong> establish and<br />

maintain a safe atmosphere.<br />

Mechanical ventilation equipment shall be regularly inspected and maintained in proper working<br />

condition by competent persons.<br />

Mechanical ventilation equipment used during confined space occupancy shall be continuously<br />

moni<strong>to</strong>red while the confined space is occupied and the controls will be clearly tagged <strong>to</strong> ensure they<br />

are not interfered with by unauthorised persons.<br />

The risk assessment and procedures shall take in<strong>to</strong> account the hazards of introducing atmospheric<br />

contaminants from unsafe sources including the location of combustion engines, their exhaust and<br />

the ability for any atmospheric contaminants <strong>to</strong> enter or re-enter a confined space (eg change of wind<br />

direction).<br />

6.6 Stand-by Person<br />

A Stand-by Person, shall be designated and remain outside the confined space where determined by<br />

risk assessment.<br />

All stand-by Persons shall be trained, assessed and passed as competent <strong>to</strong>:<br />

• Initiate site emergency procedures if required<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 33 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

• Operate and moni<strong>to</strong>r as required any specific safety plant or equipment identified as being<br />

required <strong>to</strong> ensure health and safety<br />

• Use communications equipment as appropriate<br />

• Moni<strong>to</strong>r the surrounding environment for impact on the confined space<br />

• Recognise changes in risk <strong>to</strong> those inside the confined space and <strong>to</strong> take appropriate action<br />

where necessary<br />

• Where the risk assessment determines that the Stand-by Person may be required <strong>to</strong> perform<br />

first aid, they shall be trained, assessed and passed as competent <strong>to</strong> perform that task.<br />

A Stand-by Person shall be positioned such that they are capable of being in continuous<br />

communication with and, where possible, <strong>to</strong> observe those inside a confined space.<br />

Stand-by Persons may alternate with persons working inside the confined space providing they are<br />

properly trained.<br />

Stand-by Persons shall be assigned no other duties that may affect their ability <strong>to</strong> fully maintain<br />

constant communication and control of the safety of person/s within the confined space.<br />

Under no circumstances is the Stand-by Person <strong>to</strong> enter the confined space.<br />

6.7 Safety Equipment<br />

There shall be management procedures <strong>to</strong> ensure that any safety equipment used in a confined<br />

space (including personal protective equipment) is:<br />

• Appropriate <strong>to</strong> the work <strong>to</strong> be conducted<br />

• Maintained in proper working condition<br />

• Selected and fitted (where required) <strong>to</strong> suit the individual<br />

• In compliance with relevant statu<strong>to</strong>ry requirements and <strong>Standard</strong>s where applicable.<br />

Any equipment used <strong>to</strong> ensure a safe environment during confined space occupancy shall be<br />

continuously moni<strong>to</strong>red while the confined space is occupied and the controls will be clearly tagged <strong>to</strong><br />

ensure unauthorised persons do not interfere with them.<br />

6.8 Portable Electrical Equipment<br />

There shall be a system <strong>to</strong> ensure that any portable electrical equipment used in a confined space:<br />

• Uses flexible heavy duty power supply cable of at least AS/NZS 3191 standard<br />

• Has the power supply cable/s suspended or guarded against damage<br />

• Is double insulated where available<br />

• Is in compliance with relevant statu<strong>to</strong>ry requirements and <strong>Standard</strong>s where applicable.<br />

Portable electrical equipment used within confined spaces should:<br />

• Be connected, individually or collectively, <strong>to</strong> an earth-free, protected, extra-low voltage supply<br />

(see AS/NZS 3000) from an isolating transformer/s complying with AS/NZS 3108, with the<br />

transformer/s being located outside the confined space<br />

• Be protected through a residual current device complying with AS 3190, with the device being<br />

located outside the confined space; or<br />

• Where there is a potential for combustibles, be intrinsically safe.<br />

Note: In all cases consideration must be given <strong>to</strong> the use of extra-low voltage, air, hydraulic or other<br />

means of powering portable equipment used in confined spaces.<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 34 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

6.9 Gas Cylinders<br />

There shall be a system <strong>to</strong> manage the use of compressed or liquefied gas equipment in confined<br />

spaces that shall include ensuring that:<br />

• No cylinder of compressed or liquefied gas should taken in <strong>to</strong> a confined space (except<br />

cylinders for use with breathing apparatus)<br />

• Supply hoses are inspected, repaired or replaced as required prior <strong>to</strong> use<br />

• Supply hoses are located, suspended or guarded against damage<br />

• Gas cylinders are secured at all times<br />

• Supply <strong>to</strong> the equipment is turned off when the equipment is not in use<br />

There shall be management procedures <strong>to</strong> ensure that any equipment used inside a confined space<br />

is in compliance with relevant statu<strong>to</strong>ry requirements and <strong>Standard</strong>s where applicable.<br />

7. Training<br />

Training (and re-training at appropriate intervals but in any case not <strong>to</strong> exceed two years) shall at<br />

least be given <strong>to</strong> persons who:<br />

• Perform work in or on confined spaces including Stand-by Persons<br />

• Manage and/or supervise persons working in confined spaces<br />

• Provide, fit, wear and maintain PPE used in confined spaces<br />

• Are conducting atmospheric testing of confined spaces<br />

• Are involved in rescue and first aid procedures<br />

Details of training are <strong>to</strong> be recorded in the individual’s training record.<br />

