<strong>City</strong> <strong>of</strong> <strong>Deltona</strong>, <strong>Florida</strong><br />

Capital Equipment Replacement Fund<br />

Desktop/Laptop Replacements FY 10/11: $100,000<br />

The current desktop/laptops have been installed for 5 years or more and currently most systems<br />

are out <strong>of</strong> warranty for service or parts. This has increased maintenance costs by IT for labor and<br />

parts, increased downtime by staff, and ultimately results in a reduction <strong>of</strong> services throughout<br />

the <strong>City</strong> in every department.<br />

Laptops for EOC Functions (Finance Dept.) FY 10/11: $3,500<br />

The purchasing function, (ability to contact vendors, buy supplies and search availability via<br />

internet), and the finance function, (A/P processing, payroll processing to a minimal degree, and<br />

monitoring cash flow between banks & investments), are vital functions in the event <strong>of</strong> a<br />

hurricane or a major flooding event. The requested laptops will enable critical workflow to<br />

continue without interruption. All other <strong>City</strong> departments have laptops for EOC functions.<br />

Replacement Blades FY 10/11: $10,000<br />

The <strong>City</strong> has to retire servers that can no longer be supported by our vendor. Blade technology is<br />

allowing us to virtualize and reduce costs when server replacements continue to come up. We<br />

risk servers failing and losing service for departments, resulting in loss <strong>of</strong> time for employees<br />

and the <strong>City</strong>.<br />

WAN Optimization FY 10/11: $20,000<br />

The WAN Optimization project will allow us to use a remote site as a Disaster Recovery site,<br />

giving the <strong>City</strong> the capability to send data via network circuits to another site in case <strong>of</strong> a<br />

disaster. In order to provide redundancy for all critical systems, we need to have a remote<br />

location that can bring our critical data online. Currently we utilize tapes but they have a short<br />

shelf life and getting back online could take weeks.<br />

Virtual Desktop Test Implementation FY 10/11 $10,000<br />

Virtualization s<strong>of</strong>tware is maturing and allowing us to provide virtual desktops that eliminate the<br />

cost <strong>of</strong> desktop replacements. Other costs such as s<strong>of</strong>tware and server hardware will also be<br />

significantly less. In addition, staff time required to deploy new desktops would be reduced.<br />

Physical Security Solution FY 10/11 $50,000<br />

The intent <strong>of</strong> the Physical Security Solution project is to secure areas <strong>of</strong> the <strong>City</strong> network<br />

infrastructure with physical security solutions such as cameras. The <strong>City</strong> is experiencing<br />

exposure in certain areas and the project will reduce missing hardware and allow for better<br />

tracking <strong>of</strong> the <strong>City</strong>’s areas.<br />

10/11 Annual Budget<br />

228 Adopted - 9/20/2010