Management Plan for Firth Park - MP4-Interreg
Management Plan for Firth Park - MP4-Interreg
Management Plan for Firth Park - MP4-Interreg
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
11.3 The Clock Tower and Hinde Common<br />
Wood<br />
The redesign of this area aims to improve the<br />
entrance in to the park, improve the linkage<br />
between the two park areas, to create an<br />
appropriate setting <strong>for</strong> the Clock Tower and<br />
create new experiences in the area not found<br />
elsewhere in the park, which will encourage<br />
and increase park users to visit the area.<br />
The design will build on the historical<br />
importance of the Clock Tower, improve its<br />
setting, re-establish its importance as a<br />
gateway in to the park, and create a new,<br />
related use <strong>for</strong> the old boating lake.<br />
The Following improvements are proposed<br />
Re-establish the Clock tower as an<br />
entranceway in to the park and improve the<br />
setting of the building in to the natural<br />
landscape. Remove the recycling bins and<br />
install disabled parking in front of the building<br />
as well as improving the perimeter railings<br />
Enhance the naturalistic planting either side of<br />
<strong>Firth</strong> <strong>Park</strong> Road.<br />
Improve the pedestrian safety along <strong>Firth</strong> park<br />
road by introducing traffic calming and crossing<br />
points linking in to the park and the footpath<br />
network<br />
Improve vehicle access to the Clock tower and provide areas of off Site Street parking<br />
along <strong>Firth</strong> <strong>Park</strong> road by narrowing the highway<br />
Improve the footpath woodland links in Hinde Common Wood to link in to the main <strong>Park</strong><br />
footpath network<br />
Explore the feasibility of lighting the clock Tower building at night to act as a local feature<br />
within the area<br />
61