WMC Environment, Health & Safety Management System<br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
<strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
MHS-07<br />
DocsOpen Ref: 155520, 23/12/2003<br />
Uncontrolled copy – check web for latest revision<br />
Revision Reviewed Description of Changes Date Approved<br />
2 D Batchler Revised <strong>to</strong> incorporate Confined Spaces, Hot <strong>Work</strong> etc 23/12/2003 P Plavina<br />
1 A Barfield Revised Isolations <strong>Standard</strong> 17/10/2001 P Plavina<br />
0 First Issue of Isolations <strong>Standard</strong> 12/07/2000 K Thomas<br />
© WMC Resources Ltd<br />
WMC has developed this document for internal use, specific <strong>to</strong> circumstances and conditions within its operations. It is<br />
intended <strong>to</strong> provide general information and its applicability <strong>to</strong> external parties may therefore be limited. WMC makes no<br />
representations as <strong>to</strong> the applicability of the information for use by any party other than WMC and should not be relied<br />
upon as such. WMC provides no representation or warranty as <strong>to</strong> safety or business outcomes arising from application<br />
of this document and its requirements by third parties.
EHS<br />
MS<br />
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
CONTENTS<br />
1 PURPOSE AND SCOPE.....................................................................................................4<br />
1.1 Purpose ..............................................................................................................................4<br />
1.2 Scope .................................................................................................................................4<br />
2 GENERAL ...........................................................................................................................4<br />
3 DOCUMENT STRUCTURE.................................................................................................5<br />
4 SYSTEM OVERVIEW..........................................................................................................5<br />
5 TRAINING AND COMPETENCY ........................................................................................6<br />
6 MONITORING AND AUDITS ..............................................................................................6<br />
7 WORK PERMIT PROCESS ................................................................................................6<br />
7.1 Scope of <strong>Work</strong>....................................................................................................................6<br />
7.2 <strong>Hazard</strong> Identification and Assessment ...............................................................................7<br />
7.3 <strong>Work</strong> <strong>Permit</strong> Document Preparation ...................................................................................7<br />
7.4 <strong>Work</strong>place Preparation .......................................................................................................8<br />
7.5 <strong>Work</strong> <strong>Permit</strong> Issue and Acceptance....................................................................................8<br />
7.5.1 <strong>Work</strong> <strong>Permit</strong>s..........................................................................................................8<br />
7.5.2 <strong>Work</strong> <strong>Permit</strong>s with a Block Isolation .......................................................................8<br />
7.6 <strong>Work</strong> Progression ...............................................................................................................9<br />
7.6.1 <strong>Work</strong> Commencement............................................................................................9<br />
7.6.2 Shift Handover........................................................................................................9<br />
7.6.3 <strong>Work</strong> <strong>Permit</strong> Relinquishment ..................................................................................9<br />
7.6.4 Scope of <strong>Work</strong> Change ........................................................................................10<br />
7.6.5 <strong>Work</strong> <strong>Permit</strong> Suspension ...................................................................................... 10<br />
7.6.6 Testing..................................................................................................................10<br />
7.7 <strong>Work</strong> <strong>Permit</strong> Hand-back ................................................................................................... 10<br />
8 RESPONSIBILITIES .........................................................................................................11<br />
8.1 <strong>Permit</strong> Issuer .................................................................................................................... 11<br />
8.2 Isola<strong>to</strong>r.............................................................................................................................. 12<br />
8.3 Isolation Checker..............................................................................................................12<br />
8.4 Service Provider / <strong>Permit</strong> Reques<strong>to</strong>r ................................................................................ 12<br />
8.5 <strong>Permit</strong> Accep<strong>to</strong>r................................................................................................................12<br />
8.6 <strong>Work</strong> Team Member......................................................................................................... 13<br />
8.7 Site General Manager ...................................................................................................... 13<br />
9 REFERENCES ..................................................................................................................13<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 2 of 59
EHS<br />
MS<br />
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
10 TABLE 1............................................................................................................................15<br />
Guide for When a <strong>Work</strong> <strong>Permit</strong> is Required............................................................................. 15<br />
APPENDICES ........................................................................................................................16<br />
A PERMIT TO WORK – OVERVIEW FLOWCHART........................................................... 17<br />
B WORK PERMIT................................................................................................................ 18<br />
C WORK PERMIT REGISTER ............................................................................................ 20<br />
D1 ISOLATION PROCEDURE .............................................................................................. 21<br />
D2 ISOLATION CERTIFICATE.............................................................................................. 27<br />
E1 SAFE WORKING IN CONFINED SPACE PROCEDURE ................................................ 28<br />
E2 CONFINED SPACE ENTRY CERTIFICATE .................................................................... 37<br />
E3 REAR OF CONFINED SPACE CERTIFICATE ................................................................ 38<br />
E4 CONFINED SPACE ENTRY/EXIT LOG............................................................................. 39<br />
E5 CONFINED SPACE WORK AUTHORISATION TAG....................................................... 40<br />
E6 CONFINED SPACE EVALUATION.................................................................................. 41<br />
F1 HOT WORK PROCEDURE.............................................................................................. 45<br />
F2 HOT WORK CERTIFICATE ............................................................................................. 49<br />
F3 FIRE WATCH SIGN OFF/ON ( rear of Hot work certificate)............................................. 50<br />
F4 HOT WORK- WORK AUTHORISATION TAG.................................................................. 51<br />
G1 RADIATION PROCEDURE .............................................................................................. 52<br />
G2 RADIATION PROCESS - FLOWCHART.......................................................................... 54<br />
G3 RADIATION CERTIFICATE ............................................................................................. 55<br />
H1 EXCAVATION PROCEDURE........................................................................................... 56<br />
H2 EXCAVATION CERTIFICATE.......................................................................................... 58<br />
H3 EXCAVATION – FLOWCHART........................................................................................ 59<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 3 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
1 PURPOSE AND SCOPE<br />
1.1 Purpose<br />
This <strong>Standard</strong> details the requirements of the<br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong> System for application at all<br />
WMC Resources owned and operated sites.<br />
The purpose is <strong>to</strong>:<br />
• Authorise and control high-risk work<br />
designated as requiring a ‘<strong>Work</strong> <strong>Permit</strong>’<br />
• Provide a process for competent<br />
personnel <strong>to</strong> authorise progress of highrisk<br />
work<br />
• Ensure that all hazards are identified and<br />
that appropriate controls are in place and<br />
communicated prior <strong>to</strong> work commencing<br />
• Provide a formal hand-over process <strong>to</strong><br />
acknowledge that all hazards have been<br />
addressed<br />
• Ensure that personnel carrying out the<br />
work are aware of the exact scope of<br />
work and the hazard controls required<br />
• Ensure the impact of work on other tasks<br />
and the Operations is unders<strong>to</strong>od<br />
• Provide a formal hand-back process <strong>to</strong><br />
ensure the work area is safe <strong>to</strong> return <strong>to</strong><br />
normal duties when the work is<br />
completed<br />
• Provide a process for controlling the<br />
safety of specific types of work that, due<br />
<strong>to</strong> circumstances, have been classified<br />
as lower risk work (e.g. some Hot <strong>Work</strong><br />
and Confined Space inspection activities)<br />
• Provide a record of a safe system of<br />
work.<br />
1.2 Scope<br />
This <strong>Standard</strong> defines a comprehensive <strong>Permit</strong><br />
<strong>to</strong> <strong>Work</strong> System. This document includes<br />
Appendices that describe particular hazard<br />
controls and other requirements that need <strong>to</strong><br />
be considered when establishing work controls<br />
for designated high-risk work activities. This<br />
set of high-risk work activities includes:<br />
• Intrusive work on systems containing<br />
energy (Appendix D1)<br />
• <strong>Work</strong>ing in a Confined Space (Appendix<br />
E1)<br />
• Hot <strong>Work</strong> (Appendix F1)<br />
• <strong>Work</strong>ing with or near Radiation Sources<br />
(Appendix G1)<br />
• Excavation Tasks (Appendix H1).<br />
Not all work in these areas will be designated<br />
as high-risk and require a <strong>Work</strong> <strong>Permit</strong>. The<br />
site is required <strong>to</strong> establish criteria that allows<br />
personnel <strong>to</strong> judge when a <strong>Work</strong> <strong>Permit</strong> is<br />
required versus alternative work controls.<br />
The specific requirements for working at<br />
heights is covered in <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
08 Safe <strong>Work</strong> at Height.<br />
Similarly there may be other activities deriving<br />
from risk assessment processes that will need<br />
a <strong>Work</strong> <strong>Permit</strong>. Typical examples of additional<br />
high-risk work are working with mineral fibres<br />
and removal of grid mesh/platform walkways in<br />
operational areas.<br />
2 GENERAL<br />
The <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> System describes a<br />
rigorous process for managing designated<br />
high-risk work.<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 4 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
Not all high-risk work requires a <strong>Work</strong> <strong>Permit</strong>.<br />
For instance risk assessment can lead <strong>to</strong> a low<br />
risk designation for inspection of certain<br />
confined spaces and some hot work activities.<br />
For such examples, this <strong>Standard</strong> provides for<br />
a simplified process of safe work authorisation<br />
through the use of appropriate stand-alone<br />
‘<strong>Work</strong> Authorisation’ tags. In all cases the use<br />
of a <strong>Work</strong> Authorisation shall require a formal<br />
risk assessment confirming the application of<br />
the tag and the availability of a THA or<br />
<strong>Standard</strong> <strong>Work</strong> Procedure. This simplified<br />
process is covered in respective Appendices<br />
E1 and F1.<br />
Table 1 provides general guidance on when a<br />
<strong>Work</strong> <strong>Permit</strong> is required.<br />
Reference <strong>to</strong> this table can be made, as a<br />
guide for each site <strong>to</strong> decide and document<br />
which types of high-risk work requires a <strong>Work</strong><br />
<strong>Permit</strong>. This analysis shall be formal and<br />
consider the type of activity as well as different<br />
geographical areas of the site in which the<br />
activity takes place. The results of this process<br />
shall be effectively communicated <strong>to</strong> provide<br />
clarity <strong>to</strong> those personnel required <strong>to</strong> decide<br />
whether a <strong>Work</strong> <strong>Permit</strong> is required <strong>to</strong> progress<br />
work.<br />
All work that does not require the higher level<br />
of rigour that a <strong>Work</strong> <strong>Permit</strong> provides shall be<br />
carried out using the Take Time, Take Charge<br />
(TTTC) process, a Task <strong>Hazard</strong> Analysis<br />
(THA), <strong>Standard</strong> <strong>Work</strong> Procedure (SWP) or the<br />
use of a <strong>Work</strong> Authorisation tag, or<br />
combinations of these as appropriate.<br />
3 DOCUMENT STRUCTURE<br />
The <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> System encompasses the<br />
following core documents:<br />
• A <strong>Work</strong> <strong>Permit</strong><br />
• Certificates for designated high-risk<br />
work:<br />
- Isolation of energy (including<br />
reference <strong>to</strong> High Voltage work<br />
under SP 25 Procedures)<br />
- Confined Space Entry<br />
- Hot <strong>Work</strong><br />
- Radiation<br />
- Excavation.<br />
Note: Certificates are documents that<br />
define the core preparations required for<br />
work <strong>to</strong> proceed and do not, by<br />
themselves, authorise work <strong>to</strong> proceed.<br />
They cannot stand-alone and shall<br />
always be accompanied by a covering<br />
<strong>Work</strong> <strong>Permit</strong>.<br />
• <strong>Work</strong> Authorisation tags for inspection of<br />
low risk Confined Spaces and performing<br />
low risk hot work. These tags can standalone<br />
• <strong>Work</strong> <strong>Permit</strong> Register when using a<br />
Block Isolation.<br />
4 SYSTEM OVERVIEW<br />
Core functions of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> System<br />
are summarised in Flow Chart Appendix A.<br />
Following the identification of a work need and<br />
the definition of a scope of work an<br />
assessment of the hazard controls required <strong>to</strong><br />
ensure safe work should be conducted.<br />
If this analysis leads <strong>to</strong> a decision <strong>to</strong> initiate the<br />
full <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> process, the following core<br />
activities shall take place:<br />
• Initial preparation of the <strong>Work</strong> <strong>Permit</strong><br />
(this process is managed by the Service<br />
Provider)<br />
• Final agreement <strong>to</strong> the required hazard<br />
controls and completion of all <strong>Work</strong><br />
<strong>Permit</strong> documentation (this process is<br />
managed by equipment/plant owner)<br />
• Implementation of agreed hazard<br />
controls by authorised personnel<br />
• Authorisation and issue of the <strong>Work</strong><br />
<strong>Permit</strong> by the <strong>Permit</strong> Issuer <strong>to</strong> a<br />
representative of the work team (<strong>Permit</strong><br />
Accep<strong>to</strong>r). This is the hand-over process.<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 5 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
• The <strong>Permit</strong> Accep<strong>to</strong>r ensures the work<br />
team understands the extent of hazard<br />
controls in place and assumes control of<br />
work activities for the duration of work.<br />
The <strong>Work</strong> <strong>Permit</strong> hazard controls shall<br />
remain in place whilst work is in<br />
progress.<br />
• When the agreed work is complete the<br />
<strong>Permit</strong> Accep<strong>to</strong>r leaves the work site<br />
clean and safe and hands back the <strong>Work</strong><br />
<strong>Permit</strong> <strong>to</strong> the <strong>Permit</strong> Issuer.<br />
• The <strong>Permit</strong> Issuer resumes control over<br />
the equipment / plant and progresses the<br />
removal of any temporary hazard<br />
controls established for the task before<br />
returning <strong>to</strong> normal operations.<br />
5 TRAINING AND COMPETENCY<br />
Structured competency-based training shall be<br />
given <strong>to</strong> all users of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
System. Competency shall be reassessed at a<br />
maximum interval of two years.<br />
<strong>Standard</strong>ised training modules shall be<br />
established for the following:<br />
• <strong>Permit</strong> Issuer<br />
• Isola<strong>to</strong>r (including Isolation Checker)<br />
• <strong>Permit</strong> Accep<strong>to</strong>r<br />
• Confined Space Entry<br />
• Confined Space Stand-by Person<br />
• Hot <strong>Work</strong> and Fire Safety (including Fire<br />
Watch)<br />
• <strong>Work</strong> Team Member.<br />
<strong>Permit</strong> Issuers and Isola<strong>to</strong>rs require detailed<br />
knowledge of the area in which they are<br />
