The following changes between budget items have been done:<br />
- from Long-term International Experts (savings 119,700 Euro)<br />
45,000 Euro to Short-term International Experts<br />
38,000 Euro to Regional Experts<br />
20,950 Euro to Travel Costs<br />
15,750 Euro to Procurement Costs<br />
- from Training (savings 58,100 Euro)<br />
29,358 Euro to Travel Costs<br />
28,742 Euro to Project Support Costs<br />
- from Project Operating Costs (savings 115,292 Euro)<br />
115,292 Euro to Travel Costs<br />
- from GoF Contingencies (3 % - contingency has been reduced to 2,5 % releasing 22,258 Euro)<br />
22,258 Euro to Project Support Costs<br />
8. Monitoring and Evaluation<br />
The progress, effectiveness, efficiency, impacts and sustainability of the project will be planned and monitored through the<br />
regular planning and reporting system, including the following reports:<br />
1. General project work plan (5 years)<br />
2. Annual work plans (including revised Logical Framework Matrix);<br />
3. Annual progress reports;<br />
4. Trimester financial and progress reports;<br />
5. Monthly progress report;<br />
6. Project completion report.<br />
The above plans and reports will meet the requirements of the Guidelines for Program Design, Monitoring and Evaluation of<br />
the Ministry for Foreign Affairs of Finland (1998). Besides, monitoring and reporting system will make compatible with the<br />
rules and regulations of GoN. The final project evaluation will be carried out after the completion of the project.<br />
8.1 Project Auditing<br />
The financial performance of the contribution of the Government of <strong>Nepal</strong> will be audited as per the prevailing rules and<br />
regulations of the Government of <strong>Nepal</strong>. The expenditure of the Finnish Government will be audited as per the prevailing<br />
rules and regulations of the Government of Finland. Auditor General of <strong>Nepal</strong> shall carry out the audit of the project as per<br />
the project document. GoN shall permit the representatives of the GoF to carry out audit in respect of the implementation of<br />
the project. Such an audit may also be initiated by GoN.<br />
ANNEXES<br />
Annex A Logical framework matrix with activities<br />
Annex B Detailed budget in €<br />
Annex C Previous NFI inventory design<br />
Annex D Inventory Design for the <strong>FRA</strong> <strong>Nepal</strong><br />
Annex E Terms of References<br />
41