ANNUAL REPORT 2011-12 - State Load Despatch Centre (SLDC)
ANNUAL REPORT 2011-12 - State Load Despatch Centre (SLDC)
ANNUAL REPORT 2011-12 - State Load Despatch Centre (SLDC)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Apr<br />
Apr<br />
May<br />
May<br />
June<br />
June<br />
July<br />
July<br />
Aug<br />
Aug<br />
Sept<br />
Sept<br />
Oct<br />
Oct<br />
Nov<br />
Nov<br />
Dec<br />
Dec<br />
Jan<br />
Jan<br />
Feb<br />
Feb<br />
Mar<br />
Mar<br />
Annual Report <strong>2011</strong>-<strong>12</strong><br />
13. THREE PHASE POWER SUPPLY TO AGRICULTURE SECTOR<br />
09:36<br />
08:58<br />
08:38<br />
08:11<br />
07:40<br />
Average supply Hrs 2010-11 Average supply Hrs <strong>2011</strong>-<strong>12</strong><br />
14. NETWORK LOSSES<br />
6<br />
% Losses 2010-11 % Losses <strong>2011</strong>-<strong>12</strong><br />
5<br />
4<br />
4.81<br />
4.23<br />
4.85<br />
4.57<br />
5.<strong>12</strong> 5.15<br />
4.32 4.30<br />
4.73<br />
3.47<br />
4.65<br />
4.29<br />
4.43<br />
3.90<br />
4.30 4.28<br />
3.38<br />
3.78<br />
4.07<br />
3.88<br />
3.89 3.83<br />
4.22<br />
4.15<br />
3<br />
<strong>State</strong> <strong>Load</strong> <strong>Despatch</strong> <strong>Centre</strong><br />
Gujarat Energy Transmission Corporation Limited<br />
37