issuing permits or carrying out isolations. Such<br />
knowledge shall be achieved as a prerequisite<br />
<strong>to</strong> gaining <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> competencies.<br />
Competency records for all personnel shall be<br />
maintained on a site register and the extent of<br />
specific competency for individuals shall be<br />
clearly known <strong>to</strong> users of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
System.<br />
6 MONITORING AND AUDITS<br />
It is a requirement of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
System that <strong>Permit</strong> Issuers, or a competent<br />
delegate, perform regular inspections of active<br />
<strong>Work</strong> <strong>Permit</strong>s in the work site. The frequency<br />
and degree of detail included in this inspection<br />
should be based on the level of risk and<br />
complexity of the task being performed. The<br />
inspection shall include:<br />
• Review of the <strong>Work</strong> <strong>Permit</strong><br />
documentation<br />
• Confirmation that the actual work being<br />
performed is consistent with the defined<br />
hazard controls in place. This does not<br />
require a detailed knowledge of the<br />
technical aspects of work being done.<br />
• Confirmation that the hazard controls<br />
defined in the <strong>Work</strong> <strong>Permit</strong> remain in<br />
place.<br />
Each site shall conduct regular (at least<br />
quarterly) compliance audits of the <strong>Permit</strong> <strong>to</strong><br />
<strong>Work</strong> System.<br />
A person independent of the area in which<br />
<strong>Work</strong> <strong>Permit</strong>s are issued shall carry out a<br />
compliance audit of the over-all functioning of<br />
the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> System at least annually.<br />
7 WORK PERMIT PROCESS<br />
Effective work planning and risk assessment<br />
processes are essential <strong>to</strong> the smooth and<br />
safe execution of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> System.<br />
7.1 Scope of <strong>Work</strong><br />
For any potentially hazardous work activity<br />
there shall be a clearly defined Scope of <strong>Work</strong><br />
(SOW). This SOW shall:<br />
• Be defined by the Service Provider in<br />
consultation as appropriate with a <strong>Permit</strong><br />
Issuer (or another equipment / plant<br />
owner representative)<br />
• Enable identification of all hazards<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 6 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
• Be used <strong>to</strong> determine resource<br />
requirements (people, materials etc.) and<br />
estimated time <strong>to</strong> complete the task<br />
• Enable identification of which particular<br />
hazard control(s) is most appropriate (i.e.<br />
<strong>Work</strong> <strong>Permit</strong>s / Certificates, <strong>Work</strong><br />
Authorisation tags, <strong>Standard</strong> <strong>Work</strong><br />
Procedures or THA).<br />
7.2 <strong>Hazard</strong> Identification and Assessment<br />
Using the scope of work as a basis, the<br />
Service Provider shall make the initial<br />
identification of hazards associated with<br />
conducting the work and determine necessary<br />
controls. Assistance in developing this can be<br />
sought from the <strong>Permit</strong> Issuer or their<br />
representative.<br />
Tools used <strong>to</strong> identify necessary hazard<br />
controls will vary according <strong>to</strong> the risk<br />
exposure and range from application of TTTC<br />
<strong>to</strong> use of a THA and other risk assessments.<br />
Some hazard controls will be defined in a<br />
<strong>Standard</strong> <strong>Work</strong> Procedure and other work<br />
defined <strong>to</strong> be at the high-risk exposure level<br />
will require the increased level of rigour of a<br />
<strong>Work</strong> <strong>Permit</strong> and associated Certificates.<br />
The site criteria established for deciding when<br />
a <strong>Work</strong> <strong>Permit</strong> is required (see guidance in<br />
Table 1) shall be used <strong>to</strong> help in this process.<br />
<strong>Work</strong> that is determined <strong>to</strong> be low risk<br />
inspection of certain confined spaces or low<br />
risk hot work shall proceed with the use of<br />
<strong>Work</strong> Authorisation Tags as described in<br />
respective Appendices E1 and F1.<br />
<strong>Work</strong> that is determined as not requiring a<br />
<strong>Work</strong> <strong>Permit</strong> or a <strong>Work</strong> Authorisation Tag shall<br />
proceed with appropriate use of TTTC / THA /<br />
<strong>Standard</strong> <strong>Work</strong> Procedure controls and<br />
processes.<br />
• The Service Provider confirms that a<br />
THA(s) or <strong>Standard</strong> <strong>Work</strong> Procedure(s) is<br />
available for the defined scope of work<br />
• A final assessment of the number of<br />
<strong>Work</strong> <strong>Permit</strong>s/Certificates required for the<br />
particular scope of work shall be<br />
conducted. Issues <strong>to</strong> be considered are:<br />
- The degree of confidence that the<br />
scope of work is complete<br />
- Whether multiple crews will work<br />
under a common <strong>Work</strong> <strong>Permit</strong> (see<br />
reference following)<br />
- If a Block Isolation is applicable<br />
(see section 7.5.2)<br />
- If Testing or jogging is applicable<br />
(see section 7.6.6).<br />
• <strong>Work</strong> <strong>Permit</strong>s shall be specific <strong>to</strong> the<br />
scope of work. Generally they are raised<br />
for discrete tasks and do not span<br />
several different work crews or unrelated<br />
tasks. However, a <strong>Work</strong> <strong>Permit</strong> can be<br />
raised for multi-disciplined crews<br />
conducting different work on the same<br />
equipment in the same geographical<br />
area, in certain circumstances. For<br />
example crews working on a au<strong>to</strong>clave, a<br />
bank of flotation cells or a conveyor<br />
system with little potential impact on<br />
other work activities can be covered<br />
under one <strong>Work</strong> <strong>Permit</strong>. Separate THA’s<br />
or <strong>Standard</strong> <strong>Work</strong> Procedures would<br />
cover each of the different tasks. (Note<br />
that the <strong>Permit</strong> Accep<strong>to</strong>r shall accept this<br />
<strong>Work</strong> <strong>Permit</strong> on behalf of all separate<br />
work crews and must fulfil all of the<br />
normal accountabilities of the Accep<strong>to</strong>r).<br />
7.3 <strong>Work</strong> <strong>Permit</strong> Document Preparation<br />
If a decision is taken that a <strong>Work</strong> <strong>Permit</strong> is<br />
required <strong>to</strong> authorise progress of defined work,<br />
the following shall occur:<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 7 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
• Using a full knowledge of the scope of<br />
work and hazard controls necessary <strong>to</strong><br />
complete the work, the Service Provider<br />
should commence filling out the first two<br />
Sections of the <strong>Work</strong> <strong>Permit</strong> and submit<br />
<strong>to</strong> the <strong>Permit</strong> Issuer (see Appendix B<br />
<strong>Work</strong> <strong>Permit</strong> form). This is best done as<br />
a consultative process between the<br />
Service Provider and the <strong>Permit</strong> Issuer<br />
(or other equipment/plant owner<br />
representative).<br />
• The <strong>Permit</strong> Issuer shall review the <strong>Work</strong><br />
<strong>Permit</strong> request (including the THA) and<br />
agree the final set of hazard controls.<br />
The <strong>Permit</strong> Issuer can include additional<br />
controls as appropriate.<br />
• If the planned work incorporates any<br />
“change” (as defined in the EHS<br />
Management System <strong>Standard</strong> #5<br />
Management of Change) the <strong>Permit</strong><br />
Issuer shall confirm with the Service<br />
Provider that a ‘Change Management<br />
Plan’ has been implemented. The <strong>Permit</strong><br />
Issuer is not accountable for the<br />
management of the change management<br />
process, simply confirming that a change<br />
implementation plan is in place if<br />
required. If the ‘Change’ has not been<br />
signed off, the <strong>Permit</strong> Issuer shall refer<br />
the <strong>Work</strong> <strong>Permit</strong> request back <strong>to</strong> the<br />
Service Provider.<br />
• The <strong>Permit</strong> Issuer shall complete the<br />
necessary <strong>Work</strong> <strong>Permit</strong> document<br />
preparation (including any <strong>Work</strong> <strong>Permit</strong><br />
Certificates) ensuring that all hazards<br />
due <strong>to</strong> workplace interactions or unique<br />
aspects are identified and controls<br />
indicated.<br />
7.4 <strong>Work</strong>place Preparation<br />
The <strong>Permit</strong> Issuer shall initiate implementation<br />
of the workplace hazard controls as identified<br />
in the <strong>Work</strong> <strong>Permit</strong> and Certificates.<br />
<strong>Hazard</strong> controls identified on the <strong>Work</strong><br />
<strong>Permit</strong>/Certificates shall be carried out<br />
according <strong>to</strong> the requirements in their<br />
respective Appendices D1 <strong>to</strong> H1. Authorised<br />
personnel shall establish these preparations.<br />
7.5 <strong>Work</strong> <strong>Permit</strong> Issue and Acceptance<br />
7.5.1 <strong>Work</strong> <strong>Permit</strong>s<br />
The <strong>Permit</strong> Issuer shall confirm that all defined<br />
hazard controls have been established and<br />
that authorised signa<strong>to</strong>ries have completed<br />
Certificate requirements.<br />
The <strong>Permit</strong> Issuer shall confirm that the<br />
workplace is safe <strong>to</strong> commence work. This<br />
may involve a physical check of the work<br />
environment by the <strong>Permit</strong> Issuer or<br />
confirmation via a competent source.<br />
The <strong>Permit</strong> Issuer shall brief the <strong>Permit</strong><br />
Accep<strong>to</strong>r (Service provider’s representative for<br />
the work team) on the hazard controls in place.<br />
The <strong>Permit</strong> Issuer shall sign the <strong>Work</strong> <strong>Permit</strong><br />
Authorisation section of the <strong>Work</strong> <strong>Permit</strong> (Note:<br />
the <strong>Permit</strong> Issuer shall not act as <strong>Permit</strong><br />
Accep<strong>to</strong>r for the same <strong>Work</strong> <strong>Permit</strong>).<br />
Once the <strong>Permit</strong> Accep<strong>to</strong>r understands the<br />
hazard controls in place they shall sign the<br />
<strong>Permit</strong> Acceptance section of the <strong>Work</strong> <strong>Permit</strong><br />
and take the original copy of all permit<br />
documentation (including any Certificates and<br />
THA/SWP) <strong>to</strong> the work site.<br />
The <strong>Work</strong> <strong>Permit</strong> original and associated<br />
documentation shall be clearly displayed in the<br />
<strong>Permit</strong> Control Board (see Section 7 of<br />
Appendix D1) at the work site.<br />
A duplicate copy of the <strong>Work</strong> <strong>Permit</strong> shall be<br />
retained in the <strong>Permit</strong> Office as a record of a<br />
‘live’ permit.<br />
7.5.2 <strong>Work</strong> <strong>Permit</strong>s with a Block Isolation<br />
When a number of different tasks are being<br />
completed under separate <strong>Work</strong> <strong>Permit</strong>s with<br />
all tasks sharing the same Isolation Certificate,<br />
the isolation is called a Block Isolation (see<br />
Appendix D1 Section 4).<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 8 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
All <strong>Work</strong> <strong>Permit</strong>s associated with a Block<br />
Isolation shall be recorded on a <strong>Work</strong> <strong>Permit</strong><br />
Register by the <strong>Permit</strong> Issuer and signed on<br />
when issued and off when the <strong>Work</strong> <strong>Permit</strong> is<br />
closed (see <strong>Work</strong> <strong>Permit</strong> Register in Appendix<br />
C).<br />
No de-isolation of any points within the Block<br />
Isolation shall commence until all <strong>Work</strong> <strong>Permit</strong>s<br />
have been signed off on the <strong>Work</strong> <strong>Permit</strong><br />
Register by the <strong>Permit</strong> Issuer.<br />
Note: If a Testing Program is in place for any<br />
one of the <strong>Work</strong> <strong>Permit</strong>s under a Block<br />
Isolation then all work shall cease and the<br />
procedure as defined in Section 9 of Appendix<br />
D1 followed.<br />
7.6 <strong>Work</strong> Progression<br />
7.6.1 <strong>Work</strong> Commencement<br />
The <strong>Permit</strong> Accep<strong>to</strong>r shall brief the work team<br />
about the hazard controls already in place and<br />
any additional controls required for the job.<br />
The THA and <strong>Work</strong> <strong>Permit</strong> shall be used as a<br />
basis for this briefing. As part of this process<br />
the THA shall be given a final review<br />
The <strong>Permit</strong> Accep<strong>to</strong>r seeks <strong>to</strong> clarify any<br />
issues team members have about the hazard<br />
controls in place and asks them <strong>to</strong> sign on<strong>to</strong><br />
the <strong>Work</strong> <strong>Permit</strong> <strong>to</strong> acknowledge the fact that<br />
they have been briefed, they understand the<br />
hazard controls in place and will comply with<br />
the requirements.<br />
The <strong>Permit</strong> Accep<strong>to</strong>r checks that controls are<br />
maintained during work progress. If any<br />
conditions are breached, all work shall cease<br />
and the <strong>Permit</strong> Accep<strong>to</strong>r shall refer the matter<br />
<strong>to</strong> the <strong>Permit</strong> Issuer.<br />
If the <strong>Permit</strong> Accep<strong>to</strong>r accepts multiple <strong>Work</strong><br />
<strong>Permit</strong>s they should not perform tasks as a<br />
working team member under any one of the<br />
<strong>Work</strong> <strong>Permit</strong>s.<br />
Note: When energies are isolated as part of<br />
hazard controls, each work team member shall<br />
also attach their Personal Danger Tag with a<br />
lock <strong>to</strong> the <strong>Permit</strong> Control Board, as per the<br />
requirements of Appendix D1 – Isolations.<br />
7.6.2 Shift Handover<br />
If work covered by a <strong>Work</strong> <strong>Permit</strong> proceeds<br />
from one work shift <strong>to</strong> another, the following<br />
shall occur:<br />
• The off going <strong>Permit</strong> Accep<strong>to</strong>r shall<br />
check that all work team members<br />
remove their Personal Danger Tag if<br />
energies are isolated<br />
• A formal handover occurs between the<br />
off going and the new <strong>Permit</strong> Accep<strong>to</strong>r<br />
with respective signatures being<br />
recorded on the <strong>Work</strong> <strong>Permit</strong>. During this<br />
handover the new <strong>Permit</strong> Accep<strong>to</strong>r is<br />
briefed on the hazard controls in place<br />
and the status of work<br />
• An informal handover between the off<br />
going and new <strong>Permit</strong> Issuer shall occur<br />
• The new shift <strong>Permit</strong> Accep<strong>to</strong>r seeks <strong>to</strong><br />
clarify any issues team members have<br />
about the hazard controls in place and<br />
asks them <strong>to</strong> sign on<strong>to</strong> the <strong>Work</strong> <strong>Permit</strong><br />
<strong>to</strong> acknowledge their understanding and<br />
acceptance <strong>to</strong> comply with requirements.<br />
7.6.3 <strong>Work</strong> <strong>Permit</strong> Relinquishment<br />
If a face-<strong>to</strong>-face handover from the off going <strong>to</strong><br />
the new <strong>Permit</strong> Accep<strong>to</strong>r is not possible, then<br />
the following shall occur:<br />
• The off going <strong>Permit</strong> Accep<strong>to</strong>r checks<br />
that all work team members have<br />
removed their Personal Danger Tag if<br />
energies are isolated<br />
• The <strong>Permit</strong> Accep<strong>to</strong>r shall return the<br />
<strong>Permit</strong> Control Board <strong>to</strong> the <strong>Permit</strong> Issuer<br />
and provide a formal brief on work status<br />
and sign off in the ‘Change of <strong>Permit</strong><br />
Accep<strong>to</strong>r’ section of <strong>Work</strong> <strong>Permit</strong><br />
• The receiving <strong>Permit</strong> Issuer shall sign in<br />
the ‘Relinquishment <strong>to</strong> <strong>Permit</strong> Issuer’<br />
section of the <strong>Work</strong> <strong>Permit</strong> and indicate<br />
the reason<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 9 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
• The off going / new <strong>Permit</strong> Issuers carry<br />
out a face-<strong>to</strong>-face hand over with a full<br />
brief on hazard controls in place and the<br />
general work status<br />
• When the new shift <strong>Permit</strong> Accep<strong>to</strong>r is<br />
available the new <strong>Permit</strong> Issuer shall<br />
provide a face-<strong>to</strong>-face briefing on the<br />
hazard controls in place and re-issue the<br />
<strong>Work</strong> <strong>Permit</strong> by signing as the issuing<br />
<strong>Permit</strong> Issuer in the ‘Relinquishment <strong>to</strong><br />
<strong>Permit</strong> Issuer’ section. The <strong>Permit</strong><br />
Accep<strong>to</strong>r accepts by signing in the<br />
‘Change of <strong>Permit</strong> Accep<strong>to</strong>r’ section of<br />
<strong>Work</strong> <strong>Permit</strong>.<br />
• The new shift <strong>Permit</strong> Accep<strong>to</strong>r shall brief<br />
the work team members and ask them <strong>to</strong><br />
sign on<strong>to</strong> the <strong>Work</strong> <strong>Permit</strong> prior <strong>to</strong><br />
commencing work.<br />
7.6.4 Scope of <strong>Work</strong> Change<br />
If the scope of work changes during work<br />
progress the <strong>Permit</strong> Accep<strong>to</strong>r shall consult<br />
their line supervisor and the <strong>Permit</strong> Issuer as<br />
necessary and <strong>to</strong>gether consider the impact of<br />
the proposed changes on the existing hazard<br />
controls in place and the potential for additional<br />
hazards. The THA shall be reviewed as part of<br />
this process.<br />
If this analysis indicates a need <strong>to</strong> change an<br />
existing <strong>Work</strong> <strong>Permit</strong> condition or the need for<br />