8. Emergency Response<br />

There shall be a system <strong>to</strong> ensure that:<br />

• Emergency response (including confined space rescue) and first aid procedures and provisions<br />

are planned, established and rehearsed<br />

• Persons involved in emergency response are trained, assessed and passed as competent<br />

• Persons involved in emergency response are advised of conditions within the confined space<br />

prior <strong>to</strong> entry.<br />

9. Contrac<strong>to</strong>rs<br />

Where contrac<strong>to</strong>rs have been engaged <strong>to</strong> conduct confined space work, evidence of recognised<br />

confined space training will need <strong>to</strong> be provided <strong>to</strong> the WMC Resources Nominated Person. In<br />

addition, the contrac<strong>to</strong>rs shall understand how confined space work is managed at the WMC<br />

Resources site, including the requirements of this <strong>Standard</strong>.<br />

10. Audit and Review<br />

There shall be a program for:<br />

• Inspection of the condition and accuracy of contents of the confined space register and its<br />

accessibility<br />

• A bi-annual check <strong>to</strong> ensure that there has been no change <strong>to</strong> the evaluation of a Confined<br />

Space<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 35 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

• A 6 monthly review of the risk assessment of a low risk inspection confined space <strong>to</strong> ensure that<br />

no foreseeable risk of an atmospheric hazard existing or occurring that will change the<br />

assessment.<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 36 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

APPENDIX E2<br />

E2 CONFINED SPACE ENTRY CERTIFICATE<br />

Plant / Area :<br />

Register No. :<br />

<strong>Work</strong> <strong>Permit</strong> No.:<br />

SPECIAL PRECAUTIONS AND CONDITIONS<br />

CONFINED SPACE ENTRY CERTIFICATE<br />

This certificate must be accompanied by a <strong>Work</strong> <strong>Permit</strong><br />

Isolation Certificate No.:<br />

Equipment No.:<br />

No:<br />

Self-contained BA Safety Harness Secure from engulfment<br />

Airline respira<strong>to</strong>r Life line Rescue Plan<br />

Ventilation extraction<br />

Lighting<br />

Audible alarm<br />

Communications equipment<br />

NOMINATED STANDBY PERSON<br />

Name Signature On Time Signature Off Time<br />

Atmospheric Testing required : Yes No <br />

Continuous moni<strong>to</strong>ring required : Yes No <br />

Initial Atmospheric Testing<br />

Gas Test Analysis Date Gas Test Analysis Date<br />

Toxic gas : ppm Oxygen content %<br />

Toxic gas : ppm LEL %<br />

Toxic gas : ppm Other<br />

Toxic gas :<br />

ppm<br />

AUTHORISED GAS TESTER<br />

Name: Signature: Date: Time:<br />

Is repeat gas testing required : Yes No Required every ...........................................<br />

Repeat gas tests results on rear of form.<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 37 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

APPENDIX E3<br />

E3 REAR OF CONFINED SPACE CERTIFICATE<br />

REPEAT GAS TESTS<br />

Date Gas Test Analysis Authorised Gas Tester<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 38 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

APPENDIX E4<br />

E4 CONFINED SPACE ENTRY/EXIT LOG<br />

Confined Space ID:<br />

<strong>Work</strong> <strong>Permit</strong> No:<br />

CONFINED SPACE ENTRY/EXIT LOG<br />

Confined Space Entry Cert No:<br />

Date<br />

Name<br />

In<br />

Time<br />

Out<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 39 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

APPENDIX E5<br />

E5 CONFINED SPACE WORK AUTHORISATION TAG<br />

FRONT<br />

REAR<br />

No:<br />

Confined Space Inspection<br />

<strong>Work</strong> Authorisation<br />

Use of this authority is restricted <strong>to</strong> inspection only<br />

and in compliance with the attached THA/SWP and<br />

Confined Space hazard identification and evaluation<br />

Confined Space ID No:<br />

THA/SWP No:<br />

Entrant Name:<br />

Date:<br />

Time In:<br />

Time Out:<br />

Authorised Person:<br />

On completion of work<br />

Confined Space Inspection<br />

<strong>Work</strong> Authorisation<br />

Checklist prior <strong>to</strong> work<br />

Confined Space Register<br />

confirms use of the Tag<br />

Can the inspection be achieved<br />

by head & should entry only?<br />

<strong>Hazard</strong> Controls in place as per<br />

THA/SWP?<br />

Yes<br />

The inspection is completed, I have left the space,<br />

the confined space is clear of all <strong>to</strong>ols and<br />

equipment.<br />

Entrants Name<br />

Name:<br />

Signature:<br />

Time:<br />

Confined space isolated from all<br />

energies?<br />

Confined Space Inspection<br />

No:<br />

<strong>Work</strong> Authorisation<br />

Completion of <strong>Work</strong><br />

Confined Space Inspection in Progress<br />

Confined Space ID No: Job Completion Time: Date:<br />

THA/SWP No:<br />

All persons & equipment are<br />

clear of the space.<br />

Authorised Entrant<br />

Authorised Person:<br />

Name:<br />

Job Start Time: Date: Time:<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 40 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

APPENDIX E6<br />

E6 CONFINED SPACE EVALUATION<br />

Confined Space Identification & Inherent <strong>Hazard</strong> <strong>Work</strong>sheet<br />

