PROJECT REQUIREMENTS<br />

AND PROJECT TEAM (cont)<br />

‐ Transfer survey control via the single existing shaft to the 512 level, establish<br />

orient<strong>at</strong>ion <strong>at</strong> th<strong>at</strong> level, traverse to the design loc<strong>at</strong>ion of the raise bore <strong>at</strong> th<strong>at</strong><br />

level and establish control there for a raise bore from 512 level to the 1300 level;<br />

‐ Transfer survey control via the<br />

shaft to the bottom of the mine<br />

<strong>at</strong> the 1300 level, establish<br />

orient<strong>at</strong>ion <strong>at</strong> th<strong>at</strong> level,<br />

traverse control to the raise<br />

bore chamber on th<strong>at</strong> level and<br />

extend survey control by gyro<br />

supported traverse throughout<br />

the 1300 level workings; and<br />

‐ Report the results of this work.