additional controls and the newly defined work<br />
is ready <strong>to</strong> commence, all work shall cease.<br />
The <strong>Permit</strong> Accep<strong>to</strong>r shall return the <strong>Work</strong><br />
<strong>Permit</strong> <strong>to</strong> the <strong>Permit</strong> Issuer and indicate the<br />
scope of work change (the change is<br />
highlighted in Scope of <strong>Work</strong> section of <strong>Permit</strong>)<br />
and request any additional hazard controls.<br />
The <strong>Permit</strong> Issuer shall vet the request for<br />
additional controls and initiate implementation<br />
as necessary. These are recorded / added <strong>to</strong><br />
the existing <strong>Work</strong> <strong>Permit</strong> and highlighted.<br />
When all additional hazard control preparations<br />
have been completed the <strong>Permit</strong> Issuer shall<br />
sign and date all changes made on the <strong>Work</strong><br />
<strong>Permit</strong>. Authorisation is then provided <strong>to</strong> the<br />
<strong>Permit</strong> Accep<strong>to</strong>r for work <strong>to</strong> proceed.<br />
The <strong>Permit</strong> Accep<strong>to</strong>r shall take <strong>Permit</strong><br />
documents <strong>to</strong> the worksite, brief the work team<br />
members on any changed hazard controls and<br />
indicate that it is safe <strong>to</strong> return <strong>to</strong> work.<br />
7.6.5 <strong>Work</strong> <strong>Permit</strong> Suspension<br />
If there is a need <strong>to</strong> suspend work for a<br />
number of shifts due <strong>to</strong> delays in material or<br />
resource availability the following shall occur:<br />
• <strong>Permit</strong> Accep<strong>to</strong>r leaves the worksite in a<br />
safe state, returns the <strong>Permit</strong> Control<br />
Board and associated documentation <strong>to</strong><br />
the <strong>Permit</strong> Issuer with a briefing on<br />
reason for suspension and signs off the<br />
<strong>Work</strong> <strong>Permit</strong><br />
• The <strong>Permit</strong> Issuer signs in the<br />
‘Relinquishment <strong>to</strong> <strong>Permit</strong> Issuer’ section<br />
of <strong>Work</strong> <strong>Permit</strong> and records the reason<br />
for suspension<br />
• When the <strong>Work</strong> <strong>Permit</strong> is required <strong>to</strong> be<br />
re-instated the, <strong>Permit</strong> Issuer arranges<br />
for an Isolation Checker <strong>to</strong> revalidate the<br />
isolations and sign the original Isolation<br />
Certificate<br />
• The <strong>Permit</strong> Issuer shall re-issue the <strong>Work</strong><br />
<strong>Permit</strong> by signing in the ‘Relinquishment<br />
<strong>to</strong> <strong>Permit</strong> Issuer’ section of the <strong>Work</strong><br />
<strong>Permit</strong>.<br />
7.6.6 Testing<br />
When energies are isolated and there is a<br />
need <strong>to</strong> carry out testing or re-positioning of<br />
equipment during work progress and<br />
temporary removal of isolations is required,<br />
reference should be made <strong>to</strong> Appendix D1<br />
Section 9.<br />
7.7 <strong>Work</strong> <strong>Permit</strong> Hand-back<br />
When work defined in the scope of work is<br />
complete or there is a requirement <strong>to</strong> close the<br />
<strong>Work</strong> <strong>Permit</strong>, the following shall occur:<br />
• The <strong>Permit</strong> Accep<strong>to</strong>r ensures the work<br />
site is left in a clean and safe state<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 10 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
• If energies have been isolated, all work<br />
team members shall remove their<br />
Personal Danger Tags<br />
• The <strong>Permit</strong> Accep<strong>to</strong>r shall return the<br />
<strong>Work</strong> <strong>Permit</strong>/documentation and <strong>Permit</strong><br />
Control Board <strong>to</strong> the <strong>Permit</strong> Issuer and<br />
indicate that the work is complete and<br />
the equipment is fit <strong>to</strong> be returned <strong>to</strong><br />
work or alternately, whether there are<br />
any restrictions on its use<br />
• The <strong>Permit</strong> Accep<strong>to</strong>r shall sign the hand<br />
back section of the <strong>Work</strong> <strong>Permit</strong><br />
• The <strong>Permit</strong> Issuer shall assemble all of<br />
the <strong>Work</strong> <strong>Permit</strong> documentation and<br />
initiate the removal of hazard controls<br />
originally installed for the work <strong>to</strong> take<br />
place<br />
• In the case of work done in a confined<br />
space the <strong>Permit</strong> Issuer shall inspect the<br />
confined space <strong>to</strong> ensure that removal of<br />
isolations and closure can proceed<br />
• Once the work environment status has<br />
been returned <strong>to</strong> a state of readiness for<br />
return <strong>to</strong> normal duties, the <strong>Permit</strong> Issuer<br />
shall sign the permit closure section of<br />
the <strong>Work</strong> <strong>Permit</strong> on both original and<br />
duplicate copy<br />
• The <strong>Permit</strong> Issuer shall file the <strong>Work</strong><br />
<strong>Permit</strong> original and associated<br />
certificates in compliance with WMC<br />
Resources document retention policy.<br />
8 RESPONSIBILITIES<br />
The following general roles have been<br />
identified within the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> System.<br />
Specific other roles have been identified and<br />
described in respective Appendices.<br />
8.1 <strong>Permit</strong> Issuer<br />
Competency required:<br />
• A detailed knowledge of the work<br />
environment and the process and area<br />
related hazards<br />
• A competent knowledge of the isolation<br />
requirements for specific plant or<br />
equipment i.e. competent as an Isola<strong>to</strong>r<br />
• A competent knowledge of the <strong>Permit</strong> <strong>to</strong><br />
<strong>Work</strong> System.<br />
Is responsible for:<br />
• Reviewing the <strong>Work</strong> <strong>Permit</strong> request from<br />
the Service Provider and agreeing the<br />
final set of hazard controls for the<br />
defined scope of work<br />
• Verifying that a change implementation<br />
plan has been implemented for<br />
‘Management of Change’ initiatives<br />
covered by the <strong>Work</strong> <strong>Permit</strong><br />
• Initiating implementation of the <strong>Work</strong><br />
<strong>Permit</strong> hazard controls defined in<br />
Certificates. When isolations are<br />
involved, develop the Isolation<br />
Certificate/Instruction for the specific<br />
scope of work<br />
• Maintaining control over the isolated<br />
equipment (through control of isolation<br />
padlocks)<br />
• Confirming that all agreed hazard<br />
controls have been implemented and all<br />
necessary documentation signed off by<br />
authorised personnel<br />
• Confirming that the work site is safe for<br />
work and that any operational activities<br />
do not compromise safety in the work<br />
area<br />
• Briefing the <strong>Permit</strong> Accep<strong>to</strong>r on the<br />
hazard controls that have been put in<br />
place<br />
• Authorising issue of the <strong>Work</strong> <strong>Permit</strong><br />
• Managing the <strong>Permit</strong> Issuer’s lock and<br />
key cabinet (see Appendix D1 for details)<br />
• Being aware of the work being carried<br />
out and any interactions from adjacent<br />
work activities or hazards<br />
• Ensuring routine inspections of the work<br />
environment are carried out<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 11 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
• Ensuring copies of all <strong>Work</strong> <strong>Permit</strong>s are<br />
maintained in the <strong>Permit</strong> Office<br />
• Handing-over the control of active <strong>Work</strong><br />
<strong>Permit</strong>s <strong>to</strong> a new shift <strong>Permit</strong> Issuer<br />
• Initiating removal of hazard controls<br />
following hand back of the <strong>Work</strong> <strong>Permit</strong><br />
• Authorising closure of the <strong>Work</strong> <strong>Permit</strong><br />
by signing off on both original and<br />
duplicate copies of the <strong>Work</strong> <strong>Permit</strong><br />
• Filing <strong>Work</strong> <strong>Permit</strong> documentation<br />
originals in compliance with WMC<br />
Resources document retention policy.<br />
8.2 Isola<strong>to</strong>r<br />
Competency required:<br />
• Maintaining a technical and / or<br />
legislative ability <strong>to</strong> be able <strong>to</strong> perform<br />
and prove isolations<br />
• A competent knowledge of the isolation<br />
requirements for specific plant or<br />
equipment<br />
• A general knowledge of the <strong>Permit</strong> <strong>to</strong><br />
<strong>Work</strong> System and a competent<br />
knowledge of the Isolations Procedure.<br />
Is responsible for:<br />
• Establishing isolations of plant or<br />
equipment according <strong>to</strong> the Isolation<br />
Certificate/Instruction <strong>to</strong> prevent<br />
inadvertent re-energisation which may<br />
cause injury <strong>to</strong> others or damage <strong>to</strong> plant<br />
or equipment<br />
Note: In the situation in which the <strong>Permit</strong><br />
Issuer performs the role of the Isolation<br />
Checker, the Isola<strong>to</strong>r shall confirm that<br />
the <strong>Permit</strong> Issuer defined Isolation<br />
Certificate/Instruction is appropriate for<br />
the defined scope of work.<br />
• De-isolating equipment according <strong>to</strong><br />
<strong>Permit</strong> Issuer requirements.<br />
8.3 Isolation Checker<br />
Competency required:<br />
• Achieving the competency of an Isola<strong>to</strong>r.<br />
Is responsible for:<br />
• Confirming that the <strong>Permit</strong> Issuer defined<br />
Isolation Certificate / Isolation Instruction<br />
is appropriate for the defined scope of<br />
work<br />
• Validating that isolation of energies has<br />
been completed according <strong>to</strong> the<br />
requirements of the Isolation<br />
Certificate/Isolation Instruction and the<br />
Isolation Procedure.<br />
8.4 Service Provider / <strong>Permit</strong> Reques<strong>to</strong>r<br />
Competency required:<br />
• A knowledge of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
System<br />
• Understanding the work planning<br />
processes.<br />
Is responsible for:<br />
• Developing a clear scope of work<br />
• Making the initial determination of hazard<br />
controls required for work <strong>to</strong> proceed and<br />
initiating <strong>Work</strong> <strong>Permit</strong> documentation.<br />
8.5 <strong>Permit</strong> Accep<strong>to</strong>r<br />
Competency required:<br />
• A competent knowledge of the work <strong>to</strong> be<br />
completed as per the scope of work<br />
• A knowledge of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
System<br />
• A competent knowledge of requirements<br />
for Certificates that they will accept.<br />
Is responsible for:<br />
• Signing the permit acceptance on the<br />
<strong>Work</strong> <strong>Permit</strong> once they understand the<br />
extent of hazard controls that have been<br />
established<br />
• Retaining the original of <strong>Work</strong> <strong>Permit</strong><br />
documentation in the <strong>Permit</strong> Control<br />
Board at the work site<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 12 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
• Briefing the work site team on the hazard<br />
controls in place and reviewing the THA<br />
• Ensuring each work team member signs<br />
on <strong>to</strong> the <strong>Work</strong> <strong>Permit</strong> (and attach their<br />
Personal Danger Tag if energies<br />
isolated)<br />
• Ensuring that work remains within the<br />
defined scope of work<br />
• Ceasing work and informing the <strong>Permit</strong><br />
Issuer when any hazard controls have<br />
been breached<br />
• Handing over the work activity and <strong>Work</strong><br />
<strong>Permit</strong> <strong>to</strong> a new <strong>Permit</strong> Accep<strong>to</strong>r at shift<br />
change or during work progress as<br />
necessary<br />
• Relinquishing and suspending a <strong>Work</strong><br />
<strong>Permit</strong> as required<br />
• Inspecting the work site before<br />
commencing/recommencing work at end<br />
of shift or completion of work<br />
• Confirming that the work site is left in a<br />
clean and safe state when work is<br />
completed<br />
• Checking that all work team members<br />
remove their Personal Danger Tags<br />
when work is complete, if isolations have<br />
been involved<br />
• When work is complete, returning the<br />
<strong>Work</strong> <strong>Permit</strong> documentation and the<br />
<strong>Permit</strong> Control Board <strong>to</strong> the <strong>Permit</strong><br />
Issuer, providing a briefing on the status<br />
of work and signing off the <strong>Work</strong> <strong>Permit</strong>.<br />
8.6 <strong>Work</strong> Team Member<br />
Competency required:<br />
• Having a general understanding of the<br />
site <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> System<br />
• Completed a successful Area Induction.<br />
Is responsible for:<br />
• Understanding the job scope of work and<br />
the hazard controls that have been<br />
implemented for the defined work<br />
• Participating in the review or<br />
development of the job THA<br />
• Signing on <strong>to</strong> the <strong>Work</strong> <strong>Permit</strong> and, if<br />
applicable, attaching their Personal<br />
Danger Tag <strong>to</strong> the lock box within the<br />
<strong>Permit</strong> Control Board<br />
• Ensuring that hazard controls defined in<br />
the <strong>Work</strong> <strong>Permit</strong>/Certificates are strictly<br />
followed<br />
• Leaving a clean and safe work site<br />
• If isolations are involved, removing their<br />
Personal Danger Tag when work is<br />
completed.<br />
8.7 Site General Manager<br />
Is responsible for:<br />
• Authorising the implementation of this<br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong> <strong>Standard</strong> across the site<br />
• Approving the criteria for determining<br />
what work requires a <strong>Work</strong> <strong>Permit</strong><br />
• Approving the necessary competencies<br />
for personnel fulfilling <strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
roles.<br />
9 REFERENCES<br />
AS2865<br />
AS1596<br />
AS1940<br />
AS2430<br />
Safe <strong>Work</strong>ing in Confined Space<br />
SAA LPG Code<br />
SAA Flammable & Combustible<br />
Liquids Code<br />
Classification of <strong>Hazard</strong>ous Areas<br />
AS1674 Safety in Welding & Applied<br />
Processes<br />
AS6124 Electrical Apparatus for use in the<br />
Presence of Combustible Dusts<br />
AS2275 Combustible Gas Detection<br />
Instruments for use in Explosive<br />
Atmospheres<br />
Radiation Safety Act 1975-79<br />
Radiation Safety (Transport of<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 13 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
Radioactive Substances)<br />
Regulations 1992 and various<br />
conditions imposed by the<br />
Radiological Council<br />
SP 25 High Voltage and Access<br />
Procedures<br />
EHS MS Management <strong>Standard</strong> #5 –<br />
Management of Change<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 14 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
10 TABLE 1<br />
Guide for When a <strong>Work</strong> <strong>Permit</strong> is Required<br />
Note: Each site shall decide and document which types of high-risk work require a <strong>Work</strong><br />
<strong>Permit</strong>. This analysis shall be risk based and consider the type of activity as well as<br />
different geographical areas of the site in which the activity takes place.<br />
• Tasks requiring level 2 isolation<br />
• <strong>Work</strong> in Confined Spaces<br />
• <strong>Work</strong> with High Voltage equipment<br />
WORK PERMIT REQUIRED<br />
• Hot work in Classified Areas (Class 1, Zone 0 and 1)<br />
• When isolating safety control systems or devices<br />
• All work on ionising radiation sources and working within 1 metre of radiation source (dosage based<br />
assessment. For example, work in areas or with products that emit natural radiation are excluded)<br />
• Excavation greater than 300mm in vicinity of buried services<br />
The following general criteria is provided <strong>to</strong> assist sites in deciding what other work requires a <strong>Work</strong><br />
<strong>Permit</strong>:<br />
• <strong>Work</strong> at heights<br />
• <strong>Work</strong> in designated areas<br />
• <strong>Work</strong> with special hazards<br />
• Whenever swinging blanks or blinds in hazardous systems<br />
• <strong>Work</strong> of high complexity<br />
• <strong>Work</strong> involving inexperienced personnel.<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 15 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
APPENDICES<br />
APPENDIX A<br />
APPENDIX B<br />
APPENDIX C<br />
APPENDIX D1<br />
APPENDIX D2<br />
APPENDIX E1<br />
APPENDIX E2<br />
APPENDIX E3<br />
APPENDIX E4<br />
APPENDIX F1<br />
APPENDIX F2<br />
APPENDIX F3<br />
APPENDIX G1<br />
APPENDIX G2<br />
APPENDIX G3<br />
APPENDIX H1<br />
APPENDIX H2<br />
APPENDIX H3<br />
PERMIT TO WORK – OVERVIEW FLOWCHART<br />
WORK PERMIT FORM<br />
WORK PERMIT REGISTER<br />
ISOLATION PROCEDURE<br />
ISOLATION CERTIFICATE<br />
SAFE WORKING IN CONFINED SPACE PROCEDURE<br />
CONFINED SPACE ENTRY CERTIFICATE<br />
CONFINED SPACE ENTRY WORK AUTHORISATION TAG<br />
CONFINED SPACE ENTRY EVALUATION<br />
HOT WORK PROCEDURE<br />
HOT WORK CERTIFICATE<br />
HOT WORK – WORK AUTHORISATION TAG<br />
RADIATION PROCEDURE<br />
RADIATION – FLOWCHART<br />
RADIATION CERTIFICATE<br />
EXCAVATION PROCEDURE<br />
EXCAVATION CERTIFICATE<br />
EXCAVATION – FLOWCHART<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 16 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
APPENDIX A<br />
A PERMIT TO WORK – OVERVIEW FLOWCHART<br />
<strong>Work</strong> need<br />
identified<br />
Scope of <strong>Work</strong><br />
developed<br />
including<br />
identification of<br />
hazards<br />
Area made clean<br />
and safe<br />
<strong>Work</strong> complete<br />
<strong>Permit</strong> Accep<strong>to</strong>r<br />
instructs team <strong>to</strong><br />
remove their PDT /<br />
lock (if applicable)<br />
<strong>Permit</strong> Accep<strong>to</strong>r returns<br />
<strong>Permit</strong> Control Board<br />
and briefs <strong>Permit</strong> Issuer<br />
No<br />
Is a <strong>Work</strong> <strong>Permit</strong><br />
required?<br />
Carry out work<br />
using TTTC, <strong>Work</strong><br />
Authorisation Tag<br />
or THA / SWP<br />
