- Page 1 and 2: 229-RU0473 RUTGERS PAVEMENT RESOURC
- Page 3 and 4: Report No. 229-RU0473 Government Ac
- Page 5 and 6: TABLE OF CONTENTS EXECUTIVE SUMMARY
- Page 7 and 8: equipment aimed at enhancing networ
- Page 9 and 10: The Pavement Resource Program coord
- Page 11 and 12: enhanced GIS tools will provide add
- Page 13 and 14: wearing course (such as a Novachip
- Page 15 and 16: NJDOT Deighton dTIMS CT Pavement Ma
- Page 17 and 18: 4.1 Condition and Travel Distributi
- Page 19 and 20: List of Tables Table 1: Perspective
- Page 21: Executive Summary To follow draft r
- Page 25 and 26: Chapter 2: The dTIMS CT Database O
- Page 27 and 28: Chapter 2: The dTIMS CT Database Me
- Page 29 and 30: Chapter 2: The dTIMS CT Database Vi
- Page 31 and 32: Chapter 2: The dTIMS CT Database Ch
- Page 33 and 34: Chapter 2: The dTIMS CT Database Se
- Page 35 and 36: Chapter 2: The dTIMS CT Database Hi
- Page 37 and 38: Chapter 2: The dTIMS CT Database Pe
- Page 39 and 40: Chapter 2: The dTIMS CT Database Pe
- Page 41 and 42: Chapter 2: The dTIMS CT Database 2.
- Page 43 and 44: Chapter 2: The dTIMS CT Database fo
- Page 45 and 46: Chapter 2: The dTIMS CT Database Th
- Page 47 and 48: Chapter 2: The dTIMS CT Database 2.
- Page 49 and 50: Chapter 2: The dTIMS CT Database Te
- Page 51 and 52: Chapter 2: The dTIMS CT Database Ca
- Page 53 and 54: Chapter 2: The dTIMS CT Database 2
- Page 55 and 56: Chapter 2: The dTIMS CT Database D
- Page 57 and 58: Chapter 2: The dTIMS CT Database as
- Page 59: Chapter 2: The dTIMS CT Database Ot
- Page 62 and 63: Chapter 3: The dTIMS CT Analysis Da
- Page 64 and 65: Chapter 3: The dTIMS CT Analysis Fo
- Page 66 and 67: Chapter 3: The dTIMS CT Analysis 3.
- Page 68 and 69: Condition Index Chapter 3: The dTIM
- Page 70 and 71: Chapter 3: The dTIMS CT Analysis Pe
- Page 72 and 73:
Chapter 3: The dTIMS CT Analysis On
- Page 74 and 75:
Chapter 3: The dTIMS CT Analysis an
- Page 76 and 77:
Chapter 3: The dTIMS CT Analysis Th
- Page 78 and 79:
Chapter 3: The dTIMS CT Analysis Re
- Page 80 and 81:
NJDOT Deighton dTIMS CT User Manual
- Page 82 and 83:
Chapter 3: The dTIMS CT Analysis Fi
- Page 84 and 85:
Chapter 3: The dTIMS CT Analysis va
- Page 86 and 87:
Chapter 3: The dTIMS CT Analysis Ef
- Page 88 and 89:
Chapter 3: The dTIMS CT Analysis Co
- Page 90 and 91:
Chapter 3: The dTIMS CT Analysis Th
- Page 92 and 93:
Chapter 3: The dTIMS CT Analysis
- Page 94 and 95:
Chapter 3: The dTIMS CT Analysis on
- Page 96 and 97:
Chapter 3: The dTIMS CT Analysis LC
- Page 98 and 99:
Chapter 3: The dTIMS CT Analysis LC
- Page 100 and 101:
Chapter 5: Conclusions and Recommen
- Page 102 and 103:
Chapter 5: Conclusions and Recommen
- Page 104 and 105:
Chapter 5: Conclusions and Recommen
- Page 106 and 107:
Chapter 5: Conclusions and Recommen
- Page 109:
