WMC EHS Management System <strong>Major</strong> <strong>Hazard</strong> <strong>Standard</strong><br />

<strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

• The <strong>Permit</strong> Accep<strong>to</strong>r ensures the work<br />

team understands the extent of hazard<br />

controls in place and assumes control of<br />

work activities for the duration of work.<br />

The <strong>Work</strong> <strong>Permit</strong> hazard controls shall<br />

remain in place whilst work is in<br />

progress.<br />

• When the agreed work is complete the<br />

<strong>Permit</strong> Accep<strong>to</strong>r leaves the work site<br />

clean and safe and hands back the <strong>Work</strong><br />

<strong>Permit</strong> <strong>to</strong> the <strong>Permit</strong> Issuer.<br />

• The <strong>Permit</strong> Issuer resumes control over<br />

the equipment / plant and progresses the<br />

removal of any temporary hazard<br />

controls established for the task before<br />

returning <strong>to</strong> normal operations.<br />

5 TRAINING AND COMPETENCY<br />

Structured competency-based training shall be<br />

given <strong>to</strong> all users of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

System. Competency shall be reassessed at a<br />

maximum interval of two years.<br />

<strong>Standard</strong>ised training modules shall be<br />

established for the following:<br />

• <strong>Permit</strong> Issuer<br />

• Isola<strong>to</strong>r (including Isolation Checker)<br />

• <strong>Permit</strong> Accep<strong>to</strong>r<br />

• Confined Space Entry<br />

• Confined Space Stand-by Person<br />

• Hot <strong>Work</strong> and Fire Safety (including Fire<br />

Watch)<br />

• <strong>Work</strong> Team Member.<br />

<strong>Permit</strong> Issuers and Isola<strong>to</strong>rs require detailed<br />

knowledge of the area in which they are<br />

issuing permits or carrying out isolations. Such<br />

knowledge shall be achieved as a prerequisite<br />

<strong>to</strong> gaining <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> competencies.<br />

Competency records for all personnel shall be<br />

maintained on a site register and the extent of<br />

specific competency for individuals shall be<br />

clearly known <strong>to</strong> users of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

System.<br />

6 MONITORING AND AUDITS<br />

It is a requirement of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong><br />

System that <strong>Permit</strong> Issuers, or a competent<br />

delegate, perform regular inspections of active<br />

<strong>Work</strong> <strong>Permit</strong>s in the work site. The frequency<br />

and degree of detail included in this inspection<br />

should be based on the level of risk and<br />

complexity of the task being performed. The<br />

inspection shall include:<br />

• Review of the <strong>Work</strong> <strong>Permit</strong><br />

documentation<br />

• Confirmation that the actual work being<br />

performed is consistent with the defined<br />

hazard controls in place. This does not<br />

require a detailed knowledge of the<br />

technical aspects of work being done.<br />

• Confirmation that the hazard controls<br />

defined in the <strong>Work</strong> <strong>Permit</strong> remain in<br />

place.<br />

Each site shall conduct regular (at least<br />

quarterly) compliance audits of the <strong>Permit</strong> <strong>to</strong><br />

<strong>Work</strong> System.<br />

A person independent of the area in which<br />

<strong>Work</strong> <strong>Permit</strong>s are issued shall carry out a<br />

compliance audit of the over-all functioning of<br />

the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> System at least annually.<br />

7 WORK PERMIT PROCESS<br />

Effective work planning and risk assessment<br />

processes are essential <strong>to</strong> the smooth and<br />

safe execution of the <strong>Permit</strong> <strong>to</strong> <strong>Work</strong> System.<br />

7.1 Scope of <strong>Work</strong><br />

For any potentially hazardous work activity<br />

there shall be a clearly defined Scope of <strong>Work</strong><br />

(SOW). This SOW shall:<br />

• Be defined by the Service Provider in<br />

consultation as appropriate with a <strong>Permit</strong><br />

Issuer (or another equipment / plant<br />

owner representative)<br />

• Enable identification of all hazards<br />

WMC-EHS-MHS-007 DocsOpen Ref : 155520 Issued: 23/12/03 Page 6 of 59