Confined Space ID:<br />

Exact Location of the Space:<br />

ID & Analysis Team:<br />

Confined Space Name<br />

Date of Analysis:<br />

Picture of Confined Space & Access Points<br />

Confined Space (Low Risk)<br />

Confined Space (High Risk)<br />

Nature of the Space<br />

• Describe the space<br />

• What is it primarily designed for?<br />

• What is the space made of?<br />

• Describe the location, number and<br />

dimensions of entry/exit points.<br />

(Example)<br />

Metal transfer chute designed <strong>to</strong> pass<br />

product from one conveyor <strong>to</strong> the next via<br />

gravity. There are two inspection hatches –<br />

one on the north side approx. 600-x 600mm,<br />

which is 1.3m from floor level. The other is<br />

on the east side approx. 450 x 450mm, which<br />

is also 1.3m above floor level. The space is<br />

approx. 3.5m x 2.5m x 5m deep.<br />

Is Entry Necessary?<br />

It is vital <strong>to</strong> consider the need <strong>to</strong> actually enter the space at allanswer<br />

the following questions first.<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 41 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

Question<br />

Details<br />

• Is a regular head or head/shoulders<br />

inspection performed on this space<br />

• How often will these inspections be<br />

undertaken?<br />

• Can the inspection be done without<br />

actually putting head/shoulders in<strong>to</strong> the<br />

space?<br />

• Can the inspection be done using any<br />

other method?<br />

Inherent <strong>Hazard</strong>s<br />

Is there a potential for atmospheric hazards <strong>to</strong> be present within the space?<br />

(Consider what is or has been s<strong>to</strong>red in the space or the product or material that flows through the space)<br />

<strong>Hazard</strong> Yes No Details<br />

• Oxygen deficient or enriched<br />

• Combustible gasses or<br />

vapours<br />

• Toxic gasses or vapours<br />

• Fumes or particulates<br />

• Other<br />

Could there be any atmospheric hazards that could be released and/or enter the space?<br />

(Consider what is or has been s<strong>to</strong>red in the space or the product or material that flows through the space)<br />

<strong>Hazard</strong> Yes No Details<br />

Contaminants that could be<br />

trapped in:<br />

• Sludge, scale, liquids, other<br />

deposits<br />

• Fittings, joints, bends in pipes,<br />

other<br />

Contaminants that could be<br />

caused by:<br />

Oxidisation, decomposition, leaks<br />

Are there other potential hazards inherent <strong>to</strong> the space?<br />

(Consider what is or has been s<strong>to</strong>red in the space or the product or material that flows through the space)<br />

<strong>Hazard</strong> Yes No Details<br />

• Structural integrity, movement<br />

of the space, radiation<br />

• Moving parts, machinery or<br />

equipment, s<strong>to</strong>red energy<br />

within the space<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 42 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

• Potential for engulfment or<br />

introduction of materials, or<br />

suspended loads<br />

• Temperature extremes, noise<br />

or lighting<br />

• External hazards, exposure <strong>to</strong><br />

elements, Snakes, insects,<br />

animals<br />

• Electrical equip., cables,<br />

services, impact of persons,<br />

plant, in area<br />

• Ergonomics, manual handling,<br />

slips, trips, falls<br />

• Fire, explosion<br />

• <strong>Hazard</strong>ous substance (eg.<br />

chemicals,<br />

poisons)<br />

absorption, inhalation,<br />

ingestion)<br />

• Other (list)<br />

•<br />

Considerations<br />

Details Yes No<br />

Isolations required?<br />

Isolations: What services will be required <strong>to</strong> be isolated for safe occupancy? (list)<br />

Note- If the space requires a Level 2 isolation then the space must be recorded on the register as a<br />

High Risk Confined Space requiring a <strong>Work</strong> <strong>Permit</strong> and Entry Certificate<br />

Details Yes No<br />

Emergency Response Team Involvement Required:<br />

Emergency Response: If there is any concern about the ability <strong>to</strong> rescue persons from the space, detail the<br />

concerns below and contact Emergency Response Team <strong>to</strong> investigate and develop an emergency plan as<br />

required.<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 43 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

Details Yes No<br />

Other considerations required?<br />

Does the evaluation confirm that the space is a Low Risk inspection only space allowing for a <strong>Work</strong><br />

Authorisation process <strong>to</strong> manage entry, including:<br />

• Head or head and shoulders entry (for inspection only)<br />

• The atmosphere is safe and is expected <strong>to</strong> remain safe at all times during inspection<br />

• Any isolation required enabling inspection shall be done by a qualified Level 1 Isola<strong>to</strong>r<br />

• There is a purpose designed Inspection/access way (e.g. a purpose designed inspection<br />

hatch in<strong>to</strong> a transfer chute)<br />

• There is no expected risk of contamination occurring<br />

• Appropriate lighting is available<br />

• Whilst conducting the inspection there is no expected chance of a person being overcome by<br />

extremes of temperature<br />

• There is no requirement <strong>to</strong> have rescue equipment at the job site<br />

• The inspection cannot change any of the above conditions<br />

Note – If the space does not meet all of the above conditions then it must be recorded as a High<br />

Risk Confined Space requiring a <strong>Work</strong> <strong>Permit</strong> and Confined Space Entry Certificate at all times.<br />

Record the risk level on the front page of the evaluation.<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 44 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

APPENDIX F1<br />

F1 HOT WORK PROCEDURE<br />

1. Scope<br />

This procedure shall apply <strong>to</strong> any person, or group of persons, undertaking “Hot <strong>Work</strong>” at any Site<br />

owned or controlled by WMC Resources.<br />

For the purposes of this procedure “Hot <strong>Work</strong>” means any grinding, welding, thermal or oxygen<br />

cutting, heating, and other related heat or spark producing operations. <strong>Work</strong> with live electrical<br />

equipment not classed as intrinsically safe, including instrumentation, mobile phones, cameras and<br />

test equipment/<strong>to</strong>ols, in a Classified <strong>Hazard</strong>ous area is also considered as hot work.<br />

