WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

• The Isola<strong>to</strong>r commences removal of the isolations lock/tag(s)<br />

• When all isolation locks/tags have been removed, the Isola<strong>to</strong>r shall return the Isolation<br />

Certificate <strong>to</strong>gether with all locks/tags <strong>to</strong> the <strong>Permit</strong> Issuer<br />

• The <strong>Permit</strong> Issuer shall confirm the number of locks/tags matches the Isolation Certificate<br />

requirements<br />

6. Tags<br />

Isolation procedures shall use the following four tags:<br />

• Isolation Tag<br />

• Personal Danger Tag<br />

• Testing Tag<br />

• Out of Service Tag<br />

6.1 Isolation Tag<br />

This is an instruction tag that indicates the equipment is in a state that prevents the flow of energy.<br />

The tag shall refer the reader <strong>to</strong> the person(s) or position(s) who are authorised <strong>to</strong> change the status<br />

of the equipment.<br />

The tag shall be locked in place at an isolation point with an isolation lock.<br />

When used <strong>to</strong> secure the isolation key(s) in the <strong>Permit</strong> Control Board, it is locked in place with a<br />

<strong>Permit</strong> Issuers lock.<br />

6.2 Personal Danger Tag (PDT)<br />

This is an instruction tag indicating that there shall be no change in equipment status while this tag is<br />

in place.<br />

The tag shall be locked in place with a uniquely keyed lock<br />

All persons working on isolated equipment shall affix their PDT <strong>to</strong> the <strong>Permit</strong> Control Board before<br />

commencing work. Whilst any PDT remains in place removal of isolations shall not take place.<br />

Any person may place their PDT on any or all isolation point(s) affecting their safety.<br />

A PDT shall be removed by the owner before they leave the work site e.g. at shift end.<br />

Only the tag owner shall remove their PDT. If this is not possible, the site shall have a procedure in<br />

place for the removal of a PDT without risk <strong>to</strong> personnel. .This procedure shall be authorised by the<br />

General Manager (or equivalent).<br />

6.3 Testing Tag<br />

This is an instruction tag indicating <strong>to</strong> the reader that the isolations associated with the tag have been<br />

temporarily removed <strong>to</strong> allow testing <strong>to</strong> be carried out.<br />

The tag shall be tied on<strong>to</strong> the <strong>Permit</strong> Control Board and on<strong>to</strong> isolation points whilst testing.<br />

6.4 Out of Service Tag<br />

This is an informational tag, indicating <strong>to</strong> the reader the equipment item shall not be used until cleared<br />

for safe operation by a competent person.<br />

When Out of Service tags are used, they must be secured in place.<br />

7. <strong>Permit</strong> Control Board<br />

A <strong>Permit</strong> Control Board has the dual function of housing the <strong>Work</strong> <strong>Permit</strong> documentation and securing<br />

the isolation key(s) in a lock box.<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 24 of 59