<strong>to</strong>ols<br />
Yes<br />
<strong>Hazard</strong> controls<br />
remain in place<br />
during work<br />
progress<br />
<strong>Permit</strong> Accep<strong>to</strong>r signs<br />
off <strong>Work</strong> <strong>Permit</strong><br />
Agree safe work<br />
precautions and<br />
prepare permit<br />
documents<br />
<strong>Work</strong> commences<br />
<strong>Permit</strong> Issuer ensures<br />
all temporary hazard<br />
controls removed<br />
Implement<br />
workplace hazard<br />
controls<br />
<strong>Work</strong>team signs on<strong>to</strong><br />
<strong>Work</strong> <strong>Permit</strong><br />
<strong>Work</strong>team attaches PDT<br />
<strong>to</strong> Lock box (if isolations<br />
involved)<br />
<strong>Permit</strong> Issuer closes<br />
<strong>Work</strong> <strong>Permit</strong><br />
<strong>Permit</strong> Issuer<br />
Briefs <strong>Permit</strong><br />
Accep<strong>to</strong>r on<br />
hazard controls<br />
<strong>Permit</strong> Accep<strong>to</strong>r<br />
briefs workteam<br />
(ie. no briefing, no<br />
work)<br />
Equipment<br />
available for<br />
normal duty<br />
<strong>Work</strong> <strong>Permit</strong> and<br />
any associated<br />
certificates issued<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 17 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
APPENDIX B<br />
B<br />
WORK PERMIT<br />
WORK PERMIT<br />
No:<br />
Plant / Area :<br />
Equipment Description:<br />
Scope of <strong>Work</strong>:<br />
Equipment No.:<br />
<strong>Work</strong> <strong>Permit</strong> Register No.:<br />
THA / SWP No.:<br />
NO WORK OUTSIDE OF THIS SCOPE MAY BE PERFORMED UNDER THIS PERMIT<br />
SPECIAL PRECAUTIONS AND CONDITIONS<br />
<strong>Work</strong> <strong>Permit</strong> certificates Y/N Number Y/N Number<br />
Isolation<br />
Excavation<br />
Confined Space Entry<br />
Radiation<br />
Hot <strong>Work</strong><br />
Testing Program<br />
Plant Change Applicable -------------<br />
Any other conditions<br />
<strong>Work</strong> <strong>Permit</strong> Authorisation<br />
I acknowledge that all prepara<strong>to</strong>ry work has been completed and that work is safe <strong>to</strong> proceed.<br />
<strong>Permit</strong> Issuer:<br />
Signature:<br />
Date:<br />
Time:<br />
I fully understand the hazard controls in place for this work <strong>to</strong> proceed.<br />
<strong>Permit</strong> Accep<strong>to</strong>r:<br />
Signature:<br />
Date:<br />
Time:<br />
<strong>Work</strong> <strong>Permit</strong> Closure<br />
I confirm that the work is complete and the work environment is in a clean and safe state.<br />
<strong>Permit</strong> Accep<strong>to</strong>r:<br />
Signature:<br />
Date:<br />
Time:<br />
I have confirmed that work is complete and the job site is safe <strong>to</strong> return <strong>to</strong> normal duty.<br />
<strong>Permit</strong> Issuer:<br />
Signature:<br />
Date:<br />
Time:<br />
AUTHORITY TRANSFER, WORKER SIGN ON REQUIREMENTS ON REAR OF THIS FORM<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 18 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
WORK PERMIT SIGNATURES (Reverse of <strong>Work</strong> <strong>Permit</strong>)<br />
CHANGE OF PERMIT ACCEPTOR:<br />
I confirm that the hazard controls as stated on this <strong>Work</strong> <strong>Permit</strong> and attached documents will be strictly<br />
observed and all persons in my work team will be informed of them<br />
Dat<br />
e<br />
SIGN ON<br />
SIGN OFF<br />
Time Name Initials Date Time Name Initials<br />
RELINQUISHMENT TO PERMIT ISSUER<br />
All work has ceased and <strong>Work</strong> <strong>Permit</strong> returned <strong>to</strong> <strong>Permit</strong> Issuer for subsequent re-issue<br />
Receiving <strong>Permit</strong> Issuer<br />
Re-Issuing <strong>Permit</strong> Issuer<br />
Date: Name: Initial: Date: Name: Initial:<br />
Reason:<br />
Reason:<br />
Date: Name: Initial: Date: Name: Initial:<br />
Reason:<br />
Reason:<br />
Date: Name: Initial: Date: Name: Initial:<br />
Reason:<br />
Reason:<br />
WORK TEAM MEMBER:<br />
I have read, fully understand and will comply with all conditions stated on this <strong>Work</strong> <strong>Permit</strong><br />
SIGN ON<br />
SIGN ON<br />
Date Name Initials Date Name Initials<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 19 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
APPENDIX C<br />
C WORK PERMIT REGISTER<br />
WORK PERMIT REGISTER<br />
Plant / Area :<br />
Overall Scope of <strong>Work</strong>:<br />
No:<br />
Isolation Certificate No. (Block Isolation):<br />
WORK PERMITS UNDER THIS BLOCK ISOLATION<br />
No. <strong>Work</strong> <strong>Permit</strong> No.<br />
<strong>Work</strong> Commences<br />
<strong>Permit</strong> Issuer<br />
<strong>Work</strong> Completed<br />
<strong>Permit</strong> Issuer<br />
Date Name Initial Date Name Initial<br />
Register Closure<br />
<strong>Permit</strong> Issuer: Signature: Date: Time:<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 20 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
APPENDIX D1<br />
D1 ISOLATION PROCEDURE<br />
PURPOSE AND SCOPE<br />
The purpose of this Procedure is <strong>to</strong> minimise risk of injuries from an uncontrolled release of energy. It<br />
forms an integral part of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> System and shall be read in conjunction with the<br />
requirements of the preceding section of this <strong>Standard</strong>.<br />
Isolation is the act of ceasing the flow of energy and installing a hard barrier <strong>to</strong> maintain integrity of<br />
isolation. This procedure covers isolation and removal of the hard barriers when work is completed. It<br />
does not cover the process of reinstating energies following work completion. This forms part of a<br />
recommissioning process and outside of the scope of this procedure.<br />
This Procedure applies <strong>to</strong>:<br />
• All work with a risk of a hazardous release of energy<br />
• Fixed and mobile equipment (including design, construction, commissioning, operation,<br />
maintenance, cleaning, modification or demolition of equipment)<br />
• WMC Resources owned or controlled sites<br />
DETAILS<br />
1. Levels of Isolation<br />
This Procedure addresses two levels of isolation <strong>to</strong> cater for the wide variation in complexity of plant<br />
and equipment. These are:<br />
Level 1 – Non-recorded isolation<br />
Level 2 – Recorded isolation<br />
Each level has different requirements and a competent and authorised person shall determine which<br />
level is appropriate <strong>to</strong> the work.<br />
1.1 Level 1 – Non Recorded Isolation<br />
This level of isolation is intended for routine work covered by a <strong>Standard</strong> <strong>Work</strong> Procedure or THA that<br />
describes the specific points of isolation as one component of the <strong>to</strong>tal task. Each Site shall identify<br />
what work is covered under a level 1 process<br />
Permission <strong>to</strong> carry out the task is verbal and a person carrying out the work performs the isolation<br />
and proves the integrity of such isolation(s). If more than one work team member is engaged in the<br />
work they shall confirm the integrity of all isolations prior <strong>to</strong> commencing work<br />
The isolation is not recorded on an Isolation Certificate. However it is recommended that a log of such<br />
work activities is maintained by the work environment owner<br />
An isolation tag is not required and instead a Personal Danger Tag shall be attached by a lock <strong>to</strong><br />
each isolation point by all work team members<br />
Note: By itself Level 1 isolation does not require a <strong>Work</strong> <strong>Permit</strong>. However, some of the tasks carried<br />
out in association with Level 1 isolation may require a <strong>Work</strong> <strong>Permit</strong>.<br />
1.2 Level 2 – Recorded Isolation<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 21 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
All isolations are performed by an Isola<strong>to</strong>r and checked by an Isolation Checker. This is a recorded<br />
isolation performed under the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> System. A written record is required on an ‘Isolation<br />
Certificate‘ and forms part of the documentation attached <strong>to</strong> the covering <strong>Work</strong> <strong>Permit</strong>.<br />
Note: When High Voltage or radiation sources are involved there is a need for specialist help and a<br />
need <strong>to</strong> demonstrate compliance with a legislated requirement then a High Voltage (HV) <strong>Permit</strong><br />
according <strong>to</strong> requirements of SP 25 or Radiation Certificate will be required in addition <strong>to</strong> the Isolation<br />
Certificate.<br />
2. Isolation Documents<br />
2.1 Isolation Certificate<br />
An Isolation Certificate is a checklist and permanent record showing nominated isolation points and<br />
the precautions that have been taken <strong>to</strong> address special hazards associated with performing Level 2<br />
Isolation (see Appendix D2).<br />
These can be manually generated or produced in electronic document controlled form (using the<br />
same Isolation Certificate format) for frequently executed isolations.<br />
For work on High Voltage equipment an additional SP 25 <strong>Permit</strong>(s) is required and a Radiation<br />
Certificate for work on or near radiation sources (See Appendix G3). These serve as checklists and<br />
permanent records indicating safe work precautions have been taken <strong>to</strong> address special hazards as<br />
per legislated requirements. When HV or radiation isolations are conducted the specific points are<br />
also recorded on the Isolation Certificate/Instruction.<br />
2.2 Isolation Instruction<br />
An additional ‘Isolation Instruction’ can be used for a complex isolation or an isolation that has <strong>to</strong> be<br />
done in a sequential order <strong>to</strong> bring the equipment <strong>to</strong> a state of zero energy for work <strong>to</strong> commence. It<br />
is attached <strong>to</strong> the Isolation Certificate that records the Instruction reference number. The Instruction<br />
shall include:<br />
• The limits and extent of the isolation<br />
• Any special conditions <strong>to</strong> be met (beyond those already specified in <strong>Work</strong> <strong>Permit</strong>)<br />
• Specialist isolations required (eg. HV or Radiation)<br />
• Isolation point information in the same format as the Isolation Certificate<br />
This Instruction shall be produced following a risk assessment, authorised by a senior line person and<br />
controlled within the sites document control system. It shall not be altered without proper authorisation<br />
by a senior line person. A procedure for authorising alteration shall be developed by the site.<br />
3. Performing an Isolation<br />
Following advice from a <strong>Permit</strong> Issuer that as part of implementing agreed <strong>Work</strong> <strong>Permit</strong> hazard<br />
controls, isolation of energies is required:<br />
• An Isola<strong>to</strong>r shall confirm that the <strong>Permit</strong> Issuer prepared Isolation Certificate (and Isolation<br />
Instruction if attached) is appropriate for the defined scope of work (in the situation in which the<br />
<strong>Permit</strong> Issuer performs the role of an Isolation Checker)<br />
• An Isola<strong>to</strong>r shall carry out isolation of energies they are authorised <strong>to</strong> perform. Positive isolation<br />
of each isolation point must be proved<br />
• An Isola<strong>to</strong>r shall padlock each isolation point with a uniquely keyed isolation lock(s) and<br />
isolation tag cross referenced <strong>to</strong> the <strong>Work</strong> <strong>Permit</strong> number<br />
• An Isola<strong>to</strong>r shall sign the Isolation Certificate indicating that isolations have been achieved and<br />
proved. Isola<strong>to</strong>rs who isolate multiple isolation points on one Certificate may sign once only <strong>to</strong><br />
acknowledge their work<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 22 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
• A <strong>Permit</strong> Issuer shall arrange for an Isolation Checker <strong>to</strong> check completed isolations and sign<br />
on the Isolation Certificate (checking for correct isolation point as per Certificate/Instruction and<br />
that tag / lock are in place). If the <strong>Permit</strong> Issuer also performed the isolations as Isola<strong>to</strong>r, then<br />
the Isolation Checker shall additionally confirm that the Isolation Certificate/Instruction as<br />
defined by the <strong>Permit</strong> Issuer is appropriate for the scope of work. Because the competency of<br />
the Checker is equal <strong>to</strong> the Isola<strong>to</strong>r it is anticipated that the Checker will check isolation integrity<br />
as a part of the process<br />
The Isolation Checker shall be a different person from the person who performed the isolations (this<br />
person can be the <strong>Permit</strong> Issuer if they did not perform the isolations).<br />
An Isola<strong>to</strong>r shall return the completed Isolation Certificate <strong>to</strong> the <strong>Permit</strong> Issuer and place the isolation<br />
lock key(s) in the <strong>Permit</strong> Control Board (see Section 7).<br />
A <strong>Permit</strong> Issuer shall ensure that all isolation key(s) are locked in place with an isolation tag (with the<br />
<strong>Work</strong> <strong>Permit</strong> number recorded) and uniquely keyed <strong>Permit</strong> Issuers lock.<br />
When a Testing Program (see Section 9) forms part of the defined scope of work, the following shall<br />
occur:<br />
• The Isola<strong>to</strong>r performs isolations following the standard method, but uses a different uniquely<br />
keyed lock(s) for the nominated testing points.<br />
• The <strong>Permit</strong> Issuer places all non-testing point isolation key(s) in a separate lock box, apply an<br />
isolation tag and lock in place with a <strong>Permit</strong> Issuer lock. This lock box is placed inside the<br />
<strong>Permit</strong> Control Board. The remaining ‘testing point’ isolation key(s) are placed in the <strong>Permit</strong><br />
Control Board.<br />
4. Performing a Block Isolation<br />
When a number of different tasks are being completed under separate <strong>Work</strong> <strong>Permit</strong>s with all tasks<br />
sharing the same Isolation Certificate the isolation is called a Block Isolation.<br />
If the need for a Block Isolation has been established by the scope of work/hazard control analysis<br />
conducted by the Service Provider, the <strong>Permit</strong> Issuer initiates the standard isolation process. The<br />
<strong>Permit</strong> Issuer shall draw up a <strong>Work</strong> <strong>Permit</strong> Register and the number of this document is recorded on<br />
the Isolation Tag for use during isolations.<br />
Note: The <strong>Permit</strong> Control Board resulting from this isolation should be placed centrally as close <strong>to</strong> the<br />
common worksite as possible.<br />
When a large number of personnel are involved in work associated with a Block Isolation, additional<br />
<strong>Permit</strong> Control Boards may be used and placed closer <strong>to</strong> the specific worksite. In this situation the<br />
following shall occur:<br />
• The <strong>Permit</strong> Issuer shall attach an additional Isolation Tag annotated with the specific <strong>Work</strong><br />
<strong>Permit</strong> number and secured in place by a uniquely keyed Isolation lock <strong>to</strong> the central <strong>Permit</strong><br />
Control board<br />
• The key for this lock is placed in an additional <strong>Permit</strong> Control Board that is taken <strong>to</strong> the specific<br />
work site<br />
• Following a <strong>Permit</strong> Accep<strong>to</strong>r briefing, each work team member shall attach their Personal<br />
Danger Tag and lock <strong>to</strong> the worksite located <strong>Permit</strong> Control Board prior <strong>to</strong> commencing work.<br />
5. Cancelling an Isolation<br />
When work is complete and the <strong>Permit</strong> Issuer initiates the requirement <strong>to</strong> remove the isolation, the<br />
following shall occur:<br />
• The <strong>Permit</strong> Issuer removes the <strong>Permit</strong> Issuer lock and Isolation Tag and provides the isolation<br />
key(s) <strong>to</strong> the Isola<strong>to</strong>r<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 23 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
• The Isola<strong>to</strong>r commences removal of the isolations lock/tag(s)<br />
• When all isolation locks/tags have been removed, the Isola<strong>to</strong>r shall return the Isolation<br />
Certificate <strong>to</strong>gether with all locks/tags <strong>to</strong> the <strong>Permit</strong> Issuer<br />
• The <strong>Permit</strong> Issuer shall confirm the number of locks/tags matches the Isolation Certificate<br />
requirements<br />
6. Tags<br />
Isolation procedures shall use the following four tags:<br />
• Isolation Tag<br />
• Personal Danger Tag<br />
• Testing Tag<br />
• Out of Service Tag<br />
6.1 Isolation Tag<br />
This is an instruction tag that indicates the equipment is in a state that prevents the flow of energy.<br />
The tag shall refer the reader <strong>to</strong> the person(s) or position(s) who are authorised <strong>to</strong> change the status<br />
of the equipment.<br />
The tag shall be locked in place at an isolation point with an isolation lock.<br />
When used <strong>to</strong> secure the isolation key(s) in the <strong>Permit</strong> Control Board, it is locked in place with a<br />
<strong>Permit</strong> Issuers lock.<br />
6.2 Personal Danger Tag (PDT)<br />
This is an instruction tag indicating that there shall be no change in equipment status while this tag is<br />
in place.<br />
The tag shall be locked in place with a uniquely keyed lock<br />
All persons working on isolated equipment shall affix their PDT <strong>to</strong> the <strong>Permit</strong> Control Board before<br />
commencing work. Whilst any PDT remains in place removal of isolations shall not take place.<br />
Any person may place their PDT on any or all isolation point(s) affecting their safety.<br />
A PDT shall be removed by the owner before they leave the work site e.g. at shift end.<br />
Only the tag owner shall remove their PDT. If this is not possible, the site shall have a procedure in<br />
place for the removal of a PDT without risk <strong>to</strong> personnel. .This procedure shall be authorised by the<br />
General Manager (or equivalent).<br />
6.3 Testing Tag<br />
