<strong>601</strong> Fourth <strong>Avenue</strong> OUTLINE SPECIFICATION<br />

Seattle, Washington 051213 – ARCHITECTURALLY EXPOSED STRUCTURAL STEEL FRAMING<br />

2.9 FINISHES:<br />

A. Galvanized Steel Assemblies: Shop galvanize steel and prepare ready for field painting.<br />

Page 4 of 4<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. Perform cutting, drilling, and fitting required for installing metal items. Set items accurately in<br />

location, alignment, and elevation; with edges and surfaces level, plumb, true, and free of rack.<br />

B. Touch up galvanizing of field welds.<br />

END OF SECTION<br />