JWF Fund 2010 Report #500<br />

Construction <strong>of</strong> Three Pit <strong>to</strong>ilets <strong>in</strong> L.G.E.A Primary<br />

School UNG/Mamuda UN/RIMI KATSIT Bayan Loco,<br />

Kafanchan, Kaduna State, Nigeria<br />

February 2011<br />

CENTRE FOR RURAL<br />

EMPOWWERMENT OF NIGERIA


JWF Fund 2010 Report #500<br />

Summary (with<strong>in</strong> 2 pages)<br />

The outl<strong>in</strong>e <strong>of</strong> your project should <strong>be</strong> summarized <strong>here</strong> and <strong>the</strong> <strong>be</strong>low stated items<br />

should <strong>be</strong> <strong>in</strong>cluded, with<strong>in</strong> max 2 pages.<br />

1. Name <strong>of</strong> <strong>the</strong> organization: Centre for Rural Empowerment <strong>of</strong> Nigeria (CREN)<br />

2. Country: Nigeria<br />

3. Area: Kaduna State<br />

4. Name <strong>of</strong> <strong>the</strong> project or activity: Construction <strong>of</strong> Three Pit latr<strong>in</strong>es <strong>in</strong> L.G.E.A Primary School<br />

UNG/Mamuda UN/RIMI KATSIT Baya Loco, Kafanchan, Kaduna State<br />

5. <strong>Project</strong> time-period: 3 months<br />

6. Description <strong>of</strong> <strong>the</strong> water <strong>is</strong>sues/ objectives <strong>of</strong> your activities (with<strong>in</strong> 250 words):<br />

Bayan Loco community <strong>is</strong> a community located <strong>in</strong> <strong>the</strong> rural surbubs <strong>of</strong> Kafanchan, Kaduna State. Due<br />

<strong>to</strong> longterm drought experienced <strong>in</strong> th<strong>is</strong> part <strong>of</strong> <strong>the</strong> country almost all through <strong>the</strong> year, primary<br />

schools, especially <strong>in</strong> <strong>the</strong> rural sett<strong>in</strong>g experience frequent outbreak <strong>of</strong> d<strong>is</strong>eases and flu result<strong>in</strong>g from<br />

poor use <strong>of</strong> water. Availabilty <strong>of</strong> <strong>the</strong> pit <strong>to</strong>ilets <strong>in</strong> th<strong>is</strong> primary school has <strong>be</strong>en able <strong>to</strong> curtail <strong>the</strong><br />

contam<strong>in</strong>ation <strong>of</strong> <strong>the</strong> school prem<strong>is</strong>es with faeces and ur<strong>in</strong>e.<br />

It has also contributed <strong>to</strong> reduc<strong>in</strong>g <strong>the</strong> mobidity rates <strong>of</strong> <strong>the</strong> school population and it has promoted<br />

comfort and sense <strong>of</strong> well<strong>be</strong><strong>in</strong>g for anyone that <strong>is</strong> pressed <strong>of</strong> faeces and ur<strong>in</strong>e.<br />

7. Description <strong>of</strong> your activities with <strong>the</strong> JWF Fund (with<strong>in</strong> 500 words):<br />

The project was implementation done <strong>in</strong> three phases:<br />

a). Assessment Phase: (one week)Th<strong>is</strong> phase will <strong>be</strong> a period w<strong>here</strong>by we organized a<br />

stakeholder meet<strong>in</strong>g with <strong>the</strong> community mem<strong>be</strong>rs. Some <strong>of</strong> <strong>the</strong> <strong>is</strong>sue we would d<strong>is</strong>cussed<br />

were : i. formation <strong>of</strong> <strong>the</strong> project committee; <strong>the</strong>se people were <strong>in</strong>-charge <strong>of</strong> <strong>the</strong> project from <strong>the</strong><br />

<strong>in</strong>ception and till end <strong>of</strong> project and <strong>be</strong>yond. The committee compr<strong>is</strong>ed <strong>of</strong> <strong>the</strong> chairman (Parents<br />

