Algorithm Theoretical Based Document (ATBD) - CESBIO
Algorithm Theoretical Based Document (ATBD) - CESBIO
Algorithm Theoretical Based Document (ATBD) - CESBIO
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
SO-TN-ESL-SM-GS-0001<br />
Issue 1.a<br />
Date: 31/08/2006<br />
SMOS level 2 processor<br />
Soil moisture <strong>ATBD</strong><br />
1.2.4 Open issues<br />
This section is only concerned with open issues that are relevant for implementing the initial prototype, and must<br />
definitely be closed before acceptance.<br />
• Consolidate processing in presence of SEA ice<br />
• Address cases of missing data<br />
Every TBC annotation concerning numerical values of operational constants has been removed. While many of them<br />
will need tuning, note that such values, when presented in the <strong>ATBD</strong>, are only illustrative: the figures to be considered<br />
are provided by the tables in TGRD, together with TBC comments when appropriate.<br />
Several useful developments will not be accomplished in time for defining the prototype, because data are lacking or<br />
further scientific work is needed. While decisions have been made in order to close at best the corresponding issues, it is<br />
necessary to keep them in the forefront of the scientific agenda. The most prominent are listed in a concluding section<br />
3.7<br />
1.3 End Users’ Requirements<br />
End users requirements are described in the Mission Requirement <strong>Document</strong> [AD 1] derived from [1]. Taking the<br />
example of soil moisture the requirements are (see also [2-5]):<br />
Table 1: End users’ requirements<br />
Property<br />
User requirement<br />
1 Soil moisture accuracy 0.04 m 3 m -3 (i.e. 4% volumetric soil moisture) or better<br />
2a Spatial Resolution: size The “average” dimensions of the footprint should not exceed 50 km:<br />
< TH_SIZE = 50 km<br />
2b Spatial Resolution: elongation The elongation of the footprint should not exceed 1.5<br />
< TH_ELON = 1.5<br />
3 Global Coverage ± 80° latitude or higher<br />
4 Revisit time 3-days max<br />
While requirements 3 & 4 are met thanks to the mission scenario features, requirement 2 is met based on the SMOS<br />
interferometer performances [6], bounding the usable Field of view to SMOS pixel sizes and elongations.<br />
Requirement 1 has been extensively assessed in the framework of ESA's SMOS retrieval study. Results are presented in<br />
the error budget section.<br />
Formally and in a nutshell, the algorithm should deliver soil moisture every 3 days max all over the globe with the<br />
nominal spatial resolution. Retrieving vegetation opacity, simultaneously to soil moisture (so-called "two-parameter<br />
retrievals"), requires a large range of incidence angle which are available only in the central part of the FOV. The<br />
estimation of vegetation opacity will thus be made with a lower repetitivity (~ every week). This is not an issue since it<br />
is expected that, except for possible effects of rainfall interception by the canopy, opacity vary slowly with time at<br />
rather coarse spatial resolution. Should for some reason the algorithm be less reliable, a flag should be issued, and when<br />
no soil moisture retrievals are possible the algorithm should nevertheless deliver either information about the equivalent<br />
dielectric constant or both dielectric constant and canopy opacity.<br />
1.4 References<br />
1.4.1 Applicable <strong>Document</strong>s<br />
N° Reference Content<br />
[AD 1] EEOM-SMOS-MRD, V5 SMOS Mission Requirement <strong>Document</strong><br />
[AD 2] SO-RS-ESA-SYS-0555 SMOS System requirement document issue 4.1 28/09/2004 131 pp<br />
[AD 3] SO.RS.ESA.GS.1351 <strong>Algorithm</strong> <strong>Theoretical</strong> Basis <strong>Document</strong> Guidelines<br />
[AD 4] SO-IS-DME-L1PP-0002 SMOS L1 Products Format Specification<br />
[AD 5] SO-IS-DME-L1PP-0003 SMOS L1 Auxiliary Data Specification Format<br />
[AD 6] SO-DS-DME-L1PP-0006 SMOS L1 System Concept<br />
[AD 7] SO-DS-DME-L1PP-0007 SMOS L1 Processor L0 to L1a Data Processing Model<br />
[AD 8] SO-IS-DME-L1PP-0014 SMOS L1 Processor Input/Output Definition<br />
[AD 9] SO-TN-ESA-GS-1250 High level Product Definition<br />
.<br />
2