2. Purpose<br />

The purpose of this procedure is <strong>to</strong> define the method and the responsibilities associated with<br />

correctly defining the hazard controls required and preparing the work environment for hot work <strong>to</strong> be<br />

conducted safely. It should be read as a component of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> System<br />

3. Competency Development<br />

Training specifically related <strong>to</strong> Hot <strong>Work</strong> Safety is required for all personnel who issue and accept<br />

<strong>Work</strong> <strong>Permit</strong>s or perform fire watch duties. This training shall be re-assessed at a maximum interval of<br />

two years.<br />

4. Definitions<br />

Designated Hot <strong>Work</strong> Area An area specifically prepared and adequately signed for hot work<br />

activities. All flammable and combustible liquids or materials are<br />

removed from this area. Fire extinguishers and fire fighting equipment<br />

is provided within boundaries of the area. Hot work in this area does<br />

not require a <strong>Work</strong> <strong>Permit</strong> or Hot <strong>Work</strong> Certificate<br />

<strong>Hazard</strong>ous Areas<br />

A three dimensional region or space in which an explosive<br />

atmosphere is present, or may be expected <strong>to</strong> be present, in<br />

quantities such as <strong>to</strong> require special precautions for the construction,<br />

installation and use of potential ignition sources<br />

<strong>Hazard</strong>ous Areas – Zone 0<br />

<strong>Hazard</strong>ous Areas – Zone 1<br />

<strong>Hazard</strong>ous Areas – Zone 2<br />

Non-classified Areas<br />

Gas testing<br />

Gas Tester<br />

Fire Watch<br />

An area in which an explosive gas atmosphere is present<br />

continuously, or is present for long periods<br />

An area in which an explosive gas atmosphere is likely <strong>to</strong> occur in<br />

normal operation<br />

An area in which an explosive gas atmosphere is not likely <strong>to</strong> occur in<br />

normal operation and if it does occur it will exist for a short period only<br />

All other areas that are not ‘Designated Hot <strong>Work</strong> Area’ or ‘Classified<br />

<strong>Hazard</strong>ous Area’<br />

Checking of the worksite with a calibrated gas detec<strong>to</strong>r, prior <strong>to</strong> and<br />

during work activities, <strong>to</strong> detect the presence of flammable gas<br />

A person adequately trained in the use of gas testing equipment and<br />

in the interpretation of results through the successful completion of<br />

competency based training<br />

Personnel who are been suitably trained and appointed <strong>to</strong> standby<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 45 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

Intrinsically safe equipment<br />

Lower Explosive Limit<br />

Upper Explosive Limit<br />

and observe a work area where hot work is being done. The Fire<br />

Watch shall not perform other tasks whilst assigned in this role<br />

Equipment that has been specifically designed and certified for use in<br />

hazardous areas<br />

The ‘leaner’ point at which a mixture of flammable gas or vapour in air<br />

will no longer support combustion<br />

The ‘richer’ point at which a mixture of flammable gas or vapour in air<br />

will no longer support combustion<br />

5. Details<br />

5.1 General<br />

A <strong>Work</strong> <strong>Permit</strong> and associated Hot <strong>Work</strong> Certificate is required when:<br />

• Flammable or combustible gases or liquids are present which have the potential <strong>to</strong> ignite or<br />

explode<br />

• Flammable or combustible materials are present which may ignite if not protected or controlled<br />

adequately<br />

• Flash vapours and non-condensable gases have the potential <strong>to</strong> accumulate and develop<br />

flammable mixtures.<br />

Risk assessments shall be conducted <strong>to</strong> identify the areas where the higher level of control of a <strong>Work</strong><br />

<strong>Permit</strong>/Hot <strong>Work</strong> Certificate is required. All other hot work where a risk of ignition exists is either<br />

performed in a designated hot work area or, if considered low risk hot work, under the authority of a<br />

<strong>Work</strong> Authorisation. Where there is no risk of fire or explosion from hot work the work can proceed<br />

under a management authorised THA or <strong>Standard</strong> <strong>Work</strong> Procedure.<br />

5.2 Performing Hot <strong>Work</strong> when a <strong>Work</strong> <strong>Permit</strong> is not Required<br />

• Where it has been determined by risk assessment that no risk of fire or explosion exists, the hot<br />

work may proceed under an authorised THA or <strong>Standard</strong> <strong>Work</strong> Procedure (SWP).<br />

• The THA shall be signed as a written authority by a line supervisor confirming that a <strong>Work</strong><br />

<strong>Permit</strong>/Safety Checklist is not required and all controls defined are appropriate for the work in<br />

the defined work environment<br />

• The hot work technician shall obtain verbal clearance from the work environment ‘owner’ prior <strong>to</strong><br />

work commencing.<br />

5.3 Performing Hot <strong>Work</strong> under a <strong>Work</strong> Authorisation<br />

Where it has been determined by risk assessment that the risk of fire and explosion from hot work is<br />

low the work may be conducted under the authority of a <strong>Work</strong> Authorisation and a THA/SWP signed<br />

by the hot work technician’s line supervisor.<br />

The hot work technician and team leader shall confirm that:<br />

• They have verified that a <strong>Work</strong> <strong>Permit</strong> is not required<br />