Teachers Association) PTA, <strong>the</strong> headmaster, a representative <strong>of</strong> <strong>the</strong> traditional ruler, men’s group,<br />

women’s group and youth group.<br />

Dur<strong>in</strong>g th<strong>is</strong> period also, a memorandum <strong>of</strong> understand<strong>in</strong>g was signed <strong>be</strong>tween <strong>the</strong><br />

implement<strong>in</strong>g organization (CREN) and <strong>the</strong> community stakeholder <strong>to</strong> ma<strong>in</strong>ta<strong>in</strong> and susta<strong>in</strong> <strong>the</strong><br />

project after <strong>the</strong> project year.<br />

b). The Implementation Phase: (three weeks) Th<strong>is</strong> <strong>is</strong> <strong>the</strong> implementation phase proper. In th<strong>is</strong><br />

phase, we selected <strong>the</strong> <strong>be</strong>st contrac<strong>to</strong>r that applied for <strong>the</strong> construction <strong>of</strong> <strong>the</strong> project. .<br />

All <strong>the</strong> components <strong>of</strong> th<strong>is</strong> project was actively <strong>in</strong> process <strong>of</strong> construction was completed. Here,<br />

<strong>the</strong> project implementation committee moni<strong>to</strong>red <strong>the</strong> day <strong>to</strong> day activities <strong>of</strong> work on site. Th<strong>is</strong>


JWF Fund 2010 Report #500<br />

helped <strong>to</strong> ensure quality <strong>of</strong> work at site.<br />

Th<strong>is</strong> stage <strong>in</strong>volved <strong>the</strong> ga<strong>the</strong>r<strong>in</strong>g <strong>of</strong> materials, digg<strong>in</strong>g <strong>of</strong> <strong>the</strong> holes, lay<strong>in</strong>g <strong>of</strong> foundation, ra<strong>is</strong><strong>in</strong>g<br />

<strong>the</strong> build<strong>in</strong>g <strong>to</strong> foundation level, dress<strong>in</strong>g <strong>the</strong> pit holes, ro<strong>of</strong><strong>in</strong>g, and pa<strong>in</strong>t<strong>in</strong>g..<br />

c). Moni<strong>to</strong>r<strong>in</strong>g and Evaluation Phase: at th<strong>is</strong> phase, CREN paid v<strong>is</strong>its <strong>to</strong> project site <strong>to</strong><br />

ensure completion and quality <strong>of</strong> work done. The committee mem<strong>be</strong>rs drafted plans on how <strong>to</strong><br />

susta<strong>in</strong> <strong>the</strong> projects s<strong>in</strong>ce <strong>the</strong> project <strong>is</strong> <strong>the</strong>irs. Follow<strong>in</strong>g th<strong>is</strong>, <strong>the</strong> project was comm<strong>is</strong>sioned and<br />

handed over <strong>to</strong> <strong>the</strong> school community.<br />

8. The num<strong>be</strong>r <strong>of</strong> direct <strong>be</strong>neficiaries <strong>of</strong> your project: 438 pupils and 13 teachers = 451 direct<br />

<strong>be</strong>neficiaries


JWF Fund 2010 Report #500<br />

<strong>Project</strong> Description (with<strong>in</strong> 5 pages)<br />

A detailed description <strong>of</strong> your project should <strong>be</strong> reported <strong>here</strong> and <strong>the</strong> <strong>be</strong>low<br />

stated items should <strong>be</strong> <strong>in</strong>cluded, with<strong>in</strong> max 5 pages.<br />

1. Name <strong>of</strong> <strong>the</strong> organization: Centre for Rural Empowerment <strong>of</strong> Nigeria<br />

