ANNUAL REPORT 2011-12 - State Load Despatch Centre (SLDC)
ANNUAL REPORT 2011-12 - State Load Despatch Centre (SLDC)
ANNUAL REPORT 2011-12 - State Load Despatch Centre (SLDC)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Annual Report <strong>2011</strong>-<strong>12</strong><br />
4.4.2 Gas Units<br />
Gas<br />
Unit<br />
Installed<br />
Capacity (MW)<br />
Derated<br />
Capacity (MW)<br />
Generation<br />
(in MUs)<br />
DHUVARAN<br />
UTRAN<br />
GIPCL-I<br />
GIPCL-II<br />
TORRENT POWER<br />
ESSAR POWER<br />
CLPIPL<br />
GSEG<br />
GSEG STAGE 2<br />
SUGEN<br />
DTPS - GT1 68 68 359.83<br />
DTPS -STG1 39 39 209.35<br />
DTPS-GT2 72 72 284.18<br />
DTPS-STG2 40 40 160.80<br />
UGPP GT1 33 30 83.63<br />
UGPP GT2 33 30 96.45<br />
UGPP GT3 33 30 171.18<br />
UGPP ST1 46 45 266.59<br />
UGPP GT-4 229 228.57 1439.98<br />
UGPP ST2 146 146 930.28<br />
GIPCL GT1 32 32 167.41<br />
GIPCL GT2 32 32 211.73<br />
GIPCL GT3 32 32 174.65<br />
GIPCL ST1 49 49 266.66<br />
GIPCL GT4 111 111 433.28<br />
GIPCL ST2 54 54 231.36<br />
AECO GT1 32.5 32.5 197.10<br />
AECO GT2 32.5 32.5 117.96<br />
AECO STG 35 35 167.38<br />
ESSAR GT1 110 110 399.80<br />
ESSAR GT2 110 110 459.<strong>12</strong><br />
ESSAR GT3 110 110 395.22<br />
ESSAR SGT 185 185 713.34<br />
CLPIPL GT1 138 138 546.45<br />
CLPIPL GT2 138 138 745.69<br />
CLPIPL GT3 138 138 674.40<br />
CLPIPL STG 241 241 1<strong>12</strong>1.70<br />
GSEG 1 52 52 290.01<br />
GSEG 2 52 52 271.98<br />
GSEG ST 52 52 501.85<br />
GSEG 20 103.78<br />
STG 20 47.24<br />
SUGEN GT1 383 382.5 2354.68<br />
SUGEN GT2 383 382.5 2589.24<br />
SUGEN GT3 383 382.5 3542.84<br />
Total Gas 3623 3397.07 20727.<strong>12</strong><br />
<strong>State</strong> <strong>Load</strong> <strong>Despatch</strong> <strong>Centre</strong><br />
Gujarat Energy Transmission Corporation Limited<br />
20