Surveying at Oyu Tolgoi Copper/Gold Mine - Chris Hutchison - AIMS
Surveying at Oyu Tolgoi Copper/Gold Mine - Chris Hutchison - AIMS
Surveying at Oyu Tolgoi Copper/Gold Mine - Chris Hutchison - AIMS
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
CONCLUSION (cont)<br />
There were, as a result, some time<br />
consuming calcul<strong>at</strong>ions (and check<br />
calcul<strong>at</strong>ions) to finally provide the<br />
requested coordin<strong>at</strong>es.<br />
However, we were very pleased to<br />
have the principle of our work<br />
proven in August 2010 when we<br />
received an email from Mongolia<br />
advising th<strong>at</strong> the drill hole from<br />
the surface to the 512 level broke<br />
through “spot on” our prediction.<br />
As we have not received any further inform<strong>at</strong>ion it is believed they<br />
are still working on the 512 to 1300 level and we are hoping for a<br />
similar result.