PROJECT REQUIREMENTS<br />
AND PROJECT TEAM (cont)<br />
‐ Transfer survey control via the single existing shaft to the 512 level, establish<br />
orient<strong>at</strong>ion <strong>at</strong> th<strong>at</strong> level, traverse to the design loc<strong>at</strong>ion of the raise bore <strong>at</strong> th<strong>at</strong><br />
level and establish control there for a raise bore from 512 level to the 1300 level;<br />
‐ Transfer survey control via the<br />
shaft to the bottom of the mine<br />
<strong>at</strong> the 1300 level, establish<br />
orient<strong>at</strong>ion <strong>at</strong> th<strong>at</strong> level,<br />
traverse control to the raise<br />
bore chamber on th<strong>at</strong> level and<br />
extend survey control by gyro<br />
supported traverse throughout<br />
the 1300 level workings; and<br />
‐ Report the results of this work.