Stormwater Capital Equipment – Budget FY 10/11<br />
Two 6” Trailer Mounted High Head Pumps FY 10/11: $94,000<br />
By not purchasing these pumps, we would continue to use rental equipment and therefore always<br />
be at the mercy <strong>of</strong> rental companies delaying our response to major flooding within the <strong>City</strong>.<br />
These pumps would benefit the <strong>City</strong> greatly with emergency pumping during and after major<br />
storm events. The pumps would pay for themselves within a few years by eliminating the need<br />
to rent them. These pumps would also give us the ability to stage pumps in problem areas before<br />
a major storm event and would help us to protect private properties.<br />
8” Trailer Mounted High Head Pump FY 10/11: $54,000<br />
By not purchasing this pump, we would continue to use rental equipment and therefore always<br />
be at the mercy <strong>of</strong> rental companies delaying our response to major flooding within the <strong>City</strong>.<br />
This pump would benefit the <strong>City</strong> greatly with emergency pumping during and after major storm<br />
events. The pump would pay for itself within a few years by eliminating the need to rent a<br />
pump. This pump would also give us the ability to stage pumps in problem areas before a major<br />
storm event and would help us to projected private properties.<br />
Stormwater Capital Projects – Budget FY 10/11<br />
McGarrity/Kirkhill Project FY 10/11: <strong>City</strong>: $269,383 / Grant: $280,617<br />
This is an on-going project which has been primarily funded through the State <strong>of</strong> <strong>Florida</strong> DEP<br />
McGarrity/Kirkhill grant. The amount shown is the amount needed to complete the project. The<br />
McGarrity/Kirkhill project is key in relieving the Theresa Basin from high stormwater levels<br />
during prolonged rainy seasons. The Theresa Basin is a vast area that has numerous bodies <strong>of</strong><br />
water that are connected through pipe and ditches and has an outfall that is currently plugged up.<br />
This project will allow us to have better control <strong>of</strong> the quality <strong>of</strong> the stormwater discharge that<br />
actually enters into the waters <strong>of</strong> the State <strong>of</strong> <strong>Florida</strong>. This project will fulfill our legal obligation<br />
to treat our stormwater discharge before it enters the waters <strong>of</strong> the State.<br />
Drysdale/Chapel Interconnect FY 10/11: $1,200,000<br />
This has been an area <strong>of</strong> concern for severe flooding in previous storms. This project provides<br />
flood protection for several areas in the <strong>City</strong> including the Beechdale area which experienced<br />
significant flooding in 1994, 1998, 2003 and 2004.<br />
Piedmont Pump Station Improvements FY 10/11: <strong>City</strong>: $357,000 / Grant: $243,000<br />
This will be a joint funded project with the <strong>City</strong> having been awarded a grant from Volusia<br />
County – DCA for a large portion <strong>of</strong> this project. The current pump station at Piedmont is in<br />
need <strong>of</strong> upgrading. The residential area around the station has increased therefore producing<br />
more stormwater run<strong>of</strong>f as it has less vegetative areas in which to be absorbed. Tropical Storm<br />
Fay resulted in Lake Piedmont, a small land-locked lake, staging up and flooding certain<br />
residential homes on the western and northern shores. Existing sanitary sewer facilities were<br />
also flooded and affected the area as well resulting in the need to upgrade the current pump<br />
station to keep up with the increasing amount <strong>of</strong> stormwater. The design and permitting <strong>of</strong> this<br />
project was funded in FY 09/10 through CDBG funding.<br />
10/11 Annual Budget<br />
159 Adopted - 9/20/2010