TECHNICAL SOLUTIONS (cont)<br />

• As the mine is rel<strong>at</strong>ively new, we enquired by email if any of the piano<br />

wires used to sink the shaft still existed and we were told th<strong>at</strong> three of<br />

the original six remained.<br />

The team resolved to go back to the “tried and true” old fashioned<br />

method of plumbing the shaft using those wires. They were thoroughly<br />

checked to ensure they were not fouled on any part of the shaft<br />

concrete and all the steady brackets were fully opened to ensure the<br />

wires followed gravity without a bend.<br />

Prior to commencement, 100 pound weights were <strong>at</strong>tached to each<br />

wire and each weight was damped in a 44 gallon drum filled with oil.<br />

The ventil<strong>at</strong>ion was shut down for 12 hours before measurement so<br />

th<strong>at</strong> the wires could steady.