25.12.2014 Views

Download - FRA Nepal

Download - FRA Nepal

Download - FRA Nepal

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Project elements Output indicators Means of verification Assumptions<br />

Activity 1. Data sharing and<br />

dissemination<br />

Activity 2. Forest Information<br />

System (FIS) Development<br />

Activity 3. Development of Internet<br />

Map Server Service<br />

Activity 4. Object oriented image<br />

analysis<br />

Activity 5. Data collection and<br />

processing of NTFPs, TOFs and<br />

Biodiversity<br />

Component 4. Project<br />

management<br />

3. Internet Map Server Service<br />

established<br />

4. Human and institutional capacity in<br />

the fields of GIS and remote sensing<br />

strengthened<br />

1. Data sharing, dissemination,<br />

promotion and marketing policy<br />

2. Standard <strong>FRA</strong> report outline<br />

3. Seminars and other data use<br />

promotion occasions<br />

4. Newspaper articles<br />

5. Progress reports<br />

1. Description of the system<br />

2. Selection of map layers<br />

3. GIS based FIS established and<br />

operational<br />

1. System documentation<br />

2. Internet Map Server Service<br />

established<br />

3. Training on the use of the system<br />

arranged<br />

1. Pilot areas selected<br />

2. The selected software acquired and<br />

installed<br />

3. Manuals and results publication<br />

1. Identification of indicator trees and<br />

habitats associated to NTFPs<br />

2. Methodology to collect TOF data prepared<br />

3. Methodology to collect biodiversity data<br />

prepared<br />

4. Data collection of NTFPs, TOFs and<br />

biodiversity incorporated to the <strong>FRA</strong><br />

inventory design<br />

5. Collaborative meetings with NGOs and<br />

local people<br />

6. Data of NTFPs, TOFs and Biodiversity<br />

collected and processed<br />

1. Decision are timely made<br />

2. Smooth cooperation prevails<br />

3. Recruitment and procurement is<br />

4. National staff able to run activities Suitable persons for long term training are<br />

available<br />

1. Policy report submitted<br />

2. Standard report outline available<br />

3. Documentation of the seminars: time<br />

and place, program, participants, etc.<br />

4. Scrapbook<br />

5. Reports submitted<br />

1. Written documents<br />

2. List of map layers<br />

3. FIS running<br />

1. Written document available<br />

2. System available in the Internet<br />

3. Documentation of the training<br />

sessions<br />

1. Annual reports<br />

2. Written documents<br />

1. List of trees and habitats<br />

2. Methodology documented and available<br />

3. Methodology documented and available<br />

4. <strong>FRA</strong> inventory design including NTFPs,<br />

TOFs and Biodiversity available<br />

5. Meetings documented and achieved<br />

data/information documented<br />

6. Data of NTFPs, TOFs and Biodiversity<br />

available and inserted to OSFIS system<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

DFRS as willing to adopt open publishing<br />

policy<br />

Digital map material and remote sensing<br />

material are of the quality which enables<br />

system development<br />

DFRS as willing to adopt open publishing<br />

policy<br />

FIS has been successfully developed<br />

Remote sensing material and data from the<br />

field plots are of the quality which enables<br />

system development.<br />

Field and remote sensing data can be<br />

accurately overlaid.<br />

Availability of past inventory results and<br />

supporting data<br />

Proper supporting materials found and<br />

available<br />

Most of the data collection can be<br />

incorporated and only minor additional<br />

inventory is needed for NTFPs and TOFs<br />

NGOs and local people are collaborative<br />

and ready to distribute data/information<br />

Compatibility requirements of data of<br />

NTFPs, TOFs and Biodiversity met<br />

1. Annual and other progress reports All personnel for Project mgmt. bodies and<br />

duties can be found and will be nominated<br />

Bureaucratic procedures, PSC and PMC<br />

45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!