Quarry Clasp Park Development Project - Watershed Conservation ...
Quarry Clasp Park Development Project - Watershed Conservation ...
Quarry Clasp Park Development Project - Watershed Conservation ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
EMERALD NECKLACE / Phase 1 <strong>Project</strong>s 03/14/2013<br />
Fig. 10. <strong>Quarry</strong> <strong>Clasp</strong> Phase 1 <strong>Project</strong>s include two trail alignment projects,<br />
a street crossing and the development of a park and trailhead.<br />
The following projects have been identified for future consideration.<br />
• Land acquisition would allow a land swap with a warehouse which is currently too close<br />
to the edge of the quarry and currently prevent the placement of the bicycle and multi-use<br />
trails where views are most spectacular.<br />
• <strong>Park</strong> land donation and historic quarry interpretive facilities developed by private owners<br />
for public use.<br />
• Peck Pit water line installation may provide an opportunity for trail installation over the<br />
top of the water line on the “spine” between quarries and connection east to the San<br />
Gabriel River Class I bicycle trail.<br />
QUARRY CLASP PARK DEVELOPMENT / DRAFT 8 of 8