ANNUAL REPORT 2011-12 - State Load Despatch Centre (SLDC)
ANNUAL REPORT 2011-12 - State Load Despatch Centre (SLDC)
ANNUAL REPORT 2011-12 - State Load Despatch Centre (SLDC)
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Annual Report <strong>2011</strong>-<strong>12</strong><br />
5.1.5 Wind Farm Installation Vs Maximum Hourly Energy Received<br />
Month wise wind farm sources installation and maximum hourly energy received from the sources<br />
Installed Capacity Vs Maximum Wind Injection during the Month<br />
5.1.6 Maximum Variation in Wind Energy Generation in MUs<br />
Maximum variation in wind energy generation in MUs on two consecutive days<br />
<strong>State</strong> <strong>Load</strong> <strong>Despatch</strong> <strong>Centre</strong><br />
Gujarat Energy Transmission Corporation Limited<br />
23