27.12.2014 Views

Quarry Clasp Park Development Project - Watershed Conservation ...

Quarry Clasp Park Development Project - Watershed Conservation ...

Quarry Clasp Park Development Project - Watershed Conservation ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EMERALD NECKLACE / Phase 1 <strong>Project</strong>s 03/14/2013<br />

Fig. 10. <strong>Quarry</strong> <strong>Clasp</strong> Phase 1 <strong>Project</strong>s include two trail alignment projects,<br />

a street crossing and the development of a park and trailhead.<br />

The following projects have been identified for future consideration.<br />

• Land acquisition would allow a land swap with a warehouse which is currently too close<br />

to the edge of the quarry and currently prevent the placement of the bicycle and multi-use<br />

trails where views are most spectacular.<br />

• <strong>Park</strong> land donation and historic quarry interpretive facilities developed by private owners<br />

for public use.<br />

• Peck Pit water line installation may provide an opportunity for trail installation over the<br />

top of the water line on the “spine” between quarries and connection east to the San<br />

Gabriel River Class I bicycle trail.<br />

QUARRY CLASP PARK DEVELOPMENT / DRAFT 8 of 8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!