2. Country: Nigeria<br />

3. Area: Bayan Loco, Kafanchan, Kaduna State<br />

4. Details <strong>of</strong> <strong>the</strong> <strong>Project</strong>-site: Address <strong>of</strong> <strong>the</strong> site as well as maps are required if possible. To <strong>be</strong> mailed<br />

later<br />

5. <strong>Project</strong> time-period: Oct 2010 – Feb 2011<br />

6. <strong>Project</strong> manager:<br />

Name: Mrs. Osuagwu Glory<br />

<strong>Title</strong>:President<br />

E-mail: cren<strong>in</strong>nigeria@yahoo.com<br />

Phone: +234 8050318987<br />

Fax: N/A<br />

7. Name <strong>of</strong> <strong>the</strong> project or activity: Construction <strong>of</strong> Three Pit Latr<strong>in</strong>es at L.G.E.A. Mamuda Primary<br />

School, Bayan Loco, Katsit ung-rimi, Kafanchan, Kaduna State<br />

8. Description <strong>of</strong> <strong>the</strong> water <strong>is</strong>sues/ objectives <strong>of</strong> your projects or activities:<br />

L.G.E.A. Mamuda Primary School, Bayan Loco ,Katsit ung-rimi, Kafanchan <strong>is</strong> one <strong>of</strong> <strong>the</strong><br />

government schools located <strong>in</strong> suburbs <strong>of</strong> Kaduna State . It has a population <strong>of</strong> 483 (266<br />

boys, 171 girls) pupils and13 teachers. Sanitation <strong>in</strong> that community has <strong>be</strong>en a big<br />

challenge as <strong>the</strong>re are no sources <strong>of</strong> water supply and <strong>to</strong>ilet facilities available.<br />

Due <strong>to</strong> non available <strong>of</strong> water and <strong>to</strong>ilet facilities, school children normally pollute <strong>the</strong><br />

environment with faecal deposits. As a result, <strong>the</strong>re are <strong>of</strong>ten outbreaks <strong>of</strong> d<strong>is</strong>eases<br />

amongst <strong>the</strong> school population result<strong>in</strong>g <strong>to</strong> high drop-outs, morbidity and mortality rates.<br />

As it <strong>is</strong>, Pit latr<strong>in</strong>es <strong>be</strong>come <strong>the</strong> only <strong>to</strong>ilet facility that can <strong>be</strong> managed and susta<strong>in</strong>ed<br />

<strong>be</strong>cause <strong>of</strong> its use without <strong>the</strong> need for water.<br />

9. Description <strong>of</strong> your activities with <strong>the</strong> JWF Fund:<br />

The project started earnestly <strong>in</strong> Decem<strong>be</strong>r 2010. The <strong>in</strong>itial project location was changed due <strong>to</strong><br />

government <strong>in</strong>tervention <strong>in</strong> <strong>the</strong> former location.<br />

The project was implementation done <strong>in</strong> three phases:<br />

a). Assessment Phase: (one week)Th<strong>is</strong> phase will <strong>be</strong> a period w<strong>here</strong>by we organized a<br />

stakeholder meet<strong>in</strong>g with <strong>the</strong> community mem<strong>be</strong>rs. Some <strong>of</strong> <strong>the</strong> <strong>is</strong>sue we would d<strong>is</strong>cussed<br />

were : i. formation <strong>of</strong> <strong>the</strong> project committee; <strong>the</strong>se people were <strong>in</strong>-charge <strong>of</strong> <strong>the</strong> project from <strong>the</strong><br />

<strong>in</strong>ception and till end <strong>of</strong> project and <strong>be</strong>yond. The committee compr<strong>is</strong>ed <strong>of</strong> <strong>the</strong> chairman (Parents<br />

Teachers Association) PTA, <strong>the</strong> headmaster, a representative <strong>of</strong> <strong>the</strong> traditional ruler, men’s group,


JWF Fund 2010 Report #500<br />

women’s group and youth group.<br />

Dur<strong>in</strong>g th<strong>is</strong> period also, a memorandum <strong>of</strong> understand<strong>in</strong>g was signed <strong>be</strong>tween <strong>the</strong> implement<strong>in</strong>g<br />

organization (CREN) and <strong>the</strong> community stakeholder <strong>to</strong> ma<strong>in</strong>ta<strong>in</strong> and susta<strong>in</strong> <strong>the</strong> project after <strong>the</strong><br />

project year.<br />

b). The Implementation Phase: (three weeks) Th<strong>is</strong> <strong>is</strong> <strong>the</strong> implementation phase proper. In th<strong>is</strong><br />

phase, we selected <strong>the</strong> <strong>be</strong>st contrac<strong>to</strong>r that applied for <strong>the</strong> construction <strong>of</strong> <strong>the</strong> project. .<br />

