11.11.2014 Views

tentative map application submittal requirements - City of Temecula

tentative map application submittal requirements - City of Temecula

tentative map application submittal requirements - City of Temecula

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Enter the parcel number. If there is more than one parcel number, you must input them one at a<br />

time and print out each report individually. A report for each parcel must be attached to the<br />

<strong>application</strong> at the time <strong>of</strong> <strong>submittal</strong>.<br />

SECTION E. WQMP INITIAL CHECKLIST<br />

A signed Water Quality Management Plan Initial Checklist must be completed and submitted<br />

with the <strong>application</strong> materials. The WQMP Initial Checklist has been provided and is available<br />

online at www.city<strong>of</strong>temecula.org. If “yes” can be answered to any <strong>of</strong> the criteria outlined in the<br />

checklist, a WQMP is required for the project. If a WQMP is required, it will have to be<br />

submitted with the <strong>application</strong> materials at the time <strong>of</strong> <strong>submittal</strong>. A sample WQMP is available<br />

online at www.city<strong>of</strong>temecula.org.<br />

<br />

<br />

WQMP Initial Checklist<br />

WQMP (if required)<br />

SECTION F. 8 1/2” X 11” COLOR PHOTOS SET<br />

8 ½ “ x 11” color photos from the interior <strong>of</strong> the site looking north , south, east, and west with<br />

direction attached to each photo<br />

R:\Applications 2008\Tentative Maps 2008.doc<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!