This is an instruction tag indicating <strong>to</strong> the reader that the isolations associated with the tag have been<br />
temporarily removed <strong>to</strong> allow testing <strong>to</strong> be carried out.<br />
The tag shall be tied on<strong>to</strong> the <strong>Permit</strong> Control Board and on<strong>to</strong> isolation points whilst testing.<br />
6.4 Out of Service Tag<br />
This is an informational tag, indicating <strong>to</strong> the reader the equipment item shall not be used until cleared<br />
for safe operation by a competent person.<br />
When Out of Service tags are used, they must be secured in place.<br />
7. <strong>Permit</strong> Control Board<br />
A <strong>Permit</strong> Control Board has the dual function of housing the <strong>Work</strong> <strong>Permit</strong> documentation and securing<br />
the isolation key(s) in a lock box.<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 24 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
• Following isolations, all isolation keys common <strong>to</strong> locks used at specific isolation points shall be<br />
placed in the lock box section of the <strong>Permit</strong> Control Board<br />
• The lock box shall be locked with an Isolation Tag and a <strong>Permit</strong> Issuer’s lock prior <strong>to</strong> work team<br />
members attaching their Personal Danger Tags<br />
• The key <strong>to</strong> the <strong>Permit</strong> Issuer’s lock shall remain in a <strong>Permit</strong> Issuers key cabinet under control of<br />
<strong>Permit</strong> Issuers at all times<br />
• The <strong>Permit</strong> Issuer shall not remove the Isolation Tag and <strong>Permit</strong> Issuer Lock from the <strong>Permit</strong><br />
Control Board until the <strong>Work</strong> <strong>Permit</strong> has been handed back and signed off by the <strong>Permit</strong><br />
Accep<strong>to</strong>r<br />
• Removal of isolations shall not commence before all Personal Danger Tags have been removed<br />
from the <strong>Permit</strong> Control Board<br />
8. Achieving and Securing Positive Isolation<br />
All equipment requiring isolation and all isolation points shall be uniquely and clearly identified<br />
Isolation shall always be applied <strong>to</strong> the energy source and not rely on control circuitry. Push but<strong>to</strong>ns,<br />
s<strong>to</strong>p switches, interlocks, emergency s<strong>to</strong>ps, pilot circuitry lanyards, etc. shall not be used as a means<br />
of isolation<br />
To achieve positive isolation the following steps shall be followed:<br />
• Isolate and prove (By Isola<strong>to</strong>r)<br />
• Tag and lock (By Isola<strong>to</strong>r)<br />
• Test (By <strong>Permit</strong> Accep<strong>to</strong>r/<strong>Work</strong> team member)<br />
Effective mechanical and process isolations shall be achieved <strong>to</strong> a particular standard for all intrusive<br />
work. Energies associated with mechanical, kinetic, pressure and chemical processes shall be<br />
isolated <strong>to</strong> an acceptable standard. The method used shall be based upon risk assessment with the<br />
objective being <strong>to</strong> ensure that the risk of release of energies is reduced <strong>to</strong> as low as is reasonably<br />
practicable (ALARP).<br />
All parts of isolation shall be proved during installation <strong>to</strong> confirm that they do prevent the flow of<br />
energy. During the period that the isolation is in place it may be necessary <strong>to</strong> confirm that the integrity<br />
has not been compromised, by moni<strong>to</strong>ring bleeds or vents for isolation breach.<br />
Isolation methods range from physical disconnection and insertion of blanks/spades <strong>to</strong> double block<br />
valve and bleed through <strong>to</strong> single block valve. Each method has advantages/disadvantages and the<br />
risk assessment shall be used <strong>to</strong> determine the most effective method.<br />
Proof of electrical isolation requires evidence of a physical break in the electrical supply. If the use of<br />
a de-contac<strong>to</strong>r, visible break contac<strong>to</strong>r or phase lights is not possible, electrician continuity testing is<br />
required <strong>to</strong> establish proof of isolation.<br />
All isolations shall be secured by use of a locking device and these locking devices shall require the<br />
use of a key or special <strong>to</strong>ol <strong>to</strong> achieve removal.<br />
Isolation locks are uniquely keyed or keyed alike in sets.<br />
Personal Danger locks shall be uniquely keyed.<br />
<strong>Permit</strong> Issuers locks shall be uniquely keyed (Note: these locks and keys are best secured in a <strong>Permit</strong><br />
Issuers cabinet with <strong>Permit</strong> Issuers retaining a common key <strong>to</strong> cabinet).<br />
Coloured padlock systems shall not be used under this procedure.<br />
A system of locking device and key management shall be defined by the site.<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 25 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
9. Testing Program<br />
If equipment that has energies isolated requires testing, jogging or re-positioning during progress of<br />
work, then the following shall occur:<br />
• An authorised Test Program is required and referenced on the <strong>Work</strong> <strong>Permit</strong>. This program shall<br />
specify the designated points for temporary removal of isolations and a Designated Person who<br />
will be in charge and/or performing the testing task<br />
• For routine, low risk single point Testing Programs the Designated Person may manage the<br />
process of re-energisation and re-isolation. However for more complex multi testing point high<br />
risk Programs the process should be managed by the <strong>Permit</strong> Accep<strong>to</strong>r.<br />
• The Designated Person shall be assessed as competent in the Testing Program for the specific<br />
equipment / plant.<br />
• When testing is <strong>to</strong> commence, work team members remove their Personal Danger Tag from the<br />
<strong>Permit</strong> Control Board and for low risk Testing Programs the Designated Person is the last<br />
person <strong>to</strong> remove their Personal Danger Tag prior <strong>to</strong> commencing testing. For high risk Testing<br />
Programs the <strong>Permit</strong> Accep<strong>to</strong>r’s Personal Danger Tag is the last tag removed from the <strong>Permit</strong><br />
Control Board prior <strong>to</strong> testing.<br />
• The Designated Person:<br />
- Removes the isolation keys designated as part of the Testing Program from the <strong>Permit</strong><br />
Control Board<br />
- Removes the Isolation Tag(s) from the points designated for removal of isolations<br />
- Ties Testing Tag(s) <strong>to</strong> each isolation point and on<strong>to</strong> the <strong>Permit</strong> Control Board<br />
- Removes isolations from designated points <strong>to</strong> allow the testing program <strong>to</strong> be completed.<br />
• For high risk Testing Programs the <strong>Permit</strong> Accep<strong>to</strong>r remains at the work site for the duration of<br />
testing.<br />
• Upon completion of Testing Program the Designated Person:<br />
- Removes the Testing Tag and re-attaches the Isolation Tag and lock<br />
- Removes the Testing Tag from the <strong>Permit</strong> Control Board and returns the isolation key(s)<br />
• If work is <strong>to</strong> continue, work team members re-attach their Personal Danger Tags.<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 26 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
APPENDIX D2<br />
D2 ISOLATION CERTIFICATE<br />
ISOLATION CERTIFICATE<br />
This certificate must be accompanied by a <strong>Work</strong> <strong>Permit</strong><br />
Plant / Area:<br />
Equipment Description:<br />
<strong>Work</strong> <strong>Permit</strong> Reference No.:<br />
No. of Isolation Keys used:<br />
SPECIAL INSTRUCTIONS:<br />
No:<br />
Equipment No.:<br />
Is Radiation Certificate required? □ Yes □ No No:<br />
Is HV <strong>Permit</strong> required? □ Yes □ No No:<br />
Testing Program required? □ Yes □ No No:<br />
Isolation Instruction No : DRW No :<br />
Isola<strong>to</strong>r<br />
Checker<br />
No. Isolation Point Description Method<br />
Name Initial Name Initial<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 27 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
APPENDIX E1<br />
E1 SAFE WORKING IN CONFINED SPACE PROCEDURE<br />
PURPOSE AND SCOPE<br />
This Procedure covers requirements for:<br />
• Identifying and registering all defined confined spaces at each WMC Resources site<br />
• Ensuring that all work conducted in or on confined spaces complies with the specific controls<br />
determined by the WMC <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> <strong>Standard</strong>. (Note – Certain types of work performed “on”<br />
a confined space has the potential <strong>to</strong> affect a person working within the space and shall be<br />
considered when conducting the risk assessment)<br />
• Conducting regular audits of work within confined spaces<br />
• Designing, manufacturing, constructing, maintaining and inspecting plant, equipment and<br />
structures <strong>to</strong> ensure where practicable, the need for entry in<strong>to</strong> confined spaces is eliminated<br />
This procedure should be read as a component of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> <strong>Standard</strong>.<br />
DETAILS<br />
1. Responsibilities<br />
The General Manager or equivalent is responsible for ensuring:<br />
• All confined spaces are identified (sign posted where practicable) and placed on a register<br />
• In preparation for any potential future work within these spaces, a hazard identification and risk<br />
assessment of the inherent hazards of each confined space itself has been competently<br />
conducted and the results also recorded on the register<br />
• A specific risk assessment (THA as a minimum) is conducted for work <strong>to</strong> be completed within<br />
the space that identifies all hazards and determines the control measures prior <strong>to</strong> the<br />
commencement of the work<br />
• All confined space entries are conducted under a specific <strong>Work</strong> <strong>Permit</strong> and a Confined Space<br />
Entry Certificate<br />
• All low risk confined space inspections are conducted under a specific confined space entry<br />
<strong>Work</strong> Authorisation process<br />
• There is a rescue plan that is capable of execution for each entry in<strong>to</strong> a confined space<br />
• Where practicable the need for entry in<strong>to</strong> confined spaces is eliminated.<br />
2. Definition<br />
A Confined Space is:<br />
• An enclosed or partially enclosed space that is at atmospheric pressure during occupancy and<br />
is not intended or designed primarily as a place of work, and:<br />
(a) is liable at any time <strong>to</strong>:<br />
(i) have an atmosphere which contains potentially harmful levels of contaminant;<br />
(ii) have an oxygen deficiency or excess; or<br />
(iii) cause engulfment; and<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 28 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
(b) could have a restricted means for entry and exit.<br />
Note 1: where an enclosed or partially enclosed space is <strong>to</strong> be at atmospheric pressure during<br />
occupancy and it is not intended or designed primarily as a place of work and the content of oxygen in<br />
atmosphere is liable at any time <strong>to</strong> be below or above 20.9% by volume under normal atmospheric<br />
pressure, the space must be considered <strong>to</strong> be a confined space.<br />
Note 2: when a person’s head, i.e. breathing zone, or upper body is within the boundary of the<br />
confined space they are considered <strong>to</strong> have entered the space. Inserting an arm for atmospheric<br />
testing purposes is not considered an entry <strong>to</strong> a confined space.<br />
3. Confined Space Entry<br />
3.1 General<br />
Allowance has been made within the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> <strong>Standard</strong> for a two-tiered <strong>Work</strong> <strong>Permit</strong> process<br />
for inspection and for full entry in<strong>to</strong> confined spaces. The two-tiered work permits are:<br />
• Confined Space <strong>Work</strong> Authorisation<br />
This level is for a low risk inspection only in<strong>to</strong> a atmospherically safe environment and requires<br />
the use of a <strong>Work</strong> Authorisation Tag<br />
• Confined Space Entry permit<br />
This level is for all work within all confined spaces and requires the use of a <strong>Work</strong> <strong>Permit</strong> and<br />
Confined space Entry Certificate<br />
3.2 Confined Space Inspection (Low Risk)<br />
A confined space inspection only can be managed on site providing that all of the following criteria<br />
determined by the risk assessment are complied with:<br />
• Head or head and shoulders entry (for inspection only)<br />
• The atmosphere is safe and is expected <strong>to</strong> remain safe at all times during inspection<br />
• Any isolation required enabling inspection shall be done by a qualified Level 1 Isola<strong>to</strong>r<br />
• There is a purpose designed Inspection/access way (e.g. a purpose designed inspection hatch<br />
in<strong>to</strong> a transfer chute)<br />
• There is no expected risk of contamination occurring<br />
• Appropriate lighting is available<br />
• Whilst conducting the inspection there is no expected chance of a person being overcome by<br />
extremes of temperature<br />
• There is no requirement <strong>to</strong> have rescue equipment at the job site<br />
• The inspection cannot change any of the above conditions<br />
3.3 Confined Space Entry (High Risk)<br />
All entry in<strong>to</strong> confined spaces shall comply with the full requirements of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> <strong>Standard</strong><br />
with the issue of a <strong>Work</strong> <strong>Permit</strong> and Confined Space Entry Certificate (see Appendix E2).<br />
4. Evaluation, Identification and Registration Of Confined Spaces<br />
A confined space inherent hazard evaluation (refer <strong>to</strong> Appendix E4) shall be conducted on any<br />
potential confined space in preparation for any future work within that space being required.<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 29 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
The evaluation of the space will also determine if the space meets all of the requirements <strong>to</strong> allow for<br />
an inspection only <strong>to</strong> be completed under a low risk <strong>Work</strong> Authorisation Tag.<br />
These potential confined spaces can be in existence or be created by new construction or<br />
modifications <strong>to</strong> existing structures, equipment etc.<br />
The evaluation assesses the risk of the inherent hazards of the space itself.<br />
To assess if the space can be managed under a low risk inspection process the evaluation shall<br />
establish that the space will not have any potential unsafe atmosphere at all times during the<br />
inspection.<br />
The confined space evaluation shall be referred <strong>to</strong> when performing or reviewing a <strong>Standard</strong> <strong>Work</strong><br />
Procedure/THA for any task <strong>to</strong> be performed within that space.<br />
In all cases the need for entry <strong>to</strong> the confined space shall be evaluated as a first consideration with<br />
the work conducted from outside the space if practicable.<br />
4.1 Identification<br />
The site shall identify and assign a unique identification <strong>to</strong> each confined space.<br />
4.2 Register<br />
The site shall maintain a register and a record of the evaluation for all identified confined spaces. The<br />
register as a minimum shall contain:<br />
• The unique identification number<br />
• Separate identification of all designated low risk inspection only confined spaces<br />
• The confined space location<br />
• A description of the space and its inherent foreseeable hazards<br />
The register and evaluation of the space shall be reviewed and updated by competent persons at<br />
appropriate intervals but in any case not exceeding two years.<br />
4.3 Signage<br />
Each entry point <strong>to</strong> a confined space shall have a sign of appropriate material and size stating<br />
“Danger Confined Space - Entry by <strong>Permit</strong> Only”. The sign should be mounted as close as is<br />
practicable <strong>to</strong> the entry point. Where it is impracticable <strong>to</strong> place and maintain signs on every entry,<br />
alternate warning systems shall be implemented <strong>to</strong> prevent unauthorised entry in<strong>to</strong> any confined<br />
space.<br />
The placement and condition of signs shall be included on regular inspection checklists.<br />
5. Requirements To Inspect a Low Risk Confined Space<br />
All inspections conducted for a low risk confined space shall be in compliance with the following<br />
details:<br />
• The identification and evaluation of the inherent hazards of the space s<strong>to</strong>red on the site<br />
database must be retrieved and reviewed before completion of a Confined Space <strong>Work</strong><br />
Authorisation Tag<br />
• A SWP for the inspection, or a new THA for the inspection <strong>to</strong> be performed must be reviewed<br />
or completed detailing all precautions and controls required <strong>to</strong> maintain safe inspection<br />
• The confined space ID number, SWP or THA number, entrants name and Authorising Persons<br />
signature be recorded on the confined space entry <strong>Work</strong> Authorisation Tag<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 30 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
• The completed lower tear off portion of the tag (Confined Space inspection in progress section)<br />
must be left with the supervisor controlling work within that area<br />
• All control measures and precautions detailed on the SWP or THA shall be established and<br />
confirmed before commencement of the inspection (checklist on the tag completed)<br />
• Persons performing the inspection shall sign the SWP or THA confirming they understand and<br />
will comply with the hazards control requirements for the task<br />
• Isolations must be in compliance with level 1 requirement<br />
• Once the task is finished, the completion of work sections of the tag shall be signed off and both<br />
portions kept and filed as part of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> documentation.<br />
6. Requirements <strong>to</strong> <strong>Work</strong> in a Confined Space<br />
6.1 General<br />