• An authorised THA/SWP is available for the specific work<br />

• The person(s) performing the hot work is competent <strong>to</strong> perform the particular hot work<br />

• The area is free of flammable and combustible materials, which may ignite if not protected or<br />

controlled adequately (a 15 metre radius is required by AS 1674)<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 46 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

• The person performing the hot work can safely moni<strong>to</strong>r the work environment<br />

• The appropriate fire fighting equipment is available and in working order<br />

Once the above questions have been answered in the affirmative and the <strong>Work</strong> Authorisation Tag has<br />

been filled out, the Tag shall be authorised.<br />

The Authorising Person retains the tear off portion of the Tag as a record of work authorisation.<br />

Prior <strong>to</strong> commencing work verbal clearance shall be obtained from the ‘owner’ of the work<br />

environment.<br />

The Tag is hung adjacent <strong>to</strong> the area where hot work is performed (see Appendix F3 for <strong>Work</strong><br />

Authorisation Tag).<br />

When work is complete the hot work technician informs the ‘owner’ that work is complete and the Tag<br />

is returned <strong>to</strong> the Authorising Person for sign off and filed as part of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

documentation.<br />

5.4 Preparing for a <strong>Work</strong> <strong>Permit</strong>/Hot <strong>Work</strong> Certificate<br />

The process of defining necessary controls for hot work forms part of the preparation for obtaining a<br />

<strong>Work</strong> <strong>Permit</strong> and is described in the beginning of this <strong>Standard</strong>. When it has been decided as part of<br />

this process that a Hot <strong>Work</strong> Certificate (see Appendix F2) is required, the person performing the hot<br />

work (hot work technician) and/or the <strong>Permit</strong> Accep<strong>to</strong>r, in consultation as necessary with the <strong>Permit</strong><br />

Issuer, shall:<br />

• Prepare the work site <strong>to</strong> contain all ignition sources as close <strong>to</strong> the point of work as possible, i.e.<br />

erect barriers <strong>to</strong> contain slag and sparks<br />

• Identify and remove or control all combustible/flammable materials (gases, vapours, dusts,<br />

fibres, other solids) from within 15 meters of each hot work point and immediately below this<br />

area when working at height<br />

• Equipment, piping and tanks on which hot work is <strong>to</strong> be performed shall be thoroughly drained,<br />

flushed with water, dried, steamed and air purged as necessary (the plant/equipment owner<br />

would normally perform process preparations) <strong>to</strong> provide an atmosphere which can be tested<br />

and certified as gas-free immediately before the commencement of hot work. Hot tapping is a<br />

special case in which hot work takes place on live lines and under hazard controls defined from<br />

a risk assessment<br />

• Provide a safe entry and exit from the hot work area.<br />

If combustible/flammable materials cannot be removed:<br />

• Ensure suitable non-combustible covers or shields (e.g. fire blankets) are secured in place<br />

• Provide proper ventilation of hot work areas<br />

• Locate and check the emergency fire fighting equipment for safe operation<br />

• Establish a Fire Watch if required by the risk assessment<br />

• The <strong>Permit</strong> Issuer shall arrange for required gas testing (initial and repeat or continuous) and<br />

shall be undertaken using an intrinsically safe gas detec<strong>to</strong>r and conducted by an authorised<br />

Gas Tester<br />

• The <strong>Permit</strong> Issuer shall be satisfied that the level of any flammable or combustible material in<br />

the atmosphere adjacent the hot work area is less than 5% of its Lower Explosive Limit (LEL)<br />

immediately prior <strong>to</strong> authorising the <strong>Work</strong> <strong>Permit</strong><br />

• See Appendix E1 for requirements when conducting hot work in confined spaces.<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 47 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

When all of the hazard controls defined in the <strong>Work</strong> <strong>Permit</strong> and Hot <strong>Work</strong> Certificate have been<br />

completed (including any initial gas test results) the <strong>Permit</strong> Accep<strong>to</strong>r shall request issue of the <strong>Work</strong><br />

<strong>Permit</strong>. The <strong>Permit</strong> Issuer shall follow the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> issuing process <strong>to</strong> allow progress of work.<br />

6. Responsibilities<br />

The assigned Fire Watch is responsible for:<br />

• Being alert at all times and continually observing the hot work<br />

• Maintaining a safe place of work in the vicinity of the hot work<br />

• Obtaining fire fighting equipment (extinguishers/hoses/blankets etc) and confirming operational<br />

capacity<br />

• Ensuring personnel are wearing the appropriate personal protective equipment<br />

• Moni<strong>to</strong>ring changes in weather conditions specifically wind direction<br />

• Taking immediate action <strong>to</strong> combat any outbreak of fire and informing the Emergency Services<br />

Personnel<br />

• Withdrawing the <strong>Work</strong> <strong>Permit</strong>/Hot <strong>Work</strong> Certificate if a breach of hazard controls is observed<br />

• Signing on/off the Hot <strong>Work</strong> Certificate at beginning /end of hot work<br />

• Not leaving the work area unless relieved by an authorised person<br />

• Not leaving the work area until the risk of fire has been removed and any designated post watch<br />

period determined by the risk assessment has expired.<br />

The Gas Tester is responsible for:<br />

• Conducting an alarm point challenge at the beginning of each shift or before a gas detec<strong>to</strong>r is<br />

used for the first time during a shift<br />

• Conducting fresh air calibrations<br />

• Ensuring gas testing equipment is available as required and remains in a fully operational state<br />

whilst in place<br />

• Recommending sampling and atmosphere control strategies <strong>to</strong> the <strong>Permit</strong> Issuer<br />

