16.11.2014 Views

move over freightliner, we want to get into ... - Rail Professional

move over freightliner, we want to get into ... - Rail Professional

move over freightliner, we want to get into ... - Rail Professional

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PRODUCTS AND SERVICES<br />

SIEMENS<br />

Leading supplier of control and asset management solutions<br />

Transmit<strong>to</strong>n, now part of Siemens Transportation Systems<br />

(STS) Infrastructure <strong>Rail</strong> Communications group, has won a<br />

contract alongside STS’s Infrastructure Electrification group <strong>to</strong><br />

provide new equipment for Network <strong>Rail</strong>’s infrastructure,<br />

which allows a fully integrated SCADA approach in<strong>to</strong> the<br />

switchgear.<br />

The 25kV National Oil switchgear replacement project will<br />

end in 2008.<br />

As a result of various electrification equipment renewals<br />

across the network, SCADA systems must be modified <strong>to</strong><br />

accept ne<strong>we</strong>r variants of switchgear.<br />

There are two types of oil switchgear <strong>to</strong> be rene<strong>we</strong>d under<br />

this scheme – Switchgear & Cowan type K11, and ASEA.While<br />

the <strong>over</strong>all renewal programme consists of around 290 circuit<br />

breakers, this scheme addresses 24 sites, which are due for<br />

replacement.<br />

Out of 24 sites,Transmit<strong>to</strong>n will undertake work associated<br />

with 21. Nineteen sites are connected <strong>to</strong> the Romford<br />

electrical control room and two are connected <strong>to</strong> the existing<br />

Transmit<strong>to</strong>n control system at Cathcart.<br />

Fastflex provides a common approach for future<br />

switchgear renewal schemes (with respect <strong>to</strong> the SCADA<br />

design) by using a single fibre cable loop that connects key<br />

items of substation SCADA equipment in a distributed<br />

arrangement. Using fastflex’s distributed capacity, modules<br />

can be installed within each piece of switchgear, so reducing<br />

cabling and providing cost benefits <strong>to</strong> the <strong>over</strong>all SCADA<br />

solution.<br />

Transmit<strong>to</strong>n account manager John Wes<strong>to</strong>n said:‘For<br />

SCADA control and moni<strong>to</strong>ring, using fastflex is not only<br />

forward-looking but also provides a fully integrated switchgear<br />

solution that is more cost effective <strong>to</strong> install.’<br />

● Call 01784 461616<br />

HOLDFAST<br />

HoldFast, Europe’s leader in level crossing systems, has<br />

launched a new identity.After 20 years, it has dropped the<br />

familiar red triangle and opted for a s<strong>we</strong>eping red and green<br />

rail abstract, and a new strap line:‘Working For a Better <strong>Rail</strong>,<br />

Road and Urban Environment.’<br />

All products are now being offered in two distinct ranges:<br />

<strong>Rail</strong> Crossing Solutions and Urban Transport Solutions.A new<br />

<strong>we</strong>bsite is also under construction at<br />

www.holdfastsolutions.com<br />

Sales and marketing direc<strong>to</strong>r Mark Coates Smith is behind<br />

the project.‘My father Peter has developed a brand known for<br />

being friendly, innovative and producing products that are<br />

durable and simple <strong>to</strong> install and maintain.<br />

‘I now <strong>want</strong> HoldFast <strong>to</strong> build on this reputation and reflect<br />

our willingness <strong>to</strong> innovate and our very strong green<br />

credentials, turning waste rubber in<strong>to</strong> transport infrastructure.<br />

‘We are applying these credentials in rising <strong>to</strong> the challenge<br />

of urban congestion with products such as Carpet Track,<br />

HoldFast Rubber Highways, HoldFast Bus Lanes and HoldFast<br />

Paving.’<br />

● Visit www.railcrossings.co.uk<br />

www.holdfastsolutions.com<br />

WILKINSON STAR<br />

Wilkinson Star Limited, the Worsley, Manchester based<br />

industrial equipment supplier and sole UK representative for<br />

MOSA petrol driven <strong>we</strong>lding and generating sets, has launched<br />

the MOSA TS200-RW (PADS No. 094/007031).<br />

This genera<strong>to</strong>r, which has been specifically modified <strong>to</strong><br />

meet the requirements of Carillion <strong>Rail</strong> with Network <strong>Rail</strong><br />

Approval (certificate number PA05/02502), is a portable wraparound<br />

protective frame design, air-cooled, petrol driven<br />

<strong>we</strong>lder genera<strong>to</strong>r rated 190A @ 60 per cent duty cycle with a<br />

safety critical 110V CTE 4kVA AC auxiliary output for running<br />

po<strong>we</strong>r <strong>to</strong>ols and other ancillary equipment.<br />

Features of this genera<strong>to</strong>r include use with a separate 300A<br />

wire feed unit for MIG/MAG <strong>we</strong>lding; a 20m TC2-RW<br />

umbilical remote control and emergency s<strong>to</strong>p but<strong>to</strong>n;<br />

infinitely adjustable electronic stepless <strong>we</strong>lding current<br />

control; a Honda GX390 OHV four-stroke petrol engine<br />

operating at 3,000 rpm; and re-coil starting.The 6.5 litres fuel<br />

tank capacity produces an engine running time of 3.5 hours at<br />

60 per cent load.This genera<strong>to</strong>r meets EC engine noise<br />

compliance regulations and the DC output produces smooth<br />

high-quality <strong>we</strong>lding characteristics.<br />

Options include heavy duty 10m x 50mm 2 <strong>we</strong>lding cables,<br />

an inline digital <strong>we</strong>lding amp and volt meter, whilst the<br />

PAR600-RW parallel <strong>we</strong>lding control box allows two <strong>we</strong>lder<br />

genera<strong>to</strong>rs <strong>to</strong> be connected <strong>to</strong><strong>get</strong>her for heavier duty <strong>we</strong>lding.<br />

● Call 0161 793 8127<br />

IF YOU WOULD LIKE YOUR PRODUCT FEATURED HERE CALL ROB TIDSWELL ON 01223 477427<br />

RECRUITMENT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!