Surveying at Oyu Tolgoi Copper/Gold Mine - Chris Hutchison - AIMS
Surveying at Oyu Tolgoi Copper/Gold Mine - Chris Hutchison - AIMS
Surveying at Oyu Tolgoi Copper/Gold Mine - Chris Hutchison - AIMS
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PROJECT REQUIREMENTS<br />
AND PROJECT TEAM (cont)<br />
• The project required th<strong>at</strong> we:<br />
‐ Transfer survey<br />
control from the<br />
surface network to<br />
the shaft collar and<br />
the centre of a raise<br />
bore site which was<br />
proposed to be drilled<br />
from the surface to<br />
the 512 level;