• Setting up continuous gas moni<strong>to</strong>rs <strong>to</strong> ensure a representative sample at all times<br />

• Carrying out initial and repeat gas testing as required.<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 48 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

APPENDIX F2<br />

F2 HOT WORK CERTIFICATE<br />

HOT WORK CERTIFICATE<br />

This certificate must be accompanied by a <strong>Work</strong> <strong>Permit</strong><br />

<strong>Work</strong> Location :<br />

<strong>Work</strong> <strong>Permit</strong> No:<br />

SPECIAL PRECAUTIONS AND CONDITIONS<br />

No:<br />

Fire watch Barricading ER standby<br />

Fire extinguisher Drains covered Fire Blanket<br />

Signs erected Area wetting Non sparking <strong>to</strong>ols<br />

Welding screens Flame-proof PPE Thickness Test<br />

Gas test requirements<br />

Yes No Yes No<br />

Is a gas test required<br />

Continuous testing<br />

Gas test frequency<br />

Initial gas test Result:<br />

Gast tester: Signature: Date and time:<br />

Any other conditions<br />

Repeat Gas Tests<br />

Result Name Signature Date Time<br />

Fire Watch sign on/off on rear of Certificate<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 49 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

APPENDIX F3<br />

F3 FIRE WATCH SIGN OFF/ON ( rear of Hot work certificate)<br />

FIRE WATCH SIGN OFF/ON<br />

Date<br />

Name<br />

On<br />

Time<br />

Off<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 50 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

APPENDIX F4<br />

F4 HOT WORK- WORK AUTHORISATION TAG<br />

FRONT<br />

Tag No:<br />

HOT WORK- WORK AUTHORISATION<br />

Checklist prior <strong>to</strong> work<br />

This tag must be displayed on equipment<br />

being worked on and returned <strong>to</strong> the<br />

Authorised Person on completion of<br />

work<br />

Location: .................................................<br />

REAR<br />

HOT WORK- WORK AUTHORISATION<br />

• <strong>Hazard</strong> controls in place as per<br />

THA/SWP............................................<br />

• All combustible materials have<br />

controls established.............................<br />

• Appropriate safety signs/barricades<br />

installed................................................<br />

• Fire fighting equipment located<br />

and checked ........................................<br />

• Water hose located and checked.......<br />

THA/SWP Ref: .......................................<br />

Dept/Comp: ............................................<br />

Date: .......................................................<br />

Name: .....................................................<br />

Authorised Person<br />

Name: .....................................................<br />

Signature: ...............................................<br />

Signature: ...............................................<br />

On Completion of <strong>Work</strong><br />

The hot work is complete and the area left<br />

clean and safe.<br />

Name:<br />

Signature:<br />

Date:<br />

Tag No:<br />

Hot <strong>Work</strong>- <strong>Work</strong> Authorisation<br />

Name: .....................................................<br />

Location: .................................................<br />

Date: .......................................................<br />

Hot <strong>Work</strong>- <strong>Work</strong> Authorisation<br />

Tear off tab <strong>to</strong> be handed <strong>to</strong> Authorised<br />

Person at time of issue<br />

<strong>Work</strong> Completion<br />

Authorised Person:<br />

Name:<br />

Date:<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 51 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

APPENDIX G1<br />

G1 RADIATION PROCEDURE<br />

1. Purpose And Scope<br />

This procedure details the requirements <strong>to</strong> ensure safe conditions when working with or near radiation<br />

sources.<br />

All work with portable sources or when working within a 5 metre radius from a gauge which involves<br />

breaking in<strong>to</strong> the process line or other process equipment shall be controlled through the issue of a<br />

<strong>Work</strong> <strong>Permit</strong> and associated Radiation Certificate (and Isolations Certificate as necessary).<br />

2. Details<br />

The process is shown in Appendix G2 Radiation Process – Flow Chart.<br />

3. Safety<br />

The following issues shall be considered when establishing controls for working with radiation<br />

sources:<br />

• Radiation Certificates shall be authorised by the Site Radiation Safety Officer (RSO) or delegate<br />

• Use of Authorised Radiation <strong>Work</strong>ers only. An Authorised Radiation worker is a site employee<br />

who has successfully completed a recognised radiation-training course and has been registered<br />

on site as authorised <strong>to</strong> work with radiation sources. This worker must undertake <strong>to</strong> complete<br />

periodic refresher courses as required by the RSO<br />

• Ensure that radiation warning signs are in place at the work site<br />

• Whilst transporting a gauge or In Stream Analyser (ISA) probe, appropriate placards shall be<br />

placed on the vehicle<br />

• Ensure that all other work team members are aware when a portable nuclear gauge is in use<br />

and that work that may create ionising radiation is being conducted<br />

• Ensure that any radiation gauge in use is clearly and correctly labelled with the radiation<br />

warning symbol, and name and telephone number of the person <strong>to</strong> contact immediately in the<br />

event of an emergency<br />

• Only the supplier, trained persons and persons authorised by the supplier, or persons<br />

authorised by the State Regula<strong>to</strong>ry Authority are permitted <strong>to</strong> repair source, source holder or the<br />

shutter<br />

• Authorised Radiation personnel shall ensure that they:<br />

- Always lock the shutter in the ‘Off Position’ until maintenance is complete<br />