All <strong>the</strong> components <strong>of</strong> th<strong>is</strong> project was actively <strong>in</strong> process <strong>of</strong> construction was completed. Here,<br />

<strong>the</strong> project implementation committee moni<strong>to</strong>red <strong>the</strong> day <strong>to</strong> day activities <strong>of</strong> work on site. Th<strong>is</strong><br />

helped <strong>to</strong> ensure quality <strong>of</strong> work at site.<br />

Th<strong>is</strong> stage <strong>in</strong>volved <strong>the</strong> ga<strong>the</strong>r<strong>in</strong>g <strong>of</strong> materials, digg<strong>in</strong>g <strong>of</strong> <strong>the</strong> holes, lay<strong>in</strong>g <strong>of</strong> foundation, ra<strong>is</strong><strong>in</strong>g<br />

<strong>the</strong> build<strong>in</strong>g <strong>to</strong> foundation level, dress<strong>in</strong>g <strong>the</strong> pit holes, ro<strong>of</strong><strong>in</strong>g, and pa<strong>in</strong>t<strong>in</strong>g..<br />

c). Moni<strong>to</strong>r<strong>in</strong>g and Evaluation Phase: at th<strong>is</strong> phase, CREN paid v<strong>is</strong>its <strong>to</strong> project site <strong>to</strong><br />

ensure completion and quality <strong>of</strong> work done. The committee mem<strong>be</strong>rs drafted plans on how <strong>to</strong><br />

susta<strong>in</strong> <strong>the</strong> projects s<strong>in</strong>ce <strong>the</strong> project <strong>is</strong> <strong>the</strong>irs<br />

d). Comm<strong>is</strong>sion<strong>in</strong>g/lecture on Hygiene: We <strong>of</strong>ficially comm<strong>is</strong>sioned <strong>the</strong> project on <strong>the</strong> 10 th <strong>of</strong><br />

February, 2011. Many dignitaries were present <strong>in</strong>clud<strong>in</strong>g <strong>the</strong> government local education<br />

authority. A lecture was given <strong>to</strong> <strong>the</strong> audience by Mr. Hassan Usman- a Social Studies teacher<br />

on Environmental Health Sanitation and how <strong>to</strong> susta<strong>in</strong> <strong>the</strong> project was summarized by Mrs.<br />

Osuagwu Glory. The teachers and community anf government representatives were very happy<br />

for th<strong>is</strong> great honour and ass<strong>is</strong>tance given <strong>to</strong> <strong>the</strong>m.<br />

10. Involved stakeholders: Parents/Teachers association formed a <strong>Project</strong> Implementation Committee<br />

with <strong>the</strong> implement<strong>in</strong>g organ<strong>is</strong>ation<br />

11. Methodology <strong>of</strong> your projects or activities:<br />

• The project started after series <strong>of</strong> stakeholders meet<strong>in</strong>g<br />

• The project was accepted by <strong>the</strong> community mem<strong>be</strong>rs<br />

• The contract was awarded <strong>to</strong> contrac<strong>to</strong>rs approved by <strong>the</strong> village head<br />

• CREN moni<strong>to</strong>red <strong>the</strong> project three times <strong>be</strong>fore <strong>the</strong> project <strong>is</strong> completed<br />

• Dur<strong>in</strong>g <strong>the</strong> comm<strong>is</strong>sion<strong>in</strong>g a health talk on environmental sanitation was given by Mr. Hassan<br />

Usman<br />

• F<strong>in</strong>ally, <strong>the</strong> project was handed over <strong>to</strong> <strong>the</strong> community mem<strong>be</strong>rs and <strong>the</strong>y prom<strong>is</strong>ed <strong>to</strong><br />

cont<strong>in</strong>ue <strong>to</strong> take care <strong>of</strong> <strong>the</strong> project <strong>in</strong> <strong>the</strong> future<br />

