Capital Equipment Replacement Fund<br />
Desktop/Laptop Replacements FY 10/11: $100,000<br />
The current desktop/laptops have been installed for 5 years or more and currently most systems<br />
are out <strong>of</strong> warranty for service or parts. This has increased maintenance costs by IT for labor and<br />
parts, increased downtime by staff, and ultimately results in a reduction <strong>of</strong> services throughout<br />
the <strong>City</strong> in every department.<br />
Laptops for EOC Functions (Finance Dept.) FY 10/11: $3,500<br />
The purchasing function, (ability to contact vendors, buy supplies and search availability via<br />
internet), and the finance function, (A/P processing, payroll processing to a minimal degree, and<br />
monitoring cash flow between banks & investments), are vital functions in the event <strong>of</strong> a<br />
hurricane or a major flooding event. The requested laptops will enable critical workflow to<br />
continue without interruption. All other <strong>City</strong> departments have laptops for EOC functions.<br />
Replacement Blades FY 10/11: $10,000<br />
The <strong>City</strong> has to retire servers that can no longer be supported by our vendor. Blade technology is<br />
allowing us to virtualize and reduce costs when server replacements continue to come up. We<br />
risk servers failing and losing service for departments, resulting in loss <strong>of</strong> time for employees<br />
and the <strong>City</strong>.<br />
WAN Optimization FY 10/11: $20,000<br />
The WAN Optimization project will allow us to use a remote site as a Disaster Recovery site,<br />
giving the <strong>City</strong> the capability to send data via network circuits to another site in case <strong>of</strong> a<br />
disaster. In order to provide redundancy for all critical systems, we need to have a remote<br />
location that can bring our critical data online. Currently we utilize tapes but they have a short<br />
shelf life and getting back online could take weeks.<br />
Virtual Desktop Test Implementation FY 10/11 $10,000<br />
Virtualization s<strong>of</strong>tware is maturing and allowing us to provide virtual desktops that eliminate the<br />
cost <strong>of</strong> desktop replacements. Other costs such as s<strong>of</strong>tware and server hardware will also be<br />
significantly less. In addition, staff time required to deploy new desktops would be reduced.<br />
Physical Security Solution FY 10/11 $50,000<br />
The intent <strong>of</strong> the Physical Security Solution project is to secure areas <strong>of</strong> the <strong>City</strong> network<br />
infrastructure with physical security solutions such as cameras. The <strong>City</strong> is experiencing<br />
exposure in certain areas and the project will reduce missing hardware and allow for better<br />
tracking <strong>of</strong> the <strong>City</strong>’s areas.<br />
10/11 Annual Budget<br />
228 Adopted - 9/20/2010