West Bengal - Visva - Bharati University _30.pdf - Sarva Shiksha ...
West Bengal - Visva - Bharati University _30.pdf - Sarva Shiksha ...
West Bengal - Visva - Bharati University _30.pdf - Sarva Shiksha ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
(vii)<br />
Who is designated for Technical Supervision for civil<br />
works What level (Block/District/Sub-District)<br />
To be obtained from the SPO/DPO and then<br />
verified on the field with VEC/SMC and School<br />
Teachers (sample as in (ii) above).<br />
The Field Junior Engineers (FJEs) is the primarily responsible for Technical Supervision for civil works<br />
however, the Asst. Engineer at the DPO level and other project personnel do visits to the spot.<br />
(viii)<br />
The number of times the technical person visited the<br />
construction site and guided the construction process Did<br />
he visit at the foundation stage, lintel and roof stage<br />
2-3 times in each phase of work.<br />
To be verified on the spot with assistance of<br />
VEC/SMC and School Teachers (sample as in (ii)<br />
above).<br />
(ix)<br />
(x)<br />
If there any convergence with Swajaldhara and Total<br />
Sanitation Campaign (TSC) taking place in respect of<br />
drinking water facilities provided in the schools visited by<br />
MI The quantum of funds utilised from Swajaldhara and<br />
TSC and SSA in the sites visited<br />
Status to be obtained from SPO updated at DPO in<br />
districts visited by MI. To be verified on the spot<br />
with assistance of VEC/SMC and School Teachers<br />
(sample as in (ii) above).<br />
There are convergence with Swajaldhara and Total Sanitation Campaign (TSC) taking place in the district<br />
in respect of drinking water & sanitation. It was informed that funds for the 55 sample primary schools and<br />
4 sample upper primary schools were provided out of TSC.<br />
Whether construction of drinking water facilities in schools<br />
is being carried out by a specialized Agency or VEC/SMC<br />
To be verified on the spot with assistance of<br />
VEC/SMC and School Teachers (sample as in (ii)<br />
above).<br />
No specialized agency was involved. The Local self govt. particularly panchyats takes care of the area.<br />
(xi)<br />
(xii)<br />
(xiii)<br />
Is there any convergence with Total Sanitation Campaign<br />
(TSC) taking place in respect of toilet facilities in the<br />
schools The quantum of funds available from TSC and<br />
SSA in the sites visited<br />
No information regarding the fund allotment of is available at the school level.<br />
What is MI’s impression of quality construction in sites<br />
visited by MI<br />
The quality of construction of the school sites visited by the MIs is found to be good.<br />
Is there a civil works in charge at SPO level Is it an<br />
engineering person or other What format & frequency does<br />
he maintain for reviewing progress of districts What steps<br />
has been taken by SPO to ensure quality in civil works Is<br />
there a third party evaluation If so, please give details<br />
Status to be obtained from SPO updated at DPO in<br />
districts visited by MI. To be verified on the spot<br />
with assistance of VEC/SMC and School Teachers<br />
(sample as in (ii) above).<br />
To be assessed on the spot. (sample as in (ii)<br />
above).<br />
Status to be obtained from SPO and to be verified<br />
from schools visited by MI.<br />
At SPO level, there is a Chief (Consultant) Engineer and State Project Engineers who is in charge of all<br />
kinds of civil works constructed under SSA in the State. He conducts both State and Districts level review<br />
meetings along with spot verification for cross checking the progress. Third party evaluations for civil<br />
works have been initiated at the SPO level.<br />
18