12. The num<strong>be</strong>r <strong>of</strong> direct <strong>be</strong>neficiaries <strong>of</strong> your projects or activities:<br />

13. Achieved outcomes <strong>of</strong> your projects or activities:<br />

• Three pit <strong>to</strong>ilets constructed<br />

• Over 451 Pupils and teachers have comfortable place <strong>to</strong> ease <strong>the</strong>mselves <strong>of</strong> faeces and ur<strong>in</strong>e<br />

• The environment <strong>is</strong> now void <strong>of</strong> <strong>in</strong>d<strong>is</strong>crim<strong>in</strong>ate d<strong>is</strong>pose <strong>of</strong> faeces and ur<strong>in</strong>e


JWF Fund 2010 Report #500<br />

• Community mem<strong>be</strong>rs participated actively and grateful <strong>to</strong> <strong>be</strong> <strong>be</strong>neficiary <strong>of</strong> an <strong>in</strong>ternational<br />

aid.<br />

• The project has contributed immensely <strong>to</strong> promote conducive environment for learn<strong>in</strong>g<br />

*The evaluation <strong>of</strong> <strong>the</strong> project must <strong>be</strong> as quantitative as possible, such as <strong>the</strong> decrease <strong>in</strong><br />

BOD/COD concentration, <strong>the</strong> d<strong>is</strong>tance <strong>of</strong> <strong>be</strong>ach cleaned, <strong>the</strong> num<strong>be</strong>r <strong>of</strong> water supply or<br />

sanitation facilities provided, <strong>the</strong> num<strong>be</strong>r <strong>of</strong> people educated and so on.<br />

14. Pictures and questionnaires (at least 5 <strong>in</strong> <strong>the</strong> report. Additional ones compile with <strong>the</strong> report<br />

should <strong>be</strong> sent separately, <strong>in</strong> JPEG format)<br />

<br />

A. Site pho<strong>to</strong>graphs <strong>be</strong>fore your project (at least 1 picture)<br />

B. Site pho<strong>to</strong>graphs dur<strong>in</strong>g <strong>the</strong> course <strong>of</strong> construction <strong>of</strong> your project (at least 1 picture)<br />

C. Site pho<strong>to</strong>graphs at <strong>the</strong> completion <strong>of</strong> your project (at least 1 picture)<br />

<br />

A. Site pho<strong>to</strong>graphs <strong>of</strong> your educational activities (at least 3 pictures)<br />

B. Questionnaires for <strong>the</strong> participants<br />

15. Conclusion, such as lessons learned, rema<strong>in</strong><strong>in</strong>g <strong>is</strong>sues for future activities.<br />

• Pit <strong>to</strong>ilets <strong>in</strong> low resources communities <strong>is</strong> <strong>the</strong> <strong>be</strong>st option <strong>in</strong> sanitary promotion<br />

• The community mem<strong>be</strong>rs thanked <strong>the</strong> JWF and plead for more ass<strong>is</strong>tance <strong>in</strong> regards <strong>to</strong><br />

prov<strong>is</strong>ion <strong>of</strong> well water and o<strong>the</strong>r <strong>in</strong>frastructures <strong>to</strong> <strong>the</strong> school.<br />

16. Table <strong>of</strong> actual expenditures <strong>of</strong> your project/ activity with <strong>the</strong> JWF Fund.<br />

*Please note that no additional grants will <strong>be</strong> paid <strong>in</strong> case <strong>of</strong> fund shortage.