- Only remove the source rod if authorisation is approved by license<br />

- After a radiation gauge has been switched <strong>to</strong> the ‘beam off’ position and locked out, the<br />

Radiation Technician shall perform a gamma survey around the gauge <strong>to</strong> ensure the<br />

beam is off, and record results. The radiation level shall not exceed 500 µSv/h at any<br />

point 5cm from the external surface and 10 µSv/h at any point I metre from the surface<br />

- Avoid any physical contact with or direct exposure <strong>to</strong> the source when performing any<br />

maintenance<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 52 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

- Log in an appropriate site register the temporary or permanent removal of a radiation<br />

gauge or ISA probe<br />

- Ensure the gauge has been wipe tested as per statu<strong>to</strong>ry requirements or as<br />

recommended in the maker’s instructions. The gauge should not be left untested for<br />

leakage for a period exceeding three years<br />

• In the event that a radiation device has been damaged, seek expert advice prior <strong>to</strong> use<br />

• Before responding <strong>to</strong> an emergency that involves a radioactive source, the Emergency<br />

Response Co-ordina<strong>to</strong>r shall notify the RSO and await their attendance and advice before<br />

attempting any action<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 53 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

APPENDIX G2<br />

G2 RADIATION PROCESS - FLOWCHART<br />

Scope of work defined<br />

including need <strong>to</strong> carry out<br />

work on radiation devices<br />

Service provider consults<br />

with RSO and <strong>Permit</strong> Issuer<br />

<strong>to</strong> determine necessary<br />

controls<br />

<strong>Permit</strong> Issuer receives all permit<br />

documentation, agrees controls and initiates<br />

preparation of the work environment by an<br />

authorised Isola<strong>to</strong>r (RSO or delegate),<br />

according <strong>to</strong> requirements on the Radiation<br />

Certificate and Isolation Certificate (as required)<br />

No<br />

Are Isolations<br />

required?<br />

Yes<br />

<strong>Work</strong> <strong>Permit</strong> closure by<br />

standard process<br />

The authorised Isola<strong>to</strong>r (RSO or delegate)<br />

completes the necessary preparations and<br />

returns the authorised Radiation / Isolation<br />

Certificates <strong>to</strong> the <strong>Permit</strong> Issuer<br />

<strong>Work</strong> completed<br />

<strong>Permit</strong> Issuer issues<br />

Radiation Certificate and<br />

<strong>Work</strong> <strong>Permit</strong> <strong>to</strong> <strong>Permit</strong><br />

Accep<strong>to</strong>r<br />

<strong>Work</strong> progresses under<br />

control of RSO and<br />

authorised radiation workers<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 54 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

APPENDIX G3<br />

G3 RADIATION CERTIFICATE<br />

Plant / Area :<br />

Equipment Description :<br />

Covering <strong>Work</strong> <strong>Permit</strong> No.:<br />

RADIATION CERTIFICATE<br />

This certificate must be accompanied by a work permit<br />

Equipment No.:<br />

No:<br />

SOURCE DETAILS (TO BE COMPLETED BY RSO)<br />

Source type<br />

RAD Source No.:<br />

Activity :<br />

Serial No.:<br />

Calculated exclusion zone :<br />

SPECIAL PRECAUTIONS AND CONDITIONS<br />

Film Badge Written plan Shutters locked on/off<br />

Signpost Irrigating dose meter Sentries posted<br />

Barrier tape Warning lights Collima<strong>to</strong>r fitted<br />

Other:<br />

AUTHORISATION<br />

The above controls have been implemented and checked.<br />

RSO Name: Signature: Date: Time:<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 55 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

APPENDIX H1<br />

H1 EXCAVATION PROCEDURE<br />

1. Purpose and Scope<br />

This appendix documents the process for establishing necessary controls <strong>to</strong> prevent injury from an<br />

uncontrolled release of energy through the exposure of underground services and <strong>to</strong> prevent damage<br />

<strong>to</strong> underground services<br />

The process controls the authorisation of all work where the ground or surface is required <strong>to</strong> be<br />

excavated by hand or machinery below 300mm.<br />

It does not apply <strong>to</strong>:<br />

• Any earthmoving or excavation work undertaken within defined ‘Open Cut’ or ‘Underground<br />

Mine’ boundaries<br />

• Exploration drilling within defined ‘Open Cut’ boundaries.<br />

2. Details<br />

The process is described in Appendix H2.<br />

3. Safety<br />

3.1 Excavation Close <strong>to</strong> Services<br />

• For any excavation work in close proximity <strong>to</strong> an energy source (eg. power cables,<br />

communication cables, live pipe lines) where there is potential for uncontrolled release of<br />

energy, then the energy source shall be positively isolated, tagged and tested<br />

• Any work within 1 metre of any buried service shall be done using hand <strong>to</strong>ols<br />

• Any work within a 10 metre corridor of any overhead power lines can only proceed through the<br />

authority of a ‘Vicinity <strong>Permit</strong>’ from the owner of the power line.<br />

3.2 Crossing Thoroughfares<br />

The excavation Supervisor will ensure the following precautions if an excavation involves the crossing<br />

of a road or will impede access <strong>to</strong> the plant:<br />

• Install all appropriate signs<br />

• Notify the Emergency Services Co-ordina<strong>to</strong>r of the area concerned before commencement of<br />

work<br />

• Notify the Departmental Manager of the area concerned before commencement of work.<br />

