23.11.2014 Views

ANNUAL REPORT 2011-12 - State Load Despatch Centre (SLDC)

ANNUAL REPORT 2011-12 - State Load Despatch Centre (SLDC)

ANNUAL REPORT 2011-12 - State Load Despatch Centre (SLDC)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Apr<br />

Apr<br />

May<br />

May<br />

June<br />

June<br />

July<br />

July<br />

Aug<br />

Aug<br />

Sept<br />

Sept<br />

Oct<br />

Oct<br />

Nov<br />

Nov<br />

Dec<br />

Dec<br />

Jan<br />

Jan<br />

Feb<br />

Feb<br />

Mar<br />

Mar<br />

Annual Report <strong>2011</strong>-<strong>12</strong><br />

13. THREE PHASE POWER SUPPLY TO AGRICULTURE SECTOR<br />

09:36<br />

08:58<br />

08:38<br />

08:11<br />

07:40<br />

Average supply Hrs 2010-11 Average supply Hrs <strong>2011</strong>-<strong>12</strong><br />

14. NETWORK LOSSES<br />

6<br />

% Losses 2010-11 % Losses <strong>2011</strong>-<strong>12</strong><br />

5<br />

4<br />

4.81<br />

4.23<br />

4.85<br />

4.57<br />

5.<strong>12</strong> 5.15<br />

4.32 4.30<br />

4.73<br />

3.47<br />

4.65<br />

4.29<br />

4.43<br />

3.90<br />

4.30 4.28<br />

3.38<br />

3.78<br />

4.07<br />

3.88<br />

3.89 3.83<br />

4.22<br />

4.15<br />

3<br />

<strong>State</strong> <strong>Load</strong> <strong>Despatch</strong> <strong>Centre</strong><br />

Gujarat Energy Transmission Corporation Limited<br />

37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!