All work conducted in or on confined spaces shall be in compliance with the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> <strong>Standard</strong><br />
defined in this document. A specific Confined Space Entry Certificate (see Appendix E2) shall be<br />
completed and attached <strong>to</strong> the relevant <strong>Work</strong> <strong>Permit</strong>.<br />
No person shall enter a confined space unless:<br />
• They have been trained, and assessed as competent <strong>to</strong> do so<br />
• They have signed on <strong>to</strong> the <strong>Work</strong> <strong>Permit</strong> confirming they have read and unders<strong>to</strong>od the<br />
requirements of the current THA, <strong>Work</strong> <strong>Permit</strong> and Confined Space Entry Certificate for the<br />
work <strong>to</strong> be performed<br />
• They sign on and off the Entry/Exit log each time they enter and exit the confined space<br />
• It has been determined that there is either a safe atmosphere inside the space or that adequate<br />
protective measures are implemented <strong>to</strong> ensure their safety<br />
• There is a system <strong>to</strong> ensure that where there is more than one entry <strong>to</strong> the confined space, the<br />
other entry points are sign posted and barricaded in a way that shall prevent involuntary entry<br />
but will allow emergency egress.<br />
A <strong>Work</strong> <strong>Permit</strong> and a Confined Space Entry Certificate is required <strong>to</strong> enter a confined space and shall<br />
include provision for the recording of:<br />
• The risk assessment for the task <strong>to</strong> be performed within/on the space (i.e. THA as a minimum)<br />
has been completed and is available<br />
• Evidence that isolation of contaminants and energy sources has been completed by an<br />
authorised person and in accordance with the requirements of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> <strong>Standard</strong><br />
• The location of the job<br />
• The description of work (scope of work)<br />
• Atmospheric testing requirements and results if applicable<br />
• An emergency rescue plan<br />
• Any special instructions that may be required<br />
• The authority <strong>to</strong> enter signed by an authorised person (<strong>Permit</strong> Issuer)<br />
• Acceptance of the permit signed by the <strong>Permit</strong> Accep<strong>to</strong>r<br />
• Nominated Stand-by Person(s)<br />
• Provision for signing in and out of persons who may enter and exit the confined space<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 31 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
• The completion of the work and cancellation of the <strong>Work</strong> <strong>Permit</strong> and Certificate by the<br />
authorised person.<br />
The Confined Space Entry Certificate shall be prominently displayed in the <strong>Permit</strong> Control Board at<br />
the entry point <strong>to</strong> a confined space.<br />
Should any site alarms, outside of normal site testing requirements, require evacuation of the space<br />
then the confined space shall be re-gas tested prior <strong>to</strong> re-entry.<br />
When work is completed the <strong>Work</strong> <strong>Permit</strong> shall be cancelled by the <strong>Permit</strong> Issuer only after that<br />
person has:<br />
• Ensured that all persons who entered the space have signed off the Entry/Exit Log and<br />
removed their Personal Danger Tag from the <strong>Permit</strong> Control Board<br />
• Visually checked the confined space <strong>to</strong> ensure that all personnel are clear and that all<br />
equipment & <strong>to</strong>ols have been removed from the confined space<br />
• Checked that the work area is clear and that the equipment can safely be returned <strong>to</strong> service.<br />
6.2 Atmosphere<br />
Before a person enters a confined space, it shall be ensured where it is technically feasible <strong>to</strong> do so,<br />
that:<br />
• The confined space contains an oxygen level within the safe oxygen range<br />
• The atmospheric contaminants in the confined space are reduced <strong>to</strong> below the relevant<br />
exposure standards<br />
• The concentration of flammable contaminant in the atmosphere of the confined space is below<br />
5% of its LEL.<br />
Each site shall have systems <strong>to</strong> ensure that:<br />
• Risk assessments identify appropriate control measures where any activity in or on a confined<br />
space may introduce atmospheric contaminants (<strong>to</strong>xic or flammable) or affect the level of<br />
oxygen inside the space<br />
• Atmospheric testing, re-testing & moni<strong>to</strong>ring of confined spaces on each site is conducted<br />
consistent with the inherent nature of the space and the hazards identified in the risk<br />
assessment for the work <strong>to</strong> be performed<br />
• Atmospheric testing is only performed by trained and competent persons authorised <strong>to</strong> do so. A<br />
register of authorised Gas Testers shall be kept and maintained on each site<br />
• Atmospheric testing is performed from outside the space if practicable and technically feasible.<br />
If it is necessary <strong>to</strong> enter the space <strong>to</strong> test the atmosphere, a risk assessment that stipulates the<br />
safe testing procedure and a <strong>Work</strong> <strong>Permit</strong> and a Confined Space Entry Certificate is required<br />
prior <strong>to</strong> entry<br />
• Where persons have entered a confined space and the level of flammable contaminant in the<br />
atmosphere of the confined space has been found <strong>to</strong> be greater than 5% but less than 10% of<br />
its LEL, all persons are <strong>to</strong> be removed from the space unless continuous moni<strong>to</strong>ring is used in<br />
accordance with AS 2865<br />
• Where the concentration of flammable contaminant in the atmosphere of the confined space is<br />
greater than 10% of its LEL, no person shall enter or remain in the confined space<br />
• Where there is a presence of flammable contaminants, there shall be a system implemented <strong>to</strong><br />
control all potential ignition sources including static electricity<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 32 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
• Where it is not technically feasible <strong>to</strong> ensure an oxygen level in the atmosphere greater than<br />
19.5% (and less than 23.5%), or the atmospheric contaminants cannot be reduced <strong>to</strong> below the<br />
relevant exposure standards, no person shall enter the confined space unless they are<br />
equipped with suitable personal protective equipment including appropriate air supplied<br />
respira<strong>to</strong>ry protective equipment.<br />
6.3 Cleaning and Purging<br />
There shall be a system <strong>to</strong> ensure that identified confined spaces are cleaned and purged, consistent<br />
with the risk assessment.<br />
Purging and cleaning should be performed from outside the space if reasonably practicable. If it is<br />
necessary <strong>to</strong> enter the space <strong>to</strong> purge or clean the space, a <strong>Work</strong> <strong>Permit</strong> and a Confined Space Entry<br />
Certificate in accordance with this standard is required prior <strong>to</strong> entry.<br />
6.4 Hot <strong>Work</strong><br />
Any hot work that must be performed within or on a confined space shall be in compliance with the<br />
requirements of Appendix F1 of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> <strong>Standard</strong>.<br />
A detailed risk assessment for any hot work performed within or on confined spaces shall consider<br />
the potential <strong>to</strong> affect the safety of the atmosphere.<br />
Good working practices include:<br />
• Identifying the flammability and thermal decomposition products of coatings, scale, sludge and<br />
metals (alloys) generated from hot work<br />
• Switching off the power source <strong>to</strong> equipment when arc welding is suspended for crew breaks or<br />
at end of shift. All electrodes shall be removed from holders and placed so that accidental<br />
arcing or contact cannot occur<br />
• Closing <strong>to</strong>rch and cylinder valves, de-pressure and remove the whole <strong>to</strong>rch and assembly hose<br />
when oxy acetylene cutting, heating or welding is suspended for breaks or shift change<br />
• Not taking compressed gas cylinders or associated manifolds, other than those used for<br />
breathing apparatus, inside the confined space.<br />
6.5 Ventilation<br />
Ventilation of confined spaces can include natural, forced air or mechanical means <strong>to</strong> establish and<br />
maintain a safe atmosphere.<br />
Mechanical ventilation equipment shall be regularly inspected and maintained in proper working<br />
condition by competent persons.<br />
Mechanical ventilation equipment used during confined space occupancy shall be continuously<br />
moni<strong>to</strong>red while the confined space is occupied and the controls will be clearly tagged <strong>to</strong> ensure they<br />
are not interfered with by unauthorised persons.<br />
The risk assessment and procedures shall take in<strong>to</strong> account the hazards of introducing atmospheric<br />
contaminants from unsafe sources including the location of combustion engines, their exhaust and<br />
the ability for any atmospheric contaminants <strong>to</strong> enter or re-enter a confined space (eg change of wind<br />
direction).<br />
6.6 Stand-by Person<br />
A Stand-by Person, shall be designated and remain outside the confined space where determined by<br />
risk assessment.<br />
All stand-by Persons shall be trained, assessed and passed as competent <strong>to</strong>:<br />
• Initiate site emergency procedures if required<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 33 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
• Operate and moni<strong>to</strong>r as required any specific safety plant or equipment identified as being<br />
required <strong>to</strong> ensure health and safety<br />
• Use communications equipment as appropriate<br />
• Moni<strong>to</strong>r the surrounding environment for impact on the confined space<br />
• Recognise changes in risk <strong>to</strong> those inside the confined space and <strong>to</strong> take appropriate action<br />
where necessary<br />
• Where the risk assessment determines that the Stand-by Person may be required <strong>to</strong> perform<br />
first aid, they shall be trained, assessed and passed as competent <strong>to</strong> perform that task.<br />
A Stand-by Person shall be positioned such that they are capable of being in continuous<br />
communication with and, where possible, <strong>to</strong> observe those inside a confined space.<br />
Stand-by Persons may alternate with persons working inside the confined space providing they are<br />
properly trained.<br />
Stand-by Persons shall be assigned no other duties that may affect their ability <strong>to</strong> fully maintain<br />
constant communication and control of the safety of person/s within the confined space.<br />
Under no circumstances is the Stand-by Person <strong>to</strong> enter the confined space.<br />
6.7 Safety Equipment<br />
There shall be management procedures <strong>to</strong> ensure that any safety equipment used in a confined<br />
space (including personal protective equipment) is:<br />
• Appropriate <strong>to</strong> the work <strong>to</strong> be conducted<br />
• Maintained in proper working condition<br />
• Selected and fitted (where required) <strong>to</strong> suit the individual<br />
• In compliance with relevant statu<strong>to</strong>ry requirements and <strong>Standard</strong>s where applicable.<br />
Any equipment used <strong>to</strong> ensure a safe environment during confined space occupancy shall be<br />
continuously moni<strong>to</strong>red while the confined space is occupied and the controls will be clearly tagged <strong>to</strong><br />
ensure unauthorised persons do not interfere with them.<br />
6.8 Portable Electrical Equipment<br />
There shall be a system <strong>to</strong> ensure that any portable electrical equipment used in a confined space:<br />
• Uses flexible heavy duty power supply cable of at least AS/NZS 3191 standard<br />
• Has the power supply cable/s suspended or guarded against damage<br />
• Is double insulated where available<br />
• Is in compliance with relevant statu<strong>to</strong>ry requirements and <strong>Standard</strong>s where applicable.<br />
Portable electrical equipment used within confined spaces should:<br />
• Be connected, individually or collectively, <strong>to</strong> an earth-free, protected, extra-low voltage supply<br />
(see AS/NZS 3000) from an isolating transformer/s complying with AS/NZS 3108, with the<br />
transformer/s being located outside the confined space<br />
• Be protected through a residual current device complying with AS 3190, with the device being<br />
located outside the confined space; or<br />
• Where there is a potential for combustibles, be intrinsically safe.<br />
Note: In all cases consideration must be given <strong>to</strong> the use of extra-low voltage, air, hydraulic or other<br />
means of powering portable equipment used in confined spaces.<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 34 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
6.9 Gas Cylinders<br />
There shall be a system <strong>to</strong> manage the use of compressed or liquefied gas equipment in confined<br />
spaces that shall include ensuring that:<br />
• No cylinder of compressed or liquefied gas should taken in <strong>to</strong> a confined space (except<br />
cylinders for use with breathing apparatus)<br />
• Supply hoses are inspected, repaired or replaced as required prior <strong>to</strong> use<br />
• Supply hoses are located, suspended or guarded against damage<br />
• Gas cylinders are secured at all times<br />
• Supply <strong>to</strong> the equipment is turned off when the equipment is not in use<br />
There shall be management procedures <strong>to</strong> ensure that any equipment used inside a confined space<br />
is in compliance with relevant statu<strong>to</strong>ry requirements and <strong>Standard</strong>s where applicable.<br />
7. Training<br />
Training (and re-training at appropriate intervals but in any case not <strong>to</strong> exceed two years) shall at<br />
least be given <strong>to</strong> persons who:<br />
• Perform work in or on confined spaces including Stand-by Persons<br />
• Manage and/or supervise persons working in confined spaces<br />
• Provide, fit, wear and maintain PPE used in confined spaces<br />
• Are conducting atmospheric testing of confined spaces<br />
• Are involved in rescue and first aid procedures<br />
Details of training are <strong>to</strong> be recorded in the individual’s training record.<br />
8. Emergency Response<br />
There shall be a system <strong>to</strong> ensure that:<br />
• Emergency response (including confined space rescue) and first aid procedures and provisions<br />
are planned, established and rehearsed<br />
• Persons involved in emergency response are trained, assessed and passed as competent<br />
• Persons involved in emergency response are advised of conditions within the confined space<br />
prior <strong>to</strong> entry.<br />
9. Contrac<strong>to</strong>rs<br />
Where contrac<strong>to</strong>rs have been engaged <strong>to</strong> conduct confined space work, evidence of recognised<br />
confined space training will need <strong>to</strong> be provided <strong>to</strong> the WMC Resources Nominated Person. In<br />
addition, the contrac<strong>to</strong>rs shall understand how confined space work is managed at the WMC<br />
Resources site, including the requirements of this <strong>Standard</strong>.<br />
10. Audit and Review<br />
There shall be a program for:<br />
• Inspection of the condition and accuracy of contents of the confined space register and its<br />
accessibility<br />
• A bi-annual check <strong>to</strong> ensure that there has been no change <strong>to</strong> the evaluation of a Confined<br />
Space<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 35 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
• A 6 monthly review of the risk assessment of a low risk inspection confined space <strong>to</strong> ensure that<br />
no foreseeable risk of an atmospheric hazard existing or occurring that will change the<br />
assessment.<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 36 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
APPENDIX E2<br />
E2 CONFINED SPACE ENTRY CERTIFICATE<br />
Plant / Area :<br />
Register No. :<br />
<strong>Work</strong> <strong>Permit</strong> No.:<br />
SPECIAL PRECAUTIONS AND CONDITIONS<br />
CONFINED SPACE ENTRY CERTIFICATE<br />
This certificate must be accompanied by a <strong>Work</strong> <strong>Permit</strong><br />
Isolation Certificate No.:<br />
Equipment No.:<br />
No:<br />
Self-contained BA Safety Harness Secure from engulfment<br />
Airline respira<strong>to</strong>r Life line Rescue Plan<br />
Ventilation extraction<br />
Lighting<br />
Audible alarm<br />
Communications equipment<br />
NOMINATED STANDBY PERSON<br />
Name Signature On Time Signature Off Time<br />
Atmospheric Testing required : Yes No <br />
Continuous moni<strong>to</strong>ring required : Yes No <br />
Initial Atmospheric Testing<br />
Gas Test Analysis Date Gas Test Analysis Date<br />
Toxic gas : ppm Oxygen content %<br />
Toxic gas : ppm LEL %<br />
Toxic gas : ppm Other<br />
Toxic gas :<br />
ppm<br />
AUTHORISED GAS TESTER<br />
Name: Signature: Date: Time:<br />
Is repeat gas testing required : Yes No Required every ...........................................<br />
Repeat gas tests results on rear of form.<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 37 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
APPENDIX E3<br />
E3 REAR OF CONFINED SPACE CERTIFICATE<br />
REPEAT GAS TESTS<br />
Date Gas Test Analysis Authorised Gas Tester<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 38 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
APPENDIX E4<br />
E4 CONFINED SPACE ENTRY/EXIT LOG<br />
Confined Space ID:<br />
<strong>Work</strong> <strong>Permit</strong> No:<br />
CONFINED SPACE ENTRY/EXIT LOG<br />
Confined Space Entry Cert No:<br />
Date<br />
Name<br />
In<br />
Time<br />
Out<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 39 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
APPENDIX E5<br />
E5 CONFINED SPACE WORK AUTHORISATION TAG<br />
FRONT<br />
REAR<br />
No:<br />
Confined Space Inspection<br />
<strong>Work</strong> Authorisation<br />
Use of this authority is restricted <strong>to</strong> inspection only<br />
and in compliance with the attached THA/SWP and<br />
Confined Space hazard identification and evaluation<br />