3.3 Blasting<br />

Blasting is not permitted in the excavation unless the General Manager or his delegate grants written<br />

permission.<br />

3.4 Environmental clearance<br />

Whenever there is a requirement <strong>to</strong> disturb ground previously undisturbed, the site environmental<br />

department shall be contacted <strong>to</strong> clarify specific environmental requirements.<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 56 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

3.5 Equipment/Material near an Excavation<br />

No hoisting or power driven equipment or other load should be placed in or adjacent <strong>to</strong> an excavation<br />

unless the sides of the excavation have been adequately supported <strong>to</strong> prevent wall collapse.<br />

Excavated material or other material should not be placed or s<strong>to</strong>red at a distance of less than one<br />

third the depth of the excavation from the edge of the excavation.<br />

All heavy machinery/equipment shall be s<strong>to</strong>red a minimum distance of 5 metres from the edge of the<br />

excavation, or a minimum distance equal <strong>to</strong> the depth of the excavation, which ever is larger.<br />

3.6 Personnel <strong>Work</strong>ing in Excavations<br />

The following applies <strong>to</strong> all personnel working under a <strong>Work</strong> <strong>Permit</strong>/Excavation Certificate:<br />

• All excavations shall have warning signs and notices posted<br />

• All excavations left open shall be barricaded off and have flashing lights installed at night and<br />

outside working hours (note: barricades <strong>to</strong> a minimum height of 900mm)<br />

• Any excavation deeper than 1.2 metres shall have a Confined Space Entry Certificate<br />

authorised if personnel are required <strong>to</strong> enter<br />

• No personnel shall be present in an excavation while that part is being mechanically dug<br />

• Sufficient and safe means of access in<strong>to</strong>, out of and across excavations shall be maintained<br />

• A ladder shall be provided for any excavation having a depth of 1 metre or more.<br />

3.7 Shoring of Excavations<br />

Every face of any excavation that exceeds 1.2 metres shall be supported or contained by shoring<br />

unless:<br />

• The face is cut back <strong>to</strong> a safe slope<br />

• The material in the face has good standing<br />

• There is no danger <strong>to</strong> personnel because of the nature of the work or their position in the vicinity<br />

of the work.<br />

3.8 Updating Records<br />

Where the excavation is for the installation of any new buried services, full details shall be shown on<br />

records maintained by the Engineering Section.<br />

Where any excavation exposes an incorrectly documented buried service the Authorised Excavation<br />

Officer shall be advised for updating of records.<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 57 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

APPENDIX H2<br />

H2<br />

EXCAVATION CERTIFICATE<br />

Plant / Area :<br />

EXCAVATION CERTIFICATE<br />

No:<br />

This certificate must be accompanied by a work permit<br />

Location: Attach sketch: Yes No <br />

Purpose of Excavation :<br />

Covering <strong>Work</strong> <strong>Permit</strong> No.:<br />

DWG Ref No.:<br />

SPECIAL PRECAUTIONS AND CONDITIONS<br />

Underground Services<br />

Service Tested Result Name Signature<br />

Electrical<br />

Sewerage / Water<br />

Telecom<br />

Gas Pipes<br />

Other<br />

Other<br />

Yes <br />

Yes <br />

Yes <br />

Yes <br />

Yes <br />

Yes <br />

Is environmental approval required : Yes No <br />

Other:<br />

Is road crossing required : Yes No <br />

AUTHORISATION<br />

Authorised Excavation Officer: Signature: Date: Time:<br />

Authorised Electrical Person: Signature: Date: Time:<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 58 of 59


WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

APPENDIX H3<br />

H3 EXCAVATION – FLOWCHART<br />

Scope of work defined<br />

including need for<br />

excavation<br />

<strong>Work</strong> completed<br />

<strong>Work</strong> permit<br />

closure by<br />

standard process<br />

Service provider consults<br />

with Environmental<br />

section <strong>to</strong> determine<br />

environmental<br />

requirements<br />

<strong>Permit</strong> accep<strong>to</strong>r<br />

accepts work<br />

permit<br />

<strong>Permit</strong> issuer<br />

issues work permit<br />

and associated<br />

certificates<br />

Is environmental<br />

approval required?<br />

Yes<br />

Follow<br />

Environmental<br />

Request <strong>to</strong><br />

Proceed Form<br />

Completed all<br />

other controls on<br />

Excavation<br />

certificate<br />

No<br />

No<br />

Request authority <strong>to</strong><br />

excavate from authorised<br />

officer (site <strong>to</strong> nominate)<br />

Is additional fill<br />

required?<br />

Yes<br />

Seek advice from<br />

Environmental<br />

section<br />

No<br />

Excava<strong>to</strong>r Supervisor and<br />

authorised officer (and<br />

<strong>Permit</strong> Issuer as<br />

necessary) inspect site<br />

and identify controls<br />

required<br />

Is road closure<br />

required?<br />

Yes<br />

Notify ER coordina<strong>to</strong>r<br />

No<br />

All agree necessary<br />

controls and complete<br />

Excavation Certificate and<br />

covering <strong>Work</strong> <strong>Permit</strong><br />

Is confined space<br />

entry required?<br />

Yes<br />

Complete<br />

preparedness for<br />

Confined Space<br />

Entry certificate as<br />

per procedure<br />

No<br />

Are isolations<br />

required?<br />

Yes<br />

<strong>Permit</strong> issuer<br />

requests isola<strong>to</strong>r<br />

<strong>to</strong> complete<br />

Isolation certificate<br />

Service provider forwards<br />

all work permit request<br />

documents <strong>to</strong> <strong>Permit</strong><br />

Issuer<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 59 of 59