27.12.2014 Views

Quarry Clasp Park Development Project - Watershed Conservation ...

Quarry Clasp Park Development Project - Watershed Conservation ...

Quarry Clasp Park Development Project - Watershed Conservation ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EMERALD NECKLACE / Phase 1 <strong>Project</strong>s 03/14/2013<br />

An existing equestrian trail, located in the abandoned Clark St. right-of-way, connects Durfee<br />

Ave. to the <strong>Quarry</strong>. Ownership of this approximate 14-foot wide passage is unclear at this time.<br />

The proposed <strong>Quarry</strong> <strong>Clasp</strong> Multi-Use Trail and Bike Path project assumes that continued use of<br />

the trail alignment is feasible and with the purchase of the abandoned right-of-way and additional<br />

adjacent property. Land purchase is necessary for the proposed park which will also secure trail<br />

access for both a soft-surface multi-use trail and a new Class 1 bicycle path.<br />

Fig. 2. Signed horse crossing and access trail to edge of Hanson <strong>Quarry</strong>, looking east from the<br />

intersection on Clark St. and Durfee Ave.<br />

Demolition will involve the removal of approximately 1,200 square feet of concrete driveway<br />

aprons, miscellaneous weed vegetation, and re-grading of approximately 2.75 acres.<br />

Approximately 1,600 lineal feet of 6 foot chain link fencing and gating will be removed.<br />

The new park elements will include a new concrete curb cut and drive entrance, parking space for<br />

approximately five horse trailers and five cars, bicycle racks, drinking fountain, a viewing and<br />

seating plaza approximately 100 feet by 100 feet in size, two interpretive signs, and<br />

approximately one acre of turf area. The remaining landscape would be planted with native trees<br />

and shrubs. Approximately 60 lineal feet of concrete curbing will be replaced. As this park will be<br />

utilized as a trailhead area, a restroom facility with an approximate building area of 600 square<br />

feet is recommended. Safety lighting will be associated with the building. Both dry and wet<br />

utilities will be brought into the site.<br />

The northern most end of the park will feature both a 10-foot wide multi-use trail and a 12-foot<br />

wide, asphalted and striped Class I bicycle trail. The multi-use trail will be designed and constructed<br />

per the County of Los Angeles Trails Manual. The Class I bicycle path will be designed<br />

and constructed per the CalTrans Highway Design Manual standards and AASHTO guidelines.<br />

QUARRY CLASP PARK DEVELOPMENT / DRAFT 2 of 8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!