24.11.2014 Views

ROAD INFRASTRUCTURE DEVELOPMENT IN THE PHILIPPINES

ROAD INFRASTRUCTURE DEVELOPMENT IN THE PHILIPPINES

ROAD INFRASTRUCTURE DEVELOPMENT IN THE PHILIPPINES

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EXPRESSWAYS UNDER CONSTRUCTION/PLANN<strong>IN</strong>G<br />

Metro Manila<br />

Skyway, Stage 2<br />

Stage 3<br />

South Luzon Tollway,<br />

TR3<br />

Manila-Cavite Toll<br />

Expressway, R-1<br />

Extension<br />

North Luzon Tollway,<br />

Phase 2<br />

Segment 8.1<br />

Segment 8.2<br />

Segment 9<br />

Phase 3<br />

Segment 10<br />

Tarlac- Pangasinan-<br />

La Union (TPLEX)<br />

Bicutan-Alabang<br />

Buendia-NLEX<br />

Location<br />

Length<br />

(km)<br />

6.88<br />

17.50<br />

Started<br />

April 2009<br />

Under planning Stage<br />

Target<br />

Completion<br />

Funding<br />

2010 BOT<br />

Calamba-Sto. Tomas, Batangas 7.50 March 2008 2011 BOT<br />

Zapote- Kawit, Cavite 7.00 March 2006 2010 BOT<br />

Mindanao Ave., Quezon City-<br />

NLE, Valenzuela City<br />

C.P. Garcia-Mindanao Ave.<br />

NLEX-MacArthur<br />

MacArthur-Letre<br />

Tarlac City, Pangasinan - Rosario,<br />

La Union<br />

2.34<br />

10.23<br />

4.06<br />

5.63<br />

Total 149.72<br />

April 2009<br />

Under planning Stage<br />

-do-<br />

88.58 2008<br />

(ROWA and DE)<br />

February 2009<br />

(Construction)<br />

2010 BOT<br />

2010<br />

2013<br />

BOT<br />

37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!