27.11.2014 Views

Surveying at Oyu Tolgoi Copper/Gold Mine - Chris Hutchison - AIMS

Surveying at Oyu Tolgoi Copper/Gold Mine - Chris Hutchison - AIMS

Surveying at Oyu Tolgoi Copper/Gold Mine - Chris Hutchison - AIMS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CONCLUSION (cont)<br />

There were, as a result, some time<br />

consuming calcul<strong>at</strong>ions (and check<br />

calcul<strong>at</strong>ions) to finally provide the<br />

requested coordin<strong>at</strong>es.<br />

However, we were very pleased to<br />

have the principle of our work<br />

proven in August 2010 when we<br />

received an email from Mongolia<br />

advising th<strong>at</strong> the drill hole from<br />

the surface to the 512 level broke<br />

through “spot on” our prediction.<br />

As we have not received any further inform<strong>at</strong>ion it is believed they<br />

are still working on the 512 to 1300 level and we are hoping for a<br />

similar result.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!