JWF Fund 2010 Report #500<br />

chart must <strong>be</strong> filled <strong>in</strong> US$<br />

Item Content Unit cost(US$) Quantity Amount(US$)<br />

Sett<strong>in</strong>g out<br />

Provid<strong>in</strong>g pegs,<br />

pr<strong>of</strong>iles, template<br />

<strong>in</strong>struments and<br />

check same with <strong>the</strong><br />

Architect.<br />

Provid<strong>in</strong>g water and<br />

transport all<br />

materials<br />

Stage two<br />

Substructure(excav<br />

ation and Earth<br />

work), Digg<strong>in</strong>g <strong>of</strong><br />

<strong>the</strong> pit <strong>to</strong>ilets<br />

Block lay<strong>in</strong>g/works<br />

Land <strong>is</strong> measured 15m<br />

x 15m<br />

pegs<br />

- - -<br />

0.3 20 6<br />

ropes 0.5 10 5<br />

Water for <strong>the</strong> work<br />

Transportation <strong>of</strong> all <strong>the</strong><br />

materials with Hired<br />

vehicle<br />

Digg<strong>in</strong>g 3 pit holes <strong>of</strong><br />

0.01 5000 ltrs 50<br />

- - 40<br />

2<br />

30 ft<br />

deep x 3<br />

270<br />

Blocks (6 <strong>in</strong>ches)<br />

1 80 80<br />

3 bags <strong>of</strong> cement for<br />

each slab 11 9 99<br />

Slab bars for<br />

cover<strong>in</strong>g/dress<strong>in</strong>g <strong>of</strong><br />

each <strong>of</strong> <strong>the</strong> three<br />

pit holes<br />

sand<br />

concrete<br />

12mm rods<br />

4 3 cubits 12<br />

10 3 cubits 30<br />

13 6 78<br />

Plaster<strong>in</strong>g/ floor<strong>in</strong>g<br />

Ro<strong>of</strong><strong>in</strong>g<br />

Fix<strong>in</strong>g <strong>of</strong> doors and<br />

hollow blocks for<br />

ventilation<br />

Pa<strong>in</strong>t<strong>in</strong>g<br />

<strong>Project</strong><br />

d<strong>is</strong>sem<strong>in</strong>ation<br />

workshop/comm<strong>is</strong>si<br />

on<strong>in</strong>g ceremony<br />

Labour contribution<br />

sand<br />

cement<br />

4 8 32<br />

11 3 33<br />

Nails (3” and 4”)<br />

1<br />

40 pieces<br />

each<br />

2<br />

z<strong>in</strong>c 4 20 pieces 80<br />

Iron doors 25 3 75<br />

hollow blocks <strong>in</strong> place<br />

<strong>of</strong> w<strong>in</strong>dows. 3 <strong>in</strong> each<br />

1 9 9<br />

<strong>to</strong>ilet<br />

25 – liter emulsion<br />

35 3 105<br />

Writ<strong>in</strong>g materials for<br />

50<br />

participants and<br />

1.5 persons<br />

d<strong>is</strong>tribution <strong>of</strong> summary<br />

present<br />

<strong>of</strong> project report<br />

75<br />

For pr<strong>of</strong>essional<br />

consults<br />

33 1 pers 33<br />

Total Amount 1,114<br />

PTA Contribution for<br />

labour<br />

Total used for <strong>the</strong><br />

work<br />

Persons <strong>to</strong> ass<strong>is</strong>t <strong>to</strong><br />

facilitate <strong>the</strong> work and<br />

ensure quality<br />

5.1<br />

6<br />

persons<br />

153<br />

-<br />

961


VIEW OF THE PROJECT SIDE AT SITE CLEARING<br />

FULL VIEW OF THE PROJECT AFTER FOUNDATION AND LAYING OF THE SLABS


FRONT VIEW OF THE PROJECT UNDER CONSTRUCTION<br />

FRONT VIEW OF THE TOILETS AT COMPLETION


SIDE VIEW OF THE PROECT ON COMPLETION<br />

BOLD VIEW OF THE INSCRIPTION ON THE PROJECT WALL


SAMPLE VIEW OF INSIDE OF ONE OF THE TOILETS<br />

COMMISIONING OF THE PROJECT


MRS. OSUAGWU GLORY (PRESIDENT‐ IN THE MIDDLE) WITH THE EXECUTIVES OF (PARENTS TEACHERS<br />

ASSOCIATION)P.T.A TEAM ON THE COMMISIONING DAY