Confined Space ID No:<br />
THA/SWP No:<br />
Entrant Name:<br />
Date:<br />
Time In:<br />
Time Out:<br />
Authorised Person:<br />
On completion of work<br />
Confined Space Inspection<br />
<strong>Work</strong> Authorisation<br />
Checklist prior <strong>to</strong> work<br />
Confined Space Register<br />
confirms use of the Tag<br />
Can the inspection be achieved<br />
by head & should entry only?<br />
<strong>Hazard</strong> Controls in place as per<br />
THA/SWP?<br />
Yes<br />
The inspection is completed, I have left the space,<br />
the confined space is clear of all <strong>to</strong>ols and<br />
equipment.<br />
Entrants Name<br />
Name:<br />
Signature:<br />
Time:<br />
Confined space isolated from all<br />
energies?<br />
Confined Space Inspection<br />
No:<br />
<strong>Work</strong> Authorisation<br />
Completion of <strong>Work</strong><br />
Confined Space Inspection in Progress<br />
Confined Space ID No: Job Completion Time: Date:<br />
THA/SWP No:<br />
All persons & equipment are<br />
clear of the space.<br />
Authorised Entrant<br />
Authorised Person:<br />
Name:<br />
Job Start Time: Date: Time:<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 40 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
APPENDIX E6<br />
E6 CONFINED SPACE EVALUATION<br />
Confined Space Identification & Inherent <strong>Hazard</strong> <strong>Work</strong>sheet<br />
Confined Space ID:<br />
Exact Location of the Space:<br />
ID & Analysis Team:<br />
Confined Space Name<br />
Date of Analysis:<br />
Picture of Confined Space & Access Points<br />
Confined Space (Low Risk)<br />
Confined Space (High Risk)<br />
Nature of the Space<br />
• Describe the space<br />
• What is it primarily designed for?<br />
• What is the space made of?<br />
• Describe the location, number and<br />
dimensions of entry/exit points.<br />
(Example)<br />
Metal transfer chute designed <strong>to</strong> pass<br />
product from one conveyor <strong>to</strong> the next via<br />
gravity. There are two inspection hatches –<br />
one on the north side approx. 600-x 600mm,<br />
which is 1.3m from floor level. The other is<br />
on the east side approx. 450 x 450mm, which<br />
is also 1.3m above floor level. The space is<br />
approx. 3.5m x 2.5m x 5m deep.<br />
Is Entry Necessary?<br />
It is vital <strong>to</strong> consider the need <strong>to</strong> actually enter the space at allanswer<br />
the following questions first.<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 41 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
Question<br />
Details<br />
• Is a regular head or head/shoulders<br />
inspection performed on this space<br />
• How often will these inspections be<br />
undertaken?<br />
• Can the inspection be done without<br />
actually putting head/shoulders in<strong>to</strong> the<br />
space?<br />
• Can the inspection be done using any<br />
other method?<br />
Inherent <strong>Hazard</strong>s<br />
Is there a potential for atmospheric hazards <strong>to</strong> be present within the space?<br />
(Consider what is or has been s<strong>to</strong>red in the space or the product or material that flows through the space)<br />
<strong>Hazard</strong> Yes No Details<br />
• Oxygen deficient or enriched<br />
• Combustible gasses or<br />
vapours<br />
• Toxic gasses or vapours<br />
• Fumes or particulates<br />
• Other<br />
Could there be any atmospheric hazards that could be released and/or enter the space?<br />
(Consider what is or has been s<strong>to</strong>red in the space or the product or material that flows through the space)<br />
<strong>Hazard</strong> Yes No Details<br />
Contaminants that could be<br />
trapped in:<br />
• Sludge, scale, liquids, other<br />
deposits<br />
• Fittings, joints, bends in pipes,<br />
other<br />
Contaminants that could be<br />
caused by:<br />
Oxidisation, decomposition, leaks<br />
Are there other potential hazards inherent <strong>to</strong> the space?<br />
(Consider what is or has been s<strong>to</strong>red in the space or the product or material that flows through the space)<br />
<strong>Hazard</strong> Yes No Details<br />
• Structural integrity, movement<br />
of the space, radiation<br />
• Moving parts, machinery or<br />
equipment, s<strong>to</strong>red energy<br />
within the space<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 42 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
• Potential for engulfment or<br />
introduction of materials, or<br />
suspended loads<br />
• Temperature extremes, noise<br />
or lighting<br />
• External hazards, exposure <strong>to</strong><br />
elements, Snakes, insects,<br />
animals<br />
• Electrical equip., cables,<br />
services, impact of persons,<br />
plant, in area<br />
• Ergonomics, manual handling,<br />
slips, trips, falls<br />
• Fire, explosion<br />
• <strong>Hazard</strong>ous substance (eg.<br />
chemicals,<br />
poisons)<br />
absorption, inhalation,<br />
ingestion)<br />
• Other (list)<br />
•<br />
Considerations<br />
Details Yes No<br />
Isolations required?<br />
Isolations: What services will be required <strong>to</strong> be isolated for safe occupancy? (list)<br />
Note- If the space requires a Level 2 isolation then the space must be recorded on the register as a<br />
High Risk Confined Space requiring a <strong>Work</strong> <strong>Permit</strong> and Entry Certificate<br />
Details Yes No<br />
Emergency Response Team Involvement Required:<br />
Emergency Response: If there is any concern about the ability <strong>to</strong> rescue persons from the space, detail the<br />
concerns below and contact Emergency Response Team <strong>to</strong> investigate and develop an emergency plan as<br />
required.<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 43 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
Details Yes No<br />
Other considerations required?<br />
Does the evaluation confirm that the space is a Low Risk inspection only space allowing for a <strong>Work</strong><br />
Authorisation process <strong>to</strong> manage entry, including:<br />
• Head or head and shoulders entry (for inspection only)<br />
• The atmosphere is safe and is expected <strong>to</strong> remain safe at all times during inspection<br />
• Any isolation required enabling inspection shall be done by a qualified Level 1 Isola<strong>to</strong>r<br />
• There is a purpose designed Inspection/access way (e.g. a purpose designed inspection<br />
hatch in<strong>to</strong> a transfer chute)<br />
• There is no expected risk of contamination occurring<br />
• Appropriate lighting is available<br />
• Whilst conducting the inspection there is no expected chance of a person being overcome by<br />
extremes of temperature<br />
• There is no requirement <strong>to</strong> have rescue equipment at the job site<br />
• The inspection cannot change any of the above conditions<br />
Note – If the space does not meet all of the above conditions then it must be recorded as a High<br />
Risk Confined Space requiring a <strong>Work</strong> <strong>Permit</strong> and Confined Space Entry Certificate at all times.<br />
Record the risk level on the front page of the evaluation.<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 44 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
APPENDIX F1<br />
F1 HOT WORK PROCEDURE<br />
1. Scope<br />
This procedure shall apply <strong>to</strong> any person, or group of persons, undertaking “Hot <strong>Work</strong>” at any Site<br />
owned or controlled by WMC Resources.<br />
For the purposes of this procedure “Hot <strong>Work</strong>” means any grinding, welding, thermal or oxygen<br />
cutting, heating, and other related heat or spark producing operations. <strong>Work</strong> with live electrical<br />
equipment not classed as intrinsically safe, including instrumentation, mobile phones, cameras and<br />
test equipment/<strong>to</strong>ols, in a Classified <strong>Hazard</strong>ous area is also considered as hot work.<br />
2. Purpose<br />
The purpose of this procedure is <strong>to</strong> define the method and the responsibilities associated with<br />
correctly defining the hazard controls required and preparing the work environment for hot work <strong>to</strong> be<br />
conducted safely. It should be read as a component of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> System<br />
3. Competency Development<br />
Training specifically related <strong>to</strong> Hot <strong>Work</strong> Safety is required for all personnel who issue and accept<br />
<strong>Work</strong> <strong>Permit</strong>s or perform fire watch duties. This training shall be re-assessed at a maximum interval of<br />
two years.<br />
4. Definitions<br />
Designated Hot <strong>Work</strong> Area An area specifically prepared and adequately signed for hot work<br />
activities. All flammable and combustible liquids or materials are<br />
removed from this area. Fire extinguishers and fire fighting equipment<br />
is provided within boundaries of the area. Hot work in this area does<br />
not require a <strong>Work</strong> <strong>Permit</strong> or Hot <strong>Work</strong> Certificate<br />
<strong>Hazard</strong>ous Areas<br />
A three dimensional region or space in which an explosive<br />
atmosphere is present, or may be expected <strong>to</strong> be present, in<br />
quantities such as <strong>to</strong> require special precautions for the construction,<br />
installation and use of potential ignition sources<br />
<strong>Hazard</strong>ous Areas – Zone 0<br />
<strong>Hazard</strong>ous Areas – Zone 1<br />
<strong>Hazard</strong>ous Areas – Zone 2<br />
Non-classified Areas<br />
Gas testing<br />
Gas Tester<br />
Fire Watch<br />
An area in which an explosive gas atmosphere is present<br />
continuously, or is present for long periods<br />
An area in which an explosive gas atmosphere is likely <strong>to</strong> occur in<br />
normal operation<br />
An area in which an explosive gas atmosphere is not likely <strong>to</strong> occur in<br />
normal operation and if it does occur it will exist for a short period only<br />
All other areas that are not ‘Designated Hot <strong>Work</strong> Area’ or ‘Classified<br />
<strong>Hazard</strong>ous Area’<br />
Checking of the worksite with a calibrated gas detec<strong>to</strong>r, prior <strong>to</strong> and<br />
during work activities, <strong>to</strong> detect the presence of flammable gas<br />
A person adequately trained in the use of gas testing equipment and<br />
in the interpretation of results through the successful completion of<br />
competency based training<br />
Personnel who are been suitably trained and appointed <strong>to</strong> standby<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 45 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
Intrinsically safe equipment<br />
Lower Explosive Limit<br />
Upper Explosive Limit<br />
and observe a work area where hot work is being done. The Fire<br />
Watch shall not perform other tasks whilst assigned in this role<br />
Equipment that has been specifically designed and certified for use in<br />
hazardous areas<br />
The ‘leaner’ point at which a mixture of flammable gas or vapour in air<br />
will no longer support combustion<br />
The ‘richer’ point at which a mixture of flammable gas or vapour in air<br />
will no longer support combustion<br />
5. Details<br />
5.1 General<br />
A <strong>Work</strong> <strong>Permit</strong> and associated Hot <strong>Work</strong> Certificate is required when:<br />
• Flammable or combustible gases or liquids are present which have the potential <strong>to</strong> ignite or<br />
explode<br />
• Flammable or combustible materials are present which may ignite if not protected or controlled<br />
adequately<br />
• Flash vapours and non-condensable gases have the potential <strong>to</strong> accumulate and develop<br />
flammable mixtures.<br />
Risk assessments shall be conducted <strong>to</strong> identify the areas where the higher level of control of a <strong>Work</strong><br />
<strong>Permit</strong>/Hot <strong>Work</strong> Certificate is required. All other hot work where a risk of ignition exists is either<br />
performed in a designated hot work area or, if considered low risk hot work, under the authority of a<br />
<strong>Work</strong> Authorisation. Where there is no risk of fire or explosion from hot work the work can proceed<br />
under a management authorised THA or <strong>Standard</strong> <strong>Work</strong> Procedure.<br />
5.2 Performing Hot <strong>Work</strong> when a <strong>Work</strong> <strong>Permit</strong> is not Required<br />
• Where it has been determined by risk assessment that no risk of fire or explosion exists, the hot<br />
work may proceed under an authorised THA or <strong>Standard</strong> <strong>Work</strong> Procedure (SWP).<br />
• The THA shall be signed as a written authority by a line supervisor confirming that a <strong>Work</strong><br />
<strong>Permit</strong>/Safety Checklist is not required and all controls defined are appropriate for the work in<br />
the defined work environment<br />
• The hot work technician shall obtain verbal clearance from the work environment ‘owner’ prior <strong>to</strong><br />
work commencing.<br />
5.3 Performing Hot <strong>Work</strong> under a <strong>Work</strong> Authorisation<br />
Where it has been determined by risk assessment that the risk of fire and explosion from hot work is<br />
low the work may be conducted under the authority of a <strong>Work</strong> Authorisation and a THA/SWP signed<br />
by the hot work technician’s line supervisor.<br />
The hot work technician and team leader shall confirm that:<br />
• They have verified that a <strong>Work</strong> <strong>Permit</strong> is not required<br />
• An authorised THA/SWP is available for the specific work<br />
• The person(s) performing the hot work is competent <strong>to</strong> perform the particular hot work<br />
• The area is free of flammable and combustible materials, which may ignite if not protected or<br />
controlled adequately (a 15 metre radius is required by AS 1674)<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 46 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
• The person performing the hot work can safely moni<strong>to</strong>r the work environment<br />
• The appropriate fire fighting equipment is available and in working order<br />
Once the above questions have been answered in the affirmative and the <strong>Work</strong> Authorisation Tag has<br />
been filled out, the Tag shall be authorised.<br />
The Authorising Person retains the tear off portion of the Tag as a record of work authorisation.<br />
Prior <strong>to</strong> commencing work verbal clearance shall be obtained from the ‘owner’ of the work<br />
environment.<br />
The Tag is hung adjacent <strong>to</strong> the area where hot work is performed (see Appendix F3 for <strong>Work</strong><br />
Authorisation Tag).<br />
When work is complete the hot work technician informs the ‘owner’ that work is complete and the Tag<br />
is returned <strong>to</strong> the Authorising Person for sign off and filed as part of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
documentation.<br />
5.4 Preparing for a <strong>Work</strong> <strong>Permit</strong>/Hot <strong>Work</strong> Certificate<br />
The process of defining necessary controls for hot work forms part of the preparation for obtaining a<br />
<strong>Work</strong> <strong>Permit</strong> and is described in the beginning of this <strong>Standard</strong>. When it has been decided as part of<br />
this process that a Hot <strong>Work</strong> Certificate (see Appendix F2) is required, the person performing the hot<br />
work (hot work technician) and/or the <strong>Permit</strong> Accep<strong>to</strong>r, in consultation as necessary with the <strong>Permit</strong><br />
Issuer, shall:<br />
• Prepare the work site <strong>to</strong> contain all ignition sources as close <strong>to</strong> the point of work as possible, i.e.<br />
erect barriers <strong>to</strong> contain slag and sparks<br />
• Identify and remove or control all combustible/flammable materials (gases, vapours, dusts,<br />
fibres, other solids) from within 15 meters of each hot work point and immediately below this<br />
area when working at height<br />
• Equipment, piping and tanks on which hot work is <strong>to</strong> be performed shall be thoroughly drained,<br />
flushed with water, dried, steamed and air purged as necessary (the plant/equipment owner<br />
would normally perform process preparations) <strong>to</strong> provide an atmosphere which can be tested<br />
and certified as gas-free immediately before the commencement of hot work. Hot tapping is a<br />
special case in which hot work takes place on live lines and under hazard controls defined from<br />
a risk assessment<br />
• Provide a safe entry and exit from the hot work area.<br />
If combustible/flammable materials cannot be removed:<br />
• Ensure suitable non-combustible covers or shields (e.g. fire blankets) are secured in place<br />
• Provide proper ventilation of hot work areas<br />
• Locate and check the emergency fire fighting equipment for safe operation<br />
• Establish a Fire Watch if required by the risk assessment<br />
• The <strong>Permit</strong> Issuer shall arrange for required gas testing (initial and repeat or continuous) and<br />
shall be undertaken using an intrinsically safe gas detec<strong>to</strong>r and conducted by an authorised<br />
Gas Tester<br />
• The <strong>Permit</strong> Issuer shall be satisfied that the level of any flammable or combustible material in<br />
the atmosphere adjacent the hot work area is less than 5% of its Lower Explosive Limit (LEL)<br />
immediately prior <strong>to</strong> authorising the <strong>Work</strong> <strong>Permit</strong><br />
• See Appendix E1 for requirements when conducting hot work in confined spaces.<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 47 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
When all of the hazard controls defined in the <strong>Work</strong> <strong>Permit</strong> and Hot <strong>Work</strong> Certificate have been<br />
completed (including any initial gas test results) the <strong>Permit</strong> Accep<strong>to</strong>r shall request issue of the <strong>Work</strong><br />
<strong>Permit</strong>. The <strong>Permit</strong> Issuer shall follow the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> issuing process <strong>to</strong> allow progress of work.<br />
6. Responsibilities<br />
The assigned Fire Watch is responsible for:<br />
• Being alert at all times and continually observing the hot work<br />
• Maintaining a safe place of work in the vicinity of the hot work<br />
• Obtaining fire fighting equipment (extinguishers/hoses/blankets etc) and confirming operational<br />
capacity<br />
• Ensuring personnel are wearing the appropriate personal protective equipment<br />
