ANNUAL REPORT 2011-12 - State Load Despatch Centre (SLDC)
ANNUAL REPORT 2011-12 - State Load Despatch Centre (SLDC)
ANNUAL REPORT 2011-12 - State Load Despatch Centre (SLDC)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
0 to 1<br />
1 to 2<br />
2 to 3<br />
3 to 4<br />
4 to 5<br />
5 to 6<br />
6 to 7<br />
7 to 8<br />
8 to 9<br />
9 to 10<br />
10 to 11<br />
11 to <strong>12</strong><br />
<strong>12</strong> to 13<br />
13 to 14<br />
14 to 15<br />
15 to 16<br />
16 to 17<br />
17 to 18<br />
18 to 19<br />
19 to 20<br />
20 to 21<br />
21 to 22<br />
22 to 23<br />
23 to 24<br />
Annual Report <strong>2011</strong>-<strong>12</strong><br />
5.1.3 Maximum Wind Energy Variation in a day during the month<br />
5.1.4 Hourly Wind Energy Injection Trend during the year <strong>2011</strong>-<strong>12</strong>.<br />
Observation of Hourly Wind Generation Trend<br />
500 MW<br />
151 149 149 143 140 <strong>12</strong>3 <strong>12</strong>0 116 114 88 78 83 92 94 106 <strong>12</strong>4 139 144 142 144 156 158 156 154<br />
<strong>12</strong>5 131 136 132 137 144 137 117 87<br />
82 86 91<br />
97 1<strong>12</strong> 116<br />
<strong>12</strong>7 114 116 131 140 133 135 139 131<br />
90 86 81 91 89 99 109 133 165 196 202 192 177 160 144 115 113 106 93 82 77 73 71 81<br />
From the above, it is observed that the wind energy injection between 08:00 Hrs. to 13:00<br />
Hrs. during the year is quite less.<br />
<strong>State</strong> <strong>Load</strong> <strong>Despatch</strong> <strong>Centre</strong><br />
Gujarat Energy Transmission Corporation Limited<br />
22