Chapter 5: Conclusions and Recommen
- Page 112 and 113:
Appendix “A” Perspective Name A
- Page 114 and 115:
Appendix “A” Perspective Name A
- Page 116 and 117:
Appendix “A” Perspective Name A
- Page 118 and 119:
Appendix “A” Perspective Name A
- Page 120 and 121:
Appendix “A” Perspective Name A
- Page 122 and 123:
Appendix “A” Perspective Name A
- Page 124 and 125:
Appendix “A” Table 40: SLD_Widt
- Page 126 and 127:
Appendix “B” NJDOT Deighton dTI
- Page 128 and 129:
Table of Content Introduction Profi
- Page 130 and 131:
Pavement Profiler Certification Tes
- Page 132 and 133:
DYNAMIC CERTIFICATION TESTING— Th
- Page 134 and 135:
Reference Profiler Analysis The pro
- Page 136 and 137:
Analysis Report All eleven referenc
- Page 138 and 139:
SurPRO 2000 S1 Repeatability File L
- Page 140 and 141:
SurPRO 2000 S2 Repeatability File L
- Page 142 and 143:
Portable and High Speed Profiler An
- Page 144 and 145:
The left portion of the screen allo
- Page 146 and 147:
Minimum Repeatability percentage =
- Page 148 and 149:
The accuracy analysis checks the pe
- Page 150 and 151:
Summary
- Page 152 and 153:
Profiles Reference Profiler - SurPR
- Page 154 and 155:
High Speed Profilers ICC S1 Left Le
- Page 156 and 157:
ICC S2 Left Lead-in Test Area Lead-
- Page 158 and 159:
Dynatest 146 S1 Left Test Area S1 D
- Page 160 and 161:
Dynatest 146 S1 Right Test Area S1
- Page 162 and 163:
Dynatest 146 S2 Left Test Area S2 D
- Page 164 and 165:
Dynatest 147 S1 Left S1 Dynatest 14
- Page 166 and 167:
Dynatest 147 S2 Left S2 Dynatest 14
- Page 168 and 169:
Profiler Certification Analysis Tes
- Page 170 and 171:
SurPRO 2000 S2 Left
- Page 172 and 173:
ICC S1
- Page 174 and 175:
Dynatest 146 S1
- Page 176 and 177:
Dynatest 147 S1
- Page 178 and 179:
Profiler IRI Verification Test Resu
- Page 180 and 181:
Dynatest 146 S1 File Profile IRI (i
- Page 182 and 183:
Accuracy Dynatest 146 S1
- Page 184 and 185:
Accuracy Dynatest 147 S1
- Page 186 and 187:
ON-BOARD SOUND INTENSITY (OBSI) EVA
- Page 188 and 189:
ABSTRACT Quiet pavements have recei
- Page 190 and 191:
tire/pavement interface noise measu
- Page 192 and 193:
NJ. Rt. 202 is a 2 lane, 55 mph sta
- Page 194 and 195:
Figure 2 - On-Board Sound Intensity
- Page 196 and 197:
Figure 4 - Noise Spectrum Analysis
- Page 198 and 199:
Figure 6 shows the spectrum analysi
- Page 200 and 201:
spectrum properties over time. In c
- Page 202 and 203:
5. Bennert, T., D. Hanson, A. Maher
- Page 204 and 205:
SCOPE OF WORK The scope of the proj
- Page 206 and 207:
Figure 1 - Photo of the Asphalt Mix
- Page 208 and 209:
10,000,000 Dynamic Modulus (psi) 1,
- Page 210 and 211:
Repeated Load - Flow Number Test Re
- Page 212 and 213:
Table 3 - Overlay Tester Results of
- Page 214 and 215:
Fatigue Life, N f,50% (Cycles) 1,00
- Page 216:
Table 4 - Tensile Strength Ratio (T