ANNUAL REPORT 2011-12 - State Load Despatch Centre (SLDC)
ANNUAL REPORT 2011-12 - State Load Despatch Centre (SLDC)
ANNUAL REPORT 2011-12 - State Load Despatch Centre (SLDC)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Annual Report <strong>2011</strong>-<strong>12</strong><br />
h. Every licensee, generating company, generating station, sub-station and any other<br />
person connected with the operation of the power system shall comply with the<br />
directions issued by the <strong>SLDC</strong>.<br />
i. The <strong>SLDC</strong> shall comply with the directions of the Regional <strong>Load</strong> <strong>Despatch</strong> <strong>Centre</strong>.<br />
j. In case of inter-state bilateral and collective short-term open access transactions<br />
having a state utility or an intra-state entity as a buyer or a seller, <strong>SLDC</strong> shall accord<br />
concurrence or no objection or a prior standing clearance.<br />
k. The following are contemplated as exclusive functions of <strong>SLDC</strong>.<br />
a. System operation and control covering contingency analysis and operational<br />
planning on real time basis;<br />
b. Scheduling / re-scheduling of generation;<br />
c. System restoration following grid disturbances;<br />
d. Metering and data collection;<br />
e. Compiling and furnishing data pertaining to system operation;<br />
f. Operation of state UI pool account, state reactive energy account.<br />
<strong>State</strong> <strong>Load</strong> <strong>Despatch</strong> <strong>Centre</strong><br />
Gujarat Energy Transmission Corporation Limited<br />
8