25.12.2014 Views

West Bengal - Visva - Bharati University _30.pdf - Sarva Shiksha ...

West Bengal - Visva - Bharati University _30.pdf - Sarva Shiksha ...

West Bengal - Visva - Bharati University _30.pdf - Sarva Shiksha ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The SSKs are upgraded as per the rules framed by the concern authority which is on basis need &<br />

priority.<br />

(xii) Whether SPO has issued necessary instructions to<br />

the DPOs with reference to upgradation of EGS<br />

centres to primary schools, and whether funds<br />

have been released for the same<br />

Information to be obtained from SPO office and updated<br />

from DPO office in respect of the districts visited by MI.<br />

This is being done by the SSK mission separately.<br />

(xiii) The number of EGS centres actually upgraded in<br />

the district and the details of funds transferred to<br />

VEC and the details of instructions issued by DPO<br />

in this respect<br />

Information to be obtained from SPO office and updated<br />

from DPO office in respect of the districts visited by MI.<br />

This is done by the SSK mission under P&RD of Govt. of WB.<br />

(xiv) Whether the actual upgradation of EGS centre has<br />

taken place<br />

To be verified on the spot with the assistance of VECs,<br />

during field visits of MI.<br />

Information not available.<br />

(xv) Has the land for construction of the upgraded<br />

primary school (from EGS) been identified<br />

Information to be obtained from DPO and to be verified<br />

on the spot with the assistance of VEC/SMC and school<br />

Teacher during field visit by MI.<br />

MIs observed that the identification of land for construction of the upgraded SSKs is made and many<br />

places proper construction has been made.<br />

(xvi) Whether VEC/SMC etc. have received any funds To be verified on the spot with assistance of VEC/SMC<br />

for construction of schools<br />

and school Teachers during field visit by MI.<br />

MIs observed that such construction is made with the involvement of VEC.<br />

(xvii) Has the construction started and what is the stage<br />

of construction (foundation, lintel and roofing)<br />

To be verified on the spot with assistance of VEC/SMC<br />

and school Teachers during field visit by MI.<br />

None of the sample SSKs is found which are in the process of construction.<br />

(xviii) Number of Teachers sanctioned for the new<br />

upgraded (from EGS) primary school Have<br />

Teachers been put in position in this new school<br />

Are the Teachers in position<br />

Information to be obtained from SPO and verified at<br />

DPO. Also to be checked at school level from VEC etc.,<br />

during field visit by MI.<br />

NA<br />

30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!