• Moni<strong>to</strong>ring changes in weather conditions specifically wind direction<br />
• Taking immediate action <strong>to</strong> combat any outbreak of fire and informing the Emergency Services<br />
Personnel<br />
• Withdrawing the <strong>Work</strong> <strong>Permit</strong>/Hot <strong>Work</strong> Certificate if a breach of hazard controls is observed<br />
• Signing on/off the Hot <strong>Work</strong> Certificate at beginning /end of hot work<br />
• Not leaving the work area unless relieved by an authorised person<br />
• Not leaving the work area until the risk of fire has been removed and any designated post watch<br />
period determined by the risk assessment has expired.<br />
The Gas Tester is responsible for:<br />
• Conducting an alarm point challenge at the beginning of each shift or before a gas detec<strong>to</strong>r is<br />
used for the first time during a shift<br />
• Conducting fresh air calibrations<br />
• Ensuring gas testing equipment is available as required and remains in a fully operational state<br />
whilst in place<br />
• Recommending sampling and atmosphere control strategies <strong>to</strong> the <strong>Permit</strong> Issuer<br />
• Setting up continuous gas moni<strong>to</strong>rs <strong>to</strong> ensure a representative sample at all times<br />
• Carrying out initial and repeat gas testing as required.<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 48 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
APPENDIX F2<br />
F2 HOT WORK CERTIFICATE<br />
HOT WORK CERTIFICATE<br />
This certificate must be accompanied by a <strong>Work</strong> <strong>Permit</strong><br />
<strong>Work</strong> Location :<br />
<strong>Work</strong> <strong>Permit</strong> No:<br />
SPECIAL PRECAUTIONS AND CONDITIONS<br />
No:<br />
Fire watch Barricading ER standby<br />
Fire extinguisher Drains covered Fire Blanket<br />
Signs erected Area wetting Non sparking <strong>to</strong>ols<br />
Welding screens Flame-proof PPE Thickness Test<br />
Gas test requirements<br />
Yes No Yes No<br />
Is a gas test required<br />
Continuous testing<br />
Gas test frequency<br />
Initial gas test Result:<br />
Gast tester: Signature: Date and time:<br />
Any other conditions<br />
Repeat Gas Tests<br />
Result Name Signature Date Time<br />
Fire Watch sign on/off on rear of Certificate<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 49 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
APPENDIX F3<br />
F3 FIRE WATCH SIGN OFF/ON ( rear of Hot work certificate)<br />
FIRE WATCH SIGN OFF/ON<br />
Date<br />
Name<br />
On<br />
Time<br />
Off<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 50 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
APPENDIX F4<br />
F4 HOT WORK- WORK AUTHORISATION TAG<br />
FRONT<br />
Tag No:<br />
HOT WORK- WORK AUTHORISATION<br />
Checklist prior <strong>to</strong> work<br />
This tag must be displayed on equipment<br />
being worked on and returned <strong>to</strong> the<br />
Authorised Person on completion of<br />
work<br />
Location: .................................................<br />
REAR<br />
HOT WORK- WORK AUTHORISATION<br />
• <strong>Hazard</strong> controls in place as per<br />
THA/SWP............................................<br />
• All combustible materials have<br />
controls established.............................<br />
• Appropriate safety signs/barricades<br />
installed................................................<br />
• Fire fighting equipment located<br />
and checked ........................................<br />
• Water hose located and checked.......<br />
THA/SWP Ref: .......................................<br />
Dept/Comp: ............................................<br />
Date: .......................................................<br />
Name: .....................................................<br />
Authorised Person<br />
Name: .....................................................<br />
Signature: ...............................................<br />
Signature: ...............................................<br />
On Completion of <strong>Work</strong><br />
The hot work is complete and the area left<br />
clean and safe.<br />
Name:<br />
Signature:<br />
Date:<br />
Tag No:<br />
Hot <strong>Work</strong>- <strong>Work</strong> Authorisation<br />
Name: .....................................................<br />
Location: .................................................<br />
Date: .......................................................<br />
Hot <strong>Work</strong>- <strong>Work</strong> Authorisation<br />
Tear off tab <strong>to</strong> be handed <strong>to</strong> Authorised<br />
Person at time of issue<br />
<strong>Work</strong> Completion<br />
Authorised Person:<br />
Name:<br />
Date:<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 51 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
APPENDIX G1<br />
G1 RADIATION PROCEDURE<br />
1. Purpose And Scope<br />
This procedure details the requirements <strong>to</strong> ensure safe conditions when working with or near radiation<br />
sources.<br />
All work with portable sources or when working within a 5 metre radius from a gauge which involves<br />
breaking in<strong>to</strong> the process line or other process equipment shall be controlled through the issue of a<br />
<strong>Work</strong> <strong>Permit</strong> and associated Radiation Certificate (and Isolations Certificate as necessary).<br />
2. Details<br />
The process is shown in Appendix G2 Radiation Process – Flow Chart.<br />
3. Safety<br />
The following issues shall be considered when establishing controls for working with radiation<br />
sources:<br />
• Radiation Certificates shall be authorised by the Site Radiation Safety Officer (RSO) or delegate<br />
• Use of Authorised Radiation <strong>Work</strong>ers only. An Authorised Radiation worker is a site employee<br />
who has successfully completed a recognised radiation-training course and has been registered<br />
on site as authorised <strong>to</strong> work with radiation sources. This worker must undertake <strong>to</strong> complete<br />
periodic refresher courses as required by the RSO<br />
• Ensure that radiation warning signs are in place at the work site<br />
• Whilst transporting a gauge or In Stream Analyser (ISA) probe, appropriate placards shall be<br />
placed on the vehicle<br />
• Ensure that all other work team members are aware when a portable nuclear gauge is in use<br />
and that work that may create ionising radiation is being conducted<br />
• Ensure that any radiation gauge in use is clearly and correctly labelled with the radiation<br />
warning symbol, and name and telephone number of the person <strong>to</strong> contact immediately in the<br />
event of an emergency<br />
• Only the supplier, trained persons and persons authorised by the supplier, or persons<br />
authorised by the State Regula<strong>to</strong>ry Authority are permitted <strong>to</strong> repair source, source holder or the<br />
shutter<br />
• Authorised Radiation personnel shall ensure that they:<br />
- Always lock the shutter in the ‘Off Position’ until maintenance is complete<br />
- Only remove the source rod if authorisation is approved by license<br />
- After a radiation gauge has been switched <strong>to</strong> the ‘beam off’ position and locked out, the<br />
Radiation Technician shall perform a gamma survey around the gauge <strong>to</strong> ensure the<br />
beam is off, and record results. The radiation level shall not exceed 500 µSv/h at any<br />
point 5cm from the external surface and 10 µSv/h at any point I metre from the surface<br />
- Avoid any physical contact with or direct exposure <strong>to</strong> the source when performing any<br />
maintenance<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 52 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
- Log in an appropriate site register the temporary or permanent removal of a radiation<br />
gauge or ISA probe<br />
- Ensure the gauge has been wipe tested as per statu<strong>to</strong>ry requirements or as<br />
recommended in the maker’s instructions. The gauge should not be left untested for<br />
leakage for a period exceeding three years<br />
• In the event that a radiation device has been damaged, seek expert advice prior <strong>to</strong> use<br />
• Before responding <strong>to</strong> an emergency that involves a radioactive source, the Emergency<br />
Response Co-ordina<strong>to</strong>r shall notify the RSO and await their attendance and advice before<br />
attempting any action<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 53 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
APPENDIX G2<br />
G2 RADIATION PROCESS - FLOWCHART<br />
Scope of work defined<br />
including need <strong>to</strong> carry out<br />
work on radiation devices<br />
Service provider consults<br />
with RSO and <strong>Permit</strong> Issuer<br />
<strong>to</strong> determine necessary<br />
controls<br />
<strong>Permit</strong> Issuer receives all permit<br />
documentation, agrees controls and initiates<br />
preparation of the work environment by an<br />
authorised Isola<strong>to</strong>r (RSO or delegate),<br />
according <strong>to</strong> requirements on the Radiation<br />
Certificate and Isolation Certificate (as required)<br />
No<br />
Are Isolations<br />
required?<br />
Yes<br />
<strong>Work</strong> <strong>Permit</strong> closure by<br />
standard process<br />
The authorised Isola<strong>to</strong>r (RSO or delegate)<br />
completes the necessary preparations and<br />
returns the authorised Radiation / Isolation<br />
Certificates <strong>to</strong> the <strong>Permit</strong> Issuer<br />
<strong>Work</strong> completed<br />
<strong>Permit</strong> Issuer issues<br />
Radiation Certificate and<br />
<strong>Work</strong> <strong>Permit</strong> <strong>to</strong> <strong>Permit</strong><br />
Accep<strong>to</strong>r<br />
<strong>Work</strong> progresses under<br />
control of RSO and<br />
authorised radiation workers<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 54 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
APPENDIX G3<br />
G3 RADIATION CERTIFICATE<br />
Plant / Area :<br />
Equipment Description :<br />
Covering <strong>Work</strong> <strong>Permit</strong> No.:<br />
RADIATION CERTIFICATE<br />
This certificate must be accompanied by a work permit<br />
Equipment No.:<br />
No:<br />
SOURCE DETAILS (TO BE COMPLETED BY RSO)<br />
Source type<br />
RAD Source No.:<br />
Activity :<br />
Serial No.:<br />
Calculated exclusion zone :<br />
SPECIAL PRECAUTIONS AND CONDITIONS<br />
Film Badge Written plan Shutters locked on/off<br />
Signpost Irrigating dose meter Sentries posted<br />
Barrier tape Warning lights Collima<strong>to</strong>r fitted<br />
Other:<br />
AUTHORISATION<br />
The above controls have been implemented and checked.<br />
RSO Name: Signature: Date: Time:<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 55 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
APPENDIX H1<br />
H1 EXCAVATION PROCEDURE<br />
1. Purpose and Scope<br />
This appendix documents the process for establishing necessary controls <strong>to</strong> prevent injury from an<br />
uncontrolled release of energy through the exposure of underground services and <strong>to</strong> prevent damage<br />
<strong>to</strong> underground services<br />
The process controls the authorisation of all work where the ground or surface is required <strong>to</strong> be<br />
excavated by hand or machinery below 300mm.<br />
It does not apply <strong>to</strong>:<br />
• Any earthmoving or excavation work undertaken within defined ‘Open Cut’ or ‘Underground<br />
Mine’ boundaries<br />
• Exploration drilling within defined ‘Open Cut’ boundaries.<br />
2. Details<br />
The process is described in Appendix H2.<br />
3. Safety<br />
3.1 Excavation Close <strong>to</strong> Services<br />
• For any excavation work in close proximity <strong>to</strong> an energy source (eg. power cables,<br />
communication cables, live pipe lines) where there is potential for uncontrolled release of<br />
energy, then the energy source shall be positively isolated, tagged and tested<br />
• Any work within 1 metre of any buried service shall be done using hand <strong>to</strong>ols<br />
• Any work within a 10 metre corridor of any overhead power lines can only proceed through the<br />
authority of a ‘Vicinity <strong>Permit</strong>’ from the owner of the power line.<br />
3.2 Crossing Thoroughfares<br />
The excavation Supervisor will ensure the following precautions if an excavation involves the crossing<br />
of a road or will impede access <strong>to</strong> the plant:<br />
• Install all appropriate signs<br />
• Notify the Emergency Services Co-ordina<strong>to</strong>r of the area concerned before commencement of<br />
work<br />
• Notify the Departmental Manager of the area concerned before commencement of work.<br />
3.3 Blasting<br />
Blasting is not permitted in the excavation unless the General Manager or his delegate grants written<br />
permission.<br />
3.4 Environmental clearance<br />
Whenever there is a requirement <strong>to</strong> disturb ground previously undisturbed, the site environmental<br />
department shall be contacted <strong>to</strong> clarify specific environmental requirements.<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 56 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
3.5 Equipment/Material near an Excavation<br />
No hoisting or power driven equipment or other load should be placed in or adjacent <strong>to</strong> an excavation<br />
unless the sides of the excavation have been adequately supported <strong>to</strong> prevent wall collapse.<br />
Excavated material or other material should not be placed or s<strong>to</strong>red at a distance of less than one<br />
third the depth of the excavation from the edge of the excavation.<br />
All heavy machinery/equipment shall be s<strong>to</strong>red a minimum distance of 5 metres from the edge of the<br />
excavation, or a minimum distance equal <strong>to</strong> the depth of the excavation, which ever is larger.<br />
3.6 Personnel <strong>Work</strong>ing in Excavations<br />
The following applies <strong>to</strong> all personnel working under a <strong>Work</strong> <strong>Permit</strong>/Excavation Certificate:<br />
• All excavations shall have warning signs and notices posted<br />
• All excavations left open shall be barricaded off and have flashing lights installed at night and<br />
outside working hours (note: barricades <strong>to</strong> a minimum height of 900mm)<br />
• Any excavation deeper than 1.2 metres shall have a Confined Space Entry Certificate<br />
authorised if personnel are required <strong>to</strong> enter<br />
• No personnel shall be present in an excavation while that part is being mechanically dug<br />
• Sufficient and safe means of access in<strong>to</strong>, out of and across excavations shall be maintained<br />
• A ladder shall be provided for any excavation having a depth of 1 metre or more.<br />
3.7 Shoring of Excavations<br />
Every face of any excavation that exceeds 1.2 metres shall be supported or contained by shoring<br />
unless:<br />
• The face is cut back <strong>to</strong> a safe slope<br />
• The material in the face has good standing<br />
• There is no danger <strong>to</strong> personnel because of the nature of the work or their position in the vicinity<br />
of the work.<br />
3.8 Updating Records<br />
Where the excavation is for the installation of any new buried services, full details shall be shown on<br />
records maintained by the Engineering Section.<br />
Where any excavation exposes an incorrectly documented buried service the Authorised Excavation<br />
Officer shall be advised for updating of records.<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 57 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
APPENDIX H2<br />
H2<br />
EXCAVATION CERTIFICATE<br />
Plant / Area :<br />
EXCAVATION CERTIFICATE<br />
No:<br />
This certificate must be accompanied by a work permit<br />
Location: Attach sketch: Yes No <br />
Purpose of Excavation :<br />
Covering <strong>Work</strong> <strong>Permit</strong> No.:<br />
DWG Ref No.:<br />
SPECIAL PRECAUTIONS AND CONDITIONS<br />
Underground Services<br />
Service Tested Result Name Signature<br />
Electrical<br />
Sewerage / Water<br />
Telecom<br />
Gas Pipes<br />
Other<br />
Other<br />
Yes <br />
Yes <br />
Yes <br />
Yes <br />
Yes <br />
Yes <br />
Is environmental approval required : Yes No <br />
Other:<br />
Is road crossing required : Yes No <br />
AUTHORISATION<br />
Authorised Excavation Officer: Signature: Date: Time:<br />
Authorised Electrical Person: Signature: Date: Time:<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 58 of 59
WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />
<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />
APPENDIX H3<br />
H3 EXCAVATION – FLOWCHART<br />
Scope of work defined<br />
including need for<br />
excavation<br />
<strong>Work</strong> completed<br />
<strong>Work</strong> permit<br />
closure by<br />
standard process<br />
Service provider consults<br />
with Environmental<br />
section <strong>to</strong> determine<br />
environmental<br />
requirements<br />
<strong>Permit</strong> accep<strong>to</strong>r<br />
accepts work<br />
permit<br />
<strong>Permit</strong> issuer<br />
issues work permit<br />
and associated<br />
certificates<br />
Is environmental<br />
approval required?<br />
Yes<br />
Follow<br />
Environmental<br />
Request <strong>to</strong><br />
Proceed Form<br />
Completed all<br />
other controls on<br />
Excavation<br />
certificate<br />
No<br />
No<br />
Request authority <strong>to</strong><br />
excavate from authorised<br />
officer (site <strong>to</strong> nominate)<br />
Is additional fill<br />
required?<br />
Yes<br />
Seek advice from<br />
Environmental<br />
section<br />
No<br />
Excava<strong>to</strong>r Supervisor and<br />
authorised officer (and<br />
<strong>Permit</strong> Issuer as<br />
necessary) inspect site<br />
and identify controls<br />
required<br />
Is road closure<br />
required?<br />
Yes<br />
Notify ER coordina<strong>to</strong>r<br />
No<br />
All agree necessary<br />
controls and complete<br />
Excavation Certificate and<br />
covering <strong>Work</strong> <strong>Permit</strong><br />
Is confined space<br />
entry required?<br />
Yes<br />
Complete<br />
preparedness for<br />
Confined Space<br />
Entry certificate as<br />
per procedure<br />
No<br />
Are isolations<br />
required?<br />
Yes<br />
<strong>Permit</strong> issuer<br />
requests isola<strong>to</strong>r<br />
<strong>to</strong> complete<br />
Isolation certificate<br />
Service provider forwards<br />
all work permit request<br />
documents <strong>to</strong> <strong>Permit</strong><br />
Issuer<br />
WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 59 of 59