20mm<br />
Cut the top tile to fit the upper batten spacing “Y” ensuring<br />
that the cut tile rests on the full width of the upper batten.<br />
Secure in top batten with nails. The side overlaps of the tiles<br />
should be staggered to the overlaps in the previously fixed<br />
row.Nail then in the vertical front in every second profile at the<br />
point where the profile is closest to the batten.<br />
NB: If <strong>Isola</strong> Ridge Ventilation Band is not being used, the top<br />
row of roof tiles should be bent up approx. 20-30 mm at the<br />
ridge. Add this measurement to the length “Y” when cutting.<br />
Subsequent roof tiles should be laid by lifting the front of the<br />
overlying tile. Three or four rows can be prelaid in this way.<br />
The tiles should be fixed in the vertical front part in every second<br />
profile, leaving the lower row unfixed until the following<br />
rows have been placed.<br />
NB: The eaves flashing has to be installed and provisionally<br />
fixed before the eaves row of tiles is placed.<br />